PILOT PROJECT REPORT
VERSION 1.0.1
14THSTREET, MARKET STREET TO COLFAX AVENUE
CITY AND COUNTY OF DENVER, CO
Prepared by
Craig Weiland
11/03/2010
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
2/28
CONTENTS
Introduction...................................................................................................................................................................4
ProjectDescription........................................................................................................................................................4
ResourcesConsulted.....................................................................................................................................................5
PilotProject
Summary
...................................................................................................................................................
6
CreditDiscussionbyCategory.......................................................................................................................................8
ProjectRequirements(PR).......................................................................................................................................8
Environment&Water(EW)...................................................................................................................................11
Access&Equity(AE)..............................................................................................................................................13
ConstructionActivities(CA)...................................................................................................................................17
Materials&Resources(MR)..................................................................................................................................19
PavementTechnologies(PT)..................................................................................................................................21
PotentialCustomCredits.......................................................................................................................................23
Recommendations.......................................................................................................................................................
23
Limitations...................................................................................................................................................................23
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
3/28
FIGURES
Figure1:LocationMap..................................................................................................................................................5
Figure2:ProjectScorecard............................................................................................................................................7
Figure3:Typical14th
StreetConfiguration..................................................................................................................15
Figure4:
Pavement
Reuse
Quantities
.........................................................................................................................
20
TABLES
Table1:SummaryofRawScores*.................................................................................................................................6
Table2:SummaryofPotentialScoreswithNo/LowCostAdditions(Pot.Score)**.....................................................6
Table3:SummaryofMaximumScoreswithAllFeasibleAdditions(MaxScore)***....................................................7
Table4:ProjectRequirementsCategory.......................................................................................................................8
Table5:Environment&WaterVoluntaryCreditCategory.........................................................................................11
Table6:Access&EquityVoluntaryCreditCategory...................................................................................................13
Table7:ConstructionActivitiesVoluntaryCreditCategory........................................................................................17
Table8:Materials&ResourcesVoluntaryCreditCategory........................................................................................19
Table9:PavementTechnologiesVoluntaryCreditCategory......................................................................................21
Table10:PotentialCustomCredits.............................................................................................................................23
APPENDICES
AppendixA:AbouttheGreenroadsRatingSystem
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
4/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 4
INTRODUCTION
ThisreportreflectstheresultsoftheGreenroadsPilotProjectfor14th
Street,MarketStreettoColfaxAvenue
ProjectfortheCityandCountyofDenver. TheresultsarepresentedusingtheGreenroadsProgressScorecard
supplementedbyadetailedcreditbycreditdiscussion.Recommendationsarealsoincludedforapplyingthe
Greenroadssustainabilityperformancemetrictotheproject.
PreparationofthePilotProjectinvolvedareviewofprojectdocuments,interviewswithprojectcontacts,anda
sitevisit. ForalistofresourcesusedtopreparethePilotProjectReport,refertotheResourcesConsultedsection.
Thefollowingsectionprovidesabriefprojectdescription.AdetaileddescriptionoftheGreenroadsRatingSystem
canbefoundinAppendixA,includingashortlistofGreenroadsProjectRequirements(PR)andVoluntaryCredits
(VC)forreference.AdescriptionofthePilotProjectmethodologyisprovidedinAppendixB,andsupporting
calculationsforcreditsearnedareprovidedinAppendixC.
PROJECT DESCRIPTION
Theintentofthisprojectistoenhancethepedestrianexperiencealong12blocksof14th
StreetfromMarketStreet
toColfaxAvenueindowntownDenver(Figure1). Thenorthernsidewalkswillbewidenedto19feetandthe
southernsidewalk
will
be
widened
to
16
feet.
The
sidewalk
area
will
include
seating
areas,
elongated
planters
and
planterpots,trees,streetlighting,accentlightingandwayfindingsignage. Bulboutswillalsobeinstalledonthe
southsidetominimizepedestriancrossingdistances. AnonstreetbikelanewillbeaddedtoconnecttheCherry
CreektrailandCivicCenterPark. TheroadwaypavingwillconsistprimarilyofHMAmillandoverlayandfulldepth
HMAreplacementwherenecessary.
Theprojectisa$14millionbondprojectasapublic/privatepartnership,with$10millionpublic(BetterDenver
BondFunds)and$4millionprivate(14th
StreetGeneralImprovementsDistrict). Theconstructioncontracthasnot
yetbeenawarded. Thisreportservesasaninitialdesignandspecificationreviewtoevaluatehowtheproject
wouldscoreinGreenroadsV1.0ifallgoesasplanned.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
5/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 5
RESOURCES CONSULTED
ThefollowingresourceswereusedtopreparethisPilotProjectreport.
FinalBidDocuments
DocumentsrequiredbyGreenroadspreparedbyParsonsBrinckerhoffincluding:
o MasterGreenroadsDocumentwithcreditbycreditdescriptions
o 14th
StreetContractorSustainabilityRequirements
o Backupdocumentationforeachcreditpursued
Figure1:LocationMap
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
6/28
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
7/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 7
Table3:SummaryofMaximumScoreswithAllFeasibleAdditions(MaxScore)***
ProjectName PR EW AE CA MR PT CC Max Score Eligible? AwardPotential
14th
St.,MarkettoColfax 11 15 27 14 22 16 12 106 Yes Evergreen
TotalPossible 11 21 30 14 23 20 12 120 ***MaxScoresdoincludethefullpointsforallCustomCredits.Includingthesepointsinflateseachprojectscore,butdoesnotchangethe
overall
achievement
level;
this
is
intended
to
demonstrate
the
range
of
points
possible
to
each
project.
Figure2:ProjectScorecard
ProjectRequirements(PR) Possible A P M ConstructionActivities(CA) Possible A P M
PR1 Environmental ReviewProcess Req X CA1 QualityManagementSystem 2 2 0 0
PR2 LifecycleCostAnalysis Req X CA2 Environmental Training 1 1 0 0
PR3 LifecycleInventory Req X CA3 SiteRecyclingPlan 1 1 0 0
PR4 QualityControlPlan Req X CA4 Fossil Fuel Reduction 1 2 1 0 1
PR5 Noise
Mitigation
Plan Req X CA
5 Equipment
Emission
Reduction 1
2 1 0 1
PR6 WasteManagementPlan Req X CA6 PavingEmissionReduction 1 1 0 0
PR7 PollutionPreventionPlan Req X CA7 WaterUseTracking 2 2 0 0
PR8 LowImpactDevelopment Req X CA8 ContractorWarranty 3 3 0 0
PR9 PavementManagementSystem Req X Total 14 12 0 2
PR10 SiteMaintenancePlan Req X
PR11 Educational Outreach Req X Materials&Resources(MR) Possible A P M
Total 11 10 1 0 MR1 LifecycleAssessment 2 0 0 2
MR2 PavementReuse 4 5 0 0 5
Environment&Water(EW) Possible A P M MR3 EarthworkBalance 1 0 0 0
EW1 Environmental ManagementSystem 2 2 0 0 MR4 RecycledMaterials 1 5 2 1 2
EW2 RunoffFlowControl 1 3 3 0 0 MR5 Regional Materials 1 5 0 2 3
EW3 RunoffQuality 1 3 3 0 0 MR6 EnergyEfficiency 5 0 5 0
EW4 StormwaterCostAnalysis 1 1 0 0 Total 23 2 8 12
EW5 SiteVegetation 1 3 1 2 0
EW6 HabitatRestoration 3 0 0 0 PavementTechnologies(PT) Possible A P M
EW7 Ecological Connectivity 1 3 0 0 0 PT1 LongLifePavement 5 0 5 0
EW8 LightPollution 3 0 3 0 PT2 PermeablePavement 3 0 0 3
Total 21 10 5 0 PT3 WarmMix Asphalt 3 0 3 0
PT4 Cool Pavement 5 5 0 0
Access&Equity(AE) Possible A P M PT5 QuietPavement 2 3 0 0 0
AE1 SafetyAudit 1 2 0 2 0 PT6 PavementPerformanceTracking 1 0 0 0
AE2 IntelligentTransportationSystems 2 5 3 0 2 Total 20 5 8 3
AE3 ContextSensitiveSolutions 5 5 0 0
AE4 TrafficEmissions Reduction 5 0 5 0 CustomCredit(CC) Possible A P M
AE5 PedestrianAccess 1 2 2 0 0 CC1 UrbanHeatIslandEffect 5 0 0 5
AE6 BicycleAccess 1 2 2 0 0 CC2 TransitSafety 2 0 0 2
AE7 Transit&HOVAccess 1 5 0 0 4 CC3 MaintenanceDistricts 5 0 0 5
AE8 ScenicViews 2 0 0 0 Total 12 0 0 12
AE9 Cultural Outreach 1 2 2 0 0
Total 30 14 7 6 All11PRMet? N o Yes Yes
GreenroadsTotal 108 43 71 106
CertificationLevel E E
Credit Scorecard
PointTotals
A = Achievedbythisproject
P =Potential achievable withlowadditionaleffort
M =Maximumachievableregardlessofcost
CertificationLevels
C =Certified (AllPRsand32Points)
S =Silver (AllPRsand 43Points)
G = Gold (AllPRs and 54Points)
E =Evergreen (AllPRsand 64Points)
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
8/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 8
CREDIT DISCUSSION BY CATEGORY
Thissectioncontainsadetailedreviewofcreditsawardedandnotawardedtothe14th
Street,MarketStreetto
ColfaxAvenueproject.Creditintentwillnotbediscussed,andthereaderisreferredtoAppendixAforthese
details.
PROJECT REQUIREMENTS (PR)Thisprojectmet10of11ProjectRequirements.TheseareoutlinedinTable4.
Table4:ProjectRequirementsCategory
*DenotesreferenceinStandardSpecifications,orinstitutionalbestpractice.
PR-1 Environmental Review Process
DETAILS
ThisProjectRequirementwasnotmetwiththesubmitteddocuments. ASustainabilityPlanningandCloseout
FormforProjectManagerswasprovided,whichincludesinformationontheprojectandkeyplayers,butdoesnot
includedescriptionsofthepotentialenvironmental,economicandsocialimpacts,theirsignificanceorthefinal
environmental
decisions
that
were
made.
A
description
of
public
workshops
and
breakout
groups
for
public
inputontheprojectwasalsoprovided.
RATIONALE
TheprojectwasnotrequiredtofollowNEPAstandardsbecausenofederalfundingwasinvolvedandthestateof
Coloradodoesnothavesimilarprocessrequirement. Toachievethisrequirement,theprojectneedstodefinethe
impactsthattheprojectwillhave,thesignificanceoftheseimpacts,andthedecisionsthatweremadetomitigate
theseimpacts.
PR-2 Lifecycle Cost Analysis (LCCA)
DETAILS
RealCostsoftwarewasusedtoevaluatethepavementimprovementoptions. Ashortreportwasprovided,stating
theassumptionsmade,inputs,andtheoutcomeofananalysiscomparinganasphaltoverlayorafulldepth
concretereplacement.
RATIONALE
TheRealCostoutputwiththegiveninputsandassumptionssuggeststhatanasphaltoverlaywillhaveapresent
valuelifetimecostofapproximately$1.05millionwhileaconcreteroadwaywillhaveapresentvaluelifetimecost
ofapproximately$2.36million.
PR-3 Lifecycle Inventory (LCI)
DETAILS
RequirementsMet RequirementsNotMet
No. Title No. Title
PR2 LifecycleCostAnalysis(LCCA) PR1 EnvironmentalReviewProcess
PR3 LifecycleInventory(LCI)
PR4 QualityControlPlan*
PR5 NoiseMitigationPlan*
PR6 WasteManagementPlan*
PR7 PollutionPreventionPlan*
PR8
LowImpact
Development
(LID)
PR9 PavementMaintenancePlan*
PR10 SiteMaintenancePlan
PR11 EducationalOutreach
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
9/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 9
Thisrequirementhasbeenmet,asresultsfromPaLATEV2.0havebeenprovidedfortheproject. Theinputpage
wasnotprovided(astheProjectRequirementrequests).
RATIONALE
ThePaLATEoutputindicatesthatoverthelifeoftheproject,7,248GJofenergywillbeconsumedand1,149,232
kgofCO2willbeemitted.Itwasassumedthatonlyatoplayerwillneedtobereplacedinthedesignlifeof15
Yearsand
that
RCM/RAP
materials
will
not
be
removed
from
the
site
and
will
be
reused
within
the
project
area.
PR-4 Quality Control Plan
DETAILS
Completionofacontractorqualitycontrolplanisrequiredinthe14th
StreetContractorSustainability
RequirementsdocumentthatistobeattachedtotheBidPackage. Thisdocumenttakestherequirementsdirectly
fromtheGreenroadsManual,sotherequirementwillbemet.
RATIONALE
ThesubmissionoftheQCPisrequiredbeforeconstructionandmustbeapprovedofbytheowner.
PR-5 Noise Mitigation Plan
DETAILS
AnoisemitigationplanhasbeencreatedaccordingtotherequirementsofPR5. Acopyofthelocalnoise
mitigationordinancewasalsoprovided.
RATIONALE
Thepreparednoisemitigationplanmeetsallofthe10requirementsforallofconstructionandincluding
subcontractorwork.
PR-6 Waste Management Plan
DETAILS
ThefollowinglanguagewillbeincludedintheProjectSpecificationsandBidFormsfortheprimecontractor:
ContractortocompleteaConstructionandDemolitionWasteManagementPlan(CWMP)thatwillinclude,ata
minimumthe
following:
Type
of
construction
waste,
expected
(or
actual)
tonnage,
costs
and
fees
for
landfills,
recoveryfacilities,andhauling,contactinformationofresponsiblepartyforhauling,destinationofwaste(e.g.
recyclingfacility,landfill,contractorsbackyard),contactinformationofresponsiblepartyfordisposalsite.This
planistobecompletedatthebeginningofconstruction.
RATIONALE
ThisstatementfollowsexactlytheGreenroadsrequirements,soPR6shouldbeachievedisspecificationsare
followed.
PR-7 Pollution Prevention Plan
DETAILS
TheCityandCountyofDenverrequiresthecompletionofaConstructionActivitiesStormwaterDischargePermit
(CASDP)for
any
projects
that
disturb
more
than
1acre.
Since
this
project
disturbs
more
than
1acre
aCASDP
will
beacquired. Asapartofthispermittingprocess,aConstructionActivitiesStormwaterManagementPlan(CASMP)
willbecreated. TheCASMPistheequivalentofaSWPPP.
RATIONALE
SpecificationsrequirethecompletionofaCASMPwhichistheequivalentofaSWPPPandwillmeetthe
requirement.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
10/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 10
PR-8 Low-Impact Development (LID)
DETAILS
Soilboringdatawasprovidedforthisrequirementaswellasdescriptionsforthefollowingcategories:
topographicalassessment,soilsassessment,hydrologyassessment,siteevaluation,andLIDBMPs. Duetothe
urbannature,LIDoptionsarelimitedtowhateverwillfitintheROW,which,initsexistingstate,consistsofalmost
entirelyimpermeablesurfaces.
RATIONALE
TheLIDassessmentdeterminedthatmanyoptionswerenotfeasibleduetospaceconstraintsandduetothe
existingstructuresbeingalmostentirelyimpervious. Theyrecognizedtheuseofpermeablepaversandmore
vegetatedareastoincreasewaterqualityandreducerunoffvolume. Unfortunatelytheycannotuseporous
pavementsfortheroadwayastheCityofDenverdoesnthaveacurrentpolicyormeansformaintainingthese
pavements. Itwouldlikelycostsignificantlymoretoinstallporouspavements.
PR-9 Pavement Management Program
DETAILS
TheCityandCountyofDenverhasasysteminplaceforpavementmanagement. ItisthedTimsCTproducedand
managedby
Deighton
Associates
in
Toronto,
Ontario,
Canada.
A
description
of
this
system
was
provided
as
a
seconddocumentthatindicatesitcouldmeettherequirements.
RATIONALE
ThedTimsCTsystemhasthecapacitytomeetalltherequirementsofPR9,assumingthatconditionassessments
aretakenatleasteverytwoyears.
PR-10 Site Maintenance Plan
DETAILS
Documentationindicatesthatmultipleentitieswillberesponsibleformaintainingtheproject. Thisincludes
privatelandowners,theGeneralImprovementDistrict,BusinessImprovementDistrict,andtheCityandCountyof
Denver. Twoimprovementzoneswerecreatedfortheproject,thestandardzoneandpremiumzone. Baseimprovementswillbeprovidedforbothzones,whileadditionalelementsthatsupportthevisionforthecorridor
willbeprovidedinthepremiumzone. Alistofeachitemwasproducedtoaddresstheresponsible
parties/organizations,schedule,methods,andfunding. Thisdocumentdoesnotspecificallysaywhatmethodswill
beusedforroadwayreplacementbutthishasbeenmentionedelsewhereinthedocuments,suchasintheLCCA
forPR2. FundingwasdescribedintheMasterGreenroadsdocumentprovided.
RATIONALE
AlloftheitemsintherequirementsareaddressedintheSiteMaintenanceTable,includingtheresponsibleparties,
maintenanceandreplacementscheduleandinotherdocumentsprovided.
PR-11 Educational Outreach
DETAILSFoureducationaloutreachitemswereselectedforthisprojectasfollows:
1. Monumentsprovidingdirectionalsignagetodestinationsalongthecorridorwillbeinstalled. Greenroads
PilotProjectsignagewillalsobeinstalled. Theadditionofsignagewillrequirereviewandapprovalfrom
theCityandCountyofDenver
2. Atleasttwopresentationsabouttheprojectwillbegiventoareaschools,withthefocusontheaterand
publicart.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
11/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 11
3. AtechnicalproposalonthecorridorisplannedattheASCEGreenStreetsandHighwaysConferencein
November2010.
4. Theresearchprojectcurrentlyunderwaycouldprovideaframeworkforareportontheexperienceof
workingthroughGreenroads.
RATIONALE
TheProject
Requirement
requires
that
three
of
these
items
be
completed
and
documented.
These
four
items
shouldmeetthisrequirement,providedthefollowingisprovideduponcompletion:
1. Photosoftemporaryandpermanentsignsinstalledintherightofway.
2. Copiesofeachpresentationandthetimeanddateofeachpresentationmadeatareaschools
3. AcopyoftheabstractalongwiththepresentationfortheASCEGreenStreetsandHighwaysConference.
4. Acopyofthecompletedcasestudy
ENVIRONMENT & WATER (EW)
Thisprojectearned10ofthe21pointsavailableinthiscategory.Amajorityofthecreditsearnedarerelatedtothe
useofpermeablepaversanddecreasedareaofimpermeablesurfaces. Thecreditsearnedinthiscategoryare
outlinedinTable5.
Table5:Environment&WaterVoluntaryCreditCategory
EW-1 Environmental Management System
DETAILS
ParsonsBrinckerhoffswillbeservingastheconstructionmanagementfirmfortheproject. ParsonsBrinkerhoff
suppliedtheircurrentISO14001:2004certificatetomeetthiscredit.
RATIONALE
TheconstructionmanagementfirmisappropriatelyISOcertifiedtomeetthecredit. Thedocumentdoesindicated
recertificationrequiredJuly8,2010. Therecertificationwouldneedtobeverifiedtoearnthiscredit.
EW-2 Runoff Flow Control
DETAILS
StormwatercalculationswereprovidedforbothEW2andEW3. Thesecalculationsindicatedthattheinitialflow
conditionshavearunoffvolumeof31,935ft3,aflowrateof20.75cfs,andatimeofconcentrationof20minutes.
Their
calculations
indicate
that
the
new
flow
conditions
will
have
a
runoff
volume
of
29,400
ft
3
,
a
flowrate
of
19.76
cfs,andasaturationrateof20minutes. Thesecalculationsarebasedoffofan80th
percentileaverageannual
rainfallevent,theequivalentofa2yearstormevent,whichismoreconservativethantherequested90th
percentileaverageannualrainfallevent. DocumentationisalsoprovidedforthedesignBMPs(permeablepavers
andUltraUrbanfilters)andtheexpectedflowcontrolperformancecriteria
RATIONALE
Thecalculationssuggestthatthenewdesignshouldhave105%ofthepredevelopmentflowcontrolandwillhave
smallerrunoffvolumeaswell,earningtheproject3points.
CreditsEarned CreditsNotEarned
No. Title No. Title
EW1 EnvironmentalManagementSystem EW6 HabitatRestoration
EW2 RunoffQuantity EW7 EcologicalConnectivity
EW3 RunoffQuality EW8 LightPollution
EW4 StormwaterCostAnalysis
EW5 SiteVegetation
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
12/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 12
EW-3 Runoff Quality
DETAILS
DocumentationindicatesthatallstormwaterrunoffwillbetreatedbytheinstalledBMPs. UNIEcostone
permeablepaverswillbeusedforinfiltrationandwillremoveallTSS. AbtechsUltraUrbanFilterswillbeinstalled
onalldrainageinlets. PerAbtechsspecifications,watertreatedbytheUltraUrbanFilterwillataminimumhave
theTSSreducedby50%. WiththeexpectedflowthrougheachoftheseBMPsitisexpectedthattherewillbeaTSS
reductionof
25.6%
in
the
total
effluent,
with
the
total
of
all
effluent
from
the
site
entering
Cherry
Creek
being
18.98mg/L.
RATIONALE
TheTSSconcentrations,ascalculated,arelowenoughtomeettherequirementsofthiscreditand100%ofthe
runoffvolumewillbetreated. Aformaldrainagedesignreportwasnotprovided,aswouldberequiredfor
Greenroadscertification,butallofthecreditrequirementsweremettoachieve3points.
EW-4 Stormwater Cost Analysis
DETAILS
ALCCAspreadsheetwasprovidedshowingtheexpectedservicelife,constructioncosts,maintenancecosts,
interestrate,salvagevalue,andestimatedannualcostofthestormwatermanagementsystem. Theircalculations
indicatethat
the
traditional
below
grade
water
treatment
system
would
have
an
estimated
annual
cost
of
$58,937,
whiletheLIDsystemwillhaveanestimatedannualcostof$43,872.
RATIONALE
Theprovidedspreadsheetshowsalloftherequirementsforboththetraditionalbelowgradestormwatersystems
andtheproposedLIDsystem,earningtheproject1point.
EW-5 Site Vegetation
DETAILS
ProvidedwereSiteVegetationPlantingSpecifications,aDenverCityForrestersOfficelistofapprovednoninvasive
treespecies,andtheSiteVegetationPlanSheets. TheCityandCountyofDenverhasarecommendedtreelistbut
donothaveasimilarlistforseeditems.
RATIONALE
Theystatethatallvegetationchosenfortheprojectisconsiderednoninvasive,butthattheprojectcannot
committonowateruseortheuseofonlynativeplantspecies. Thisearnstheproject1point.
EW-6 Habitat Restoration
DETAILS
Thiscreditwasnotachievedorattempted.
RATIONALE
Thiscreditisnotapplicabletothisprojectasitisinanentirelyurbanareathatnolongercontainsanynatural
habitats. Also,theprojecthasverylimitedspace,restrictedtothestreetrightofwaythatdoesnotcontainany
opportunitiesfor
off
site
habitat
improvement
anywhere
near
the
project.
EW-7 Ecological Connectivity
DETAILS
Thiscreditisnotapplicabletothisurbanproject.
RATIONALE
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
13/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 13
Awildlifeassessmentwasnotperformedfortheproject,asitisacompletelyurbanenvironmentandthereisnot
anynaturalwildlifeofconcerninthearea. Therearenocurrentwildlifecrossingareasandthereareveryfewif
anyvehiclewildlifecollisionsinthecorridor.
EW-8 Light Pollution
DETAILS
Thiscredit
was
not
achieved,
as
the
installed
lighting
in
not
Dark
Sky
Certified.
As
described
below
the
lighting
systemwasdesignedusinglowwattagebulbsthatifconsideredseparateareundertherequiredmaximum
wattage. Thelampsarealsorequiredtobefullyshielded,whichcannotbeverifiedusingtheprovidedplans.
RATIONALE
TheluminairesthatwillbeusedalongtheroadwayarestandardXcelEnergyluminaires.Theluminaireshavethree
separatelights:twoforpedestriansandonefortraffic.Thetrafficlightsuselowerwattagebulbsthanarenormally
usedinroadwaylighting.ThestreetislocatedinthetheatredistrictofdowntownDenverandisheavilylighted
duringthenighttimehoursalready.DarkSkystandardsrequirethatluminairesarebelow250watts.Whilethe
totalwattageoftheluminaireson14thStreetis275watts,thepedestrianlightsare110wattsandtheroadway
lightis165watts.Thepedestrianlightsareeach55watt,3000K,QLinductionlampsystemwhichproduces3,500
initiallumens.
ACCESS & EQUITY (AE)
Thisprojectearned14ofthe30pointsavailableinthiscategory. TheprimaryimprovementtoAccess&Equityis
theinclusionofabikelaneandimprovedpedestrianfacilities. ThecreditsareoutlinedinTable6.
Table6:Access&EquityVoluntaryCreditCategory
AE-1 Safety Audit
DETAILS
Thiscreditwasnotpursuedandnopointswereearned.
RATIONALE
TheCityandCountyofDenverPublicWorksstaffindicatedthattheyarenotfamiliarwithroadsafetyaudit
programsanddonothaveonethatmeetstheRSAguidelines.SincetheCitydoesnotadheretoFHWA
requirements,theydonotimplementprogramsofthistype.
AE-2 Intelligent Transportation SystemsDETAILS
ITSplanpageshavebeenprovidedshowingtheuseofthreeITSsystems. Thisissufficienttoearntheproject3
points.
RATIONALE
ThethreeITSsystemstobeinstalledare:
1) Category:TrafficControl;Application:BicycleandPedestrian
CreditsEarned CreditsNotEarned
No. Title No. Title
AE2 IntelligentTransportationSystems AE1 SafetyAudit
AE3 ContextSensitiveSolutions AE4 TrafficEmissions Reduction
AE5 PedestrianAccess AE7 TransitandHOVAccess
AE6 BicycleAccess AE8 ScenicViews
AE9
CulturalOutreach
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
14/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 14
Withtheadditionofadedicatedbikelaneonthestreet,newbicyclesignsandsymbolsareneeded.
Pages8285ofthe90%plans,whichwereprovided,showagraphicoftheproposedsignagelocations.
ThissignagewillreplacetheexistingSharetheRoadsignssincebicyclistscurrentlyrideinmixedtraffic.
2) Category:LaneManagement;Application:LaneControl
Twothroughlanesareproposedontheproject.Thethirdlanewillserveasaflexlane,withvehicles
allowedduringthepeakhourof4pm6pmand2hourmeteredparkingatallothertimes.Newsignage
willbe
placed
along
the
corridor
to
inform
users
of
the
flex
lane
function.
Plan
sheets
of
the
90%
plans
wereprovided.
3) Category:WarningSystems;Application:PedestrianSafety
Pedestriansignageandpedestriancountdownsignalswillbeaddedalongthecorridoratintersectionsto
ensurepedestriansafetyandmobility.90%plansheetswereprovided. Newpedestrianwarningsignage
isalsoplannedatStoutStreetwheretheexistingRTDlightraillinecrosses14thStreet.Thissignageisnot
yetintheplansbutwillbeinthebidsetonceapprovedbyRTDandtheCity.
Photosofeachsystemneedtobeprovided,onceinstalled,forcertification.
AE-3 Context Sensitive Solutions
DETAILS
ACSS
white
paper
has
been
completed
for
the
project
that
described
the
10
Greenroads
listed
items.
A
Bicycle
PlanAccessSheet,PedestrianPlanAccessSheet,andStrategicTransportationPlanwerealsoprovidedinsupport
ofthewhitepaper,earningtheprojectfivepoints
RATIONALE
ThiswhitepaperdetailstheplanningprocessandaddresseseachoftheitemsaskedforinAE3. Formoredetails
seetheactualdocumentprovided.
AE-4 Traffic Emissions Reduction
DETAILS
Theprojectchosetomeet#1ofthethreelistedoptionstomeetthiscredit. TheCityandCountyofDenvers
GreenPrintDenver
plan
published
in
July
2006
states
the
following
goal:
Completeupdatedinventoryofgreenhousegasesandbeginsubstantialprogresstowarda10%reductioninper
capitagreenhousegasemissionsfromthe1990emissionratebytheyear2012,inconformitywiththeU.S.Mayors
ClimateAgreement.
ThisgoalismoreaggressivethantheminimumGreenroadsrequirementofa10%reductionof1990valuesby
2030. ThefulldocumentwasprovidedtoGreenroadsforreview.
RATIONALE
Therequiredgreenhousegasemissionsstandardsarespecifiedtobemetbuttherewasnomentionofcriteriaair
pollutantsreduction,asrequired. Theprojectdoesnotmeeteitheroftheothertwooptionsforthiscredit,but
couldearnthefullfivepointsformeetingthefirstoptioniftheemissionsreductionregulationsalsoincluded
mandatesforcriteriaairpollutantreductionsbelowcurrentEPAstandards. Thiscouldbeeasilyachievedwithaslightchangetothecityemissionsreductionplan.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
15/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 15
AE-5 Pedestrian Access
DETAILS
DetailswereprovidedintheCSSwhitepaper(AE3,#7)forphysicalchangesthatweremadetotheroadwayto
providebetterpedestrianaccess. Theexistingroadwayconsistedof12footsidewalks,four11footthrough/turn
lanes,and8footparkinglanes. Thatisbeingchangedtotheconfigurationinthepicturebelow.
Figure3:Typical14th
StreetConfiguration
ThismeansthatfouradditionalfeetwillbeaddedtothesidewalkontheNorthsideofthestreetandseven
additionalfeetwillbeaddedtotheSouthside. The19footwidthonthesouthsideincludesan8footpatiozone,
5footpedestrianzoneanda6footamenityzone.The16footwidthonthenorthsideincludesan8footamenity
zoneand
8foot
pedestrian
zone.
The
wider
sidewalks
will
facilitate
outdoor
dining
and
will
provide
awider
pedestrianwalkspacewhilehelpingmeettheCityandCountys2004PedestrianMasterPlantohavesidewalksat
least16feetwidewherepossible. Extensivelandscapingwillbeconstructedprimarilythrough3060footplanter
boxes,andstreettreesintheplanterboxesandinseparatepaverareastocreateatrulyGreenStreet.Bulbouts
areplannedateachintersectiontoshortenthepedestriancrossingdistanceandtocalmtraffic. Publicinputwas
acquiredfromeachofthelandownersalongthecorridor,whowereinsupportofadditionalpedestrianfacilities.
Thecosttoinstallthesidewalkwith6inchesofPCCalongthecorridoris$739,765.
RATIONALE
Theprojectwouldearnthefulltwopointsforthewideningofsidewalks,crosswalks,andtheadditionofbulbouts.
Theplanterboxesandothersidewalkadditionshelptomakeitamoreenjoyablecorridorandhelptheprojectget
othercreditssuchasEW2andEW3.
AE-6 Bicycle Access
DETAILS
Theadditionofadedicatedbicyclelaneisoutlinedin#8ofAE3. Therewillbea5footwidededicatedbikelane
betweenthethroughlanesandthededicatedparkinglaneontheNorthside. Theexistingroadwaysimplyhas
bicyclessharingthethroughlaneswithtraffic,withsharrowsindicatingthepresenceofbicycles.
TheCherryCreekBikePathisaregionaltraillocatedalongCherryCreektwoblockssouthofthecorridor.The14th
Streetbikepathwillhelpfacilitateconnectionstothislargerregionaltrailaswellastothestripedlanes
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
16/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 16
intersecting14thatArapahoeStandGlenarmSt. Inaddition,anewbicyclelanecouldhelpfurthertheCitysgoal
toincreasethebicyclecommutetripsfrom1.6%(asdocumentedinthe2007AmericanCommunitySurvey)to10
percentby2018agoalstatedbyMayorHickenlooperandPublicWorksManagerBillVidal. Inadditiontothe
bicyclelaneitself,theprojectwillfund121bikerackstobeplacedalongthe12blocklengthofthecorridor. In
April2010,theCityandCountyofDenverrolledouttheBCycleprogram.Thisisacitywideinitiativetoplace55
sharedbicyclestationsacrosstheCity.Threeofthosestationswillbelocatedalong14thStreetoneat14thand
Larimer,one
at
14th
and
Champa,
and
one
at
14th
and
Welton
(at
the
Convention
Center).
Publicinputhasbeenpositiveconcerningtheadditionofabikelane. Manyseetheneedtoconvertshared
bicycle/vehicularlanestodesignatedbikelanes. Stripingthebikelanewillbeanominaladditionalcostwhenthe
restoftheroadstripingisdone.Thepurchaseandinstallationofthe121bikeracksisexpectedtocost$75,000.
RATIONALE
Theprojectisperformingallthenecessaryanalysesandphysicalroadwaychangestoearnthefulltwopoints. The
dedicated5footlaneandconnectionstootherdedicatedbicyclefacilitiesmakethisavaluablepieceto
encouragingmorebicycleuse.
AE-7 Transit and HOV Access
DETAILS
Thisprojectdidnotimprovetransitroutesalongthecorridor. ThereareseveralbusroutesandtheRTDlightrail
thatcross14th
Streetatvariousintersections. Theprojectdidtrytoimproveaccommodationsforthelightrailand
bussesbyaddingtactilewarningstrips,staticsignage,andrealtimeflashingwarningsignswherepedestriansneed
tocrossthelightrailtracks. Thebulboutsweredesignedwiththebusroutesinmindtoaccommodatecrossing
routesandnewlightingshouldimprovesafetyatcrossstreetbusstops.
RATIONALE
Thiscreditwasnotpursuedandisnotapplicablesincetherearenotransitroutesalongthecorridor.
AE-8 Scenic Views
DETAILSThisprojectisinanentirelyurbanareaandcannotachievethiscredit. TherearenoNationalScenicBywaysorany
equivalentneartheproject.
RATIONALE
Thiscreditisnotapplicable
AE-9 Cultural Outreach
DETAILS
Aminimumof1%ofthetotalprojectbudget($160,000)willbededicatedtopublicartinstallationsalongthe
roadwayrightofway.ThisisstandardforallpublicprojectsconductedwithintheCityandCountyofDenver. In
themonthsofMarchandApril2010,over250artistsrespondedtoacallforartistsforthecorridor.Eachartist
developedan
idea
for
art
along
the
corridor.
Public
presentations
were
held
in
April
2010
to
review
and
comment
onthevariousideas. AnartistisanticipatedtobeselectedinSummer2010.
RATIONALE
Thiswouldearntheprojectthefulltwopoints. Photographsofthefinalinstalledartworkandacopyofthe
projectbudgetwouldneedtobesubmitted.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
17/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 17
CONSTRUCTION ACTIVITIES (CA)
Forthiscategory,12ofthe14possiblepointswereearned. The14th
StreetContractorSustainability
Requirementsdocumentasksthecontractortoachieveeachofthecreditsinthissection. Thesecreditsareall
contingentontheselectedcontractorcomplyingwiththeprojectspecificationsascurrentlywritten.Itispossible
that,throughchangeordersorothernegotiations,theserequirementswillchange.Thus,thesecreditsmustbe
verifieduponcompletionofconstructionbeforepointscanbeawarded.ThecreditsareshowninTable7.
Table7:ConstructionActivitiesVoluntaryCreditCategory
CA-1 Quality Management System
DETAILS
Aprimecontractorhasnotyetbeenbidorselectedforthisproject. TheCityandCountyofDenverplanstohandle
theConstructionManagementoftheproject. ItispossiblethatParsonsBrinckerhoffcouldhavearolein
ConstructionManagement.AcopyofthePBISO9001:2008certificate(CertificateRegistrationNo.10001797
QM08)wasprovided.
RATIONALE
AssumingPBdoesendupperformingtheConstructionManagementoftheprojectthiscreditwillbeachieved.
CA-2 Environmental TrainingDETAILS
ThefollowingdocumentationwasplacedintheContractorSpecifications:EnvironmentalTraining:Provide
constructionpersonnelwiththetrainingtoidentifyenvironmentalissuesandbestpracticemethodstominimize
environmentalimpact. UsedefinitionsperGreenroadsv1.0,CA2. Provideanenvironmentaltrainingplanandany
updatestotheplanthatoccurthroughouttheconstructionprocess.
RATIONALE
ThespecificationsweretakendirectlyfromGreenroadsV1.0,sothiscreditshouldbeachieved.
CA-3 Site Recycling Plan
DETAILS
Aform
for
aSite
Recycling
Plan
was
provided
in
the
14th
Street
Contractor
Sustainability
Requirementsdocument
asdescribedinthiscredit. Itisalsospecifiedthatthecontractormustputthefollowingintosubcontractor
agreements:
"Thesubcontractorwillmakeagoodfaithefforttoreducetheamountofwastegeneratedonthejobsiteand
recyclematerialasperthecontractor'swastemanagementplan.Thesubcontractorwillfollowthedesignated
handlingproceduresforeachtypeofwastegeneratedonsiteandprovidedocumentationtoverifymaterialreuse,
recyclinganddisposalasindicatedinthewastemanagementplan."
CreditsEarned CreditsNotEarned
No. Title No. Title
CA1 QualityManagementSystem
CA2 Environmental Training
CA3 SiteRecyclingPlan
CA4 FossilFuelReduction
CA5 EquipmentEmissionReduction
CA6 PavingEmissionReduction
CA7 WaterUseTracking
CA
8
Contractor
Warranty
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
18/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 18
RATIONALE
Thisdocumentshouldhelpreducetheamountofwasteproducedandmeettherequirementsofthiscredittoearn
1point.
CA-4 Fossil Fuel Reduction
DETAILS
Accordingto
the
website
http://findbiodiesel.org/US/CO/Denver
nine
biodiesel
stations
are
located
within
50
milesofDenver.Fiveofthosestationsarewithin10milesoftheprojectsiteinDowntownDenver.AsofJanuary
2010,theUSDepartmentofEnergywasreportingaveragecostsofB20tobe9centspergallonhigherthan
petroleumdiesel.Incontrast,B100fuelwouldbe72centshigherthandieselgasoline,whichisasubstantial
increase.Blendsof20percentbiodieselwith80percentpetroleumdiesel(B20)cangenerallybeusedin
unmodifieddieselengines.MostenginemanufacturersallowB5andsomeallowuptoB20undertheircurrent
warranties. Theowneriscommittingtoachievethiscreditbystatinginthe14thStreetContractorSustainability
RequirementsdocumentthattheprojectwillusealternativefuelsduringconstructionbyrequiringBiodiesel20in
allconstructionvehicles. Thiswouldensurea20%reductioninfossilfueluse. Theprimecontractormustsubmita
signedletterwiththefossilfuelreductionmeasuresusedandpercentagereductionachievedinadditiontoa
spreadsheetofallfuelused.
RATIONALEThoughthenecessarydeliverablescannotyetbeprovidedtheowneriscommittingtoachievingthiscreditby
includingcontractorrequirementsinthe14thStreetContractorSustainabilityRequirementsdocument. The
projectwouldachieve1point.
CA-5 Equipment Emission Reduction
DETAILS
Thefollowinghasbeenplacedinthe14thStreetContractorSustainabilityRequirements:Atleast50%ofthe
nonroadconstructionequipmentfleetoperatinghoursfortheprojectwillbeaccomplishedonequipmentwith
installedemissionreductionexhaustretrofitsandaddonfuelefficiencytechnologiesthatachievetheEPATier4
emissionstandard.Furtherdiscussionswiththecontractorfortheprojectwillbeneededtoconfirmthattheyare
abletomeettheTier4emissionstandardwiththeequipmentavailable.
RATIONALE
Thecontractorisbeingaskedtomeeta50%EPATier4requirementwhichwouldearntheproject1point. Upon
completionthesupportingdocumentationtoconfirmthecreditwasmetwouldneedtobesubmitted.Thiscredit
maybedifficulttoachievesincetherearecurrentlyfewnonroadvehiclesthatmeetEPATier4requirements.
CA-6 Paving Emission Reduction
DETAILS
A90%NIOSHemissionsapprovedpaverrequirementwasaddedtothe14thStreetContractorSustainability
Requirementsdocument.
RATIONALE
Thecontractor
will
be
required
to
meet
this
credit,
earning
the
project
1point.
A
copy
of
this
certification
and
asignedstatementfromthepavingcontractorwouldneedtobeprovidedshowingthatthecreditwasmet.
CA-7 Water Use Tracking
DETAILS
Acontractorrequirementwasaddedtothe14thStreetContractorSustainabilityRequirementsdetailing
everythingthatshouldbeintheWaterUseTrackingDocument.
RATIONALE
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
19/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 19
ThecontractorrequirementsweredirectlyfromtheGreenroadscreditrequirementssothiscreditshouldearn2
pointsuponsubmissionofthefinaldocuments.
CA-8 Contractor Warranty
DETAILS
TheCityandCountyofDenverPublicWorksDepartmentrequiresthattheContractorswarrantiesandguarantees
arefor
athree
year
period.
Title
18
(Section
1801,
Page
68)
of
the
City
and
County
of
Denvers
General
Contract
Conditionsstatesthat:TheContractorswarrantiesandguaranteesforallWorkcomponentsshallcontinueforthe
followingperiods:ForContractsexecutedundertheauthorityoftheManagerofPublicWorks,foraperiodof
three(3)yearsafterthedateofFinalInspectionforWorkperformedwithinthePublicRightofWayorpermanent
easementsheldbytheCity,orforaperiodofone(1)yearafterthedateofSubstantialCompletionforWork
constructedoutsideofthePublicRightofWay,inaccordancewithGC1902,orforsuchlongerperiodoftimeas
maybeprescribedbythetermsofanyspecialwarrantiesandguaranteesrequiredbytheContractDocuments.
TheCitysGeneralContractConditionswereprovided.
RATIONALE
TheGeneralContractConditionsrequireawarrantyasdescribedinthiscreditandwouldearntheproject3points.
MATERIALS & RESOURCES (MR)Forthiscategory,2ofthe23possiblevoluntarycreditsareearned. Theonlypointsearnedareforrecycled
materials. Itappearsthattheprojectcouldgetpointsforusingregionalmaterialsaswell,butuntilacontractoris
selectedandmaterialsareacquireditishardtoknow. ThesecreditsareoutlinedinTable8.
Table8:Materials&ResourcesVoluntaryCreditCategory
MR-1 Lifecycle Assessment (LCA)
DETAILS
Thiscreditwillnotbecompletedaspartofthisanalysis. ThehiringofaLCAcertifiedpersonorconsultantto
performthiscreditwasoutsideofthedesiredscopeofthisproject.
RATIONALE
Thiscreditwasnotattempted.
MR-2 Pavement Reuse
DETAILS
Thetotalproject,newpavement,andreusevolumesforbothasphaltandconcreteareshowninFigure4below.
Thetotalpercentageofreusedpavementintheprojectis47%.Theexistingconcreteandasphaltpavementwillbe
reusedwithintheprojectlimitswhereitisingoodconditionanddoesnotconflictwiththegradingofthe
proposedcurbandgutter.Asphaltpavementthatisreusedwillbemilledanda2inchoverlaywillbeaddedtothe
pavementtoprolongtheservicelife.Theconcretethatwillbereusedwillremaininplacewithnoadditional
changestoit.
CreditsEarned CreditsNotEarned
No. Title No. Title
MR4 RecycledMaterials MR1 LifecycleAssessment(LCA)
MR2 PavementReuse
MR3 EarthworkBalance
MR5 RegionalMaterials
MR
6 Energy
Efficiency
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
20/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 20
Figure4:PavementReuseQuantities
RATIONALE
Theprojectwillnotachievetheminimumrequirementof80%reusetoachieveanypointsandwouldneed
significantimprovementstoreachthat.
MR-3 Earthwork Balance
DETAILS
Thiscreditisnotapplicableastherewillbenocuttingandfillingoccurringfortheproject.
RATIONALE
Thiscreditisnotapplicable.
MR-4 Recycled Materials
DETAILS
ThefractionofrecycledmaterialswascalculatedusingOption2.Aspreadsheetthatdocumentsthetotalweightof
HMAandPCC,thetotalweightofrecycledmaterials,andthecomputedARCfortheprojectwassubmitted.The
ARCfortheprojectis24.61%.Acopyoftheapproveddesignmixforthepavementmaterialsisnotavailable.
RATIONALE
The24.61%recycledcontendwouldbegoodfor2points. Toearnthepointsacopyoftheapprovedmixdesigns
aswell
as
all
supporting
test
documents
(proportioning
records,
mix
tickets,
etc.)
would
need
to
be
submitted.
MR-5 Regional Materials
DETAILS
Acalculationwasdonebasedonoption1.Sincetheprojecthasnotgonetoadvertisementyet,aconstruction
contractorisnotinplace. Duetothis,theexactlocationofalloftheconstructionmaterialsisunknown.Outof
165constructionitems,thesourcelocationfor100ofthemisunknownatthistime.Fortheother65items,a
reasonableassumptionofthesourcelocationwasmade.Onceacontractorisinplace,thesourcelocationsofthe
materialsshouldbeknowntoagreaterextent.However,basedontheassumptionsmadeforthe65items,the
total%ofmaterialsourcedfromwithin50milesoftheprojectareais52%.Thecalculationssupportingthiscredit
wereprovided.
RATIONALE
Basedonthispreliminarycalculationtheprojectwouldnotreceiveanypointsbasedon52%ofthematerials
comingfromwithin50milesoftheproject. Itappearsfromthespreadsheetthatmostoftheknownmaterial
suppliersarefromwithina50milerangeandthatmanyoftheunknownmaterialscouldalsocomefromwithin50
miles. Itseemsthatpointscouldbeearnedforthisonceacontractissignedandmoreofthematerialsare
located.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
21/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 21
MR-6 Energy Efficiency
DETAILS
Theluminaireson14thStreetdonotmeettherequirementsforthiscreditastheyarestandardinduction
luminairesbyXcelEnergy.
RATIONALE
Thiscredit
was
not
pursued.
PAVEMENT TECHNOLOGIES (PT)
Forthiscategory,5ofthe20possiblevoluntarycreditswereearned. Theonlycreditearnedinthiscategoryis
CoolPavement. Thisisbecauseamajorityoftheimpermeablesurfaceareawillbeconcretesidewalks,whichhave
ahighalbedoandqualifyforcoolpavements. ThecreditsareshowninTable9.
Table9:PavementTechnologiesVoluntaryCreditCategory
PT-1 Long Life Pavement
DETAILS
The14thStreetMarkettoColfaxAvenueFinalGeotechnicalandPavementReportwasprovidedforthiscredit. The
proposed14thStreetprojectincludesthereconstructingorupgradingofpavementbetweenMarketStreetand
ColfaxAvenuedependingonpavementcondition.Theconstructionwillconsistofmillingandoverlayor
reconstructingthepavementon14thStreetdependingontheconditionoftheexistingasphaltmatorconcrete
surfaceandnewstreetscapingimprovementsinadjacentareas. ThereportindicatesthatHMApavingforthe
mainline14th
Street
new
pavement
will
be
11.5
inches
thick,
intersections
will
be
12.5
inches
thick
and
overlay
sections. AllPCCsectionswillbepaved10inchesthick. TheHMApavementshavebeendesignedfor20yearlife
andPCCpavementswitha30yearlife,havinglifetimeequivalentsingleaxleloads(ESALs)of5,945,743and
9,236,838respectively. AccordingtoFigurePT1.1intheGreenroadsmanualthenewHMAsectionswilllikely
meetthelongliferequirement,assumingtheminimumsubgradeCBRandminimumbasematerialCBRaremet.
ThePCCpavementsdonotappearinitiallytomeettherequirements. SomeoftheHMAoverlaysectionsmay
meettherequirements,butitwillvarybyexistingpavementthickness.
RATIONALE
Inordertoachievethiscreditmorecalculationswouldneedtobedonetoshowthattheinstalledpavementsmeet
therequirements. BesidesthelifetimeESALcalculations,thesubgradeCBRandbasematerialCBRwouldneedto
beprovidedtoshowthattheminimumrequirementsweremet. Theprojectmaybeabletoachievethiscredit.
PT-2 Permeable Pavement
DETAILS
Acombinationofpermeablepavers(UNIEcoStone)andUltraUrbanfilterswillbeusedtocontrolandtreatthe
90thpercentileaverageannualrainfalleventpostconstructionrunoff. Thepaversandplanterscombinedwill
treat2,535ft3ofthetotalrunoffareaof31,935ft
3.Thisrepresentsapproximately7.9%oftherunofftreated
throughpermeablepaversandplanters.Thus,thisisbelowthe50%minimumthresholdforthiscredit.
Documentationwasprovidedforthesecalculations.
CreditsEarned CreditsNotEarned
No. Title No. Title
PT4 CoolPavement PT1 LongLifePavement
PT
2 Permeable
Pavement
PT3 WarmMixAsphalt
PT5 QuietPavement
PT6 PavementPerformanceTracking
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
22/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 22
RATIONALE
Notenoughsurfaceareaistreatedbytheamountofpermeablepaversbeinginstalled.
PT-3 Warm Mix Asphalt
DETAILS
TheCityandCountyofDenverwillnotapprovetheuseofWarmMixAsphaltontheproject.Theywill,however,
allowthe
project
team
to
include
avalue
engineering
option
for
contractors
to
use
WMA
for
patching
and
full
depthpavement.IfWarmMixAsphaltisused,theCCDwillrequirethecontractortodoanumberofdurability
testsfortheWMApriortoapproval.Astatementtothiseffecthasbeenplacedinthe14thStreetContractor
SustainabilityRequirements.
RATIONALE
Thiscreditisnotcurrentlybeingpursued.
PT-4 Cool Pavement
DETAILS
Thisprojectwillhaveapavementsurfacewithaminimumalbedoof0.3for56.9%ofthetotalprojectpavement
surfacingbyarea,asshownbythefollowing:
BaseBid
TotalProjectPavedArea:41,654.98SquareYards(SY)
LSA(LightSurfaceArea):23,695.63SY
Project%CoolPavement:56.9%
Thiscalculationisnotbackedwithanyalbedotestresultscurrently.
RATIONALE
Accordingtothecalculationtheprojectwillmeetthe50%requirementforcoolpavements. Toachievethiscredit
albedotestresults,aphotoofthepavementwithcoolpavementareasidentified,andaplanshowingthelocations
ofcoolpavementswouldneedtobeprovided.
PT-5 Quiet Pavement
DETAILS
Thiscreditdoesnotapplybecausepostedspeedlimitsareunder30milesperhour.
RATIONALE
Thiscreditisnotapplicabletothisproject.
PT-6 Pavement Performance Tracking
DETAILS
TheCityhasapavementmanagementsysteminplace(describedinPR9PavementManagementSystem).
However,theCitydoesnothavetheresourcestoperformanetworkwideconditionassessmentontwoyear
intervals.The
City
conducts
assessments
based
on
measured
distresses
in
block
long
segments.
They
assess
streets
every5or6yearsandthePMSsoftwareusesdeteriorationcurvestoprojectdecliningPCIvaluesannually.
RATIONALE
TheCityandCountyofDenverdoesnotcurrentlyhavetheresourcestoattainthiscredit.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
23/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 23
POTENTIAL CUSTOM CREDITS
ThreebestpracticesimplementedonthisprojectwereidentifiedaspotentialCustomCredits.Atotalof12
additionalpointsaresuggested.CC1wouldlikelyfitintheEnvironment&watercategorywhileCC2andCC3
wouldlikelyfitintotheAccess&Equity.SomeresearchhasbeencompletedbyParsonsBrinckerhoff,butthe
GreenroadsDevelopmentTeamwillneedrevieweachcredittoensuretheymeetthesamestandardsasother
credits. Ifthecreditsmeetthesestandards,theywillearnpointsforthisprojectandbeincorporatedintolater
versionsoftheratingsystem. Table10providesthecredittitlesandintent.
Table10:PotentialCustomCredits
RECOMMENDATIONS
Onlyone
of
the
Project
Requirement
is
not
currently
met.
To
become
Greenroads
certified
PR
1Environmental
ReviewProcesswouldneedtobecompletedbydefiningtheenvironmentalimpacts,theirsignificance,and
howtheywillbemitigated.
AE4TrafficEmissionsReduction,MR5RegionalMaterials,andPT1LongLifePavementarecreditsthatseem
achievablewithlowadditionaleffort. Theprojectappearstobeontracktoachievethesecreditswithsome
minorchangesoradditionalcalculations.
Manyofthecreditsthatarecurrentlyshownasachievedstillrequiresubmissionofadditionaldocumentsupon
completionforproof. ThisincludesalmostalloftheConstructionActivitiescreditsbecausetheywillbe
performedduringconstruction. Carefultrackingofcontractorprogresswillberequiredtoensurethatthese
creditsareachieved.
TheproposedcustomcreditswillrequirefurtherresearchanddiscussionbetweenGreenroadsandtheproject
teamtoevaluatethemeritandvalueofeachproposedcredit. Theprojectscorecardcurrentlyshowsthe
customcreditsintheMaximumPossiblecategory,astheGreenroadsteamdoesnotwanttounfairlyshow
achievementthatmaynotprovetobepossible. Ifcustomcreditsareeventuallygranted,theywillonlyaddto
thetotalachievementshowninthisreport.
LIMITATIONS
1. PilotProjectresultsarebasedondiscussionswithprojectpersonnelonlyandanyprojectdocumentsprovided
totheUniversityofWashingtonReviewTeam.Ingeneral,thisonlyshowshowtheprojectshoulddogiventhe
currentdesignandspecifications. Followupreviewsandadditionaldocumentationarenecessaryfor
certificationandtoreflecttheprojectssustainabilitypractices.
2. Regulatoryrequirementstendtodictatemanyoftheactionsofmostroadwayprojectteamsand
transportationagencies.However,theintentofGreenroadsistoencouragebestpracticesthatgoaboveand
beyondexistingUnitedStatesregulationsandrequirements.Alistofcurrentregulatoryrequirementsis
providedintheIntroductiontotheGreenroadsManual(Muench&Anderson,2010).
3. Greenroadsiscontinuallyunderdevelopment.Thisreviewhasbeencompletedundertheversion1.0.1rating
systemandmaynotscoreequivalentlyunderfutureversionsofGreenroads. Officialcertificationisnot
No. Title Pts. Description
CC1 UrbanHeatIslandEffect 5 Installvegetationtoreduceurbanheatislandeffect
CC2 TransitSafety 2 Improvetransitsafetyattransitcrossingsand/orstopsinthe
roadwaycorridor.
CC3 MaintenanceDistricts 5 Formamaintenancedistricttoensurecontinuedmaintenanceofthe
roadwayfacility
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
24/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 24
currentlyavailableunderversion1.0.1. Tocertifythisproject,itwouldneedtobereviewedunderversion1.5
whichisexpectedtobereleasedsoonandwillhavedifferencesfromversion1.0.1.
4. DifferentGreenroadsreviewersmayinterpretavailableinformationinaslightlydifferentmanner.Bestefforts
havebeenmadetobetransparentaboutlogicbehinddecisionstoawardanddenycreditsinthisreview.
However,notallsubjectivitymayhavebeenremoved.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
25/28
APPENDIX A
About the Greenroads Rating System
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
26/28
ABOUT GREENROADS
ThissectiondetailstheGreenroadsSustainabilityPerformanceMetric,includingabriefbackgroundondevelopmentofthesystem,
theoperatingdefinitionofsustainabilityused,andabriefdescriptionofhowitworksandcanbeimplemented.Moredetailed
information,includingtheVersion1.0.1manualofrequirementsandcreditscanbefoundontheofficialGreenroadswebsite:
http://www.greenroads.us.
ThelistofcreditsincludingabriefdescriptionisincludedattheendofthisappendixinTableA.1.
BACKGROUNDGreenroadsisaresearchproject(Sderlund,2007)thatisjointlydevelopedbytheUniversityofWashington(UW)andCH2MHILL.
Greenroadsisacollectionofsustainabilitybestpracticesthatapplytoroadwaydesignandconstruction,muchliketheLeadershipin
EnergyandEnvironmentalDesign(LEED)RatingSystemforBuildingsthatisadministeredbytheUnitedStatesGreenBuilding
Council(USGBC).Ingeneral,thesesustainabilitybestpracticesaredividedintotwotypes:requiredandvoluntary.Thereiscurrently
onerequiredcategorywith11requiredbestpracticescalledProjectRequirementsorPRs.Atminimum,allofthesebestpractices
mustbecompletedinorderforaroadwaytobeconsideredaGreenroad.
WhatisaGreenroad?
AGreenroadisdefinedasroadwayprojectthathasbeendesignedandconstructedtoalevelofsustainabilitythatissubstantially
higherthancurrentcommonpractice.
WhatisSustainability?
Sustainabilityisthecharacteristicofasystemthatrepresentsitscapacitytosupportnaturallawsandhumanvalues.(Anderson,2008;Muenchet.al,2010)
ProjectsthatregisterusingtheGreenroadswebsiteareeligibletoearnacertificationawardandwillbeabletodisplaythe
Greenroadslogoontheirprojecttorecognizetheirachievement.
STRUCTURE OF THE METRIC
Ingeneral,theGreenroadssustainabilitybestpracticesaredividedintotwotypes:requiredandvoluntary.Thereiscurrentlyone
requiredcategorywith11requiredbestpracticescalledProjectRequirementsorPRs.Atminimum,allofthesebestpracticesmust
becompletedinorderforaroadwaytobeconsideredaGreenroad.Thirtyseven(37)othervoluntarybestpracticesare
characterizedinfiveadditionalcategories,calledvoluntarycreditsorVCs.AfterthePRrequirementshavebeenmet,anumberof
differentVCsmaybeachievedandpointsmaybeearnedtowardoneoffourratings:Certified,Silver,GoldandEvergreen.
Additionally,asixth
VC
category
is
available
to
projects
that
demonstrate
and
implement
innovative
ideas
or
more
sustainable
practicesandwouldliketowriteorsubmittheirowncustomizedornewideasforpoints.
FollowingisabriefdescriptionofthesevencategoriesinGreenroads.TherelativeweightsofthefivemainVCcategoriesareshown
inFigureA.1.
ProjectRequirements
Thiscategorycontainsall11ProjectRequirements(PR)thataGreenroadsprojectmustmeetinordertobeconsideredfora
certificationlevelaward.Thegeneralintentofthiscategoryistoencourageenvironmentallyresponsibledecisionmaking
processesandtohavemanagementplansinplaceforconstruction,andtoestablishaminimumbaselineforeveryprojectthat
appliesforcertification.
Environment
&
Water
(EW)Thiscategorycontainseight(8)voluntarycreditsworthupto21points.Theintentofthiscategoryistopromotebestpractices
relatedtostormwatermanagementandecologicalresourceswithintheprojectboundary.
Access&Equity(AE)
Thiscategorycontainsnine(9)voluntarycreditsworthupto30points.Theintentofthiscategoryistopromotesafety,access,
andmobilitytousersoftheroadway.
ConstructionActivities(CA)
Thiscategorycontainseight(8)voluntarycreditsworthupto14points.Theintentofthiscategoryistopromoteresponsible
constructionmanagement,reduceuseoffossilfuelsandimprovehealthandsafetyofconstructionworkers.
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
27/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
November 3, 2010 A-5
Materials&Resources(MR)
Thiscategorycontainssix(6)voluntarycreditsworthupto23points.Theintentofthiscategoryistopromoteresponsible
materialsandenergymanagementbycombinationsofrecycling,reusingandreducingbothvirginandwastematerials.
PavementTechnologies(PT)
Thiscategorycontainssix(6)voluntarycreditsworthupto20points.Theintentofthiscategoryistohighlightspecificpavement
engineeringinnovationsandideasorbroadtypesoftechnologiesortechniqueswhicharewellestablishedinpracticeandhave
directsustainability
benefits.
CustomCredits(CC)
Thiscategorycontainsupto10creditswhichmaybeearnedbyaprojectthatimplementssustainableorinnovativeideas.The
projectteammaysubmitapplicationswithadetaileddescriptionandexplanationofthepracticetoearncreditsinthiscategory
ranginginvaluefrom1to5points.Pointsawardedforthecustomcreditaredeterminedthroughreviewandcollaborationwith
Greenroadsrepresentatives.Thereiscurrentlynolimitestablishedforhowmanycustomcreditsaprojectmaysubmitfor
review.
FigureA.1.RelativeWeightsofGreenroadsVCCategories(Muenchetal.2010)
TableA.1Greenroadsv1.0.1ListofCredits
No. Title Pts. Description
Project
Requirements
(PR)
Mandatory
for
all
projects
PR1 EnvironmentalReviewProcess Req Completeacomprehensiveenvironmentalreview
PR2 LifecycleCostAnalysis(LCCA) Req PerformLCCAforpavementsection
PR3 LifecycleInventory(LCI) Req PerformLCIofpavementsection
PR4 QualityControlPlan Req Have aformalcontractorqualitycontrolplan
PR5 NoiseMitigationPlan Req Haveaconstructionnoisemitigationplan
PR6 WasteManagementPlan Req HaveaplantodivertC&Dwastefromlandfill
PR7 PollutionPreventionPlan Req HaveaTESC/SWPPP
PR8 LowImpactDevelopment(LID) Req CompleteaLIDfeasibilitystudy
PR9 PavementManagementSystem Req Haveapavementmanagementsystem
PR10 SiteMaintenancePlan Req Havearoadsidemaintenanceplan
-
8/10/2019 14th Street Market Street to Colfax Avenue Pilot p
28/28
Greenroads Pilot Project 14thStreet, Market Street to Colfax Avenue
TableA.1Greenroadsv1.0.1ListofCredits
No. Title Pts. Description
PR11 EducationalOutreach Req Publicizesustainabilityinformationforproject
Environment&Water(EW)Upto21Points
EW1 EnvironmentalManagementSystem 2 ISO14001certificationforgeneralcontractor
EW2 RunffFlowControl 13 Reducerunoffquantity
EW3 RunoffQuality 13 Treatstormwatertoahigherlevelofquality
EW4 StormwaterCostAnalysis 1 ConductanLCCAforstormwaterelements
EW5
SiteVegetation
13 Use
native
low/no
water
vegetation
EW6 HabitatRestoration 3 Restorehabitatbeyondwhatisrequired
EW7 EcologicalConnectivity 1or3 Connecthabitatacrossroadways
EW8 LightPollution 3 Discouragelightpollution
Access&Equity(AE)Upto30Points
AE1 SafetyAudit 12 Performroadwaysafetyaudit
AE2 IntelligentTransportationSystems(ITS) 25 ImplementITSsolutions
AE3 ContextSensitiveSolutions 5 Planforcontextsensitivesolutions
AE4 TrafficEmissionsReduction 5 Reduceemissionswithquantifiablemethods
AE5 PedestrianAccess 2 Provide/improvepedestrianaccessibility
AE6 BicycleAccess 2 Provide/improvebicycleaccessibility
AE7 TransitAccess 15 Provide/improvetransitaccessibility
AE8 ScenicViews 2 Provideviewsofsceneryorvistas
AE9 CulturalOutreach 12 Promoteart/culture/communityvalues
Construction
Activities
(CA)
Up
to
14
Points
CA1 QualityManagementSystem 2 ISO9001certificationforgeneralcontractor
CA2 EnvironmentalTraining 1 Provideenvironmentaltraining
CA3 SiteRecyclingPlan 1 Haveaplantodivertwastefromlandfill
CA4 FossilFuelReduction 12 Usealternativefuelsinconstructionequipment
CA5 EquipmentEmissionsReduction 12 MeetEPATier4standardsfornonroadequip.
CA6 PavingEmissionsReduction 1 UsepaversthatmeetNIOSHrequirements
CA7 WaterTracking 2 Developdataonwateruseinconstruction
CA8 ContractorWarranty 3 Warrantyontheconstructedpavement
Materials&Resources(MR)Upto23Points
MR1 LifeCycleAssessment(LCA) 2 ConductadetailedLCAoftheentireproject
MR2 PavementReuse 45 Reuseexistingpavementsections
MR3 EarthworkBalance 1 Usenativesoilratherthanimportfill
MR4 RecycledMaterials 5 Userecycledmaterialsfornewpavement
MR5 RegionalMaterials 5 Useregionalmaterialstoreducetransportation
MR6
EnergyEfficiency
5 Improve
energy
efficiency
of
operational
systems
PavementTechnologies(PT)Upto20Points
PT1 LongLifePavement 5 Designpavementsforlonglife
PT2 PermeablePavement 3 UsepermeablepavementasaLIDtechnique
PT3 WarmMixAsphalt(WMA) 3 Use WMAinplaceofHMA
PT4 CoolPavement 5 Contributelesstourbanheatislandeffect(UHI)
PT5 QuietPavement 3 Useaquietpavementtoreducenoise
PT6 PavementPerformanceTracking 1 Relateconstructiontoperformancedata
CustomCredits(CC)Availableforallprojectsbasedoncontextandinnovation,subjecttoapproval
CC1 CustomCredit1 15 Designanewvoluntarycredit
CC2 CustomCredit2 15 Designanewvoluntarycredit
GreenroadsTotalPoints: 118