Franklin Street Feasibility Study Phase II Public Meeting 2 Preliminary Recommendations
IBI Group with Gorrill Palmer Consulting Engineers, Inc. S. W. Cole Engineering, Inc. | Titcomb Associates | Morris Communications
October 1, 2014
1
![Page 2: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/2.jpg)
Agenda
2
Presentation: 30 minutes • Welcome • How We Got Here • Recommendations To-Date: An Overview of Stations • Next Steps Workshop: 1 hour • Please visit nine stations and make comments at each,
using sticky notes o Please write clearly! o Tell us what you like o If you have suggestions for improvements, tell us
about those too
![Page 3: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/3.jpg)
Vision Statement
3
Franklin Street will be a critical transportation facility for all modes of travel, linking Interstate 295 and Back Cove to the waterfront & island ferries and serving as an attractive gateway to the city. Franklin Street will be a vibrant, active and walkable urban corridor, connecting neighborhoods and destinations. It will enhance the urban fabric of the city through mixed-use development of appropriate, functional and diverse residential, commercial and recreational space in the midst of attractive streetscapes. All modes of travel, including motor vehicle, public transit, bicycle and pedestrian, shall be able to coexist in a design that is safe and environmentally sound for an urban setting through state-of-the-art design utilizing optimum architecture, street widths, curbs, sidewalks and street level crosswalks, and other appropriate amenities such as vegetation, trees and art.
![Page 4: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/4.jpg)
How We Got Here
5
Task 3 Needs/ Goals/
Objectives
Task 4 Existing Conditions
Task 5 Future Conditions
Task 6 Alternatives
Development
Task 7 Alternatives Analysis
Task 8 Recommendations
Task 9 Study Report
Task 10 Preliminary Design
Report
Task
1
Proj
ect M
anag
emen
t Ta
sk 2
Pu
blic
Invo
lvem
ent
![Page 5: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/5.jpg)
Base Map of Franklin Street Feasibility Study Phase II Study Area
6
![Page 6: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/6.jpg)
Urban Street Option 1 Alignment
7
![Page 7: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/7.jpg)
Urban Street Option 2 Alignment
8
![Page 8: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/8.jpg)
Urban Parkway Alignment
9
![Page 9: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/9.jpg)
Recommended Alignment (subject to further refinement)
10
![Page 10: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/10.jpg)
Recommended Alignment (subject to further refinement)
11
![Page 11: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/11.jpg)
Design Speed
12
![Page 12: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/12.jpg)
13
EXISTING Typical Lane Widths and Bike-Ped Infrastructure (north of Congress St)
![Page 13: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/13.jpg)
14
Typical Lane Widths and Bike-Ped Infrastructure (north of Congress St)
EXISTING
![Page 14: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/14.jpg)
15
Typical Lane Widths and Bike-Ped Infrastructure (north of Congress St) With possibility to accommodate transit in future
EXISTING
![Page 15: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/15.jpg)
16
Reducing conflict between transit and bicycle movement
![Page 16: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/16.jpg)
Proposed Transit Service Changes (subject to refinement)
17
![Page 17: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/17.jpg)
Nodal Development Opportunities created by proposed realignment
18
Whole Foods
Franklin Towers
Cathedral
Lincoln Park
Courthouse
Hampton Inn
![Page 18: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/18.jpg)
Nodal Development Opportunities created by proposed realignment
19
Whole Foods
Franklin Towers
Cathedral
Lincoln Park
Courthouse
Hampton Inn
Potential Locations for Development; Height TBD via Future Studies
![Page 19: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/19.jpg)
Marginal Way Intersection Treatment
20
![Page 20: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/20.jpg)
21
Conceptual Marginal Way Intersection Treatments (Options considered)
![Page 21: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/21.jpg)
22
Conceptual Marginal Way Intersection Treatments (Options considered)
![Page 22: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/22.jpg)
23
Conceptual Marginal Way Intersection Treatments (Options considered)
![Page 23: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/23.jpg)
24
Conceptual Marginal Way Intersection Treatments (Options considered)
![Page 24: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/24.jpg)
25
Conceptual Marginal Way Intersection Treatments (Suggested Option)
![Page 25: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/25.jpg)
Lincoln Park Expansion Alternatives
26
![Page 26: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/26.jpg)
Lincoln Park Expansion Alternatives
27
![Page 27: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/27.jpg)
Lincoln Park Expansion Alternatives
28
![Page 28: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/28.jpg)
Range of Street Reconnection Options based on Feasibility (subject to refinement)
29
![Page 29: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/29.jpg)
Range of Signalization Options based on Feasibility (subject to refinement)
30
HAWK beacon (High-Intensity Activated crossWalK beacon)
RRFB (Rectangular Rapid Flashing Beacons)
![Page 30: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/30.jpg)
Bike Treatments – Existing
31
![Page 31: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/31.jpg)
Bike Treatments – Proposed
32
![Page 32: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/32.jpg)
Examples of Bike Boxes
33
Philadelphia: http://portlandtransport.com/archives/2012/12/why_bike_boxes.html http://otrec.us/project/227
http://www.portlandmercury.com/BlogtownPDX/archives/2012
![Page 33: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/33.jpg)
Possible Parking Availability based on Feasibility (subject to refinement)
34
![Page 34: 10.8.14Franklin Street.pdf](https://reader034.vdocuments.us/reader034/viewer/2022051516/55cf9404550346f57b9f1a4c/html5/thumbnails/34.jpg)
Next Steps
35
December 2014 – March 2015: Finalize Recommendations • Public Workshop: October 1 • Refine transportation modeling: October-November • Streetscape/landscape recommendations: November-January • Final PAC Meeting: January • Create multi-phase implementation plan: January-February • Create approximate cost estimate: January-February • Final Study Report /TS&E/Council Approval: February-March April - June 2015 – Preliminary Design Report • Develop 60% construction plans • Probable cost estimate