1
Bridging the gap between business and IT
Introducing IT governance processes supported by SAP Solution Manager
Wim BorremansProgram Manager
Oliver BuyssensCompetence Lead SAP Solution Manager
SAPience.be Tech Day 2012
![Page 2: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/2.jpg)
2
Expertum
Founded begin 2006
Team of 50 SAP Experts and Project Managers
Mission : Providing superior long-term customer and employee value
Offering expertise in following domains• Finance
• Supply Chain Management
• Business Intelligence
• Product Lifecycle Management
• Project Management
• SAP Solution Manager
• GRC and Security
• Netweaver
• Own SME Solution: Value4SME
SAP Service Partner, Channel Partner, Value Circle Partner
SAPience.be Partner
SAPience.be Tech Day 2012
![Page 3: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/3.jpg)
3
Infrax
As multi-utility company, with strong local presence, it is our mission to deliver:• Trustworthy and safe utility networks at the lowest rates• A durable and innovative energy and water management• A qualitative and social service to our customers
SAPience.be Tech Day 2012
![Page 4: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/4.jpg)
4
Context – Pro-FIT Program
Incident, Problem and Change Request Management
Release Management
Critical Success Factors
Concrete Results
SAPience.be Tech Day 2012
![Page 5: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/5.jpg)
5
Context
Our IT organization has gone through a significant growth and many changes during the last few years as a consequence of multiple mergers:
• More complex organization• Bigger teams• Multiple locations• Collaboration internal / external resources• Big projects
SAPience.be Tech Day 2012
More structured way of working required
![Page 6: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/6.jpg)
6
Pro-FIT Program
The Pro-FIT program has the objective to improve our IT services in a structural way, introducing:• More controlled and measureable IT processes• A knowledgeable, efficient and scalable IT organization• Better IT management tools
Following an end-to-end approach involving not only IT but also business:• Increased transparency between business and IT• Added value for Infrax as an organization
Implemented in an iterative way:• Full roadmap including 8 iterations• Small iterations of manageable size• Deliver value early and keep the momentum• Continuous improvement
SAPience.be Tech Day 2012
![Page 7: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/7.jpg)
7
Key Benefits
ITClear roles and responsibilities
More focus
Realistic workload
Better tools
More scalable organisation
BusinessMore transparency and involvement
Better quality
Better planning
More cost awareness
SAPience.be Tech Day 2012
![Page 8: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/8.jpg)
8
Pro-FIT Roadmap
Based on the COBIT framework• Objective evaluation of current maturity level• Short and long term targets based on business and IT objectives
SAPience.be Tech Day 2012
![Page 9: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/9.jpg)
9
Context – Pro-FIT Program
Incident, Problem and Change Request Management
Release Management
Critical Success Factors
Concrete Results
SAPience.be Tech Day 2012
![Page 10: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/10.jpg)
10
Categorisation
+2500 tickets per month are now categorized into incidents, service request, problems and change requestsThis leads to:• Better visibility – Tool reflects actual situation• More focus – Distinction between 1st / 2nd / 3rd line
SAPience.be Tech Day 2012
![Page 11: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/11.jpg)
11
Dedicated Processes
Each category of tickets, triggers a specific processIntroducing• Ownership – Each process is end-to-end followed up by one
responsible• Clear roles and responsibilities – Everybody involved in
the process knows exactly what is expected from them
SAPience.be Tech Day 2012
![Page 12: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/12.jpg)
12
Demo
SAPience.be Tech Day 2012
Incident and problem management in SAP Solution Manager
![Page 13: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/13.jpg)
13
Agenda
Context – Pro-FIT Program
Incident, Problem and Change Request Management
Release Management
Critical Success Factors
Concrete Results
SAPience.be Tech Day 2012
![Page 14: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/14.jpg)
14
Why Release Management?
SAPience.be Tech Day 2012
Objectives How to realize?
• Better prioritization of projects and change requests
• Involve PMO and business in the prioritization of projects / change requests and the definition of the release scope
• Realistic workload • Synergies in development and testing• Better capacity planning• More focus
• Stable production environment • Test on a representative and qualitative test environment
• Deploy release in a controlled way in production based on a tested and at release level defined cut-over plan
• Respect of scope and planning • Well defined and controlled release scope• Release planning with clear intermediate
milestones and go-live date
![Page 15: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/15.jpg)
15
Release Management Process
SAPience.be Tech Day 2012
Wijziging
Analyseren& inschatten Toestaan Plannen Implementeren Afsluiten
Project
Registreren
Beheer van releases (Applicatie)
Wijziging
Analyseren& inschatten Toestaan Plannen Implementeren Deployen AfsluitenRegistreren Valideren
Standaard
Build(D)
Integratie(U)
Productie(P)
Acceptatie(T)
Project
CorrectiefEvolutief
Preventief
Valideren
Onderhoud
Project
Technisch
Urgent
Beheer van releases (Infrastructuur)
AfsluitenPlannen
Deployen
![Page 16: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/16.jpg)
16
Data Model
SAPience.be Tech Day 2012
Change Request
Standard
Corrective
Preventive
Evolutive
ProjectMaintenance
Implementation
Change Document
General
SAP Normal
SAP Standard
SAP Urgent
Defect Correction
Transport
Transport Task
Incident
Problem
![Page 17: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/17.jpg)
17
End-to-End Integrated Solution
SAPience.be Tech Day 2012
SAP CRM
SAP ERPSAP Solution Manager
Project
CharmQuality Gate Management
IMG Project
IMG ProjectChange Request
Change Document Transport
Transport Task
Transport
Transport Task
Ticket
Problem
![Page 18: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/18.jpg)
18
Demo
SAPience.be Tech Day 2012
Change request and release management in SAP Solution Manager
![Page 19: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/19.jpg)
19
Agenda
Context – Pro-FIT Program
Incident, Problem and Change Request Management
Release Management
Critical Success Factors
Concrete Results
SAPience.be Tech Day 2012
![Page 20: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/20.jpg)
20
Critical Success Factors
SAPience.be Tech Day 2012
Process Organization Tools• First define the process and align the organization
• SAP Solution Manager only introduced in a second phase
Standard SAP Solution Manager implementation• Standard SAP solution as starting point
• Proper analysis phase – aiming for zero-gap implementation
Successful and intense collaboration between different partners• Infrax process owners
• Entrust-it – Project management, process definition, change management in organization
• Expertum – SAP Solution Manager implementation
![Page 21: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/21.jpg)
21
Agenda
Context – Pro-FIT Program
Incident, Problem and Change Request Management
Release Management
Critical Success Factors
Concrete Results
SAPience.be Tech Day 2012
![Page 22: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/22.jpg)
22
Concrete Results
SAPience.be Tech Day 2012
Implementation SAP Solution Manager• Project duration – 4 months
• Total effort – 250 man days
Application maintenance cost reduced by 30%
Some statistics (as of July 2012 to date)• +19.000 incidents / service requests
• +100 problems
• +1.200 change requests and +1.100 change documents
• 25 projects
![Page 23: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/23.jpg)
23
Contact Details
SAPience.be Tech Day 2012
Wim Borremans
entrust-it - Managing Partner
W http://www.entrust-it.be
M +32 477 59 72 76
Oliver Buyssens
Expertum - CL
W http://www.expertum.net
M +32 471 60 95 00
![Page 24: 1. sa pience be_tech_day_2012_-_infrax](https://reader034.vdocuments.us/reader034/viewer/2022051612/54c32d7d4a79596c478b46f4/html5/thumbnails/24.jpg)
Thank you!
24SAPience.be Tech Day 2012