Agenda
Introduction Process Design/redesign Measures Implementation
Challenges How to overcome them Implementation steps
![Page 3: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/3.jpg)
3
Introduction
Bob Fantina Business Process Analyst at RIM Past Experience:
AT&T – Piscataway, NJ Lucent Technologies- Liberty Corner, NJ Merrill Lynch – Princeton, NJ Motorola – Plantation, FL NorthwesTel, Whitehorse, YT
Author Practical Software Process Improvement
![Page 4: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/4.jpg)
4
The Steps
Draft the ‘as is’ What happens today
![Page 5: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/5.jpg)
5
The Steps
Validate the ‘as is’ Identify and meet with pertinent stakeholders
![Page 6: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/6.jpg)
6
The Steps
Validate the ‘as is’ Identify and meet with pertinent stakeholders
80/20 Rule
![Page 7: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/7.jpg)
7
The Steps
Create the ‘to be’ Meet with the pertinent stakeholders
Workshop format is best.
![Page 8: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/8.jpg)
8
The Steps
Validate the ‘to be’
![Page 9: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/9.jpg)
9
The Steps
Establish viable measures
![Page 10: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/10.jpg)
10
Measurable Concepts
Call response time Mean time to repair Number of defects found per phase Number of defects introduced per phase Etc.
![Page 11: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/11.jpg)
11
Measurement Constructs
Base Measure(s)
Derived Measure(s)
Indicators
RawInformation
Combined base measures
Evaluation ofcaptured
data
![Page 12: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/12.jpg)
12
Indicator
Analysis
Derived measure Derived measure
Measurement Function
Base Measurement Base MeasurementData
CollectionLevel – Single
Attribute
Two or moremeasures
Measure usable for decision-making
![Page 13: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/13.jpg)
13
Indicator
Analysis
Derived measure Derived measure
Measurement Function
Base Measurement Base MeasurementData
CollectionLevel – Single
Attribute
Two or moremeasures
Measure usable for decision-making
(Target) (Actual)
(Formula to combine basemeasurements)
(Variance fromtarget to actual)
(Formula to combinederived measures with
associated decision criteria)
Information in a context for decision-making
![Page 14: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/14.jpg)
14
Process Implementation
You have now established: The ‘as is’ The ‘Should be’ Viable measures
![Page 15: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/15.jpg)
15
Now Comes the Hard Part
Implementation
![Page 16: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/16.jpg)
16
Exercise
Silent Brainstorming List reasons you have experienced that have
caused problems in implementing a new process.
(5 minutes)
![Page 17: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/17.jpg)
17
Implement the New or Redesigned Process Why is this so hard?
Resistance to change People are accustomed to doing things a certain
way. Even if they are unhappy with the process, they see the need for other people to change what they are doing.
![Page 18: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/18.jpg)
18
Implement the New or Redesigned Process Why is this so hard?
Fear of Learning Something New Sometimes people lack the confidence to learn
new skills. A process change often requires the learning of new tools, methodologies, etc.
![Page 19: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/19.jpg)
19
Implement the New or Redesigned Process Why is this so hard?
Fear of Failure If someone is successful in what they do, they
may not want to change it.
![Page 20: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/20.jpg)
20
Implement the New or Redesigned Process Skepticism
Seen as current management fad or buzzword.
“We’ve been down this road before.”
![Page 21: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/21.jpg)
21
Implement the New or Redesigned Process Why is this so hard?
Turf issues A new or redesigned process may make
information that was previously in the hands of one or two people more readily available. For some people, this may pose a threat to their expertise.
![Page 22: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/22.jpg)
22
Implement the New or Redesigned Process These may be masked by the ‘time’ excuse.
“This will slow us down.” “We don’t have time for all this paperwork.”
![Page 23: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/23.jpg)
23
Succeeding in Process Implementation
The Step to Success
![Page 24: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/24.jpg)
24
Assure Executive Ownership
Who is responsible for the success of the implementation? This may be the project sponsor, but it could
also be someone else with a significant stake in the success of the new or redesigned process.
![Page 25: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/25.jpg)
25
Communication
Let impacted stakeholders know well in advance that a change is coming. Provide information, when it is known, about
the change. Maintain communication on an ongoing basis.
![Page 26: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/26.jpg)
26
Assess Readiness
Determine who is impacted
![Page 27: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/27.jpg)
27
Assess Readiness
Determine who is impacted
X
![Page 28: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/28.jpg)
28
Assess Readiness
Readiness: The degree to which a stakeholder group is receptive to the implementation of the new or redesigned process. High Readiness: Stakeholder group views the
change as desirable. Low Readiness: Lack of interest; views the
changes as negatively impacting individual work, the organization, etc.
![Page 29: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/29.jpg)
29
Assess Readiness
How ‘ready’ is each group?
![Page 30: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/30.jpg)
30
Assess Readiness
How ‘ready’ is each group?
H
![Page 31: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/31.jpg)
31
Disruption Assessment
How disruptive will be change be to the impacted stakeholders? High disruption: Lots of turmoil, cost,
confusion and loss expected during implementation.
Low disruption: Very little turmoil, cost or loss of work.
![Page 32: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/32.jpg)
32
Assess Disruption
How ‘disruptive’ will the change be to each group?
![Page 33: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/33.jpg)
33
Assess Disruption
How ‘disruptive’ will the change be to each group?
H
![Page 34: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/34.jpg)
34
Readiness vs. Disruption
Evaluate readiness vs. disruption for all impacted stakeholder groups.
![Page 35: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/35.jpg)
35
Readiness vs. Disruption
Evaluate readiness vs. disruption for all impacted stakeholder groups.
H
H
![Page 36: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/36.jpg)
36
Overcoming Barriers
Low Readiness/High Disruption Meet with these stakeholders individually.
Determine their objections; often what they state is not the real reason.
For example, no one is going to say that the new process encroaches on his/her turf.
Determine how to overcome their hesitancy. Easier said than done.
![Page 37: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/37.jpg)
37
Overcoming Barriers
Resistance to change: Frequent, ongoing communication.
Give people the opportunity to get used to the ides of the change.
![Page 38: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/38.jpg)
38
Overcoming Barriers
Fear of Learning Something New: Communication should include that training,
mentoring and coaching will be provided prior to rollout.
Assure impacted stakeholders that they will not be left on their own to learn the new process.
Also assure them that everyone will have training, mentoring and coaching; no one will be singled out because he/she ‘just isn’t getting it.’
![Page 39: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/39.jpg)
39
Overcoming Barriers
Fear of Failure: Closely related to ‘fear of learning something
new.’ Assure impacted stakeholders that no one
expects them to become expert overnight. Learning the new process and becoming proficient with it will take everyone some time, and management is invested in providing support for as long as it takes.
![Page 40: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/40.jpg)
40
Overcoming Barriers
Latest Buzzword Syndrome: Engage management
At the start of the project to create or redesign the process
Periodically during the project At the start of training At the start of process implementation.
![Page 41: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/41.jpg)
41
Overcoming Barriers
Turf Issues: The most difficult to determine, and to
overcome. Encourage this person to become the SME for
the new process. If you have an idea early on that someone has
turf issues, try to involve him/her in the design of the new process.
Engage upper management.
![Page 42: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/42.jpg)
42
Overcoming Barriers
None of these is a ‘silver bullet.’ Combinations and variations of each will be
required for successful implementation.
![Page 43: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/43.jpg)
43
Training
Know your audience Different impacted stakeholder groups may
require very different training. ‘One size fits all’ may not work.
![Page 44: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/44.jpg)
44
Pilot
Select a subset of the impacted stakeholders, if possible. The new or redesigned process may not lend
itself to usage by a subset of the organization. The timeframe for the pilot should be short,
but sufficient to go through the process, end to end.
![Page 45: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/45.jpg)
45
Pilot
Training should be provided to the pilot participants before it is delivered to the larger group. Adjustment made as a result of the pilot may
alter the training.
![Page 46: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/46.jpg)
46
Pilot
Piloting should include close mentoring.
![Page 47: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/47.jpg)
47
‘Tweak’
Some adjustments may be made based on the pilot. Feedback received during the pilot should be
used to make the necessary adjustments before rollout.
![Page 48: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/48.jpg)
48
Rollout
After the pilot (if a pilot is held) Scheduled as far in advance as possible.
Let people know it is coming. Provide coaching and mentoring as
necessary. Be aware that both will probably be more
necessary than many of the participants will realize.
![Page 49: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/49.jpg)
49
Continuous Improvement
Capture the pre-determined metrics. Assure that the process is providing the
expected benefit. Adjust as necessary.
![Page 50: 1 Process Implementation The Hard Part of Process Improvement](https://reader035.vdocuments.us/reader035/viewer/2022062619/55169438550346f6208b47ea/html5/thumbnails/50.jpg)