NIRANTHARA JYOTHI SCHEME:NIRANTHARA JYOTHI SCHEME:
Niranthara Jyothi Project is a prestigious scheme of Niranthara Jyothi Project is a prestigious scheme of Government of Karnataka, to provide 24 hrs 3 phase Government of Karnataka, to provide 24 hrs 3 phase power supply to non-agricultural loads like domestic, power supply to non-agricultural loads like domestic, commercial, water supply, street light, rural commercial, water supply, street light, rural industries, milk dairies etc., in rural areas by industries, milk dairies etc., in rural areas by segregating the agricultural loads, which is a boon to segregating the agricultural loads, which is a boon to the rural economy. the rural economy.
Objectives :Objectives : This will enable BESCOM to give 24X7 supply to Non-This will enable BESCOM to give 24X7 supply to Non-
Agricultural loads in Rural areasAgricultural loads in Rural areas
Reduction in transformer failureReduction in transformer failure
Increase in metered salesIncrease in metered sales
Reduction in technical lossesReduction in technical losses
Improved load managementImproved load management The plan of implementation and progress is shown separately.The plan of implementation and progress is shown separately.
NIRANTHARA JYOTHI SCHEME
• Phase IPhase I– 25 Lots, 261 feeders, 19 taluks.25 Lots, 261 feeders, 19 taluks.– Project cost :Rs 355.85 cr.Project cost :Rs 355.85 cr.– Expected completion : Dec-2013.Expected completion : Dec-2013.
• Phase IIPhase II– 24 lots, 289 feeders, 23 taluks. 24 lots, 289 feeders, 23 taluks. – Project cost :Rs 385.71 cr.Project cost :Rs 385.71 cr.– Work Award issued for 6 Lots(86 feeders), Work Award issued for 6 Lots(86 feeders), DWA issued in Nov 2011, Jan-2012 & works are under progress.DWA issued in Nov 2011, Jan-2012 & works are under progress.– Work Award issued for 10 Lots (96 feeders) , Work Award issued for 10 Lots (96 feeders) , DWA issued in Oct, Nov 2012 & Works are under progress.DWA issued in Oct, Nov 2012 & Works are under progress.– For the 5 Lots (57 feeders), LOI is issued , DWA issued in May 2013 Work under For the 5 Lots (57 feeders), LOI is issued , DWA issued in May 2013 Work under
ProgressProgress– For the 2 Lot ( 34 feeders), LOI is issued , DWA issued in June 2013 Work under For the 2 Lot ( 34 feeders), LOI is issued , DWA issued in June 2013 Work under
ProgressProgress– For the 1 Lot ( 14 feeders),DWA issued in Oct-2013 Work under Progress.For the 1 Lot ( 14 feeders),DWA issued in Oct-2013 Work under Progress.– Note: Out of Proposed 289 feeders,287 feeders work executed by PTK and 2 feeders Note: Out of Proposed 289 feeders,287 feeders work executed by PTK and 2 feeders
are to be executed by Departmentally.are to be executed by Departmentally.
STAGES OF IMPLEMENTATION
2
3
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Physical Progress of Phase-I
STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM4
Sl NoName of the
DistrictDivision
Name of the Taluk
No. of village
s covere
d
No. of existing feeders
No. of proposed
NJ feeders
Estimate cost (Rs. in Lakhs)
As per DPR
Progress Achieved
Completion
Date Feeders
completed
Feeders commision
ed
1 KolarKolar(pilot project)
Malur 272 20 10 18.67 10 10
Feb-14
2 RamanagaraRamanagara
Kanakapura 483 31 19 3184.78 18 18
3 RamanagaraRamanagara
Magadi 26 1 1 140.42 1 1
4 ChitadurgaChitradurga
Hosadurga 208 19 13 1606.12 13 13
5 Davanagere DVG Channagiri 147 53 18 1667.33 18 18
6 Davanagere HariharaHarapanahalli
113 18 10 1616.06 10 10
7 ChikkaballapuraCB pura Bagepalli 272 17 12 1588.41 12 128 Tumkur Tumkur Kunigal 414 23 16 2718.96 16 169 Tumkur Madhugiri Madhugiri 259 31 18 1897.95 18 18
10 Tumkur Tumkur Gubbi 185 68 11 1824.75 11 1111 Tumkur Madhugiri Sira 289 26 17 2423.93 17 1712 Davanagere Harihara Honnali 103 29 11 1194.42 11 1013 Chitradurga Hiriyur Hiriyur 237 29 16 2455.56 16 1614 Davanagere DVG Jagalur 106 13 9 1218.54 9 915 ChikkaballapuraChintamani Siddlaghatta 268 26 13 1969.07 13 1316 Bangalore RuralYalahanka Hosakote 222 35 18 2469.73 18 18
17 Bangalore RuralChandapura
Anekal 86 8 5 1102.06 5 5
18 Tumkur Tumkur Tumkur 569 60 25 3179.20 25 2519 Tumkur Tiptur Tiptur 224 23 12 1877.97 12 1220 Bangalore RuralYalahanka Devanahalli 208 25 17 1450.45 17 17
Total 4691 555 271 35604.38 270 269
5
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Physical Progress of Phase-II
STATUS OF NIRANTHARA JYOTHI PHASE-II IN BESCOM
6
Sl NoName of the
DistrictName of
the Division Name of the
Taluk
LOT
NO.
No. of village
s covere
d
No. of existin
g feeder
s
No. of proposed NJ feeder
s
Estimate cost
(Rs. in Lakhs)
As per DPR
Progress Achieved
Completion
Date Feeders complet
ed
Feeders commisi
oned
1 Bangalore Rural NelamangalaDoddaballapu
ra1 240 26 17 1283.81 9 7
March-14
2 Bangalore Rural Nelamangala Nelamangala 2 235 7 7 1828.84 2 23 Ramanagara Ramanagar Ramanagara 3 20 1 1 301.97 WUP _4 Ramanagara Ramanagara Channapatna 4 168 21 10 2014.55 1 15 Tumkur Madhugiri Koratagere 9 212 17 11 1513.75 8 46 Tumkur Tiptur Turuvekere 6 207 22 14 2043.53 3 _ 7 Tumkur Tumkur Gubbi (part)** 5 190 23 14 1867.91 7 3
8 Tumkur TipturChikkanayaka
nahalli(Lot-8)
8 179 15 8 1434.704 2 2
9 Tumkur TipturChikkanayaka
nahalli(Lot-7)
7 157 15 7 1255.366 6 3
10 Kolar KGF Bangarpet 10 356 33 16 2229.28 WUP _11 Kolar KGF Mulbagal 11 233 21 12 1876.28 7 512 Kolar Kolar Kolar 12 258 40 21 2292.5 12 913 Kolar Chintamani Chintamani 13 300 33 15 2196.41 12 814 Kolar Kolar Srinivaspura 14 328 33 13 2372.22 3 _
15 ChikkaballapuraChikkaballapur
aChikkaballapu
ra15 156 16 11 1392.63 8 5
16 ChikkaballapuraChikkaballapur
aGowribidanur 16 318 31 19 2303.21 10 3
17 ChikkaballapuraChikkaballapur
aGudibande 17 77 5 3 487.67 2 _
18 Chitradurga Chitradurga Chitradurga 18 183 24 16 1346.22 1 _19 Chitradurga Chitradurga Holalkere 19 194 32 14 1761.23 WUP _20 Chitradurga Hiriyur Challakere 20 173 26 13 1807.49 _ _21 Chitradurga Hiriyur Molakalmur 21 142 25 10 1480.78 3 222 Davangere Harihara Harihara** 22 58 20 10 705.05 3 123 Davanagere Davanagere Davanagere 23 129 42 18 1859.4 3 2
24 Tumkur TumkurTumkur part 3
(Additional NJY)
24 94 14 9 917 8 8
Total 4607 542 289 38571.80 110 65