douglas county sewer improvement district no. 1 muller ......douglas county sewer improvement...

109

Upload: others

Post on 25-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract
Page 2: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Specifications Table of Contents Page 1 of 1

2017

Division Section Title Pages

SPECIFICATIONS GROUP

General Requirements Subgroup

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY 3

012000 PRICE AND PAYMENT PROCEDURES 5

012500 SUBSTITUTION PROCEDURES 2

013000 ADMINISTRATIVE REQUIREMENTS 5

013216 CONSTRUCTION PROGRESS SCHEDULE 4

013300 SUBMITTAL PROCEDURES 6

014000 QUALITY REQUIREMENTS 4

015000 TEMPORARY FACILITIES AND CONTROLS 6

016000 PRODUCT REQUIREMENTS 2

017000 EXECUTION AND CLOSEOUT REQUIREMENTS 6

Facility Construction Subgroup

DIVISION 03 - CONCRETE

033000 CAST-IN-PLACE CONCRETE 7

Site and Infrastructure Subgroup

DIVISION 31 - EARTHWORK

310513 AGGREGATES AND SOILS FOR EARTHWORK 3

312316 EXCAVATION 3

312317 TRENCHING 5

312318 ROCK REMOVAL 2

312319 DEWATERING 5

312323 FILL 4

312324 FLOWABLE FILL 6

312500 EROSION AND SEDIMENTATION CONTROLS 4

DIVISION 33 - UTILITIES

330517 PRECAST CONCRETE VALVE VAULTS AND METER BOXES 5

330526 UTILITY IDENTIFICATION 2

331216 SPECIALTY VALVES 6

333400 SANITARY UTILITY SEWERAGE FORCE MAINS 7

END OF TABLE OF CONTENTS

Page 3: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SUMMARY 011000 Page 1 of 3

2017

SECTION 01 10 00 - SUMMARY

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Contract description.

2. Work by Owner or other Work at the Site.

3. Owner-furnished products.

4. Contractor's use of Site and premises.

5. Future work.

6. Work sequence.

7. Owner occupancy.

8. Permits.

9. Specification conventions.

1.2 CONTRACT DESCRIPTION

A. Work of the Project includes construction of two each new line connections between the DCSID

No. 1 existing effluent force main parallel to Muller Lane and the new the 12-inch restrained Ductile

Iron Pipe (DIP) replacement force main section constructed under CONTRACT A. The work

includes installing approximately 55± LF of new 12-inch restrained joint polyethylene encased TR-

Flex DIP with restrained elbows, fittings, couplings and thrust blocks, as well as the draining,

demolition, removal and abandonment in place with slurry fill of the existing effluent force main

within NDOT ROW as shown on the Drawings. The Work also includes supplying and installing a

new precast PCC valve vault with lid and H-20 rated aluminum access hatch and smart cover level

sensing system, as well as the supply and installation of a new 12-inch full port plug valve and bypass

line complete with 6-inch pressure relief valve and 6-inch isolation valves. The Work also includes

pressure testing the newly installed piping prior to connection. Final pressure testing of the system

after connections to the existing force main are in place will be accomplished through line working

pressure with two (2) of the existing DCSID effluent export pumps in operation.

B. Perform Work of Contract under executed Contract with Owner according to Conditions of

Contract.

1.3 CONTRACTOR'S USE OF SITE AND PREMISES

A. Limit use of Site and premises to allow:

1. Use of Site and premises by the public is limited to pedestrian, vehicular and cycling traffic

within NDOT ROW along Muller Lane. Contractor shall provide temporary lane closure to

allow for all traffic to safely travel along Muller Lane at the Brockliss Slough and project

area during the course of construction.

2. The Parcel Owner of the property on which the Project is located may have cattle grazing

near the project. The Contractor shall be responsible for erecting and maintaining temporary

barriers (e.g. temporary barbed wire fencing) to prevent cattle from entering the project area

delineated on the plans.

Page 4: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 3 SUMMARY 011000

2017

B. Construction Plan: Before start of construction, submit electronic copy of construction plan

regarding access to Work, use of Site, and utility outages for acceptance by Owner. Also provide

electronic copy of traffic control plan. After acceptance of plans, construction operations shall

comply with accepted plans unless deviations are accepted by Owner in writing.

1.4 WORK SEQUENCE

A. Construct Work in stages during construction period. Coordinate construction schedule and

operations with Engineer:

1. Stage 1: Locate existing utilities, set BMPs and temporary facilities.

2. Stage 2: Excavate, trench, bed and install restrained joint DIP necessary to reach connection

with existing sewer force main. DO NOT MAKE CONNECTION TO EXISTING FORCE

MAIN.

a. Pressure test newly installed lines up to point prior to connection with existing force

main.

3. Stage 3: UTILITY SHUTDOWN REQUIRED.

a. Coordinate with OWNER 48 hours in advance of force main shutdown. Owner will

commence dewatering of effluent force main to place of use for the temporary

discharge permit TNS-43521, identified as the Park Ranch West of the East Fork of the

Carson River.

1) OWNER will ensure force main line pressure is bled to 30 PSI or less.

2) OWNER will ensure that force main cannot receive new flow for duration of work.

Dewater the remaining portion of the effluent force main.

b. Drain residual effluent from force main, approximately 150,000± gallons, and dispose

of at DCSID approved location.

c. Perform intertie connections to existing sewer force main and install isolation valve and

bypass line.

d. Perform pressure test on complete installation under normal working pressure with two

existing export pumps in operation. Test the bypass line by temporarily closing the 12-

inch isolation valve.

B. Sequencing of Construction Plan: Before start of construction, submit electronic copy of

construction plan regarding phasing of force main relocation and all new Work, including

shutdowns, for review by ENGINEER and acceptance by OWNER. After acceptance of plan,

construction sequencing shall comply with accepted plan unless deviations are first reviewed by

ENGINEER and accepted by OWNER in writing.

1.5 OWNER OCCUPANCY

A. Schedule and substantially complete designated portions of the Work for occupancy before

Substantial Completion of the entire Work.

1. Owner intends to occupy, operate and maintain the existing sewer force main throughout the

duration of the project, except for the 12-hour maximum shutdown as described above.

2. Owner's use and occupancy of designated areas before Substantial Completion of the entire

Project do not relieve Contractor of responsibility to maintain specified insurance coverages

on a 100 percent basis until date of final payment.

B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.

Page 5: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SUMMARY 011000 Page 3 of 3

2017

C. Schedule the Work to accommodate Owner occupancy.

1.6 PERMITS

A. The Owner has applied for the following necessary permits for construction of Work including

the following:

1. Douglas County Site Improvement Permit (Contractor to pick up before start of Work)

2. Nevada Department of Transportation (NDOT) Encroachment Permit for work in Muller

Lane right of way.

1.7 SPECIFICATION CONVENTIONS

A. These Specifications are written in imperative mood and streamlined form. This imperative

language is directed to Contractor unless specifically noted otherwise. The words "shall be" are

included by inference where a colon (:) is used within sentences or phrases.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 6: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contact B

PRICE AND PAYMENT PROCEDURES 012000 Page 1 of 5

2017

SECTION 01 20 00 - PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Schedule of Values.

B. Application for Payment.

C. Change procedures.

D. Defect assessment.

E. Unit prices.

F. Alternates.

1.2 CASH ALLOWANCES – Not Used.

1.3 SCHEDULE OF VALUES

A. Submit schedule on Progress Estimate schedule on EJCDC C-620. Contractor's standard form or

electronic media printout will be considered for this use.

B. Submit Schedule of Values electronically within 15 days after date of Owner-Contractor

Agreement established in Notice to Proceed.

C. Format: Use Table of Contents of this Project Manual. Identify each line item with number and

title of major Specification Section. Also identify Site mobilization, bonds and insurance, and

general requirements.

D. Include within each line item, direct proportional amount of Contractor's overhead and profit.

E. Revise schedule to list approved Change Orders with each Application for Payment.

1.4 APPLICATION FOR PAYMENT

A. Submit electronically each Application for Payment on EJCDC C-620 - Contractor's Application

for Payment.

B. Content and Format: Use Schedule of Values for listing items in Application for Payment.

C. Submit updated construction schedule with each Application for Payment.

D. Payment Period: Submit at intervals stipulated in the Agreement.

E. Submit submittals with transmittal letter as specified in Section 01 33 00 - Submittal Procedures.

Page 7: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 5 PRICE AND PAYMENT PROCEDURES 012000

2017

F. Submit three original copies of any waivers requested by Owner.

G. Substantiating Data: When Engineer requires substantiating information, submit data justifying

dollar amounts in question. Include the following with Application for Payment:

1. Current construction photographs specified in Section 01 33 00 - Submittal Procedures.

2. Partial release of liens from major Subcontractors and vendors.

3. Record Documents as specified in Section 01 70 00 - Execution and Closeout Requirements,

for review by Owner, which will be returned to Contractor.

4. Affidavits attesting to off-Site stored products.

5. Construction Progress Schedule, revised and current as specified in Section 01 33 00 -

Submittal Procedures.

1.5 CHANGE PROCEDURES

A. Submittals: Submit name of individual who is authorized to receive change documents and is

responsible for informing others in Contractor's employ or Subcontractors of changes to the

Work.

B. Carefully study and compare Contract Documents before proceeding with fabrication and

installation of Work. Promptly advise Engineer of any error, inconsistency, omission, or apparent

discrepancy.

C. Requests for Interpretation (RFI) and Clarifications: Allot time in construction scheduling for

liaison with Engineer; establish procedures for handling queries and clarifications.

1. Use Contractor’s standard form for requesting interpretations.

2. Engineer may respond with a direct answer on the Request for Interpretation form, EJCDC

C-942 - Field Order, or Proposal Request.

D. Engineer will advise of minor changes in the Work not involving adjustment to Contract

Sum/Price or Contract Time by issuing supplemental instructions on EJCDC C-942.

E. Engineer may issue Proposal Request including a detailed description of proposed change with

supplementary or revised Drawings and Specifications, a change in Contract Time for executing

the change. Contractor will prepare and submit estimate within ten days.

F. Contractor may propose changes by submitting a request for change to Engineer, describing

proposed change and its full effect on the Work. Include a statement describing reason for the

change and the effect on Contract Sum/Price and Contract Time with full documentation and a

statement describing effect on the Work by separate or other Contractors.

G. Stipulated Sum/Price Change Order: Based on Proposal Request and Contractor's fixed price

quotation or Contractor's request for Change Order as approved by Engineer.

H. Unit Price Change Order: For Contract unit prices and quantities, the Change Order will be

executed on a fixed unit price basis. For unit costs or quantities of units of that which are not

predetermined, execute Work under Work Directive Change. Changes in Contract Sum/Price or

Contract Time will be computed as specified for Time and Material Change Order.

Page 8: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contact B

PRICE AND PAYMENT PROCEDURES 012000 Page 3 of 5

2017

I. Work Directive Change: Engineer may issue directive, on EJCDC C-940 - Work Change

Directive signed by Owner, instructing Contractor to proceed with change in the Work, for

subsequent inclusion in a Change Order. Document will describe changes in the Work and

designate method of determining any change in Contract Sum/Price or Contract Time. Promptly

execute change.

J. Time and Material Change Order: Submit itemized account and supporting data after completion

of change, within time limits indicated in Conditions of the Contract. Engineer will determine

change allowable in Contract Sum/Price and Contract Time as provided in Contract Documents.

K. Maintain detailed records of Work done on time and material basis. Provide full information

required for evaluation of proposed changes and to substantiate costs for changes in the Work.

L. Document each quotation for change in Project Cost or Time with sufficient data to allow

evaluation of quotation.

M. Change Order Forms: EJCDC C-941 - Change Order.

N. Execution of Change Orders: Engineer will issue Change Orders for signatures of parties as

provided in Conditions of the Contract.

O. Correlation of Contractor Submittals:

1. Promptly revise Schedule of Values and Application for Payment forms to record each

authorized Change Order as separate line item and adjust Contract Sum/Price.

2. Promptly revise Progress Schedules to reflect change in Contract Time, revise subschedules

to adjust times for other items of Work affected by the change, and resubmit.

3. Promptly enter changes in Record Documents.

1.6 DEFECT ASSESSMENT

A. Replace the Work, or portions of the Work, not conforming to specified requirements.

B. If, in the opinion of Engineer, it is not practical to remove and replace the Work, Engineer will

direct appropriate remedy or adjust payment.

C. The defective Work may remain, but unit sum/price will be adjusted to new sum/price reduced 50

percent at discretion of Owner upon recommendation by Engineer.

D. Defective Work will be partially repaired according to instructions of Engineer, and unit

sum/price will be adjusted to new sum/price reduced 50 percent at discretion of Owner upon

recommendation of Engineer.

E. Individual Specification Sections may modify these options or may identify specific formula or

percentage sum/price reduction.

F. Authority of Engineer to assess defects and identify payment adjustments is final.

G. Nonpayment for Rejected Products: Payment will not be made for rejected products for any of the

following reasons:

Page 9: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 5 PRICE AND PAYMENT PROCEDURES 012000

2017

1. Products wasted or disposed of in a manner that is not acceptable.

2. Products determined as unacceptable before or after placement.

3. Products not completely unloaded from transporting vehicle.

4. Products placed beyond lines and levels of the required Work.

5. Products remaining on hand after completion of the Work.

6. Loading, hauling, and disposing of rejected products.

1.7 UNIT PRICES

A. Authority: Measurement methods are delineated in individual Specification Sections.

B. Measurement methods delineated in individual Specification Sections complement criteria of this

Section. In event of conflict, requirements of individual Specification Section govern.

C. Take measurements and compute quantities. Engineer will verify measurements and quantities.

D. Unit Quantities: Quantities and measurements indicated on Bid Form are for Contract purposes

only. Quantities and measurements supplied or placed in the Work shall determine payment.

Actual quantities provided shall determine payment.

1. When actual Work requires more or fewer quantities than those quantities indicated, provide

required quantities at contracted unit sum/prices.

2. When actual Work requires 25 percent or greater change in quantity than those quantities

indicated, Owner or Contractor may claim a Contract Price adjustment.

E. Payment Includes: Full compensation for required labor, products, tools, equipment, plant and

facilities, transportation, services and incidentals; erection, application, or installation of item of

the Work; overhead and profit.

F. Final payment for Work governed by unit prices will be made on basis of actual measurements

and quantities accepted by Engineer multiplied by unit sum/price for Work incorporated in or

made necessary by the Work.

G. Measurement of Quantities:

1. Linear Measurement: Measured by linear dimension, at item centerline or mean chord.

2. Stipulated Sum/Price Measurement: Items measured by weight, volume, area, or linear

means or combination, as appropriate, as completed item or unit of the Work.

1.8 ALTERNATES

A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option.

Accepted Alternates will be identified in Owner-Contractor Agreement. The Owner-Contractor

Agreement may identify certain Alternates to remain an Owner option for a stipulated period of

time.

B. Coordinate related Work and modify surrounding Work. Description for each Alternate is

recognized to be abbreviated but requires that each change shall be complete for scope of Work

affected.

1. Coordinate related requirements among Specification Sections as required.

Page 10: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contact B

PRICE AND PAYMENT PROCEDURES 012000 Page 5 of 5

2017

2. Include as part of each Alternate: Miscellaneous devices, appurtenances, and similar items

incidental to or necessary for complete installation.

3. Coordinate Alternate with adjacent Work and modify or adjust as necessary to ensure

integration.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 11: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SUBSTITUTION PROCEDURES 012500 Page 1 of 2

2017

SECTION 01 25 00 - SUBSTITUTION PROCEDURES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Quality assurance.

B. Product options.

C. Product substitution procedures.

1.2 QUALITY ASSURANCE

A. Contract is based on products and standards established in Contract Documents without

consideration of proposed substitutions.

B. Products specified define standard of quality, type, function, dimension, appearance, and

performance required.

C. Substitution Proposals: Permitted for specified products except where specified otherwise. Do not

substitute products unless substitution has been accepted and approved in writing by Owner.

1.3 PRODUCT OPTIONS

A. See Section 01 60 00 - Product Requirements.

1.4 PRODUCT SUBSTITUTION PROCEDURES

A. Engineer will consider requests for substitutions only within 15 days after date of Owner-

Contractor Agreement established in Notice to Proceed.

B. Substitutions may be considered when a product becomes unavailable through no fault of

Contractor.

C. Document each request with complete data, substantiating compliance of proposed substitution

with Contract Documents, including:

1. Manufacturer's name and address, product, trade name, model, or catalog number,

performance and test data, and reference standards.

2. Itemized point-by-point comparison of proposed substitution with specified product, listing

variations in quality, performance, and other pertinent characteristics.

3. Reference to Article and Paragraph numbers in Specification Section.

4. Cost data comparing proposed substitution with specified product and amount of net change

to Contract Sum.

5. Changes required in other Work.

6. Availability of maintenance service and source of replacement parts as applicable.

7. Certified test data to show compliance with performance characteristics specified.

8. Samples when applicable or requested.

Page 12: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 2 SUBSTITUTION PROCEDURES 012500

2017

9. Other information as necessary to assist Engineer's evaluation.

D. A request constitutes a representation that Bidder or Contractor:

1. Has investigated proposed product and determined that it meets or exceeds quality level of

specified product.

2. Will provide same warranty for substitution as for specified product.

3. Will coordinate installation and make changes to other Work that may be required for the

Work to be complete with no additional cost to Owner.

4. Waives claims for additional costs or time extension that may subsequently become

apparent.

5. Will coordinate installation of the accepted substitute, making such changes as may be

required for the Work to be complete in all respects.

6. Will reimburse Owner for review or redesign services associated with reapproval by

authorities having jurisdiction.

E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or

Product Data submittals without separate written request or when acceptance will require revision

to Contract Documents.

F. Substitution Submittal Procedure:

1. Submit requests for substitutions on Contractor’s standard form.

2. Submit electronic copies of Request for Substitution for consideration. Limit each request to

one proposed substitution.

3. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product

equivalence. Burden of proof is on proposer.

4. Engineer will notify Contractor in writing of decision to accept or reject request.

1.5 INSTALLER SUBSTITUTION PROCEDURES

A. Engineer will consider requests for substitutions only within 15 days after date of Owner-

Contractor Agreement established in Notice to Proceed.

B. Document each request with:

1. Installer's qualifications.

2. Installer's experience in work similar to that specified.

3. Other information as necessary to assist Engineer's evaluation.

C. Substitution Submittal Procedure:

1. Submit electronic copy of Request for Substitution for consideration. Limit each request to

one proposed substitution.

2. Engineer will notify Contractor in writing of decision to accept or reject request.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 13: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

ADMINISTRATIVE REQUIREMENTS 013000 Page 1 of 5

2017

SECTION 01 30 00 - ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Coordination and Project conditions.

B. Preconstruction meeting.

C. Site mobilization meeting.

D. Progress meetings.

E. Preinstallation meetings.

F. Closeout meeting.

G. Alteration procedures.

1.2 COORDINATION AND PROJECT CONDITIONS

A. Coordinate scheduling, submittals, and Work of various Sections of Project Manual to ensure

efficient and orderly sequence of installation of interdependent construction elements.

B. Verify that utility requirements and characteristics of operating equipment are compatible with

building utilities. Coordinate Work of various Sections having interdependent responsibilities for

installing, connecting to, and placing operating equipment in service.

C. Coordinate space requirements, supports, and installation of mechanical and electrical Work

indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit as

closely as practical; place runs parallel with lines of building. Use spaces efficiently to maximize

accessibility for other installations, for maintenance, and for repairs.

1. Coordination Drawings: Prepare as required to coordinate all portions of Work. Show

relationship and integration of different construction elements that require coordination

during fabrication or installation to fit in space provided or to function as intended. Indicate

locations where space is limited for installation and access and where sequencing and

coordination of installations are important.

D. Coordination Meetings: In addition to other meetings specified in this Section, hold coordination

meetings with personnel and Subcontractors to ensure coordination of Work.

E. Coordinate completion and clean-up of Work of separate Sections in preparation for Substantial

Completion and for portions of Work designated for Owner's occupancy.

F. After Owner's occupancy of premises, coordinate access to Site for correction of defective Work

and Work not complying with Contract Documents, to minimize disruption of Owner's activities.

Page 14: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 5 ADMINISTRATIVE REQUIREMENTS 013000

2017

1.3 PRECONSTRUCTION MEETING

A. Engineer will schedule and preside over meeting after Notice of Award.

B. Attendance Required: Engineer, Owner and Contractor.

C. Minimum Agenda:

1. Distribution of Contract Documents.

2. Designation of personnel representing parties in Contract, and Engineer.

3. Communication procedures.

4. Procedures and processing of requests for interpretations, field decisions, field orders,

submittals, substitutions, Applications for Payments, proposal request, Change Orders, and

Contract closeout procedures.

5. Scheduling.

6. Critical Work sequencing.

D. Contractor: Record minutes and distribute copies to participants within two days after meeting,

with copies each to Engineer, Owner, and those affected by decisions made.

1.4 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the Work at maximum bi-monthly

intervals.

B. Engineer will make arrangements for meetings, prepare agenda with copies for participants, and

preside over meetings.

C. Attendance Required: Job superintendent, major Subcontractors Contractors and suppliers, and

Engineer, Owner, as appropriate to agenda topics for each meeting.

D. Minimum Agenda:

1. Review minutes of previous meetings.

2. Review of Work progress.

3. Field observations, problems, and decisions.

4. Identification of problems impeding planned progress.

5. Review of submittal schedule and status of submittals.

6. Review of off-Site fabrication and delivery schedules.

7. Maintenance of Progress Schedule.

8. Corrective measures to regain projected schedules.

9. Planned progress during succeeding work period.

10. Coordination of projected progress.

11. Maintenance of quality and work standards.

12. Effect of proposed changes on Progress Schedule and coordination.

13. Other business relating to Work.

E. Contractor: Record minutes and distribute copies to participants within two days after meeting,

with copies each to Engineer, Owner, and those affected by decisions made.

Page 15: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

ADMINISTRATIVE REQUIREMENTS 013000 Page 3 of 5

2017

1.5 PREINSTALLATION MEETINGS

A. When required in individual Specification Sections, convene preinstallation meetings at Project

Site before starting Work of specific Section.

B. Require attendance of parties directly affecting, or affected by, Work of specific Section.

C. Notify Engineer four days in advance of meeting date.

D. Prepare agenda and preside over meeting:

1. Review conditions of installation, preparation, and installation procedures.

2. Review coordination with related Work.

E. Record minutes and distribute copies to participants within two days after meeting, with copies

each to Engineer, Owner, and those affected by decisions made.

1.6 CLOSEOUT MEETING

A. Schedule Project closeout meeting with sufficient time to prepare for requesting Substantial

Completion. Preside over meeting and be responsible for minutes.

B. Attendance Required: Contractor Construction Manager, major Contractors, major

Subcontractors, Engineer, Owner, and others appropriate to agenda.

C. Notify Engineer four days in advance of meeting date.

D. Minimum Agenda:

1. Start-up of facilities and systems.

2. Operations and maintenance manuals.

3. Testing, adjusting, and balancing.

4. System demonstration and observation.

5. Operation and maintenance instructions for Owner's personnel.

6. Contractor's inspection of Work.

7. Contractor's preparation of an initial "punch list."

8. Procedure to request Engineer inspection to determine date of Substantial Completion.

9. Completion time for correcting deficiencies.

10. Inspections by authorities having jurisdiction.

11. Certificate of Occupancy and transfer of insurance responsibilities.

12. Partial release of retainage.

13. Final cleaning.

14. Preparation for final inspection.

15. Closeout Submittals:

a. Project record documents.

b. Operating and maintenance documents.

c. Operating and maintenance materials.

d. Affidavits.

16. Final Application for Payment.

17. Contractor's demobilization of Site.

18. Maintenance.

Page 16: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 5 ADMINISTRATIVE REQUIREMENTS 013000

2017

E. Record minutes and distribute copies to participants within two days after meeting, with copies

each to Engineer, Owner, and those affected by decisions made.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION

3.1 ALTERATION PROCEDURES

A. Cooperate with Owner in scheduling operations to minimize conflict and to permit continuous

usage.

1. Perform Work not to interfere with operations of occupied areas.

2. Keep utility and service outages to a minimum and perform only after written approval of

Owner.

3. Clean Owner-occupied areas daily. Clean spillage, overspray, and heavy collection of dust in

Owner-occupied areas immediately.

B. Materials: As specified in product Sections; match existing products with new and salvaged

products for patching and extending Work.

C. Employ skilled and experienced installer to perform alteration and renovation Work.

D. Cut, move, or remove items as necessary for access to alterations and renovation Work. Replace

and restore at completion. Comply with Section 01 70 00 - Execution and Closeout

Requirements

E. Remove unsuitable material not marked for salvage, including rotted wood, corroded metals, and

deteriorated masonry and concrete. Replace materials as specified for finished Work.

F. Remove debris and abandoned items from area and from concealed spaces.

G. Prepare surface and remove surface finishes to permit installation of new Work and finishes.

H. Close openings in exterior surfaces to protect existing Work from weather and extremes of

temperature and humidity.

I. Remove, cut, and patch Work to minimize damage and to permit restoring products and finishes

to original or specified condition.

J. Where new Work abuts or aligns with existing Work, provide smooth and even transition. Patch

Work to match existing adjacent Work in texture and appearance.

K. When finished surfaces are cut so that smooth transition with new Work is not possible, terminate

existing surface along straight line at natural line of division and submit recommendation to

Engineer for review.

Page 17: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

ADMINISTRATIVE REQUIREMENTS 013000 Page 5 of 5

2017

L. Patch or replace portions of existing surfaces that are damaged, lifted, discolored, or showing

other imperfections.

M. Finish surfaces as specified in individual product Sections.

END OF SECTION

Page 18: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

CONSTRUCTION PROGRESS SCHEDULE 013216 Page 1 of 4

2017

SECTION 01 32 16 - CONSTRUCTION PROGRESS SCHEDULE

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Submittals.

B. Quality assurance.

C. Format for network analysis schedules.

D. Network analysis schedules.

E. Bar chart schedules.

F. Review and evaluation.

G. Updating schedules.

H. Distribution.

1.2 SUBMITTALS

A. Within five (5) days after date of Owner-Contractor Agreement, established in Notice to Proceed,

submit proposed preliminary network diagram defining planned operations for the Work of the

entire project.

B. Participate in review of preliminary and complete network diagrams jointly with Engineer.

C. Submit updated network schedules with each Application for Payment.

D. Submit network schedules under transmittal letter form specified in Section 01 33 00 - Submittal

Procedures.

E. Schedule Updates:

1. Overall percent complete, projected and actual.

2. Completion progress by listed activity and subactivity, to within five days prior to submittal.

3. Changes in Work scope and activities modified since submittal.

4. Delays in submittals or resubmittals, deliveries, or Work.

5. Adjusted or modified sequences of Work.

6. Other identifiable changes.

7. Revised projections of progress and completion.

F. Narrative Progress Report:

1. Submit with each submission of Progress Schedule.

2. Summary of Work completed during the past period between reports.

3. Work planned during the next period.

Page 19: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 4 CONSTRUCTION PROGRESS SCHEDULE 013216

2017

4. Explanation of differences between summary of Work completed and Work planned in

previously submitted report.

5. Current and anticipated delaying factors and estimated impact on other activities and

completion milestones.

6. Corrective action taken or proposed.

1.3 QUALITY ASSURANCE

A. Scheduler: Contractor's personnel specializing in CPM scheduling with two years' minimum

experience in scheduling construction work of complexity comparable to the Project.

B. Contractor's Administrative Personnel: Two years' minimum experience in using and monitoring

CPM schedules on comparable Projects.

1.4 FORMAT FOR NETWORK ANALYSIS SCHEDULE

A. Listings: Reading from left to right, in ascending order for each activity. Identify each activity

with applicable Specification Section number.

B. Diagram Sheet Size: 11 inches high x 17 inches wide.

C. Scale and Spacing: To allow for notations and revisions.

1.5 NETWORK ANALYSIS SCHEDULES

A. Prepare network analysis diagrams and supporting mathematical analyses using critical path

method.

B. Illustrate order and interdependence of activities and sequence of Work; how start of given

activity depends on completion of preceding activities, and how completion of activity may

restrain start of subsequent activities.

C. Illustrate complete sequence of construction by activity, identifying Work of separate stages.

Indicate dates for submittals and return of submittals; dates for procurement and delivery of

critical products; and dates for installation and provision for testing. Include legend for symbols

and abbreviations used.

D. Mathematical Analysis: Tabulate each activity of detailed network diagrams using calendar dates,

and identify for each activity:

1. Preceding and following event numbers.

2. Activity description.

3. Estimated duration of activity, in maximum 15-day intervals. Status of critical activities.

4. Earliest start date.

5. Earliest finish date.

6. Actual start date.

7. Actual finish date.

8. Latest start date.

9. Latest finish date.

10. Total and free float; accrue float time to Owner and to Owner's benefit.

Page 20: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

CONSTRUCTION PROGRESS SCHEDULE 013216 Page 3 of 4

2017

11. Monetary value of activity, keyed to Schedule of Values.

12. Percentage of activity completed.

13. Responsibility.

E. Analysis Program: Capable of compiling monetary value of completed and partially completed

activities, of accepting revised completion dates, and of recomputing of scheduled dates and float.

F. Required Sorts: List activities in sorts or groups:

1. By preceding Work item or event number from lowest to highest.

2. By longest float, then in order of early start.

3. By responsibility in order of earliest possible start date.

4. In order of latest allowable start dates.

5. In order of latest allowable finish dates.

6. Contractor's periodic payment request sorted by Schedule of Values list.

7. List of basic input data-generating report.

8. List of activities on critical path.

G. Prepare subschedules for each stage of Work and Sequencing of Construction Plan identified in

Section 01 10 00 - Summary.

H. Coordinate contents with Schedule of Values in Section 01 33 00 - Submittal Procedures.

1.6 BAR CHART SCHEDULES

A. Format: Bar chart Schedule, to include at least:

1. Identification and listing in chronological order of those activities reasonably required to

complete the Work, including:

a. Subcontract Work.

b. Major equipment design, fabrication, factory testing, and delivery dates including

required lead times.

c. Move-in and other preliminary activities.

d. Equipment and equipment system test and startup activities.

e. Project closeout and cleanup.

f. Work sequences, constraints, and milestones.

2. Listings identified by Specification Section number.

3. Identification of the following:

a. Horizontal time frame by year, month, and week.

b. Duration, early start, and completion for each activity and subactivity.

c. Critical activities and Project float.

d. Subschedules to further define critical portions of Work.

1.7 REVIEW AND EVALUATION

A. Participate in joint review and evaluation of schedules with Engineer at each submittal.

B. Evaluate Project status to determine Work behind schedule and Work ahead of schedule.

Page 21: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 4 CONSTRUCTION PROGRESS SCHEDULE 013216

2017

1.8 UPDATING SCHEDULES

A. Maintain schedules to record actual start and finish dates of completed activities.

B. Indicate progress of each activity to date of revision, with projected completion date of each

activity. Annotate schedules to depict current status of Work.

C. Identify activities modified since previous submittal, major changes in Work, and other

identifiable changes.

D. Upon approval of a Change Order, include the change in the next schedule submittal.

E. Indicate changes required to maintain Date of Substantial Completion.

F. Submit sorts as required to support recommended changes.

G. Prepare narrative report to define problem areas, anticipated delays, and impact on schedule.

Report corrective action taken or proposed and its effect including effects of changes on

schedules of separate Contractors.

1.9 DISTRIBUTION

A. Following joint review, distribute copies of updated schedules to Contractor's Project site file, to

Subcontractors, suppliers, Engineer, Owner, and other concerned parties.

B. Instruct recipients to promptly report, in writing, problems anticipated by projections shown in

schedules.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 22: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SUBMITTAL PROCEDURES 013300 Page 1 of 6

2017

SECTION 01 33 00 - SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Definitions.

B. Submittal procedures.

C. Construction progress schedules.

D. Proposed product list.

E. Product data.

F. Shop Drawings.

G. Other submittals.

H. Design data.

I. Test reports.

J. Certificates.

K. Manufacturer's instructions.

L. Manufacturer's field reports.

M. Erection Drawings.

N. Construction photographs.

O. Contractor review.

P. Engineer review.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Engineer's

responsive action.

B. Informational Submittals: Written and graphic information and physical Samples that do not

require Engineer's responsive action. Submittals may be rejected for not complying with

requirements.

Page 23: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 6 SUBMITTAL PROCEDURES 013300

2017

1.3 SUBMITTAL PROCEDURES

A. Transmit each submittal with Engineer-accepted form.

B. Sequentially number transmittal forms. Mark revised submittals with original number and

sequential alphabetic suffix.

C. Identify: Project, Contractor, Subcontractor and supplier, pertinent Drawing and detail number,

and Specification Section number appropriate to submittal.

D. Apply Contractor's stamp, signed or initialed, certifying that review, approval, verification of

products required, field dimensions, adjacent construction Work, and coordination of information

is according to requirements of the Work and Contract Documents.

E. Schedule submittals to expedite Project, and submit electronic submittals via email as PDF

electronic files. Coordinate submission of related items.

F. For each submittal for review, allow 10 days excluding delivery time to and from Contractor.

G. Identify variations in Contract Documents and product or system limitations that may be

detrimental to successful performance of completed Work.

H. Allow space on submittals for Contractor and Engineer review stamps.

I. When revised for resubmission, identify changes made since previous submission.

J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report

inability to comply with requirements.

K. Submittals not requested will not be recognized nor processed.

L. Incomplete Submittals: Engineer will not review. Complete submittals for each item are

required. Delays resulting from incomplete submittals are not the responsibility of Engineer.

1.4 CONSTRUCTION PROGRESS SCHEDULES

A. Comply with Section 01 32 16 - Construction Progress Schedule

1.5 PROPOSED PRODUCT LIST

A. Within 15 days after date of Owner-Contractor Agreement, submit list of major products

proposed for use, with name of manufacturer, trade name, and model number of each product.

B. For products specified only by reference standards, indicate manufacturer, trade name, model or

catalog designation, and reference standards.

Page 24: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SUBMITTAL PROCEDURES 013300 Page 3 of 6

2017

1.6 PRODUCT DATA

A. Product Data: Action Submittal: Submit to Engineer for review for assessing conformance with

information given and design concept expressed in Contract Documents.

B. Submit electronic submittals via email as PDF electronic files.

C. Mark each copy to identify applicable products, models, options, and other data. Supplement

manufacturers' standard data to provide information specific to this Project.

D. Indicate product utility and electrical characteristics, utility connection requirements, and location

of utility outlets for service for functional equipment and appliances.

E. After review, produce copies and distribute according to "Submittal Procedures" Article and for

record documents described in Section 01 70 00 - Execution and Closeout Requirements.

1.7 SHOP DRAWINGS

A. Shop Drawings: Action Submittal: Submit to Engineer for assessing conformance with

information given and design concept expressed in Contract Documents.

B. Indicate special utility and electrical characteristics, utility connection requirements, and location

of utility outlets for service for functional equipment and appliances.

C. When required by individual Specification Sections, provide Shop Drawings signed and sealed by

a professional Engineer responsible for designing components shown on Shop Drawings.

1. Include signed and sealed calculations to support design.

2. Submit Shop Drawings and calculations in form suitable for submission to and approval by

authorities having jurisdiction.

3. Make revisions and provide additional information when required by authorities having

jurisdiction.

D. Submit electronic submittals via email as PDF electronic files.

E. After review, produce copies and distribute according to "Submittal Procedures" Article and for

record documents described in Section 01 70 00 - Execution and Closeout Requirements.

1.8 OTHER SUBMITTALS

A. Closeout Submittals: Comply with Section 01 70 00 - Execution and Closeout Requirements.

B. Informational Submittal: Submit data for Engineer's knowledge as Contract administrator or for

Owner.

C. Submit information for assessing conformance with information given and design concept

expressed in Contract Documents.

Page 25: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 6 SUBMITTAL PROCEDURES 013300

2017

1.9 TEST REPORTS

A. Informational Submittal: Submit reports for Engineer's knowledge as Contract administrator or

for Owner.

B. Submit test reports for information for assessing conformance with information given and design

concept expressed in Contract Documents.

1.10 CERTIFICATES

A. Informational Submittal: Submit certification by manufacturer, installation/application

Subcontractor, or Contractor to Engineer, in quantities specified for Product Data.

B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting

reference data, affidavits, and certifications as appropriate.

C. Certificates may be recent or previous test results on material or product but must be acceptable

to Engineer.

1.11 MANUFACTURER'S INSTRUCTIONS

A. Informational Submittal: Submit manufacturer's installation instructions for Engineer's

knowledge as Contract administrator or for Owner.

B. Submit printed instructions for delivery, storage, assembly, installation, startup, adjusting, and

finishing, to Engineer in quantities specified for Product Data.

C. Indicate special procedures, perimeter conditions requiring special attention, and special

environmental criteria required for application or installation.

1.12 MANUFACTURER'S FIELD REPORTS

A. Informational Submittal: Submit reports for Engineer's knowledge as Contract administrator or

for Owner.

B. Submit report in duplicate within 5 days of observation to Engineer for information.

C. Submit reports for information for assessing conformance with information given and design

concept expressed in Contract Documents.

1.13 ERECTION DRAWINGS

A. Informational Submittal: Submit Drawings for Engineer's knowledge as Contract administrator or

for Owner.

B. Submit Drawings for information assessing conformance with information given and design

concept expressed in Contract Documents.

Page 26: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SUBMITTAL PROCEDURES 013300 Page 5 of 6

2017

C. Data indicating inappropriate or unacceptable Work may be subject to action by Engineer or

Owner.

1.14 CONSTRUCTION PHOTOGRAPHS

A. Provide photographs of Site and construction throughout progress of Work produced by an

experienced photographer acceptable to Engineer.

B. Each month submit photographs with Application for Payment.

C. Photographs: electronic submission of digital photos.

D. Take four Site photographs from different directions indicating relative progress of the Work, 5

days maximum before submitting.

E. Take photographs as evidence of existing Project conditions as follows:

1. Exterior views: four directions.

F. Digital Images: Deliver complete set of digital image electronic files on CD-ROM or via email to

Owner with Project record documents. Identify electronic media with date photographs were

taken. Submit images that have same aspect ratio as sensor, uncropped.

1. Digital Images: Uncompressed TIFF format, produced by digital camera with minimum

sensor size of 4.0 megapixels, and image resolution of not less than 1024 by 768 pixels.

2. Date and Time: Include date and time in filename for each image.

1.15 CONTRACTOR REVIEW

A. Review for compliance with Contract Documents and approve submittals before transmitting to

Engineer.

B. Contractor: Responsible for:

1. Determination and verification of materials including manufacturer's catalog numbers.

2. Determination and verification of field measurements and field construction criteria.

3. Checking and coordinating information in submittal with requirements of Work and of

Contract Documents.

4. Determination of accuracy and completeness of dimensions and quantities.

5. Confirmation and coordination of dimensions and field conditions at Site.

6. Construction means, techniques, sequences, and procedures.

7. Safety precautions.

8. Coordination and performance of Work of all trades.

C. Stamp, sign or initial, and date each submittal to certify compliance with requirements of

Contract Documents.

D. Do not fabricate products or begin Work for which submittals are required until approved

submittals have been received from Engineer.

Page 27: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 6 of 6 SUBMITTAL PROCEDURES 013300

2017

1.16 ENGINEER REVIEW

A. Do not make "mass submittals" to Engineer. "Mass submittals" are defined as six or more

submittals or items in one day or 15 or more submittals or items in one week. If "mass

submittals" are received, Engineer's review time stated above will be extended as necessary to

perform proper review. Engineer will review "mass submittals" based on priority determined by

Engineer after consultation with Owner and Contractor.

B. Informational submittals and other similar data are for Engineer's information, do not require

Engineer's responsive action, and will not be reviewed or returned with comment.

C. Submittals made by Contractor that are not required by Contract Documents may be returned

without action.

D. Submittal approval does not authorize changes to Contract requirements unless accompanied by

Change Order, Field Order, or Work Change Directive.

E. Owner may withhold monies due to Contractor to cover additional costs beyond the second

submittal review.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 28: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

QUALITY REQUIREMENTS 014000 Page 1 of 4

2017

SECTION 01 40 00 - QUALITY REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Quality control.

B. Tolerances.

C. References.

D. Labeling.

E. Testing and inspection services.

F. Manufacturers' field services.

1.2 QUALITY CONTROL

A. Monitor quality control over suppliers, manufacturers, products, services, Site conditions, and

workmanship, to produce Work of specified quality.

B. Comply with specified standards as the minimum quality for the Work except where more

stringent tolerances, codes, or specified requirements indicate higher standards or more precise

workmanship.

C. Perform Work using persons qualified to produce required and specified quality.

D. Products, materials, and equipment may be subject to inspection by Engineer and Owner at place

of manufacture or fabrication. Such inspections shall not relieve Contractor of complying with

requirements of Contract Documents.

E. Supervise performance of Work in such manner and by such means to ensure that Work, whether

completed or in progress, will not be subjected to harmful, dangerous, damaging, or otherwise

deleterious exposure during construction period.

1.3 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do

not permit tolerances to accumulate.

B. Comply with manufacturers' recommended tolerances and tolerance requirements in reference

standards. When such tolerances conflict with Contract Documents, request clarification from

Engineer before proceeding.

C. Adjust products to appropriate dimensions; position before securing products in place.

Page 29: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 4 QUALITY REQUIREMENTS 014000

2017

1.4 REFERENCES

A. For products or workmanship specified by association, trade, or other consensus standards,

comply with requirements of standard except when more rigid requirements are specified or are

required by applicable codes.

B. Conform to reference standard by date of issue current as of date of Contract Documents except

where specific date is established by code.

C. Obtain copies of standards and maintain on Site when required by product Specification Sections.

D. When requirements of indicated reference standards conflict with Contract Documents, request

clarification from Engineer before proceeding.

E. Neither contractual relationships, duties, or responsibilities of parties in Contract nor those of

Engineer shall be altered from Contract Documents by mention or inference in reference

documents.

1.5 LABELING

A. Attach label from agency approved by authorities having jurisdiction for products, assemblies,

and systems required to be labeled by applicable code.

B. Label Information: Include manufacturer's or fabricator's identification, approved agency

identification, and the following information, as applicable, on each label:

1. Model number.

2. Serial number.

3. Performance characteristics.

C. Manufacturer's Nameplates, Trademarks, Logos, and Other Identifying Marks on Products: Not

allowed on surfaces exposed to view in public areas, interior or exterior.

1.6 TESTING AND INSPECTION SERVICES

A. OWNER’S independent firm will perform tests, inspections, and other services specified in

individual Specification Sections and as required by Engineer, Owner, and authorities having

jurisdiction.

1. Laboratory: Authorized to operate at Project location in State of Nevada.

2. Laboratory Staff: Maintain full-time Professional Engineer on staff to review services.

3. Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy traceable

to National Bureau of Standards or accepted values of natural physical constants.

B. Testing, inspections, and source quality control may occur on or off Project Site. Perform off-Site

testing as required by Engineer or Owner.

C. Reports shall be submitted by independent firm to Engineer, Contractor, and authorities having

jurisdiction, indicating observations and results of tests and compliance or noncompliance with

Contract Documents.

1. Submit final report indicating correction of Work previously reported as noncompliant.

Page 30: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

QUALITY REQUIREMENTS 014000 Page 3 of 4

2017

D. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools,

storage, safe access, and assistance by incidental labor as requested.

1. Notify Engineer and independent firm 24 hours before expected time for operations

requiring services.

2. Make arrangements with independent firm and pay for additional Samples and tests required

for Contractor's use.

E. Retesting or re-inspection required because of nonconformance with specified or indicated

requirements shall be performed by same independent firm on instructions from Engineer.

Payment for retesting or re-inspection will be charged to Contractor by deducting testing charges

from Contract Sum/Price.

F. Agency Responsibilities:

1. Test Samples of mixes submitted by Contractor.

2. Provide qualified personnel at Site. Cooperate with Engineer and Contractor in performance

of services.

3. Perform indicated sampling and testing of products according to specified standards.

4. Ascertain compliance of materials and mixes with requirements of Contract Documents.

5. Promptly notify Engineer and Contractor of observed irregularities or nonconformance of

Work or products.

6. Perform additional tests required by Engineer.

7. Attend preconstruction meetings and progress meetings.

G. Agency Reports: After each test, promptly submit electronic copies of report to Engineer,

Contractor, and authorities having jurisdiction. When requested by Engineer, provide

interpretation of test results. Include the following:

1. Date issued.

2. Project title and number.

3. Name of inspector.

4. Date and time of sampling or inspection.

5. Identification of product and Specification Section.

6. Location in Project.

7. Type of inspection or test.

8. Date of test.

9. Results of tests.

10. Conformance with Contract Documents.

H. Limits on Testing Authority:

1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract

Documents.

2. Agency or laboratory may not approve or accept any portion of the Work.

3. Agency or laboratory may not assume duties of Contractor.

4. Agency or laboratory has no authority to stop the Work.

1.7 MANUFACTURER'S FIELD SERVICES

A. When specified in individual Specification Sections, require material or product suppliers or

manufacturers to provide qualified staff personnel to observe Site conditions, conditions of

Page 31: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 4 QUALITY REQUIREMENTS 014000

2017

surfaces and installation, quality of workmanship, startup of equipment, testing, adjusting, and

balancing of equipment as applicable, and to initiate instructions when necessary.

B. Submit qualifications of observer to Engineer 30 days in advance of required observations.

Observer is subject to approval of Engineer.

C. Report observations and Site decisions or instructions given to applicators or installers that are

supplemental or contrary to manufacturer's written instructions.

D. Refer to Section 01 33 00 - Submittal Procedures, "Manufacturer's Field Reports" Article.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 32: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

TEMPORARY FACILITIES AND CONTROLS 015000 Page 1 of 6

2017

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Temporary facilities under Construction Management Agreement.

B. Temporary Utilities:

1. Temporary sanitary facilities.

C. Construction Facilities:

1. Vehicular access.

2. Parking.

3. Progress cleaning and waste removal.

4. Project identification.

5. Traffic regulation.

6. Fire-prevention facilities.

D. Temporary Controls:

1. Barriers.

2. Enclosures and fencing.

3. Security.

4. Water control.

5. Dust control.

6. Erosion and sediment control.

7. Pollution control.

E. Removal of utilities, facilities, and controls.

1.2 REFERENCES

A. ASTM International:

1. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building

Materials.

2. ASTM E 90 - Standard Test Method for Laboratory Measurement of Airborne Sound

Transmission Loss of Building Partitions and Elements.

3. ASTM E 119 - Standard Test Methods for Fire Tests of Building Construction and

Materials.

1.3 TEMPORARY FACILITIES UNDER CONSTRUCTION MANAGEMENT AGREEMENT

A. Temporary Provisions Provided by Construction Manager:

1. Temporary barriers, barricades, covered walkways, fencing, exterior closures, and interior

closures.

2. Cleaning during construction.

3. Access roads and approaches.

4. Temporary sanitary facilities.

Page 33: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 6 TEMPORARY FACILITIES AND CONTROLS 015000

2017

5. Temporary electrical service and distribution system for power and lighting.

B. Each Contractor: Coordinate provisions with Construction Manager and provide the following

items as necessary for execution of the Work including associated costs:

1. Construction aids.

2. Temporary fire protection, dust control, erosion and sediment control, water control, noise

control, and other necessary temporary controls.

3. Temporary barriers, barricades, and similar devices as necessary for safety and protection of

construction personnel and public.

4. Temporary tree and plant protection.

5. Temporary provisions for protection of installed Work.

1.4 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide facilities at time of Project

mobilization.

1.5 VEHICULAR ACCESS

A. Construct temporary all-weather access roads from public thoroughfares to serve construction

area, of width and load-bearing capacity to accommodate unimpeded traffic for construction

purposes.

B. Extend and relocate vehicular access as Work progress requires and provide detours as necessary

for unimpeded traffic flow.

C. Locate as indicated on Drawings approved by Engineer.

D. Provide means of removing mud from vehicle wheels before entering streets.

E. Use designated existing on-Site roads for construction traffic.

1.6 PARKING

A. If Site space is not adequate, provide additional off-Site parking.

B. Use of designated areas of existing on-Site streets and driveways used for construction traffic is

permitted. Tracked vehicles are not allowed on paved areas.

C. Use of designated areas of existing parking facilities used by construction personnel is permitted.

D. Do not allow heavy vehicles or construction equipment in parking areas.

E. Maintenance:

1. Maintain traffic and parking areas in sound condition free of excavated material,

construction equipment, products, mud, snow, ice, and the like.

2. Maintain existing and permanent paved areas used for construction; promptly repair breaks,

potholes, low areas, standing water, and other deficiencies, to maintain paving and drainage

in original condition.

Page 34: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

TEMPORARY FACILITIES AND CONTROLS 015000 Page 3 of 6

2017

F. Removal, Repair:

1. Remove temporary materials and construction before Substantial Completion.

2. Repair existing facilities damaged by use, to original condition.

G. Mud from Site vehicles: Provide means of removing mud from vehicle wheels before entering

streets.

1.7 PROGRESS CLEANING AND WASTE REMOVAL

A. Maintain areas free of waste materials, debris, and rubbish. Maintain Site in clean and orderly

condition.

B. Collect and remove waste materials, debris, and rubbish from Site weekly and dispose of off-Site.

Comply with Section 01 74 19 - Construction Waste Management and Disposal.

1.8 PROJECT IDENTIFICATION

A. Project Identification Signs:

1. One sign, 6-sq ft area, bottom 4 feet aboveground.

2. Content:

a. Project number, title, and name of Owner.

b. Names and titles of authorities.

c. Names and titles of Engineer and Consultants.

d. Name of Prime Contractor.

3. Lettering: Series C of Standard Alphabet for Traffic Control Devices, "Manual on Uniform

Traffic Control Devices for Streets and Highways," Federal Highway Administration.

B. Project Informational Signs:

1. Informational signs of same colors and lettering as Project identification sign or standard

products; size lettering for legibility at 100-foot distance.

2. Provide sign at each end of project site’s intersection with existing bike & pedestrian

pathway and provide directional signs to direct pedestrian and bicycle traffic around Site.

Relocate as Work progress requires.

3. Signs shall clearly state “No Trespassing” and indicate that active construction is occurring.

4. No other signs are allowed without Owner's permission except those required by law.

C. Sign Materials:

1. As necessary to convey project information and provide for public safety.

D. Installation:

1. Install Project identification sign within 15 days after date established by Notice to Proceed.

2. Erect at designated location of high public visibility adjacent to main entrance to Site.

3. Erect supports and framing on secure foundation, rigidly braced and framed to resist wind

loadings.

4. Install sign surface plumb and level, with butt joints. Anchor securely.

E. Maintenance: Maintain clean signs and supports; repair deterioration and damage.

Page 35: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 6 TEMPORARY FACILITIES AND CONTROLS 015000

2017

F. Removal: Remove signs, framing, supports, and foundations at completion of Project and restore

area.

1.9 TRAFFIC REGULATION

A. Signs, Signals, and Devices:

1. Traffic Cones and Drums: As approved by authorities having jurisdiction.

2. Flag Person Equipment: As required by authorities having jurisdiction.

B. Flag Persons: Provide trained and equipped flag persons to regulate traffic when construction

operations or traffic encroach on public traffic lanes.

1. Drawings indicate haul routes designated by authorities having jurisdiction for use by

construction traffic.

2. Confine construction traffic to designated haul routes.

3. Provide traffic control at critical areas of haul routes to regulate traffic and to minimize

interference with public traffic.

C. Traffic Signs and Signals:

1. Provide signs at approaches to Site and on Site, at crossroads, detours, and elsewhere as

needed to direct construction and affected public traffic.

D. Removal:

1. Remove equipment and devices when no longer required.

2. Repair damage caused by installation.

1.10 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas and to protect existing

facilities and adjacent properties from damage from construction operations.

B. Tree and Plant Protection: Preserve and protect existing trees and plants designated to remain.

1. Protect areas within drip lines from traffic, parking, storage, dumping, chemically injurious

materials and liquids, ponding, and continuous running water.

2. Provide 6-foot-high barriers around drip line, with access for maintenance.

3. Replace trees and plants damaged by construction operations.

C. Protect non-owned vehicular traffic, stored materials, Site, and structures from damage.

1.11 ENCLOSURES AND FENCING

A. Construction: Commercial-grade chain-link fence.

B. Provide 6-foot-high fence around construction Site; equip with vehicular gates with locks.

1. Enclosure shall be sufficient to prevent ingress of livestock into project area or onto Muller

Lane as indicated on the Drawings.

Page 36: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

TEMPORARY FACILITIES AND CONTROLS 015000 Page 5 of 6

2017

1.12 SECURITY

A. Security Program:

1. Protect Work on existing premises and Owner's operations from theft, vandalism, and

unauthorized entry.

2. Initiate program in coordination with Owner's existing security system at Project

mobilization.

3. Maintain program throughout construction period until directed by Engineer.

B. Entry Control:

1. Restrict entrance of persons and vehicles to Project Site.

2. Allow entrance only to authorized persons with proper identification.

1.13 WATER CONTROL

A. Grade Site to drain. Maintain excavations free of water. Provide, operate, and maintain necessary

pumping equipment.

B. Protect Site from puddles or running water. Provide water barriers as required to protect Site from

soil erosion.

1.14 DUST CONTROL

A. Execute Work by methods that minimize raising dust from construction operations.

B. Provide positive means to prevent airborne dust from dispersing into atmosphere.

1.15 EROSION AND SEDIMENT CONTROL

A. Plan and execute construction by methods to control surface drainage from cuts and fills from

borrow and waste disposal areas. Prevent erosion and sedimentation.

B. Minimize surface area of bare soil exposed at one time.

C. Provide temporary measures including berms, dikes, drains, and other devices to prevent water

flow.

D. Construct fill and waste areas by selective placement to avoid erosive surface silts and clays.

E. Periodically inspect earthwork to detect evidence of erosion and sedimentation. Promptly apply

corrective measures.

F. Comply with sediment and erosion control plan indicated on Drawings.

1.16 POLLUTION CONTROL

A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere

from discharge of noxious, toxic substances and pollutants produced by construction operations.

Page 37: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 6 of 6 TEMPORARY FACILITIES AND CONTROLS 015000

2017

B. Comply with pollution and environmental control requirements of authorities having jurisdiction.

C. Owner has applied for and received temporary discharge permit TNS-43521, for dewatering the

force main during shutdown to the place of use identified as Park Rach West of the East Fork of

the Carson River. The following permit requirements apply:

1. There must be a5 day window with no rain or precipitation such that:

a. 2 days prior to, during, and 2 days following land application no precipitation event

occurs.

b. Coordinate in advance with Owner to insure dewatering of the effluent force main

complies with the stipulated permit timeframe for discharge to land application.

2. Daily temperatures must not be less than 40°F.

3. Sampling and monitoring must be performed prior to and after discharge.

1.17 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, and materials before Final Application for

Payment inspection.

B. Remove underground installations to minimum depth of 2 feet. Grade Site as indicated on

Drawings.

C. Clean and repair damage caused by installation or use of temporary Work.

D. Restore existing and permanent facilities used during construction to original condition. Restore

permanent facilities used during construction to specified condition.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 38: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

PRODUCT REQUIREMENTS 016000 Page 1 of 2

2017

SECTION 01 60 00 - PRODUCT REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Products.

B. Product delivery requirements.

C. Product storage and handling requirements.

D. Product options.

E. Equipment electrical characteristics and components.

1.2 PRODUCTS

A. At minimum, comply with specified requirements and reference standards.

B. Specified products define standard of quality, type, function, dimension, appearance, and

performance required.

C. Furnish products of qualified manufacturers that are suitable for intended use. Furnish products of

each type by single manufacturer unless specified otherwise. Confirm that manufacturer's

production capacity can provide sufficient product, on time, to meet Project requirements.

D. Do not use materials and equipment removed from existing premises except as specifically

permitted by Contract Documents.

E. Furnish interchangeable components from same manufacturer for components being replaced.

1.3 PRODUCT DELIVERY REQUIREMENTS

A. Transport and handle products according to manufacturer's instructions.

B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct,

and products are undamaged.

C. Provide equipment and personnel to handle products; use methods to prevent soiling,

disfigurement, or damage.

1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS

A. Store and protect products according to manufacturer's instructions.

B. Store products with seals and labels intact and legible.

Page 39: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 2 PRODUCT REQUIREMENTS 016000

2017

C. Store sensitive products in weathertight, climate-controlled enclosures in an environment suitable

to product.

D. For exterior storage of fabricated products, place products on sloped supports aboveground.

E. Provide off-Site storage and protection when Site does not permit on-Site storage or protection.

F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to

prevent condensation and degradation of products.

G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with

foreign matter.

H. Provide equipment and personnel to store products; use methods to prevent soiling,

disfigurement, or damage.

I. Arrange storage of products to permit access for inspection. Periodically inspect to verify

products are undamaged and are maintained in acceptable condition.

1.5 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Products complying with

specified reference standards or description.

B. Products Specified by Naming One or More Manufacturers: Products of one of manufacturers

named and complying with Specifications; no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with Provision for Substitutions:

Submit Request for Substitution for any manufacturer not named, according to Section 01 25 00 -

Substitution Procedures.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION - Not Used

END OF SECTION

Page 40: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

EXECUTION AND CLOSEOUT REQUIREMENTS 017000 Page 1 of 6

2017

SECTION 01 70 00 - EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Field engineering.

B. Closeout procedures.

C. Project record documents.

D. Product warranties and product bonds.

E. Maintenance service.

F. Examination.

G. Preparation.

H. Execution.

I. Protecting installed construction.

J. Final cleaning.

1.2 FIELD ENGINEERING

A. Employ land surveyor registered at Project location in State of Nevada and acceptable to

Engineer.

B. Owner will locate and Contractor shall protect survey control and reference points. Promptly

notify Engineer of discrepancies discovered.

C. Control datum for survey is established by Owner-provided survey.

D. Prior to beginning Work, verify and establish elevations of existing ground to ensure that new

Work will meet existing elevations as shown on the Drawings.

E. Verify setbacks and easements; confirm Drawing dimensions and elevations.

F. Provide field engineering services. Establish elevations, lines, and levels using recognized

engineering survey practices.

G. Promptly report to Engineer loss or destruction of reference point or relocation required because

of changes in grades or other reasons.

H. Replace dislocated survey control points based on original survey control. Make no changes

without prior written notice to Engineer.

Page 41: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 6 EXECUTION AND CLOSEOUT REQUIREMENTS 017000

2017

1.3 CLOSEOUT PROCEDURES

A. Prerequisites to Substantial Completion: Complete following items before requesting

Certification of Substantial Completion, either for entire Work or for portions of Work:

1. Submit maintenance manuals, Project record documents, digital images of construction

photographs, and other similar final record data in compliance with this Section.

2. Complete facility startup, testing, adjusting, balancing of systems and equipment,

demonstrations, and instructions to Owner's operating and maintenance personnel as

specified in compliance with this Section.

3. Conduct inspection to establish basis for request that Work is substantially complete. Create

comprehensive list (initial punch list) indicating items to be completed or corrected, value of

incomplete or nonconforming Work, reason for being incomplete, and date of anticipated

completion for each item. Include copy of list with request for Certificate of Substantial

Completion.

4. Obtain and submit releases enabling Owner's full, unrestricted use of Project and access to

services and utilities. Include certificate of occupancy, operating certificates, and similar

releases from authorities having jurisdiction and utility companies.

5. Deliver tools, spare parts, extra stocks of material, and similar physical items to Owner.

6. Discontinue or change over and remove temporary facilities and services from Project Site,

along with construction tools, mockups, and similar elements.

7. Perform final cleaning according to this Section.

B. Substantial Completion Inspection:

1. When Contractor considers Work to be substantially complete, submit to Engineer:

a. Written certificate that Work, or designated portion, is substantially complete.

b. List of items to be completed or corrected (initial punch list).

2. Within seven days after receipt of request for Substantial Completion, Engineer will make

inspection to determine whether Work or designated portion is substantially complete.

3. Should Engineer determine that Work is not substantially complete:

a. Engineer will promptly notify Contractor in writing, stating reasons for its opinion.

b. Contractor shall remedy deficiencies in Work and send second written request for

Substantial Completion to Engineer.

c. Engineer will reinspect Work.

d. Redo and Inspection of Deficient Work: Repeated until Work passes Engineer's

inspection.

4. When Engineer finds that Work is substantially complete, Engineer will:

a. Prepare Certificate of Substantial Completion on EJCDC C-625 - Certificate of

Substantial Completion, accompanied by Contractor's list of items to be completed or

corrected as verified and amended by Engineer and Owner (final punch list).

b. Submit Certificate to Owner and Contractor for their written acceptance of

responsibilities assigned to them in Certificate.

5. After Work is substantially complete, Contractor shall:

a. Allow Owner occupancy of Project under provisions stated in Certificate of Substantial

Completion.

b. Complete Work listed for completion or correction within time period stipulated.

C. Prerequisites for Final Completion: Complete following items before requesting final acceptance

and final payment.

1. When Contractor considers Work to be complete, submit written certification that:

Page 42: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

EXECUTION AND CLOSEOUT REQUIREMENTS 017000 Page 3 of 6

2017

a. Contract Documents have been reviewed.

b. Work has been examined for compliance with Contract Documents.

c. Work has been completed according to Contract Documents.

d. Work is completed and ready for final inspection.

2. Submittals: Submit following:

a. Final punch list indicating all items have been completed or corrected.

b. Final payment request with final releases and supporting documentation not previously

submitted and accepted. Include certificates of insurance for products and completed

operations where required.

c. Specified warranties, workmanship/maintenance bonds, maintenance agreements, and

other similar documents.

d. Accounting statement for final changes to Contract Sum.

e. Contractor's affidavit of payment of debts and claims.

f. Contractor affidavit of release of liens.

g. Consent of surety to final payment.

3. Perform final cleaning for Contractor-soiled areas according to this Section.

D. Final Completion Inspection:

1. Within seven days after receipt of request for final inspection, Engineer will make inspection

to determine whether Work or designated portion is complete.

2. Should Engineer consider Work to be incomplete or defective:

a. Engineer will promptly notify Contractor in writing, listing incomplete or defective

Work.

b. Contractor shall remedy stated deficiencies and send second written request to Engineer

that Work is complete.

c. Engineer will reinspect Work.

d. Redo and Inspection of Deficient Work: Repeated until Work passes Engineer's

inspection.

1.4 PROJECT RECORD DOCUMENTS

A. Maintain on Site one set of the following record documents; record actual revisions to the Work:

1. Drawings.

2. Specifications.

3. Addenda.

4. Change Orders and other modifications to the Contract.

5. Reviewed Shop Drawings, product data, and Samples.

6. Manufacturer's instruction for assembly, installation, and adjusting.

B. Ensure entries are complete and accurate, enabling future reference by Owner.

C. Store record documents separate from documents used for construction.

D. Record information concurrent with construction progress, not less than weekly.

E. Specifications: Legibly mark and record, at each product Section, description of actual products

installed, including the following:

1. Manufacturer's name and product model and number.

2. Product substitutions or alternates used.

Page 43: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 6 EXECUTION AND CLOSEOUT REQUIREMENTS 017000

2017

3. Changes made by Addenda and modifications.

F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction as

follows:

1. Include Contract modifications such as Addenda, supplementary instructions, change

directives, field orders, minor changes in the Work, and change orders.

2. Include locations of concealed elements of the Work.

3. Identify depth of buried utility lines and provide dimensions showing distances from

permanent facility components that are parallel to utilities.

4. Dimension ends, corners, and junctions of buried utilities to permanent facility components

using triangulation.

5. Identify and locate existing buried or concealed items encountered during Project.

6. Measured depths of foundations in relation to finish floor datum.

7. Measured horizontal and vertical locations of underground utilities and appurtenances,

referenced to permanent surface improvements.

8. Measured locations of internal utilities and appurtenances concealed in construction,

referenced to visible and accessible features of the Work.

9. Field changes of dimension and detail.

10. Details not on original Drawings.

G. Submit marked-up paper copy documents to Engineer with claim for final Application for

Payment.

H. Submit PDF electronic files of marked-up documents to Engineer with claim for final Application

for Payment.

1.5 PRODUCT WARRANTIES AND PRODUCT BONDS

A. Obtain warranties and bonds executed in duplicate by responsible Subcontractors, suppliers, and

manufacturers within ten days after completion of applicable item of Work.

B. Execute and assemble transferable warranty documents and bonds from Subcontractors,

suppliers, and manufacturers.

C. Verify documents are in proper form, contain full information, and are notarized.

D. Co-execute submittals when required.

E. Submit prior to final Application for Payment.

F. Time of Submittals:

1. For equipment or component parts of equipment put into service during construction with

Owner's permission, submit documents within ten days after acceptance.

2. Make other submittals within ten days after date of Substantial Completion, prior to final

Application for Payment.

3. For items of Work for which acceptance is delayed beyond Substantial Completion, submit

within ten days after acceptance, listing date of acceptance as beginning of warranty or bond

period.

Page 44: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

EXECUTION AND CLOSEOUT REQUIREMENTS 017000 Page 5 of 6

2017

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that existing Site conditions and substrate surfaces are acceptable for subsequent Work.

Beginning new Work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new Work being

applied or attached.

C. Examine and verify specific conditions described in individual Specification Sections.

D. Verify that utility services are available with correct characteristics and in correct locations.

3.2 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance according to manufacturer's

instructions.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer-required or -recommended substrate primer, sealer, or conditioner prior to

applying new material or substance in contact or bond.

3.3 EXECUTION

A. Comply with manufacturer's installation instructions, performing each step in sequence. Maintain

one set of manufacturer's installation instructions at Project Site during installation and until

completion of construction.

B. When manufacturer's installation instructions conflict with Contract Documents, request

clarification from Engineer before proceeding.

C. Verify that field measurements are as indicated on approved Shop Drawings or as instructed by

manufacturer.

3.4 PROTECTING INSTALLED CONSTRUCTION

A. Protect installed Work and provide special protection where specified in individual Specification

Sections.

B. Provide temporary and removable protection for installed products. Control activity in immediate

Work area to prevent damage.

C. Prohibit traffic from landscaped areas.

Page 45: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 6 of 6 EXECUTION AND CLOSEOUT REQUIREMENTS 017000

2017

3.5 FINAL CLEANING

A. Execute final cleaning prior to final Project assessment.

B. Clean Site; sweep paved areas, rake clean landscaped surfaces.

C. Remove waste and surplus materials, rubbish, and construction facilities from Site.

END OF SECTION

Page 46: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

CAST-IN-PLACE CONCRETE 033000_SFL Page 1 of 7

2017

SECTION 03 30 00 - CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes Cast-in-Place Concrete for Following Items:

1. Thrust Blocks.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 REFERENCE STANDARDS

A. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

2. ACI 305R - Guide to Hot Weather Concreting.

3. ACI 306.1 - Standard Specification for Cold Weather Concreting.

4. ACI 308.1 - Specification for Curing Concrete.

5. ACI 318 - Building Code Requirements for Structural Concrete.

B. ASTM International:

1. ASTM C31 - Standard Practice for Making and Curing Concrete Test Specimens in the

Field.

2. ASTM C33 - Standard Specification for Concrete Aggregates.

3. ASTM C39 - Standard Test Method for Compressive Strength of Cylindrical Concrete

Specimens.

4. ASTM C94 - Standard Specification for Ready-Mixed Concrete.

5. ASTM C143 - Standard Test Method for Slump of Hydraulic-Cement Concrete.

6. ASTM C150 - Standard Specification for Portland Cement.

7. ASTM C172 - Standard Practice for Sampling Freshly Mixed Concrete.

8. ASTM C173 - Standard Test Method for Air Content of Freshly Mixed Concrete by the

Volumetric Method.

9. ASTM C231 - Standard Test Method for Air Content of Freshly Mixed Concrete by the

Pressure Method.

10. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.

1.4 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination.

1.5 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Design Data:

1. Submit concrete mix design for each concrete strength.

2. Submit separate mix designs if admixtures are required for following:

Page 47: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 7 CAST-IN-PLACE CONCRETE 033000_SFL

2017

a. Hot and cold weather concrete Work.

b. Air entrained concrete Work.

3. Identify mix ingredients and proportions, including admixtures.

4. Identify chloride content of admixtures and whether or not chlorides were added during

manufacture.

C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

D. Manufacturer Instructions: Submit installation procedures and interfacing required with adjacent

Work.

E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

1.6 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of embedded utilities and components

concealed from view in finished construction.

1.7 QUALITY ASSURANCE

A. Perform Work according to ACI 301.

B. Comply with ACI 305R when pouring concrete during hot weather.

C. Comply with ACI 306.1 when pouring concrete during cold weather.

D. Acquire cement and aggregate from one source for Work.

E. Perform Work according to State Standard Specifications for Public Works (Orange Book)

standards.

1.8 AMBIENT CONDITIONS

A. Section 01 50 00 - Temporary Facilities and Controls: Requirements for ambient condition

control facilities for product storage and installation.

B. Maintain concrete temperature after installation at minimum 50 degrees F for minimum seven

days.

C. Maintain high-early strength concrete temperature after installation at minimum 50 degrees F for

minimum three days.

PART 2 PRODUCTS

2.1 MATERIALS

A. Concrete:

1. Cement:

Page 48: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

CAST-IN-PLACE CONCRETE 033000_SFL Page 3 of 7

2017

a. Comply with ASTM C150, Type V - High Sulfate Resistant, except as specified

otherwise.

b. Type: Portland.

c. Low Alkali: have total alkali containing not more than 0.60 percent.

2. Normal Weight Aggregates:

a. Comply with ASTM C33.

b. Coarse Aggregate Maximum Size: Number 57, except as otherwise specified or

authorized in writing the Engineer.

3. Water:

a. Comply with ACI 318.

b. Potable, clean and free form oil and without deleterious amounts of chloride ions,

alkali, acid, organic matter or other substances with maximum 0.1 percent of water-

soluble chloride ions by weight of cement.

4. Where concrete is placed within NDOT ROW, concrete mix and placement shall conform to

NDOT standards.

2.2 CONCRETE MIX

A. Select proportions for normal weight concrete according to ACI 301, Method 1.

B. Performance and Design Criteria:

MATERIAL AND PROPERTY MEASUREMENT

Compressive Strength (7-day) 75% of Required 28-Day Compressive Strength, minimum

Compressive Strength (28-day) 4,000 psi

Cement Type ASTM C150

Cement Content (minimum) 564 lb./cu. yd.

Aggregate Type Normal weight

Coarse Aggregate As necessary to achieve minimum Batch unit weight of 140 pcf

Fine Aggregate As necessary to achieve minimum Batch unit weight of 140 pcf

Fiber Reinforcement Per Engineer’s Recommendations

Water-Cement Ratio (maximum) 0.45 by weight

Aggregate Size (maximum) 1 in.

Aggregate Size (minimum) No. 8 Sieve

Air Content 5 % plus or minus 1.0%

Admixture Per Manufacturer’s Recommendations

Fly Ash or Pozzolan Content 15% of cementitious materials by weight, maximum

Silica Fume Content Per Engineer’s recommendations

Slag Per Engineer’s recommendations

Slump 3 in. plus or minus 1 in.

C. Admixtures:

1. Include admixture types and quantities indicated in concrete mix designs only if approved by

Engineer.

Page 49: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 7 CAST-IN-PLACE CONCRETE 033000_SFL

2017

2. Cold Weather:

a. Use accelerating admixtures in cold weather.

b. Use of admixtures will not relax cold-weather placement requirements.

3. Hot Weather: Use set-retarding admixtures.

4. Use calcium chloride only if contained within required admixtures at less than 0.5% by

weight.

5. Add air entrainment admixture to concrete mix for Work exposed to freezing and thawing.

6. For concrete exposed to deicing chemicals, limit fly ash, pozzolans, silica fumes, and slag

content as required by applicable code.

D. Average Compressive Strength Reduction: Not permitted.

E. Ready-Mixed Concrete: Mix and deliver concrete according to ASTM C94.

F. Site-Mixed Concrete: Mix concrete according to ACI 318.

2.3 ACCESSORIES

1. Furnish materials according to 2016 State Specifications for Public Works Projects (Orange

Book) standards.

B. Vapor Retarder:

1. Furnish materials according to 2016 State Specifications for Public Works Projects (Orange

Book) standards.

C. Non-shrink Grout:

1. Furnish materials according to 2016 State Specifications for Public Works Projects (Orange

Book) standards.

D. Concrete Reinforcing Fibers:

1. Furnish materials according to 2016 State Specifications for Public Works Projects (Orange

Book) standards.

2. Description: High-strength industrial-grade fibers specifically engineered for secondary

reinforcement of concrete.

3. Comply with ASTM C1116.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

examination.

B. Verify requirements for concrete cover over reinforcement.

C. Verify that anchors, seats, plates, reinforcement, and other items to be cast into concrete are

accurately placed, positioned securely, and will not interfere with placing concrete.

Page 50: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

CAST-IN-PLACE CONCRETE 033000_SFL Page 5 of 7

2017

3.2 PREPARATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

preparation.

B. Previously Placed Concrete:

1. Prepare previously placed concrete by cleaning with steel brush and applying bonding agent.

2. Remove laitance, coatings, and unsound materials.

C. In locations where new concrete is doweled to existing work, drill holes in existing concrete,

insert steel dowels, and pack solid with non-shrink grout.

D. Remove debris and ice from formwork, reinforcement, and concrete substrates.

E. Remove water from areas receiving concrete before concrete is placed.

3.3 INSTALLATION

A. Placing Concrete:

1. Place concrete according to ACI 301.

2. Notify testing laboratory and Engineer minimum 24 hours prior to commencement of

operations.

3. Ensure that reinforcement, inserts, embedded parts, formed expansion and contraction joints,

and sumps are not disturbed during concrete placement.

4. Install vapor retarder under interior slabs on grade according to ASTM E1643.

5. Lap joints minimum 6 inches and seal watertight by adhesive applied between overlapping

edges and ends.

6. Repairs:

a. Repair vapor retarder damaged during placement of concrete reinforcement.

b. Using vapor retarder material, lap over damaged areas minimum 6 inches and seal

watertight.

7. Deposit concrete at final position, preventing segregation of mix.

8. Place concrete in continuous operation for each panel or section as determined by

predetermined joints.

9. Consolidate concrete.

10. Maintain records of concrete placement, including date, location, quantity, air temperature,

and test samples taken.

11. Place concrete continuously between predetermined expansion, control, and construction

joints.

12. Do not interrupt successive placement and do not permit cold joints to occur.

B. Concrete Finishing:

1. Provide formed concrete surfaces to be left exposed with light broom finish.

2. Steel trowel surfaces indicated to be exposed.

C. Curing and Protection:

1. Immediately after placement, protect concrete from premature drying, excessively hot or

cold temperatures, and mechanical injury.

2. Protect concrete footings from freezing for minimum of five days.

Page 51: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 6 of 7 CAST-IN-PLACE CONCRETE 033000_SFL

2017

3. Maintain concrete with minimal moisture loss at relatively constant temperature for period

as necessary for hydration of cement and hardening of concrete.

4. Cure concrete according to ACI 308.1 using plastic membrane curing method.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Section 01 70 00 - Execution and Closeout Requirements: Requirements for testing, adjusting,

and balancing.

C. Inspection and Testing: Provided by Contractor and performed by independent testing laboratory

according to 2016 State Specifications for Public Works Projects (Orange Book).

D. Perform inspection and testing according to 2016 State Specifications for Public Works Projects

(Orange Book).

E. Provide unrestricted access to Work and cooperate with appointed testing and inspection firm.

F. Submit proposed mix design of each class of concrete to inspection and testing firm for review

prior to commencement of Work.

G. Concrete Inspections:

1. Continuous Placement Inspection: Inspect for proper installation procedures.

2. Periodic Curing Inspection: Inspect for specified curing temperature and procedures.

H. Strength Test Samples:

1. Sampling Procedures: Comply with ASTM C172.

2. Cylinder Molding and Curing Procedures:

a. Comply with ASTM C31.

b. Cylinder Specimens: Field cured.

3. Sample concrete and make one set of three cylinders for every 75 cu. yd. or less of each

class of concrete placed each day, and for every 5,000 sq. ft. of surface area for slabs and

walls.

4. Concrete testing is not required for any class of concrete where less than 10 cubic yards are

placed, unless specified elsewhere in the individual specifications or on the Drawings.

5. If volume of concrete for a class of concrete would provide less than five sets of cylinders,

take samples from five randomly selected batches, or from every batch if less than five

batches are used.

6. Make one additional cylinder during cold weather concreting and field cure.

I. Field Testing:

1. Slump Test Method: Comply with ASTM C143.

2. Air Content Test Method: Comply with ASTM C173.

3. Temperature Test Method: Comply with ASTM C1064.

4. Compressive Strength Concrete:

a. Measure slump and temperature for each sample.

b. Measure air content in air-entrained concrete for each sample.

Page 52: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

CAST-IN-PLACE CONCRETE 033000_SFL Page 7 of 7

2017

J. Cylinder Compressive Strength Testing:

1. Test Method: Comply with ASTM C39.

2. Test Acceptance: According to 2016 State Specifications for Public Works Projects (Orange

Book).

3. Test one cylinder at seven days.

4. Test one cylinder at 28 days.

5. Retain one cylinder for testing when requested by Engineer.

6. Dispose of remaining cylinders if testing is not required.

K. Core Compressive Strength Testing:

1. Sampling and Testing Procedures: Comply with ASTM C42.

2. Test Acceptance: According to ACI 318.

3. Drill three cores for each failed strength test from failed concrete.

L. Water-Soluble Chloride Ion Concentration Test Method:

1. Comply with ASTM C1218.

2. Test at 28 days.

3. Maximum Chloride Ion Concentration: As permitted by 2016 State Specifications for Public

Works Projects (Orange Book).

M. Patching:

1. Allow Engineer to inspect concrete surfaces immediately upon removal of forms.

2. Honeycombing or Embedded Debris in Concrete:

a. Not acceptable.

b. Notify Engineer upon discovery.

3. Patch imperfections as directed by Engineer.

N. Defective Concrete:

1. Description: Concrete not conforming to required lines, details, dimensions, tolerances, or

specified requirements.

2. Repair or replacement of defective concrete will be determined by Engineer.

3. Do not patch, fill, touch up, repair, or replace exposed concrete except upon express

direction of Engineer for each individual area.

3.5 ATTACHMENTS

A. Schedule - Concrete Types and Finishes:

1. Foundation Walls: 3,000 psi, 28-day concrete; form finish with honeycomb-filled surface.

2. Underside of Supported Floors and Structure Exposed to View: 4,000 psi, 28-day concrete;

sack-rubbed finish.

3. Exposed Portico Structure: 4,000 psi, 28-day concrete; air entrained; smooth stone rubbed

finish.

B. Schedule - Joint Fillers:

1. Basement Floor Slab Perimeter Joint Filler: Type A; set 1/8 inch below floor slab elevation.

2. Exterior Retaining Wall at Loading Dock Joint Filler: Type F; recessed 3/8 inch; provide

sealant cover.

END OF SECTION

Page 53: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

7

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SOILS FOR EARTHWORK 310513 Page 1 of 3

2017

SECTION 31 05 13 – AGGREGATES AND SOILS FOR EARTHWORK

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Subsoil materials.

2. Topsoil materials.

3. Fine Aggregate

4. Coarse Aggregate

5. Structural Fill

B. Related Sections:

1. Section 31 23 17 - Trenching.

2. Section 31 23 23 - Fill.

1.2 REFERENCES

A. American Association of State Highway and Transportation Officials:

1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a

4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. ASTM International:

1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil

Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).

2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).

3. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil

Classification System).

1.3 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Materials Source: Submit name of imported materials source.

C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

1.4 QUALITY ASSURANCE

A. Furnish each subsoil material from single source throughout the Work.

B. Perform Work in accordance with 2016 State Specifications for Public Works Project (Orange

Book).

Page 54: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 3 SOILS FOR EARTHWORK 310513

2017

PART 2 PRODUCTS

2.1 SUBSOIL MATERIALS

A. Subsoil Type S1 – Topsoil:

1. Upper 6 to 12 inches of existing native soil.

2. Sod cut and roll vegetal mass for re-use after construction

3. Stockpile loose topsoil for reuse after construction.

B. Subsoil Type S2 – Final Backfill:

1. Excavated and re-used material.

2. Graded.

3. Free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.

2.2 AGGREGATE MATERIALS

A. Aggregate Type A1 - Bedding: Conforming to 2016 State Specifications for Public Works Project

(Orange Book) Class A Bedding standard.

B. Aggregate Type A2 – Drain Rock: Conforming to 2016 State Specifications for Public Works

Project (Orange Book) Class C Standard.

1. Conforming to ASTM D2321 Class I.

2. Coarse angular rock used for trench and excavation stabilization, backfill support.

C. Aggregate Type A3 – Structural Fill: Conforming to 2016 State Specifications for Public Works

Project (Orange Book) Standard, Section 200.01.09.

2.3 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Testing and Inspection Services Testing and analysis of

soil material.

B. When tests indicate materials do not meet specified requirements, change material and retest.

C. Furnish materials of each type from same source throughout the Work.

PART 3 EXECUTION

3.1 EXCAVATION

A. Excavate subsoil and topsoil from areas designated. Strip topsoil to full depth of topsoil in

designated areas. Sod cut vegetal mass, roll and reuse after construction.

B. Stockpile excavated material meeting requirements for subsoil materials and topsoil materials.

C. Remove excess excavated materials not intended for reuse, from site.

D. Remove excavated materials not meeting requirements for subsoil materials from site.

Page 55: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

7

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SOILS FOR EARTHWORK 310513 Page 3 of 3

2017

3.2 STOCKPILING

A. Stockpile materials on site at locations indicated.

B. Stockpile in sufficient quantities to meet Project schedule and requirements.

C. Separate differing materials with dividers or stockpile apart to prevent mixing.

D. Prevent intermixing of soil types or contamination.

E. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.

F. Stockpile unsuitable materials on impervious material and cover to prevent erosion and leaching,

until disposed of.

3.3 STOCKPILE CLEANUP

A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free

standing surface water.

B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface to

prevent free standing surface water.

END OF SECTION

Page 56: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

EXCAVATION 312316 Page 1 of 3

2017

SECTION 31 23 16 - EXCAVATION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Soil densification.

2. Excavating for building foundations.

3. Excavating for site structures.

B. Related Sections:

1. Section 31 05 13 – Aggregates and Soils for Earthwork: Stockpiling excavated materials.

2. Section 31 23 17 - Trenching: Excavating for utility trenches.

3. Section 31 23 18 - Rock Removal: Removal of rock during excavating.

4. Section 31 23 23 - Fill.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 REFERENCES

A. Local utility standards when working within 24 inches of utility lines.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Excavation Protection Plan: Describe sheeting, shoring, and bracing materials and installation

required to protect excavations and adjacent structures and property; include structural

calculations to support plan.

1.5 QUALITY ASSURANCE

A. Perform Work in accordance with 2016 State Standard Specifications for Public Works (Orange

Book) standards.

1.6 QUALIFICATIONS

A. Prepare excavation protection plan for approval by Engineer.

PART 2 PRODUCTS

Not Used.

Page 57: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 3 EXCAVATION 312316

2017

PART 3 EXECUTION

3.1 PREPARATION

A. Call Local Utility Line Information service CALL BEFORE YOU DIG 1-800-227-2600 not less

than 48 hours before performing Work.

1. Request underground utilities to be located and marked within and surrounding construction

areas.

B. Identify required lines, levels, contours, and datum.

C. Notify utility company prior to removing or relocating utilities.

D. Protect utilities indicated to remain from damage.

E. Protect plant life, lawns, rock outcroppings and other features remaining as portion of final

landscaping.

F. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and

curbs from excavating equipment and vehicular traffic.

3.2 SOIL DENSIFICATION - VIBRO-COMPACTION

A. Vibro-compact substrates below footing bearing surfaces for footings as indicated on Drawings

before excavating site.

B. Densify existing subsoils with relative density rating of compact to dense to attain relative density

rating of very dense.

C. Densification Equipment:

1. Depth Vibrator: Poker type with follower tubes with visible marking every 12 inches to

enable insertion depth measurement.

2. Motion: radial in horizontal plane.

3. Data Acquisition System: Record amps or pressure of the vibrator motor over time and

depth.

D. Insert vibrator to maximum specified depth. Densify soils for 30 seconds or other time as directed

by Engineer. Withdraw vibrator every 12 inches increments and repeat densification at each

increment.

1. When subsurface obstruction prevents vibrator insertion to specified depth, request

instructions from Engineer to compensate for obstruction.

E. Tolerances:

1. Maximum Deviation from Center of Completed Compaction: 8 inches from indicated

position.

2. Maximum Deviation from Vertical: 4 degrees during vibrator insertion.

Page 58: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

EXCAVATION 312316 Page 3 of 3

2017

3.3 EXCAVATION

A. Underpin adjacent structures which may be damaged by excavation work.

B. Excavate subsoil to accommodate force main piping, connections, testing, construction

operations, and light traffic.

C. Excavate to working elevation for installing new force main.

D. Compact disturbed load bearing soil in direct contact with foundations to original bearing

capacity; perform compaction in accordance with Section 31 23 23 and Section 31 23 17.

E. Slope banks with machine to angle of repose or less until shored.

F. Grade top perimeter of excavation to prevent surface water from draining into excavation.

G. Trim excavation. Remove loose matter.

H. Remove lumped subsoil, boulders, and rock up to 1/3 cu yd measured by volume. Remove larger

material as specified in Section 31 23 23.

I. Notify Engineer of unexpected subsurface conditions.

J. Correct areas over excavated with structural fill Type A3 specified in Section 31 23 23, as

directed by Engineer.

K. Remove excess and unsuitable material from site.

L. Repair or replace items indicated to remain damaged by excavation.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Perform inspection of excavation and controlled fill operations in accordance with 2016 State

Standard Specifications for Public Works (Orange Book) standards.

C. Request visual inspection of bearing surfaces by Engineer before installing subsequent work.

3.5 PROTECTION

A. Prevent displacement or loose soil from falling into excavation; maintain soil stability.

B. Protect bottom of excavations and soil adjacent to and beneath foundation from freezing.

C. Protect structures, utilities and other facilities from damage caused by settlement, lateral

movement, undermining, washout, and other hazards created by earth operations.

END OF SECTION

Page 59: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

TRENCHING 312317 Page 1 of 5

2017

SECTION 31 23 17 - TRENCHING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Excavating trenches for utilities from outside building to utility service.

2. Compacted fill from top of utility bedding to subgrade elevations.

3. Backfilling and compaction.

B. Related Sections:

1. Section 03 30 00 - Cast-In-Place Concrete: Concrete materials.

2. Section 31 05 13 - Soils for Earthwork: Soils for fill.

3. Section 31 23 16 - Excavation: General building excavation.

4. Section 31 23 18 - Rock Removal: Removal of rock during excavating.

5. Section 31 23 23 - Fill: General backfilling.

6. Section 33 31 00 - Sanitary Utility Sewerage Piping: Sanitary sewer piping and bedding

from building to utility service.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 REFERENCES

A. American Association of State Highway and Transportation Officials:

1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a

4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. ASTM International:

1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil

Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).

2. ASTM D1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the

Sand-Cone Method.

3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).

4. ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the

Rubber Balloon Method.

5. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by

Nuclear Methods (Shallow Depth).

6. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by

Nuclear Methods (Shallow Depth).

1.4 DEFINITIONS

A. Utility: Any buried pipe, duct, conduit, or cable.

Page 60: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 5 TRENCHING 312317

2017

1.5 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Excavation Protection Plan: Describe sheeting, shoring, and bracing materials and installation

required to protect excavations and adjacent structures and property; include structural

calculations to support plan.

C. Product Data: Submit data for geotextile fabric indicating fabric and construction.

D. Materials Source: Submit name of imported fill materials suppliers.

E. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance 2016 State Standard Specifications for Public Works (Orange Book)

standards.

1.7 QUALIFICATIONS

A. Prepare excavation protection plan for approval of Engineer.

1.8 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

1.9 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

B. Verify Work associated with lower elevation utilities is complete before placing higher elevation

utilities.

PART 2 PRODUCTS

2.1 FILL MATERIALS

A. Bedding Support: Type A2 as specified in Section 31 05 13.

B. Structural Fill: Type A3 as specified in Section 31 05 13.

C. Bedding: Type A1 as specified in Section 31 05 13.

D. Initial Backfill: Conforming to 2016 State Standard Specifications for Public Works (Orange

Book) Class E.

E. Final Backfill: Native stockpiled material from 12-inches to finish grade.

Page 61: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

TRENCHING 312317 Page 3 of 5

2017

F. Concrete: Structural concrete as specified in Section 03 30 00 with compressive strength of 4000

psi.

2.2 ACCESSORIES – NOT USED

PART 3 EXECUTION

3.1 LINES AND GRADES

A. Lay pipes to lines and grades indicated on Drawings.

1. Engineer reserves right to make changes in lines, grades, and depths of utilities when

changes are required for Project conditions.

B. Use laser-beam instrument with qualified operator to establish lines and grades.

3.2 PREPARATION

A. Call Local Utility Line Information service at CALL BEFORE YOU DIG 1-800-227-2600 not

less than 48 hours before performing Work.

1. Request underground utilities to be located and marked within and surrounding construction

areas.

B. Identify required lines, levels, contours, and datum locations.

C. Protect plant life, lawns, rock outcropping and other features remaining as portion of final

landscaping.

D. Protect bench marks, existing structures, fences, sidewalks, paving, and curbs from excavating

equipment and vehicular traffic.

E. Maintain and protect above and below grade utilities indicated to remain.

F. Establish temporary traffic control and detours when trenching is performed in public right-of-

way. Relocate controls and reroute traffic as required during progress of Work.

3.3 TRENCHING

A. Excavate subsoil required for utilities to utility service.

B. Remove lumped subsoil, boulders, and rock up of 1/6 cubic yard, measured by volume. Remove

larger material as specified in Section 31 23 18.

C. Perform hand excavation within 24 inches of existing utility service in accordance with utility’s

requirements.

D. Do not advance open trench more than 200 feet ahead of installed pipe.

E. Cut trenches to width indicated on Drawings. Remove water or materials that interfere with

Work.

Page 62: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 5 TRENCHING 312317

2017

F. Excavate bottom of trenches maximum two (2) feet wider than outside diameter of pipe.

G. Excavate trenches to depth indicated on Drawings. Provide uniform and continuous bearing and

support for bedding material and pipe.

H. When Project conditions permit, slope side walls of excavation starting bottom third of trench or

2 feet above top of pipes. When side walls cannot be sloped, provide sheeting and shoring to

protect excavation as specified in this section.

I. When subsurface materials at bottom of trench are loose or soft, excavate to greater depth as

directed by Engineer until suitable material is encountered.

J. Cut out soft areas of subgrade not capable of compaction in place. Backfill with Fill Type A2 and

compact to density equal to or greater than requirements for subsequent backfill material.

K. Trim excavation. Hand trim for bell and spigot pipe joints. Remove loose matter.

L. Correct over excavated areas with compacted backfill as specified for authorized excavation or

replace with fill concrete as directed by Engineer.

M. Remove excess subsoil not intended for reuse, from site.

3.4 SHEETING AND SHORING

A. Sheet, shore, and brace excavations to prevent danger to persons, structures and adjacent

properties and to prevent caving, erosion, and loss of surrounding subsoil.

B. Support trenches more than 5 feet deep excavated through unstable, loose, or soft material.

Provide sheeting, shoring, bracing, or other protection to maintain stability of excavation.

C. Design sheeting and shoring to be removed at completion of excavation work.

D. Repair damage caused by failure of the sheeting, shoring, or bracing and for settlement of filled

excavations or adjacent soil.

E. Repair damage to new and existing Work from settlement, water or earth pressure or other causes

resulting from inadequate sheeting, shoring, or bracing.

3.5 BACKFILLING

A. Backfill trenches to contours and elevations with unfrozen fill materials.

B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over

porous, wet, frozen, or spongy subgrade surfaces.

C. Place material in continuous layers as follows:

1. Subsoil Final and intitial Backfill: Maximum 8 inches compacted depth.

a. De-compact top 6 inches of final backfill to receive sod layer.

2. Structural Fill: Maximum 6 inches compacted depth.

Page 63: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

TRENCHING 312317 Page 5 of 5

2017

3. Bedding Fill: Maximum 8 inches compacted depth.

D. Employ placement method that does not disturb or damage site drainage, utilities in trench, and

roadway shoulder or pavement.

E. Maintain optimum moisture content of fill materials to attain required compaction density.

F. Do not leave more than 50 feet of trench open at end of working day.

G. Protect open trench to prevent danger to the public.

3.6 TOLERANCES

A. Section 01 40 00 - Quality Requirements: Tolerances.

B. Top Surface of Backfilling Under Paved Areas: Plus or minus 1 inch 0.08 feet from required

elevations.

C. Top Surface of General Backfilling: Plus or minus 1 inch 0.08 feet from required elevations.

3.7 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Perform laboratory material tests in accordance with ASTM D1557.

C. Perform in place compaction tests in accordance with the following:

1. Density Tests: ASTM D1556, ASTM D2167, or ASTM D2922.

2. Moisture Tests: ASTM D3017.

D. When tests indicate Work does not meet specified requirements, remove Work, replace, compact,

and retest.

E. Frequency of Tests: Once per lift.

3.8 PROTECTION OF FINISHED WORK

A. Section 01 70 00 - Execution and Closeout Requirements: Protecting finished work.

B. Reshape and re-compact fills subjected to vehicular traffic during construction.

3.9 SCHEDULE

A. Sanitary Piping:

1. Cover pipe and bedding with Fill Type S2: To subgrade elevation.

2. Compact uniformly to minimum 95 percent of maximum density.

END OF SECTION

Page 64: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

ROCK REMOVAL 312318 Page 1 of 2

2017

SECTION 31 23 18 - ROCK REMOVAL

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removing discovered rock during excavation.

2. Expansive tools to assist rock removal.

B. Related Sections:

1. Section 31 23 16 - Excavation: Building excavation.

2. Section 31 23 17 - Trenching: Trenching and backfilling for utilities.

3. Section 31 23 23 - Fill: Backfill materials.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 DEFINITIONS

A. Site Rock: Solid mineral material that cannot be removed with a 70,000 lb excavator (e.g. Link-

Belt 240 X2, or equivalent) will be classified as differing subsurface conditions and the

provisions of the Agreement’s General Conditions 4.03 shall be applied and the work shall

proceed accordingly.

1.4 SUBMITTALS – NOT USED

1.5 QUALITY ASSURANCE – NOT USED

1.6 PROJECT CONDITIONS

A. Alluvial fill which may contain granitic boulders.

1.7 SCHEDULING

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

PART 2 PRODUCTS

2.1 MATERIALS

A. Mechanical Disintegration Compound: Grout mix of expansive materials that expand on curing.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

Page 65: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 2 ROCK REMOVAL 312318

2017

B. Verify site conditions and note subsurface irregularities affecting Work of this section.

3.2 PREPARATION

A. Identify required lines, levels, contours, and datum.

3.3 ROCK REMOVAL BY MECHANICAL METHOD

A. Excavate and remove rock by mechanical method.

1. Drill holes and use expansive tools, wedges, or mechanical disintegration compound to

fracture rock.

B. Cut away rock at bottom of excavation to form level bearing.

C. Remove shaled layers to provide sound and unshattered base for sump foundation

D. In utility trenches, excavate to 6 inches below invert elevation of pipe and 24 inches wider than

pipe diameter.

E. Remove unsuitable excavated materials from site.

F. Correct unauthorized rock removal in accordance with backfilling and compacting requirements

of Section 31 23 23.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Request visual inspection of foundation bearing surfaces by Engineer before installing subsequent

work.

END OF SECTION

Page 66: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

DEWATERING 312319 Page 1 of 5

2017

SECTION 31 23 19 - DEWATERING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Dewatering system.

2. Surface water control system.

3. System operation and maintenance.

4. Water disposal.

B. Related Sections:

1. Section 31 23 16 - Excavation: Excavation for structures below ground water table.

2. Section 31 23 17 - Trenching: Trenching for utilities below ground water table.

3. Section 31 25 00 - Erosion and Sedimentation Controls: Surface water runoff control.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 REFERENCES

A. ASTM International:

1. ASTM C33 - Standard Specification for Concrete Aggregates.

1.4 DEFINITIONS

A. Dewatering includes the following:

1. Lowering of ground water table and intercepting horizontal water seepage to prevent ground

water from entering excavations and trenches.

2. Reducing piezometric pressure within strata to prevent failure or heaving of excavations and

trenches.

3. Disposing of removed water.

B. Surface Water Control: Removal of surface water within open excavations.

1.5 SYSTEM DESCRIPTION

A. Provide dewatering and surface water control systems to permit Work to be completed on dry and

stable subgrade.

1. Install well points to dewater and relieve hydrostatic pressure within strata as encountered

during the Work.

1.6 PERFORMANCE REQUIREMENTS

A. Design dewatering systems to:

1. Lower water table within areas of excavation to minimum two feet below bottom of

excavation to permit Work to be completed on dry and stable subgrade.

Page 67: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 5 DEWATERING 312319

2017

2. Relieve hydrostatic pressures in confined water bearing strata below excavation to eliminate

risk of uplift or other instability of excavation.

3. Prevent damage to adjacent properties, buildings, structures, utilities, and facilities from

construction operations.

4. Prevent loss of fines, quick condition, or softening of foundation subgrade.

5. Maintain stability of sides and bottoms of excavations and trenches.

B. Design surface water control systems to:

1. Collect and remove surface water and seepage entering excavation.

1.7 SUBMITTALS – NOT USED

1.8 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals.

1.9 QUALITY ASSURANCE

A. Perform Work in accordance with 2016 State Standard Specifications for Public Works Projects

(Orange Book).

1.10 PRE-INSTALLATION MEETINGS

A. Section 01 30 00 - Administrative Requirements: Pre-installation meeting.

B. Convene minimum one week prior to commencing work of this section.

1.11 SEQUENCING

A. Section 01 10 00 - Summary: Requirements for sequencing.

B. Sequence work to install and test dewatering and surface water control systems.

1.12 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination.

B. Coordinate work to permit the following construction operations to be completed on dry stable

substrate.

1. Excavation for structures specified in Section 31 23 16.

2. Trenching for utilities specified in Section 31 23 17.

Page 68: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

DEWATERING 312319 Page 3 of 5

2017

PART 2 PRODUCTS – NOT USED

2.1 MONITORING EQUIPMENT – NOT USED

2.2 ACCESSORIES – NOT USED

A. Filter Sand: ASTM C33; natural river or bank sand; washed; free of silt, clay, loam, friable or

soluble materials, and organic matter; graded to suit well screen.

B. Grout: Mixture of portland cement and bentonite clay or sand suitable for sealing abandoned

wells and piping.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Verification of existing conditions before

starting work.

B. Call Local Utility Line Information service at CALL BEFORE YOU DIG 1-800-227-2600 not

less than 48 hours before performing Work.

1. Request underground utilities to be located and marked within and surrounding construction

areas.

3.2 PREPARATION

A. Protect existing adjacent buildings, structures, and improvements from damage caused by

dewatering operations.

3.3 DEWATERING SYSTEM

A. Install dewatering system in accordance with Drawings, or as Work requires based upon

conditions encountered.

B. Locate system components to allow continuous dewatering operations without interfering with

installation of permanent Work and existing public rights-of-way, sidewalks, and adjacent

buildings, structures, and improvements.

C. Install pumps in accordance with manufacturer’s instructions.

3.4 SURFACE WATER CONTROL SYSTEM

A. Provide ditches, berms, and other devices to divert and drain surface water from excavation area

as specified in Section 31 25 00.

B. Divert surface water and seepage water within excavation areas into sumps and pump water into

settling basins in accordance with requirements of agencies having jurisdiction.

Page 69: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 5 DEWATERING 312319

2017

C. Control and remove unanticipated water seepage into excavation.

3.5 SYSTEM OPERATION AND MAINTENANCE

A. Operate dewatering system continuously until backfill is minimum 2 feet above normal ground

water table elevation.

B. Provide 24-hour supervision of dewatering system by personnel skilled in operation,

maintenance, and replacement of system components.

C. Conduct daily observation of dewatering system and monitoring system. Make required repairs

and perform scheduled maintenance.

D. Fill fuel tanks before tanks reach 25 percent capacity.

E. When dewatering system cannot control water within excavation, notify Engineer and stop

excavation work.

1. Supplement or modify dewatering system and provide other remedial measures to control

water within excavation.

2. Demonstrate dewatering system operation complies with performance requirements before

resuming excavation operations.

F. Modify dewatering and surface water control systems when operation causes or threatens to cause

damage to new construction, existing site improvements, adjacent property, or adjacent water

wells.

G. Correct unanticipated pressure conditions affecting dewatering system performance.

H. Do not discontinue dewatering operations without Engineer’s approval.

3.6 WATER DISPOSAL

A. Discharge water into settling basins as shown on the Drawings.

3.7 SYSTEM REMOVAL

A. Remove dewatering and surface water control systems after dewatering operations are

discontinued.

B. Repair damage caused by dewatering and surface water control systems or resulting from failure

of systems to protect property.

3.8 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. After dewatering system is installed, perform pumping test to determine when selected pumping

rate lowers water level in well below pump intake. Adjust pump speed, discharge volume, or both

to ensure proper operation of each pump.

Page 70: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

DEWATERING 312319 Page 5 of 5

2017

C. Submit weekly monitoring reports including the following:

1. Dewatering flow rates.

2. Piezometer readings.

END OF SECTION

Page 71: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

FILL 312323 Page 1 of 4

2017

SECTION 31 23 23 - FILL

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Backfilling trenches.

2. Fill for over-excavation.

B. Related Sections:

1. Section 03 30 00 - Cast-In-Place Concrete: Concrete materials.

2. Section 31 05 13 – Aggregates and Soils for Earthwork: Aggregates and Soils for fill.

3. Section 31 22 13 - Rough Grading: Site filling.

4. Section 31 23 16 - Excavation.

5. Section 31 23 17 - Trenching: Backfilling of utility trenches.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 REFERENCES

A. American Association of State Highway and Transportation Officials:

1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a

4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. ASTM International:

1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil

Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).

2. ASTM D1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the

Sand-Cone Method.

3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).

4. ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the

Rubber Balloon Method.

5. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by

Nuclear Methods (Shallow Depth).

6. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by

Nuclear Methods (Shallow Depth).

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data for geotextile fabric indicating fabric and construction.

C. Materials Source: Submit name of imported fill materials suppliers.

D. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

Page 72: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 4 FILL 312323

2017

1.5 QUALITY ASSURANCE

A. Perform Work in accordance with 2016 State Standard Specifications for Public Works (Orange

Book) standards.

PART 2 PRODUCTS

2.1 FILL MATERIALS

A. Subsoil Fill: Type S2 as specified in Section 31 05 13.

B. Structural Fill: Type A3 as specified in Section 31 05 13.

C. Bedding: Type A1 as specified in Section 31 05 13.

D. Bedding Support: Type A2 as specified in Section 31 05 13.

E. Concrete: Structural concrete as specified in Section 03 30 00 with compressive strength of 4,000

psi.

F. Where backfilling occurs within NDOT ROW, all materials and methods for backfilling shall

conform to NDOT specifications.

2.2 ACCESSORIES – NOT USED

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

B. Verify subdrainage, dampproofing, or waterproofing installation has been inspected.

3.2 PREPARATION

A. Compact subgrade to density requirements for subsequent backfill materials.

B. Cut out soft areas of subgrade not capable of compaction in place. Backfill with granular fill and

compact to density equal to or greater than requirements for subsequent fill material. Stabilize

trench bottom for bedding with coarse aggregate Type A2.

C. Scarify subgrade surface to depth of 6 inches.

D. Proof roll to identify soft spots; fill and compact to density equal to or greater than requirements

for subsequent fill material. No visible deflection of subgrade shall be allowed prior to placing of

bedding.

Page 73: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

FILL 312323 Page 3 of 4

2017

3.3 BACKFILLING

A. Backfill areas to contours and elevations with unfrozen materials.

B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over

porous, wet, frozen or spongy subgrade surfaces.

C. Place geotextile fabric over any non-graded aggregate fill, or structural remediation for poor

subgrade conditions described in Section 3.2 prior to placing next lift of fill.

D. Place material in continuous layers as follows:

1. Subsoil Fill: Maximum 8 inches compacted depth.

2. Structural Fill: Maximum 6 inches compacted depth.

3. Bedding Fill: Maximum8 inches compacted depth.

E. Employ placement method that does not disturb or damage other work.

F. Maintain optimum moisture content of backfill materials to attain required compaction density.

G. Backfill against supported foundation walls. Do not backfill against unsupported foundation

walls.

H. Backfill simultaneously on each side of unsupported foundation walls until supports are in place.

I. Slope grade away from building minimum 2 percent slope for minimum distance of 10 ft, unless

noted otherwise.

J. Make gradual grade changes. Blend slope into level areas.

K. Remove surplus backfill materials from site.

L. Leave fill material stockpile areas free of excess fill materials.

3.4 TOLERANCES

A. Section 01 40 00 - Quality Requirements: Tolerances.

B. Top Surface of Backfilling Under Paved Areas: Plus or minus 1 inch from required elevations.

C. Top Surface of General Backfilling: Plus or minus 1 inch from required elevations.

3.5 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Perform laboratory material tests in accordance with ASTM D1557.

C. Perform in place compaction tests in accordance with the following:

1. Density Tests: ASTM D1556, or ASTM D2922.

Page 74: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 4 FILL 312323

2017

2. Moisture Tests: ASTM D3017.

D. When tests indicate Work does not meet specified requirements, remove Work, replace and retest.

E. Frequency of Tests: Once per lift.

F. Proof roll compacted fill surfaces under slabs-on-grade, paving, and bedding for SRP Tanks.

3.6 PROTECTION OF FINISHED WORK

A. Section 01 70 00 - Execution and Closeout Requirements: Protecting finished work.

B. Reshape and re-compact fills subjected to vehicular traffic.

3.7 SCHEDULE

A. Sanitary Force Mains:

1. Initial fill of Fill Type A1, 6 inches thick lifts, to 12 inches above pipe, compacted to 90

percent.

2. Initial Backfill conforming to Class E, to less than 12 inches below subgrade elevation. Max

8” lift, compact uniformly to 90 percent of maximum density.

3. Final backfill of type S1. De-compact top 6 inches to receive sod layer.

B. Fill Under Right of Way:

1. Compact subsoil to 95 percent of its maximum dry density.

2. Fill Type A3, compact uniformly to 95 percent of maximum density.

END OF SECTION

Page 75: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation – Contract B

FLOWABLE FILL 312324 Page 1 of 6

2017

SECTION 31 23 24 - FLOWABLE FILL

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Flowable fill for:

a. Filling abandoned utilities.

B. Related Requirements:

1. Section 31 23 16 - Excavation: General building excavation.

2. Section 31 23 17 - Trenching: Soil and aggregate backfill for utility trenches.

3. Section 31 23 23 - Fill: Soil and aggregate backfill for structures.

4. Section 33 34 00 – Sanitary Utility Sewerage Force Mains.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 DEFINITIONS

A. Utility: Any buried pipe, duct, conduit, manhole, tank, or cable.

B. Excavatable Flowable Fill: Lean cement concrete fill used where future excavation may be

required, such as fill for utility trenches, bridge abutments, and culverts.

C. Non-excavatable Flowable Fill: Lean cement concrete fill used where future excavation is not

anticipated, such as fill below structure foundations and filling abandoned utilities.

1.4 REFERENCE STANDARDS

A. ASTM International:

1. ASTM C33 - Standard Specification for Concrete Aggregates.

2. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete.

3. ASTM C150 - Standard Specification for Portland Cement.

4. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.

5. ASTM C403/C403M - Standard Test Method for Time of Setting of Concrete Mixtures by

Penetration Resistance.

6. ASTM C494/C494M - Standard Specification for Chemical Admixtures for Concrete.

7. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural

Pozzolan for Use as a Mineral Admixture in Concrete.

8. ASTM C1017/C1017M - Standard Specification for Chemical Admixtures for Use in

Producing Flowing Concrete.

9. ASTM C1040 - Standard Test Methods for Density of Unhardened and Hardened Concrete

in Place By Nuclear Methods.

10. ASTM D4832 - Standard Test Method for Preparation and Testing of Controlled Low

Strength Material (CLSM) Test Cylinders.

Page 76: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation – Contract B

Page 2 of 6 FLOWABLE FILL 312324

2017

1.5 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

C. Field Quality-Control Submittals:

1. Mix Design:

a. Furnish flowable fill mix design for each specified strength.

b. Furnish separate mix designs when admixtures are require for the following:

1) Flowable fill Work during hot and cold weather.

2) Air entrained flowable fill Work.

c. Identify design mix ingredients, proportions, properties, admixtures, and tests.

2. Furnish test results to certify flowable fill mix design properties meet or exceed specified

requirements.

D. Delivery Tickets:

1. Furnish duplicate delivery tickets indicating actual materials delivered to Project Site.

E. Qualifications Statements:

1. Submit qualifications for supplier.

1.6 QUALITY ASSURANCE

A. Perform Work according to 2012 State Standard Specifications for Public Works (Orange Book)

standards.

1.7 QUALIFICATIONS

A. Supplier:

1. Company specializing in supplying products specified in this Section with minimum three

years' experience.

2. Product source approved by Engineer..

1.8 ENVIRONMENTAL REQUIREMENTS

A. Section 01 50 00 - Temporary Facilities and Controls specifies ambient condition control

facilities for product storage and installation.

B. Minimum Conditions: Do not install flowable fill during inclement weather or when ambient

temperature is less than 40 degrees F.

1.9 FIELD MEASUREMENTS

A. Verify field measurements before installing flowable fill to establish quantities required to

complete the Work.

Page 77: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation – Contract B

FLOWABLE FILL 312324 Page 3 of 6

2017

PART 2 PRODUCTS

2.1 FLOWABLE FILL

A. Furnish materials according to 2012 State Standard Specifications for Public Works (Orange

Book) standards.

B. Flowable Fill: Excavatable type and non-excavatable type.

2.2 MATERIALS

A. Portland Cement: ASTM C150 Type III - High Early Strength.

B. Fine Aggregates: ASTM C33.

C. Water: Clean and not detrimental to concrete.

2.3 ADMIXTURES

1. Furnish materials according to 2012 State Standard Specifications for Public Works (Orange

Book) standards.

B. Air Entrainment: ASTM C260.

C. Chemical Admixture: ASTM C494/C494M.

D. Fly Ash: ASTM C618 Class C or F obtained from residue of electric generating plant using

ground or powdered coal.

2.4 MIXES

A. Mix and deliver flowable fill according to ASTM C94/C94M, Option C.

B. Flowable Fill Design Mix:

ITEM EXCAVATABLE NON-EXCAVATABLE

Cement Content 75 to 100 lb/cu yd 100 to 150 lb/cu yd

Fly Ash Content None 150-600 pcf

Water Content As specified As specified

Air Entrainment 5 to 35 percent 5 to 15 percent

28-Day Compressive

Strength

Maximum 100 psi. Minimum 125 psi

Unit Mass (Wet) 80 to 110 pcf 100 to 125 pcf

Temperature, Minimum at

Point of Delivery

50 degrees F 50 degrees F

C. Provide water content in design mix to produce self-leveling, flowable fill material at time of

placement.

Page 78: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation – Contract B

Page 4 of 6 FLOWABLE FILL 312324

2017

D. Design mix air entrainment and unit mass are for laboratory design mix and source quality

control only.

2.5 SOURCE QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Testing, inspection and analysis requirements.

B. Test and analyze properties of flowable fill design mix and certify results for the following:

1. Design mix proportions by weight of each material.

2. Aggregate: ASTM C33 for material properties and gradation.

3. Properties of plastic flowable fill design mix including:

a. Temperature.

b. Slump.

c. Air entrainment.

d. Wet unit mass.

e. Yield.

f. Cement factor.

4. Properties of hardened flowable fill design mix including:

a. Compressive strength at 1 day, 7 days, and 28 days. Report compressive strength of

each specimen and average specimen compressive strength.

b. Unit mass for each specimen and average specimen unit mass at time of compressive

strength testing.

C. Prepare delivery tickets containing the following information:

1. Project designation.

2. Date.

3. Time.

4. Class and quantity of flowable fill.

5. Actual batch proportions.

6. Free moisture content of aggregate.

7. Quantity of water withheld.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Verification of existing conditions before

starting Work.

B. Verify excavation specified in Section 31 23 16 and trenching specified in Section 31 23 17 is

complete.

C. Where encountered sub-surface conditions require that flowable fill be used over specified soil

fill, promptly inform Engineer. Do not place flowable fill instead of specified soil fill without

Engineer’s approval.

D. Verify utility installation is complete and tested before placing flowable fill.

Page 79: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation – Contract B

FLOWABLE FILL 312324 Page 5 of 6

2017

E. Verify excavation is dry and dewatering system is operating.

3.2 PREPARATION

A. Section 01 70 00 - Execution and Closeout Requirements equirements for installation preparation.

B. Support and restrain utilities to prevent movement and flotation during installation of flowable

fill.

C. Protect structures and utilities from damage caused by hydraulic pressure of flowable fill before

fill hardens.

D. Protect utilities and foundation drains to prevent intrusion of flowable fill.

3.3 INSTALLATION - FILLING ABANDONED UTILITIES

A. Verify pipes and conduits are not clogged and are sufficiently empty to permit gravity installation

of flowable fill for entire length indicated to be filled.

B. Seal lower end of pipes and conduits by method to contain flowable fill and to vent trapped air

caused by filling operations.

C. Place flowable fill using method to ensure there are no voids.

1. Fill pipes and conduits from high end.

2. Fill manholes, tanks, and other structures from grade level access points.

D. After filling pipes and conduits seal both ends.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements equirements for inspecting and testing.

B. Perform inspection and testing according to ASTM C94/C94M.

1. Take samples for tests for every 150 cu yd of flowable fill, or fraction thereof, installed each

day.

2. Sample, prepare and test four compressive strength test cylinders according to ASTM

D4832. Test one specimen at 3 days, one at 7 days, and two at 28 days.

3. Measure temperature at point of delivery when samples are prepared.

C. Perform in place penetration (density) tests using hand held penetrometer to measure penetration

resistance of hardened flowable fill according to ASTM C403.

1. Perform tests at locations as directed by Engineer

D. Defective Flowable Fill: Fill failing to meet the following test requirements or fill delivered

without the following documentation.

1. Test Requirements:

a. Minimum temperature at point of delivery.

b. Compressive strength requirements for each type of fill.

2. Documentation: Duplicate delivery tickets.

Page 80: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation – Contract B

Page 6 of 6 FLOWABLE FILL 312324

2017

3.5 CLEANING

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for cleaning.

B. Remove spilled and excess flowable fill from Project Site.

C. Restore facilities and Site areas damaged or contaminated by flowable fill installation to existing

condition before installation.

END OF SECTION

Page 81: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

EROSION AND SEDIMENTATION CONTROLS 312500 Page 1 of 4

2017

SECTION 31 25 00 - EROSION AND SEDIMENTATION CONTROLS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Sediment Ponds.

2. Sediment Traps.

3. Site Restoration & Revegetation

B. Related Sections:

1. Section 03 30 00 - Cast-In-Place Concrete.

2. Section 31 05 13 - Soils for Earthwork.

3. Section 31 23 16 - Excavation.

4. Section 31 23 23 - Fill.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 REFERENCES

A. American Association of State Highway and Transportation Officials:

1. AASHTO T88 - Standard Specification for Particle Size Analysis of Soils.

2. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a

4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

C. ASTM International:

1. ASTM C127 - Standard Test Method for Density, Relative Density (Specific Gravity), and

Absorption of Coarse Aggregate.

2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil

Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).

3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).

4. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by

Nuclear Methods (Shallow Depth).

5. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by

Nuclear Methods (Shallow Depth).

D. Precast/Prestressed Concrete Institute:

1. PCI MNL-116S - Manual for Quality Control for Plants and Production of Precast and

Prestressed Concrete Products.

1.4 SUBMITTALS

A. Revegetation Mix

Page 82: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 4 EROSION AND SEDIMENTATION CONTROLS 312500

2017

1. Submit to Engineer for approval grass hay seed mix with recommended application rates and

mulch recommendations, if any.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals.

1.6 QUALITY ASSURANCE

A. Perform Work in accordance with requirements of Section 31 05 13, Section 31 23 23, Section

31 10 00, Section 31 23 16, AND Section 03 30 00.

B. Perform Work in accordance with TRPA’s BMP handbook.

C. Perform Work in accordance with 2016 State Standard Specifications for Public Works (Orange

Book) standards.

1.7 ENVIRONMENTAL REQUIREMENTS

A. Section 01 60 00 - Product Requirements: Environmental conditions affecting products on site.

B. Do not place grout when air temperature is below freezing.

C. Do not place concrete when base surface temperature is less than 40 degrees F, or surface is wet

or frozen.

D. Apply seed mix for revegetation of disturbed areas in conformance with seed supplier’s

recommendations.

PART 2 PRODUCTS

2.1 ROCK AND GEOTEXTILE MATERIALS

A. Furnish materials in accordance with 2016 State Standard Specifications for Public Works

(Orange Book) standards.

2.2 SEDIMENTATION POND

A. Clear and grub storage area and embankment foundation area site as specified in Section

31 10 00.

B. Do not use coarse aggregate as backfill material around pipe. Backfill pipe with suitable

embankment material to prevent dam leakage along pipe.

C. Construct rock basin at outlet end of pipe, as specified in this Section. Place embankment

material, as specified in Section 31 23 23. When required, obtain borrow excavation for

formation of embankment, as specified in Section 31 23 23.

Page 83: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

EROSION AND SEDIMENTATION CONTROLS 312500 Page 3 of 4

2017

D. Install Work in accordance with 2016 State Standard Specifications for Public Works (Orange

Book) standards.

2.3 SEDIMENT TRAPS

A. Clear site, as specified in Section 31 10 00.

B. Construct trap by excavating and forming embankments as specified in Section 31 23 16, and

Section 31 23 23.

C. Place coarse aggregate or rock at outlet as indicated on Drawings.

D. When required, obtain borrow excavation for formation of embankment, as specified in Section

31 23 16.

2.4 SITE STABILIZATION

A. Incorporate erosion control devices indicated on the Drawings into the Project at the earliest

practicable time.

B. Construct, stabilize and activate erosion controls before site disturbance within tributary areas of

those controls.

C. Stockpile and waste pile heights shall not exceed 35 feet. Slope stockpile sides at 2: 1 or flatter.

D. Stabilize any disturbed area of affected erosion control devices on which activity has ceased and

which will remain exposed for more than 20 days.

1. During non-germinating periods, apply mulch at recommended rates.

2. During germinating periods apply grass hay see mix at recommended rates.

3. Stabilize disturbed areas which are not at finished grade and which will be disturbed within

one year and 50 percent of permanent application rate with no topsoil.

4. Stabilize disturbed areas which are either at finished grade or will not be disturbed within

one year with permanent native seeding specifications.

E. Stabilize diversion channels, sediment traps, and stockpiles immediately.

2.5 SITE RESTORATION

A. All disturbed areas association with constructing the Work shall be reseeded with appropriate see

mix to consist of a grass hay seed mix.

B. Provide 1-year guarantee for revegetation of disturbed areas.

C. Acceptance Criteria:

1. Germination shall occur of grass hay seed mix for greater than 70% of disturbed areas within

6 months of completion of project.

Page 84: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 4 EROSION AND SEDIMENTATION CONTROLS 312500

2017

2.6 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Inspect erosion control devices on a weekly basis and after each runoff event. Make necessary

repairs to ensure erosion and sediment controls are in good working order.

C. Compaction Testing: As specified in Section 31 23 23.

D. When tests indicate Work does not meet specified requirements, remove Work, replace and retest.

2.7 CLEANING

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for cleaning.

B. When sediment accumulation in sedimentation structures has reached a point one-third depth of

sediment structure or device, remove and dispose of sediment.

C. Do not damage structure or device during cleaning operations.

D. Do not permit sediment to erode into construction or site areas or natural waterways.

E. Clean channels when depth of sediment reaches approximately one-half channel depth.

2.8 PROTECTION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for protecting finished

Work.

B. Immediately after placement, protect paving from premature drying, excessive hot or cold

temperatures, and mechanical injury.

C. Protect paving from elements, flowing water, or other disturbance until curing is completed.

END OF SECTION

Page 85: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Contract B

PRECAST CONCRETE VALVE VAULTS 330517 Page 1 of 5

2017

SECTION 33 05 17 - PRECAST CONCRETE VALVE VAULTS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Precast concrete valve vaults.

B. Related Requirements:

1. Section 31 05 16 - Aggregates for Earthwork: Bedding fill type.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT

A. Section 01 20 00 - Price and Payment Procedures: Contract Sum/Price modification procedures.

B. Precast Concrete Valve Vaults:

1. Basis of Measurement: By each.

2. Basis of Payment: Includes excavation, valve vault, accessories, tests, and backfill.

1.3 REFERENCE STANDARDS

A. ASTM International:

1. ASTM A48 - Standard Specification for Gray Iron Castings.

2. ASTM A185 - Standard Specification for Steel Welded Wire Reinforcement, Plain, for

Concrete.

3. ASTM A536 - Standard Specification for Ductile Iron Castings.

4. ASTM A615 - Standard Specification for Deformed and Plain Carbon-Steel Bars for

Concrete Reinforcement.

5. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars,

Rods, Wire, Profiles, and Tubes.

6. ASTM C33 - Standard Specification for Concrete Aggregates.

7. ASTM C150 - Standard Specification for Portland Cement.

8. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.

9. ASTM C478 - Standard Specification for Precast Reinforced Concrete Manhole Sections.

10. ASTM C497 - Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile.

11. ASTM C890 - Standard Practice for Minimum Structural Design Loading for Monolithic or

Sectional Precast Concrete Water and Wastewater Structures.

12. ASTM C913 - Standard Specification for Precast Concrete Water and Wastewater

Structures.

13. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and Precast

Box Sections Using Preformed Flexible Joint Sealants.

14. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)).

15. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).

Page 86: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Contract B

Page 2 of 5 PRECAST CONCRETE VALVE VAULTS 330517

2017

16. ASTM D4104 - Standard Test Method (Analytical Procedure) for Determining

Transmissivity of Nonleaky Confined Aquifers by Overdamped Well Response to

Instantaneous Change in Head (Slug Tests).

17. ASTM D6938 - Standard Test Method for In-Place Density and Water Content of Soil and

Soil-Aggregate by Nuclear Methods (Shallow Depth).

1.4 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination.

B. Coordinate Work with utilities within construction area.

1.5 PREINSTALLATION MEETINGS

A. Section 01 30 00 - Administrative Requirements: Requirements for preinstallation meeting.

B. Convene minimum one week prior to commencing Work of this Section.

1.6 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data on valve vaults and structures.

C. Shop Drawings: Indicate plan, location, and inverts of connecting piping.

D. Manufacturer's Certificate: Certify that precast concrete valve vaults meet or exceed ASTM

standards and specified requirements.

E. Manufacturer Instructions: Submit special procedures for precast concrete valve vaults

installation.

F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

G. Qualifications Statement:

1. Submit qualifications for manufacturer.

1.7 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for closeout procedures.

B. Project Record Documents: Record actual locations and inverts of buried pipe, components, and

connections.

1.8 QUALITY ASSURANCE

A. Perform Work according to DCSID standards.

Page 87: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Contract B

PRECAST CONCRETE VALVE VAULTS 330517 Page 3 of 5

2017

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and

protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Transport and handle precast concrete units with equipment designed to protect units from

damage.

D. Storage:

1. Store precast concrete valve vaults according to manufacturer instructions.

2. Do not place concrete units in position to cause overstress, warping, or twisting.

PART 2 PRODUCTS

2.1 DESIGN REQUIREMENTS

A. Performance and Design Criteria:

1. Watertight, Precast, Reinforced, Air-Entrained Concrete Structures:

a. Design to ASTM C890 A16 (HS20) live loading and installation conditions.

b. Manufactured to conform to ASTM C913.

2. Minimum 28-Day Compressive Strength: 5,000 psi.

3. Honeycombed or retempered concrete is not permitted.

2.2 PRECAST CONCRETE VALVES

A. Manufacturers:

1. Jensen Precast or approved equal.

2. Substitutions: As specified in Section 01 60 00 - Product Requirements.

B. Valve Vault Frames and Covers:

1. Ductile Iron Castings: ASTM A536.

2. Contact Surfaces: Machined and matched.

3. Cast cover inscription with pipeline service and Owner's name.

4. Refer to Drawings for Valve Vault access lid by Vault Access Solutions or approved equal.

C. Access Steps:

1. Steel reinforced copolymer polypropylene:

a. ASTM C478.

b. Method of Test: ASTM C497.

c. ASTM D4104, PP0344B33534Z02 copolymer polypropylene.

d. ASTM A615, Grade 40, 1/2 inch reinforced rod.

2. Aluminum: ASTM B221, Alloy 6061-T6.

2.3 MATERIALS

A. Portland Cement:

Page 88: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Contract B

Page 4 of 5 PRECAST CONCRETE VALVE VAULTS 330517

2017

1. ASTM C150, Type II.

B. Coarse Aggregates:

1. ASTM C33.

2. Graded 1 inch to No. 4 sieve.

C. Sand:

1. ASTM C33.

2. Fineness Modulus: 2.35.

D. Water:

1. Potable.

2. Clean and free of injurious amounts of acids, alkalis, salts, organic materials, and substances

incompatible with concrete or steel.

E. Air-Entraining Admixtures: ASTM C260.

F. Reinforcing Steel:

1. Deformed Bars: ASTM A615, Grade 40.

2. Welded Wire Fabric: ASTM A185.

G. Joint Sealant:

1. ASTM C990.

H. Bedding:

1. Aggregate Bedding Material: Fill Type A1 as specified in Section 31 05 16 - Aggregates for

Earthwork.

2.4 FABRICATION

A. Fabricate precast reinforced concrete structures according to ASTM C913, to dimensions

indicated on Drawings, and to specified design criteria.

2.5 MIXES

A. Design concrete mix to produce required concrete strength, air-entrainment, watertight properties,

and loading requirements.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

examination.

B. Verify that piping connections, sizes, locations, and inverts are as indicated on Drawings.

Page 89: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Contract B

PRECAST CONCRETE VALVE VAULTS 330517 Page 5 of 5

2017

3.2 PREPARATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

preparation.

B. Ream pipe ends and remove burrs.

C. Remove scale and dirt from components before assembly.

D. Establish invert elevations for each component in system.

E. Hand trim excavation to suit valve vaults; remove stones, roots, and other obstructions.

3.3 INSTALLATION

A. Tank and Bedding:

1. Excavate as specified in Section 31 23 16 - Excavation for Work of this Section.

2. Hand trim excavation for accurate placement of vaults to elevations indicated.

3. Place bedding material level in one continuous layer not exceeding 8 inches compacted

depth and compact to 95 percent maximum density.

4. Backfill around sides of vaults, tamp in place, and compact to 95 percent maximum density.

5. Maintain optimum moisture content of bedding material to attain required compaction

density.

6. Install vaults and related components on bedding.

B. Connect piping.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Request inspection by Engineer prior to placing aggregate cover over piping.

C. Compaction Testing: Conform to ASTM D1557 and/or ASTM D6938.

D. When tests indicate Work does not meet specified requirements, remove Work, replace, and

retest.

E. Frequency of Compaction Tests: Once per lift.

END OF SECTION

Page 90: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

IDENTIFICATION FOR UTILITIES PIPING AND EQUIPMENT

330526_SFL

Page 1 of 2

2017

SECTION 33 05 26 - UTILITY IDENTIFICATION

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Plastic ribbon tape for placement above direct-buried utility.

2. Trace wire for placement above direct-buried utility.

B. Related Requirements:

1. Section 31 23 17 - Trenching: Backfilling considerations for installation of underground pipe

markers.

2. Section 31 23 23 - Fill: Backfilling considerations for installation of underground pipe

markers.

3. Section 33 34 00 - Sanitary Utility Sewerage Force Mains: Piping, valves, and appurtenances

requiring identification marking.

1.2 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer's catalog information for each product required.

C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

D. Qualifications Statement:

1. Submit qualifications for manufacturer.

1.3 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of tagged valves.

1.4 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for maintenance

materials.

1.5 QUALITY ASSURANCE

A. Perform Work according to 2016 State Standard Specifications for Public Works (Orange Book)

standards.

Page 91: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 2 IDENTIFICATION FOR UTILITIES PIPING AND EQUIPMENT

330526_SFL

2017

1.6 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with

minimum three years' experience.

PART 2 PRODUCTS

2.1 UTILITY MARKERS

A. Furnish materials according to 2016 State Standard Specifications for Public Works (Orange

Book) standards.

2.2 RIBBON TAPE

A. Furnish materials according to 2016 State Standard Specifications for Public Works (Orange

Book) standards.

B. Description:

1. Material: Polyethylene.

2. Brightly colored, continuously printed.

3. Minimum Size: 6 inches wide by 4 mils thick.

4. Manufactured for direct burial service.

5. Imprint: Utility type in large letters.

2.3 TRACE WIRE

A. Furnish materials according to 2016 State Standard Specifications for Public Works (Orange

Book) standards.

1. Description:

a. Conductor: Magnetically detectable.

b. Covering: Brightly colored plastic, imprinted with Utility type in large letters.

PART 3 EXECUTION

3.1 INSTALLATION

A. Ribbon Tape and Trace Wire:

1. Place wire continuous on top of pipe, tape shall be buried 6 inches above piping.

2. If multiple pipes occur in common trench, locate tape and wire above centerline of each pipe

or conduit.

3. Coordinate with trench Work as specified in Section 31 23 17 - Trenching and 31 23 23 -

Fill.

B. Installation Standards: Install Work according to 2016 State Standard Specifications for Public

Works (Orange Book) standards.

END OF SECTION

Page 92: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SPECIALTY VALVES 331216 Page 1 of 6

2017

SECTION 33 12 16 – SPECIALTY VALVES

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Specialty Valves.

2. Valve Boxes.

3. Valve Covers.

B. Related Requirements:

1. Section 03 30 00 - Cast-in-Place Concrete: Concrete for thrust restraints.

1.2 REFERENCE STANDARDS

A. American Water Works Association:

1. AWWA C500 - Metal-Seated Gate Valves for Water Supply Service.

2. AWWA C509 - Resilient-Seated Gate Valves for Water Supply Service.

3. AWWA C512 – Air-Release, Air/Vacuum, and Combination Air Valves for Water

and Wastewater Service

4. AWWA C600 - Installation of Ductile-Iron Mains and Their Appurtenances.

B. National Sanitation Foundation:

1. NSF/ANSI 61/372 – Drinking Water System Components – Health Effects

1.3 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination.

B. Coordinate Work of this Section with DCSID standards and utilities within their respective

construction area.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer's latest published literature. Include illustrations, installation

and maintenance instructions, and parts lists.

C. Shop Drawings: Submit description of proposed installation.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Manufacturer Instructions: Submit detailed instructions on installation requirements, including

storage and handling procedures.

Page 93: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 6 SPECIALTY VALVES 331216

2017

F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of valves.

C. Operation and Maintenance Data: Submit information for valves and provide 1 (one) day of

training.

D. Warranty: Submit Manufacturer’s Warranty for valves.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for maintenance

materials.

B. Tools: Furnish one tee wrench of required length to Owner.

1.7 QUALITY ASSURANCE

A. Cast manufacturer's name, pressure rating, and year of fabrication into valve body.

B. Perform Work according to DCSID standards.

1.8 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with

minimum three years' documented experience.

B. Installer: Company specializing in performing Work of this Section with minimum three years'

documented experience.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and

protecting products.

B. Prepare valves and accessories for shipment according to applicable AWWA standards.

C. Seal valve and ends to prevent entry of foreign matter.

D. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

E. Storage:

1. Store materials in areas protected from weather, moisture, or other potential damage.

2. Do not store materials directly on ground.

F. Handle products carefully to prevent damage to interior or exterior surfaces.

Page 94: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SPECIALTY VALVES 331216 Page 3 of 6

2017

PART 2 PRODUCTS

2.1 FULL PORT PLUG VALVES

A. Manufacturers:

1. Val-Matic or approved equal.

2. Substitutions: As specified in Section 01 60 00 - Product Requirements.

3. Furnish materials according to DCSID standards.

B. Description:

1. Materials:

a. Body: Iron.

b. Trim: Stainless Steel.

2. Plug: Ductile Iron, EPDM Rubber Chloroprene, NBR.

3. Operation:

a. Electric Actuator with Manual Hand Wheel.

b. Open counterclockwise unless otherwise indicated.

4. End Connections: Flanged.

5. Coatings:

a. Comply with AWWA C550.

b. Interior and exterior.

6. Furnish 12-inch diameter valves with gear operators.

7. Differential Head:

a. Seating Head: 350 PSI

b. Unseating Head: 350 PSI

8. Pressure rating: 350 psig

2.2 PRESSURE RELIEF VALVES

A. Manufacturers:

1. Cla-Val

2. Substitutions: As specified in Section 01 60 00 – Product Requirements.

3. Furnish materials according to DCSID standards.

B. Description:

1. Materials:

a. Body: Ductile Iron.

b. Trim: Stainless Steel

2. Seats: Stainless Steel

3. Stem: Stainless Steel

a. Material: Stainless Steel

4. End Connections: Flanged

5. Coatings: Comply with AWWA C550

6. Differential head:

a. Seating Head: 350 PSI

b. Unseating Head: 350 PSI

7. Pressure rating: 350 psig

Page 95: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 6 SPECIALTY VALVES 331216

2017

2.3 ISOLATION GATE VALVES

A. Manufacturers:

1. AVK or approved equal.

2. Substitutions: As specified in Section 01 60 00 - Product Requirements.

3. Furnish materials according to DCSID standards.

B. Description:

1. Materials:

a. Body: Ductile Iron.

b. Trim: Stainless Steel.

2. Operation:

a. Manual Hand Wheel.

b. Open counterclockwise unless otherwise indicated.

3. End Connections: Flanged.

4. Coatings:

a. Comply with AWWA C550.

b. Interior and exterior.

5. Furnish 6-inch diameter valves with gear operators.

6. Differential Head:

a. Seating Head: 350 PSI

b. Unseating Head: 350 PSI

7. Pressure Rating: 350 psi

2.4 VALVE BOXES

A. Manufacturers:

1. Jensen Precast.

2. Substitutions: As specified in Section 01 60 00 - Product Requirements.

3. Furnish materials according to DCSID standards.

B. Description:

1. Plug Valves Larger than 12-inch Diameter:

a. Material: Pre-cast Concrete.

b. Type: Concrete Sections.

c. Base: Square.

d. Dimensions: 60” x 60” Internal Dimensions.

e. Lid Inscription: SEWER OVERFLOW VALVE.

2.5 VALVE BOX VAULT COVER

A. Plug Valves Larger than 12-inch diameter:

1. Manufacturer: Placer Waterworks, or Approved Equal.

2. Materials:

a. Frame: Stainless Steel

b. Doors: Structural aluminum plate

c. Accessories: Hot dip galvanized or Stainless Steel

3. Style: Dual hinged door

4. Dimensions: 60” x 60” Internal Dimension.

Page 96: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SPECIALTY VALVES 331216 Page 5 of 6

2017

5. Load Rating: H-20

6. Security: Recessed bolts, 2 per door.

2.6 ACCESSORIES

A. Concrete for Valve Supports: Concrete type as specified in Section 03 30 00 - Cast-in-Place

Concrete.

1. Provide ½” diameter steel reinforcement around the interior of valve flanges,

positively anchor into concrete pillows:

a. Lap steel ends or provide 6-inch hooks

B. Concrete for Valve Box Covers: Concrete type as specified in Section 03 30 00 - Cast-in-Place

Concrete.

1. Dimensions: See Drawings

C. Valve Box Aligner: High-strength plastic device designed to automatically center valve box base

and to prevent it from shifting off center during backfilling.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

examination.

B. Determine exact location and size of valves from Drawings.

C. Verify that invert elevations of existing work prior to excavation and installation of valves are as

indicated on Drawings.

3.2 PREPARATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

preparation.

B. Conduct operations to not interfere with, interrupt, damage, destroy, or endanger integrity of

surface or subsurface structures, utilities, and landscape in immediate or adjacent areas.

C. Identify required lines, levels, contours, and datum locations.

D. Locate, identify, and protect from damage utilities to remain.

E. Do not interrupt existing utilities without permission and without making arrangements to provide

temporary utility services.

1. Notify Engineer not less than 2 days in advance of proposed utility interruption.

2. Do not proceed without written permission from Engineer.

Page 97: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 6 of 6 SPECIALTY VALVES 331216

2017

3.3 INSTALLATION

A. Perform trench excavation, backfilling, and compaction as specified in Section 312316 –

Excavation and 312317 Trenching.

B. Install valves in conjunction with pipe laying.

C. Set valves plumb.

D. Provide buried valves with valve boxes installed flush with finished grade.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Section 01 70 00 - Execution and Closeout Requirements: Requirements for testing, adjusting,

and balancing.

END OF SECTION

Page 98: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SANITARY UTILITY SEWERAGE FORCE MAINS 333400_SFL Page 1 of 7

2017

SECTION 33 34 00 - SANITARY UTILITY SEWERAGE FORCE MAINS

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Force mains.

2. Bedding and cover materials.

B. Related Requirements:

1. Section 03 30 00 - Cast-in-Place Concrete: Concrete material requirements.

2. Section 31 05 13 – Aggregates and Soils for Earthwork: Soil backfill from above pipe to

finish grade.

3. Section 31 23 17 - Trenching: Excavation, backfilling, compacting, and fill over

underground pipe markers.

4. Section 31 23 23 - Fill: Requirements for fill over underground pipe markers.

5. Section 33 05 26 - Utility Identification: Pipe markers.

6. Section 33 31 00 - Sanitary Utility Sewerage Piping: Connections to sanitary sewerage

system.

1.2 UNIT PRICE - MEASUREMENT AND PAYMENT – NOT USED

1.3 REFERENCE STANDARDS

A. American Association of State Highway and Transportation Officials:

1. AASHTO T180 - Standard Method of Test for Moisture-Density Relations of Soils Using a

4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. American Water Works Association:

1. AWWA C104 - Cement-Mortar Lining for Ductile-Iron Pipe and Fittings.

2. AWWA C110 - Ductile-Iron and Gray-Iron Fittings.

3. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings.

4. AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast.

C. ASTM International:

1. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)).

2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil

Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)).

3. ASTM D6938 - Standard Test Method for In-Place Density and Water Content of Soil and

Soil-Aggregate by Nuclear Methods (Shallow Depth).

D. Ductile Iron Pipe Research Association (DIPRA):

1. Thrust Restraint Design for Ductile Iron Pipe.

Page 99: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 7 SANITARY UTILITY SEWERAGE FORCE MAINS 333400_SFL

2017

1.4 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination.

B. Coordinate Work of this Section with connection to existing municipal sewer utility service.

1.5 PREINSTALLATION MEETINGS

A. Section 01 30 00 - Administrative Requirements: Requirements for preinstallation meeting.

B. Convene minimum one week prior to commencing Work of this Section.

1.6 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer information indicating pipe material used, pipe accessories,

valves, restrained joint details and materials.

C. Shop Drawings:

1. Indicate piping piece numbers and locations.

2. Indicate restrained joint locations.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Qualifications Statements:

1. Submit qualifications for manufacturer, installer, and licensed professional.

2. Submit manufacturer's approval of installer.

1.7 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record invert elevations and actual location of pipe runs and

connections.

C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted

utilities.

1.8 QUALITY ASSURANCE

A. Perform Work according to 2016 State Standard Specifications for Public Works (Orange Book)

standards.

1.9 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with

minimum three years' experience.

Page 100: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SANITARY UTILITY SEWERAGE FORCE MAINS 333400_SFL Page 3 of 7

2017

B. Installer: Company specializing in performing Work of this Section with minimum three years'

documented experience and approved by manufacturer.

1.10 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and

protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Storage:

1. Store materials according to manufacturer instructions.

2. Do not place materials on private property without written permission of property owner.

3. Do not stack pipe higher than recommended by pipe manufacturer.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from

construction operations areas.

2. Store gaskets for mechanical and push-on joints in cool and dry location, out of direct

sunlight, and not in contact with petroleum products.

3. Provide additional protection according to manufacturer instructions.

1.11 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

PART 2 PRODUCTS

2.1 FORCE MAIN

A. Ductile Iron Pipe (DIP) Class 350 Restrained Joint Pressure Sewer Pipe and Fittings, 12-Inch

Nominal Size and Smaller

1. DIP Pressure Pipe

2. Restrained Joints suitable for use in horizontal directional drilling (HDD).

3. Minimum bending radius of 412’ or less.

4. 350 PSI Pressure Rated pipes and joints.

5. Field cut lengths of pipe shall also be restrained per manufacturer’s recommendations and

designed to withstand equal pressure rating of force main piping.

B. Manufacturer:

1. TR Flex by US Pipe, or Engineer Approved Equal

2. Field cut lengths of pipe shall be restrained with US Pipe TR Flex Gripper Rings, or Equal.

2.2 FITTINGS

A. Ductile Iron Fittings

Page 101: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 7 SANITARY UTILITY SEWERAGE FORCE MAINS 333400_SFL

2017

1. Class 350 Restrained Fittings

2. Fittings shall be designed for equal pressure of same diameter DIP.

B. Restrained Coupling Adaptors

1. Designed for restraint of Ductile Iron Pipe

2. Coated steel body meeting AWWA C219 Standard.

3. 350 PSI Pressure Rated

4. Ductile iron restraining bolts and lugs, Meeting or exceeding ASTM A 536 and coated for

corrosion resistance.

5. All thread bolting and nuts shall be stainless steel.

C. Manufacturers:

1. Ductile Iron Fittings: US Pipe TR Flex or Engineer Approved Equal.

2. Restrained Coupling Adaptor: Romac 400RG Restrained Coupling Adaptor or Engineer

Approved Equal.

2.3 MATERIALS

A. Bedding and Cover:

1. Bedding: Fill Type A1, as specified in Section 31 23 23 Fill.

2. Bedding Support: Fill Type A2, as specified in Section 31 23 23 Fill.

3. Soil Backfill from 12 inches above Pipe to Finish Grade: Soil Conforming to Class E, as

specified in Section 31 05 13 - Soils for Earthwork.

4. Subsoil: No rocks more than 6 inches in diameter, frozen earth, or foreign matter.

5. Topsoil: de-compact top 6 inches and overlay with sod layer.

2.4 MIXES

A. Concrete: As specified in Section 03 30 00 - Cast-in-Place Concrete.

2.5 ACCESSORIES

A. Pipe Markers: As specified in Section 33 05 26 - Utility Identification.

B. Polyethylene Encasement: Purple in color with “RECLAIMED WATER” printed in black letters.

Cover and tape encasement over pipe in accordance with the Drawings.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

examination.

B. Verify that trench cut and excavation base is ready to receive Work.

C. Verify that excavations, dimensions, and elevations are as indicated on Drawings.

Page 102: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SANITARY UTILITY SEWERAGE FORCE MAINS 333400_SFL Page 5 of 7

2017

3.2 PREPARATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

preparation.

B. Correct over-excavation with fine aggregate, structural fill or lean concrete.

C. Remove large stones or other hard matter capable of damaging pipe or of impeding consistent

backfilling or compaction.

3.3 INSTALLATION

A. Bedding:

1. Excavate pipe trench as specified in Section 31 23 17 - Trenching.

2. Place bedding material at trench bottom. Support bedding with Class C material if required

for wet or unstable trench bottom.

3. Level materials in continuous layers not exceeding 6 inches in depth.

4. Maintain optimum moisture content of bedding material to attain required compaction

density.

B. Piping:

1. Install pipe, fittings, and accessories in accordance with Manufacturer’s recommendations

and as indicated on Drawings.

a. Field cut pipe lengths shall use TR Flex Gripper Rings, or equal. All joints, including

those field cut to length, shall be restrained and certified to working pressure of parent

pipe. Make field cut connections in accordance with Manufacturer’s recommendations.

b. Cuts shall be made straight, clean and square to pipe.

2. Route piping in straight line.

3. Install bedding at sides and over top of pipe to minimum compacted thickness of 12 inches.

4. Backfilling and Compacting:

a. As specified in Section 31 23 17 - Trenching.

b. Do not displace or damage pipe while compacting.

5. Connect to municipal sewer system existing force main using restrained coupling adaptor

(RCA). RCA shall be designed for connection that meets or exceeds pressure class of force

main piping. Contractor shall field verify dimensions of existing force main to ensure

suitability of RCA prior to making connection. Prep each point of connection for installation

of RCA in accordance with manufacturer’s recommendations.

6. Pipe Markers: As specified in Section 33 05 26 - Utility Identification.

C. Thrust Restraints:

1. Provide pressure pipeline with restrained joints AND concrete thrust blocking at fittings,

tees, and other changes in direction not accomplished by HDD.

2. Construct concrete thrust blocking as indicated on Drawings.

D. Cradles and Encasements:

1. Provide concrete cradles and encasements for pipelines where indicated on Drawings and as

specified in Section 03 30 00 - Cast-in-Place Concrete.

Page 103: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 6 of 7 SANITARY UTILITY SEWERAGE FORCE MAINS 333400_SFL

2017

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Inspections: Request inspection by Engineer prior to and immediately after placing bedding.

C. Testing:

1. If tests indicate that Work does not meet specified requirements, remove Work, replace, and

retest.

2. Perform tests on Site sanitary sewage system according to of 2016 State Standard

Specifications for Public Works (Orange Book) standards.

3. Compaction Testing:

a. Comply with ASTM D1557.

b. Testing Frequency: Once per lift.

D. Pressure test system according to AWWA C600 and following:

1. Pressure test new piping prior to connection to existing force main. Submit testing plan

including all temporary bracing and restraints to Engineer prior to test.

2. Test Pressure: Working pressure of pipe.

3. Conduct hydrostatic test for at least two hours.

4. Slowly fill section to be tested with water; expel air from piping at high points. Install

corporation cocks at high points. Close air vents and corporation cocks after air is expelled.

Raise pressure to specified test pressure.

5. Observe joints, fittings, and valves under test. Remove and renew cracked pipes, joints,

fittings, and valves showing visible leakage. Retest.

6. Correct visible deficiencies and continue testing at same test pressure for additional two

hours to determine leakage rate. Maintain pressure within plus or minus 5 psi of test

pressure. Leakage is defined as quantity of water supplied to piping necessary to maintain

test pressure during period of test.

7. Compute maximum allowable leakage using following formula:

L = SD x sqrt(P)/C

L = testing allowance, gph

S = length of pipe tested, feet

D = nominal diameter of pipe, inches

P = average test pressure during hydrostatic test, psig

C = 148,000

When pipe under test contains sections of various diameters, calculate allowable leakage from sum of computed leakage for each size.

8. Leakage:

a. If test of pipe indicates leakage greater than allowed, locate source of leakage, make

corrections, and retest until leakage is within allowable limits.

b. Correct visible leaks regardless of quantity of leakage.

E. Bypass Line Testing:

1. The bypass line shall be tested by temporarily closing the 12-inch isolation valve during

normal operating pressures.

F. Visual Leak Test of connection to existing sewer force main:

Page 104: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 - Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

SANITARY UTILITY SEWERAGE FORCE MAINS 333400_SFL Page 7 of 7

2017

1. Once connections to the existing force main have been fully constructed, Contractor shall

certify that they are operational and ready to be placed into service.

2. Coordinate with OWNER for placing force main back into service.

3. Owner will operate one (1) existing export pump to bring force main up to normal operating

pressures.

4. Once the force main is back in service and under pressure, perform visual leakage test in

presence of Engineer.

5. Any leakage of connections to existing force main will be considered failure of the test.

6. If failure of the leakage test occurs, Contractor shall repair or replace the connection until no

leakage occurs.

3.5 PROTECTION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for protecting finished

Work.

B. Protect pipe and aggregate cover from damage or displacement until backfilling operation is in

progress.

END OF SECTION

Page 105: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

ULTRASONIC-LEVEL MEASUREMENT DEVIES 409123 Page 1 of 5

2017

SECTION 40 91 23 – ULTRASONIC-LEVEL MEASUREMENT DEVICES

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Ultrasonic-Level Measurement Devices

B. Related Requirements: Not Used

1.2 REFERENCE STANDARDS – NOT USED

1.3 COORDINATION

A. Section 01 30 00 - Administrative Requirements: Requirements for coordination.

B. Coordinate Work of this Section with DCSID standards and utilities within their respective

construction area.

1.4 SUBMITTALS

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer's latest published literature. Include illustrations, installation

and maintenance instructions, and parts lists.

C. Shop Drawings: Submit description of proposed installation.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Manufacturer Instructions: Submit detailed instructions on installation requirements, including

storage and handling procedures.

F. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

1.5 CLOSEOUT SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of level sensors.

C. Operation and Maintenance Data: Submit information for level sensors and provide 1 (one) day

of training.

D. Warranty: Submit Manufacturer’s Warranty for level sensors.

Page 106: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 2 of 5 ULTRASONIC-LEVEL MEASUREMENT DEVIES 409123

2017

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for maintenance

materials.

1.7 QUALITY ASSURANCE

A. Perform Work according to DCSID standards.

1.8 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with

minimum three years' documented experience.

B. Installer: Company specializing in performing Work of this Section with minimum three years'

documented experience.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 60 00 - Product Requirements: Requirements for transporting, handling, storing, and

protecting products.

B. Prepare Level Measurement Devices for shipment according to applicable AWWA standards.

C. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

D. Storage:

1. Store materials in areas protected from weather, moisture, or other potential damage.

2. Do not store materials directly on ground.

E. Handle products carefully to prevent damage to interior or exterior surfaces.

PART 2 PRODUCTS

2.1 ULTRASONIC-LEVEL MEASUREMENT DEVICES

A. Manufacturers:

1. SmartCover Systems, represented by G3 Engineering, Inc. No Equal.

916-797-1880

[email protected]

2. Substitutions: Not permitted

B. Description:

1. The system will provide continuous, real time monitoring of water level in the

Isolation Valve and PRV Bypass Vault.

Page 107: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

ULTRASONIC-LEVEL MEASUREMENT DEVIES 409123 Page 3 of 5

2017

2. The system will be battery powered and use a self-contained battery suitably sized to

provide sufficient power to operate the unit for a minimum of one year without

battery replacement.

3. The voltage of the battery shall be no more than 3.7 volts.

4. The system will provide unit Maintenance Information including, battery voltage

and radio signal strength.

5. The system shall provide a real-time security alarm that will transmit its signal in

under 15 seconds, if the vault cover is lifted at an angle greater than 30 degrees. The

intrusion detection system shall have a minimum of three axis monitoring planes so

that an alarm will be sent with any entry.

6. The system field units shall use ultrasonic water level monitoring, with a resolution

of one tenth inch or less.

7. The dead zone of the ultrasonic sensor shall be no more than 4” (10cm).

8. The system field units will monitor water levels at a nominal fixed rate of at least 10

times per hour.

9. Replacement parts should be available from the manufacturer within 5 business

days.

10. The field unit shall be capable of remote diagnostic troubleshooting.

C. Communication:

1. The system will communicate using two-way digital radio signals to existing

satellite networks and shall not require any additional communication system

installation other than that of the device itself.

2. Any radio modem used by the system shall have FCC approval.

3. The system shall use a secure web page to display the following information:

a. Graphical representation of data logging of water levels

b. Maintenance and monitored site information

c. Map based graphical user interface to display the location of each unit and

the current status. The alarm status of a unit shall be indicated by a different

representation than when the unit is operating safely.

d. Alarms and alarm history - Maintenance Alerts

e. Customer input of maintenance and location notes.

4. The web site shall be capable of the following:

a. Sending of control commands to the field units for the purpose of turning

alarms on or off, or changing the alarm set point.

b. Exporting data using commercially available file formats.

Page 108: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

Page 4 of 5 ULTRASONIC-LEVEL MEASUREMENT DEVIES 409123

2017

c. The field unit shall be designed to work in the harsh ambient conditions of a

sanitary sewer system and be capable of surviving immersion in water as

defined by IP-68.

5. The radio antenna shall be specifically designed for and matched to the field unit

and shall not be of a general purpose design. The antenna shall be capable of

operation with a standing wave ratio of 1.5 or less when affixed to a metal manhole

cover or other metallic surface. The antenna shall be traffic rated and able to

withstand the harsh conditions that exist in high traffic roadways in all seasonal

conditions.

6. The radio antenna shall be mounted directly onto service entry point cover

(aluminum cover) so that the field unit may be easily moved from location to

location without reinstallation of antenna.

7. The system shall be capable of receiving and executing commands from users within

1 hour or less.

8. The system shall not use communications protocols that share bandwidth with

commercially available devices which can be unreliable in times of high usage or

emergencies such as storms, power outages, etc.

9. The system shall have uniform global coverage of its communication system.

10. The system shall be upgradable to measuring flow (gallons per minute, cubic feet

per second, million gallons per day) under conditions of uniform and steady flow in

the manhole.

11. The system will provide a software means to separate either: geographical aspects of

the deployed system, for example, north, south, east and west sectors; or functions,

for example lift stations and collection system manholes, that are alarmed and

accessed separately by separate staff members.

12. The system will have the ability to automatically scan the level histories of each

monitored site, analyze the level trends, and provide periodic advisories to the user

in order to help indicate locations that need more immediate attention, prior to an

overflow alarm.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

examination.

B. Determine exact location of level sensors from Drawings.

Page 109: Douglas County Sewer Improvement District No. 1 Muller ......Douglas County Sewer Improvement District No. 1 - Muller Lane East Brockliss Slough Sewer Force Main Relocation Contract

Douglas County Sewer Improvement District No. 1 – Muller Lane East

Brockliss Slough Sewer Force Main Relocation Contract B

ULTRASONIC-LEVEL MEASUREMENT DEVIES 409123 Page 5 of 5

2017

3.2 PREPARATION

A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for installation

preparation.

B. Conduct operations to not interfere with, interrupt, damage, destroy, or endanger integrity of

surface or subsurface structures, utilities, and landscape in immediate or adjacent areas.

C. Identify required lines, levels, contours, and datum locations.

D. Locate, identify, and protect from damage utilities to remain.

E. Do not interrupt existing utilities without permission and without making arrangements to provide

temporary utility services.

1. Notify Engineer not less than 2 days in advance of proposed utility interruption.

2. Do not proceed without written permission from Engineer.

3.3 INSTALLATION

A. Installation shall not require confined space entry as defined by US Department of Labor

regulations, OSHA Section 1910.146.

B. The complete unit shall be small enough to be installed on single hatch cover. Except to insure

proper fit adjustments, unit installation shall not require any modifications to the hatch, valve

vault or surrounding grounds.

C. The field unit shall be designed and installed such that it can easily be moved aside within 2

minutes for routine collection system maintenance.

D. The system field units shall be capable of replacement, on site, in less than 15 minutes.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Section 01 70 00 - Execution and Closeout Requirements: Requirements for testing, adjusting,

and balancing.

END OF SECTION