dormer · 2015. 9. 1. · hospitals, schools and where ground has been badly damaged and vibration...

4
D OR MER CONSTRUCTION LTD SILENT PILER KGK130 Silent Piler The only unit in New Zealand capable of silent and vibration-free installation of sheet piles

Upload: others

Post on 20-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • DORMERCONSTRUCTION LTD

    Silent Piler

    KGK130 Silent PilerThe only unit in New Zealand capable of silent

    and vibration-free installation of sheet piles

  • 51 2 3 451 2 3 4

    1 2 3 4

    Reaction Piles

    Piling Direction

    1 2 3 4

    ChuckClamps

    1 2 3 4

    5

    Mast

    5

    1 2 3 4

    Shows hydraulic jaws of Chuck and Clamps closed.

    51 2 3 4 51 2 3 4

    Saddle

    Self-moving Procedure

    Reaction Piles

    1. The Silent Piler clamps reaction piles number 1-3 and presses-in pile number 4

    Dormer Construction have recently acquired and commissioned a Giken Silent Piler. It is believed to be the only unit of its type currently in New Zealand.

    This hydraulic machine is capable of performing vibration-free installation and extraction of sheet piles. It operates by gripping previously driven piles to provide reaction force for pressing in the next pile.

    The Silent Piler works on top of the reaction piles and self-travels to the next position as illustrated below. This technique allows sheet pile driving at sites not accessible for conventional piling techniques. Only a relatively light-weight service crane is needed to pitch the sheet piles.

    Dormer Construction’s Silent Piler fills an important niche in the sheet piling field. This coupled with our 25 tonne, mobile crane and RX2000 tracked piler means we are able to cover all eventualities, offering a full service in all sheet piling situations.

    Our rig has already proven itself invaluable at the Canterbury District Health Board (CDHB) and at St George’s Hospital, where day to day activities have carried on, unaffected by our piling operations.

    PO Box 22674, Christchurch, New Zealand P (03) 313 8967 M 027 438 1221 E [email protected] W www.dormer.co.nz

    DORMERCONSTRUCTION LTD2

    GIKeN KGK130 SIleNT PIleR

    2. Complete pressing-in pile number 4 to the specified height and open Chuck

    3. Move Mast forward and lower Chuck turning it for pile number 5

    4. Insert pile number 5 into Chuck, align the pile and start pressing-in

    51 2 3 451 2 3 4

    1 2 3 4

    Reaction Piles

    Piling Direction

    1 2 3 4

    ChuckClamps

    1 2 3 4

    5

    Mast

    5

    1 2 3 4

    Shows hydraulic jaws of Chuck and Clamps closed.

    51 2 3 4 51 2 3 4

    Saddle

    Self-moving Procedure

    Reaction Piles

    The silent piler unit allows for the installation and extraction of sheet piles in tight areas and where noise and vibration are unwelcome. For example: residential areas, hospitals, schools and where ground has been badly damaged and vibration could lead to further localised complications.

    The silent piler unit comprises a powerful hydraulic press / sheet pile installation unit, which is coupled to remote, fully silenced, hydraulic power pack and generator units. The combined facility allows installation of sheet piles without the need to employ a vibrating power head, keeping noise to an absolute minimum and most importantly, vibration to zero.

    PIlINg DIrECTION >>>

    ExaMPlE SITE PlaN

    Sheet Piles

    Electric Hydraulic Power PackDiesel Generator

    Silent Piler

    Wor

    king

    zon

    e w

    idth

    10m Datum Line

    25 tonne Crane

  • 51 2 3 451 2 3 4

    1 2 3 4

    Reaction Piles

    Piling Direction

    1 2 3 4

    ChuckClamps

    1 2 3 4

    5

    Mast

    5

    1 2 3 4

    Shows hydraulic jaws of Chuck and Clamps closed.

    51 2 3 4 51 2 3 4

    Saddle

    Self-moving Procedure

    Reaction Piles

    5. Press-in pile number 5 until the pile is sufficiently stable

    6. release Clamps from the reaction piles and raise the main body

    7. Move Saddle forward to the next position on the reaction piles

    8. lower the main body onto reaction piles number 2-4 and clamp them to complete pressing-in pile number 5

    GIKeN KGK130 SIleNT PIleR

    PO Box 22674, Christchurch, New Zealand P (03) 313 8967 M 027 438 1221 E [email protected] W www.dormer.co.nz

    DORMERCONSTRUCTION LTD 3

    SElF-MOVINg PrOCEDUrE >>>

    DIMENSIONS

    1000

    2200

    3680

    Installation Force 130 tons

    extraction Force 130 tons

    Stroke 1000 mm

    Pressing in speed 1.5 - 3.2 m/min

    Drawing out speed 1.2 - 11.4 m/min

    Sheet pile range “U” profile (larrsen) 400mm

    Operating System Radio control

    Moving System Self moving

    Machine length 2200 mm

    Machine Width 1000 mm

    Machine Height 2390 mm

    Maximum height 3680 mm

    Machine weight 7800 kg

    (m) 10 20 30 (m) 10 20 30

    (dB)

    90

    80

    70

    60

    50

    40

    (dB)

    90

    80

    70

    60

    50

    40

    VIBRATION NOISe

    Pile Hammer

    Vibro Hammer

    Other Construction Method (min)

    Environmental Vibration

    Silent Piler (max)

    Pile Hammer

    Vibro Hammer

    Other Construction Method (min)

    Background Noise

    Silent Piler (max)

    VIBraTION aND NOISE COMParISON WITH OTHEr CONSTrUCTION METHODS

    1200

    1000

    2930

    450

  • DORMERCONSTRUCTION LTD

    PO Box 22674, Christchurch, New Zealand

    P (03) 313 8967 F (03) 313 8968 E [email protected]