Dorenell Wind Farm 132 kV Grid Connection 4 Zone of Theoretical Visibility A preliminary zone of theoretical visibility (ZTV) diagram has been generated for the Proposed route. The ZTV diagram indicates the theoretically visible of the composite poles and has taken screening effects from forestry into consideration. A920 A941 AUCHINDOUN CASTLE CONSENTED DORENELL WIND FARM SUBSTATION DUFFTOWN ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Proposed Overhead Line and Pole Positions Key: Metres Scale as shown Zone of Theoretical Visibility (ZTV) Run to 24 m Composite Pole Height ZTV run to 2km either side of the proposed overhead line. The ZTV diagram indicates the theoretic visibility of the composite poles and has taken screening effects from forestry into consideration. ! ! !

Upload: others

Post on 14-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Dorenell Wind Farm 132 kV Grid Connection

4

Zone of Theoretical Visibility

A preliminary zone of theoretical visibility (ZTV) diagram has been generated for the Proposed route.

The ZTV diagram indicates the theoretically visible of the composite poles and has taken screening effects from forestry into consideration.

A920

A941

AUCHINDOUNCASTLE

CONSENTEDDORENELL WIND FARMSUBSTATION

DUFFTOWN

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!

!!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!!

!!

!

!

!!!

!

!

!!

!!

!

!

Proposed Overhead Line and Pole Positions

Key:

MetresScale as shown

Zone of Theoretical Visibility (ZTV) Run to 24 m Composite Pole Height ZTV run to 2km either side of the proposed overhead line. The ZTV diagram indicates the theoretic visibility of the composite poles and has taken screening effects from forestry into consideration.

! ! !