dorce camps

49
www.dorce.com.tr www.dorce.com.tr CAMP PROJECTS CAMP PROJECTS CAMP PROJECTS CAMP PROJECTS

Upload: europages

Post on 10-Jul-2015

176 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Dorce camps

www.dorce.com.tr www.dorce.com.tr 

CAMP PROJECTSCAMP PROJECTSCAMP PROJECTSCAMP PROJECTS

Page 2: Dorce camps

26.000 PERSON RESIDENTIAL CITY  26.000 PERSON RESIDENTIAL CITY  AL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE

Page 3: Dorce camps

26.000 PERSON RESIDENTIAL CITY  26.000 PERSON RESIDENTIAL CITY  AL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE

Type of Contract: EPC

T f W kType of Work:Worker Residential City Project including Worker, technician, supervisor dormitory buildings.

Scope of Work:Scope of Work:Building construction works, Civil works, Electrical works, Mechanical works , Assembly works

Total Building Area: 230.000 m2Total Building Area: 230.000 m2

Total Site Area: 437.000 m2

Duration of the Work: 2008 (10 Months) 

Page 4: Dorce camps
Page 5: Dorce camps
Page 6: Dorce camps
Page 7: Dorce camps

16.000 PERSON RESIDENTIAL CITY 16.000 PERSON RESIDENTIAL CITY AL MAFRAQ ABU DHABIAL MAFRAQ ABU DHABI UAEUAEAL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE

Page 8: Dorce camps

16.000 PERSON RESIDENTIAL CITY 16.000 PERSON RESIDENTIAL CITY AL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE

Type of Contract: EPC

S f W k B ildi t ti k Ci il k El t i l k M h i l k A blScope of Work: Building construction works, Civil works, Electrical works, Mechanical works , Assemblyworks

Total Building Area:64,192 m²g ,

Total Site Area:106,716 m²

D ti f th W k 2009 (10 th )Duration of the Work: 2009 (10 months)

Page 9: Dorce camps
Page 10: Dorce camps
Page 11: Dorce camps
Page 12: Dorce camps

SHAGYRLY SHOMYSHTY GAS DRILLING SHAGYRLY SHOMYSHTY GAS DRILLING AND PROCESSING FACILITYAND PROCESSING FACILITYAND PROCESSING FACILITY AND PROCESSING FACILITY BEYNAU BEYNAU ‐‐ KAZAKHSTAKAZAKHSTANN

Page 13: Dorce camps

SHAGYRLY SHOMYSHTY GAS DRILLING AND SHAGYRLY SHOMYSHTY GAS DRILLING AND PROCESSING FACILITY / BEYNAU PROCESSING FACILITY / BEYNAU ‐‐ KAZAKHSTANKAZAKHSTAN

Type of Work: Construction of Shagyrly‐Shomyshty – Central Asia Centre Main Gas Pipeline CentralBooster Compressor Station Complete with Gas Treatment Unit and Autonomous Power Plant andturkney shift workers campturkney shift workers camp.

Scope of Work: As the Main Contractor at Shagyrly‐Shomyshty gas field ; the construction of centralbooster compressor station complete with gas treatment unit autonomous power plant gas‐collectingbooster compressor station complete with gas treatment unit, autonomous power plant, gas‐collectingstation‐1 and gas‐collecting station‐2 (CBCS C/W GTU, APP, GCS‐1 AND GCS‐2) turnkey camp projectincluding production of buildings, all electrical‐mechanical works, mobilization, all construction works, allconcrete and infrastructure works, roads, landscaping, clean and waste water tanks, security systemswith cameras, all pipe connections, transportation etc.

Total Building Area : 7.793,60 m2

Total Site Area: 620.000 m2

Duration of work: August 2007 ‐ December 2008

Page 14: Dorce camps
Page 15: Dorce camps
Page 16: Dorce camps

DAEWOO WORKER CAMP & OFFICES DAEWOO WORKER CAMP & OFFICES (3400 PERSON) RUWAIS OIL(3400 PERSON) RUWAIS OIL FIELDFIELD(3400 PERSON)  RUWAIS OIL (3400 PERSON)  RUWAIS OIL FIELDFIELD

ABU ABU DHABI DHABI ‐‐ UAEUAE

Page 17: Dorce camps

DAEWOO WORKER CAMP & OFFICES DAEWOO WORKER CAMP & OFFICES RUWAIS RUWAIS OIL OIL FIELDABU FIELDABU DHABI DHABI ‐‐ UAEUAE

Type of Contract: EPC

T f W k W k ' R id ti l Cit f 3400 MType of Work :Worker's Residential City for 3400 Men

Scope of Work: Building construction works. Earth works. Electrical works, Mechanical works, Fire alarmsystem, Fire fighting systems, A/C units, Potable water tanks, Waste water tanksy , g g y , / , ,

Total Building Area: 37,663 m²

T t l Sit A 380 000 ²Total Site Area: 380,000 m²

Duration of the Work: November 2010 ‐ November 2011

Page 18: Dorce camps
Page 19: Dorce camps
Page 20: Dorce camps

TASIAST GOLD MINE TASIAST GOLD MINE 

Page 21: Dorce camps

TASIAST  GOLD MINE TASIAST  GOLD MINE 

Type of Contract: EPC 

Type of Work : Tasiast Team Village (8.400 Person ) Construction Camp

Scope of Work : Infrastructure works Building construction works Civil works Electrical works Mechanical worksScope of Work : Infrastructure works, Building construction works, Civil works, Electrical works, Mechanical worksCommunication works, Furnishing, Gen‐sets, Transformers, Potable water tanks, Waste water tanks

Total Building Area: 90,482 m2

Total Site Area : 475.000 m2 

f h k b bDuration of the Work: September 2011 ‐ October  2012

Page 22: Dorce camps

TASIAST  GOLD MINE TASIAST  GOLD MINE 

Page 23: Dorce camps
Page 24: Dorce camps
Page 25: Dorce camps
Page 26: Dorce camps

EENINI LIFE SUPPORT CAMPLIFE SUPPORT CAMP ZUBAIR OILZUBAIR OIL FIELDFIELDEENI NI LIFE SUPPORT CAMPLIFE SUPPORT CAMP‐‐ ZUBAIR OIL ZUBAIR OIL FIELD  FIELD  BASRAHBASRAH‐‐ IRAQIRAQBASRAHBASRAH IRAQIRAQ

Page 27: Dorce camps

EENI LIFE SUPPORT NI LIFE SUPPORT CAMPCAMPZUBAIR ZUBAIR OIL FIELD,  BASRAHOIL FIELD,  BASRAH‐‐ IRAQIRAQ

Type of Contract: EPC

Type of Work : Life Support Expansion Camp ‐ Zubair Oil Field Project

Scope of Work: Infrastructure works, Civil works , Electrical works, Mechanical works,Communication works Waste water treatment plant Potable water treatment plant Asphalt roadsCommunication works , Waste water treatment plant, Potable water treatment plant , Asphalt roads,Concrete roads, Sports fields, Site security works

Total Building Area: 25.788 m2

Total Site Area:137.600 m2

Duration of the Work:March ‐ October 2012Duration of the Work:March October 2012

Page 28: Dorce camps
Page 29: Dorce camps
Page 30: Dorce camps
Page 31: Dorce camps

10 000 MEN TURNKEY WORKER CAMP10 000 MEN TURNKEY WORKER CAMP10.000 MEN TURNKEY WORKER CAMP 10.000 MEN TURNKEY WORKER CAMP PROJECT PROJECT 

DOHA / QATARDOHA / QATAR

Page 32: Dorce camps

10.000 MEN TURNKEY WORKER CAMP PROJECT 10.000 MEN TURNKEY WORKER CAMP PROJECT DOHA / DOHA / QATARQATAR

Type of Contract: Construction

Scope of Work: Infrastructure works, Building construction works, Civil works, Electrical works,Mechanical works, Power plant and water treatment system, Fire alarm system

Total Building Area : 94 501 m²Total Building Area : 94.501 m²

Duration of the Work: July 2007 - December 2008

Page 33: Dorce camps
Page 34: Dorce camps
Page 35: Dorce camps

7 000 MEN CAMP7 000 MEN CAMP –– OIL AND GASOIL AND GAS7.000 MEN CAMP 7.000 MEN CAMP  OIL AND GAS OIL AND GAS PROCESSING PROCESSING FACILITY FACILITY SAKHALIN SAKHALIN ISLAND ISLAND 

RUSSIAN RUSSIAN FEDERATION FEDERATION 

Page 36: Dorce camps

7.000 MEN CAMP 7.000 MEN CAMP –– OIL AND GAS PROCESSING OIL AND GAS PROCESSING FACILITY SAKHALIN ISLAND RUSSIAN FEDERATION FACILITY SAKHALIN ISLAND RUSSIAN FEDERATION 

What is the role of DORCE in Sakhalin Island Oil Field?

Type of Contract: Design & Build

Scope of Work: Building construction works, Electrical works, Mechanical works

Total Building Area: 40.500 m²

Duration of the Work:May 2003 – November 2003

Page 37: Dorce camps
Page 38: Dorce camps
Page 39: Dorce camps

KARACHAGANAK GAS STATIONWORKERKARACHAGANAK GAS STATIONWORKERKARACHAGANAK GAS STATION WORKER KARACHAGANAK GAS STATION WORKER CAMP CAMP ( ( 7000 PERSON ) 7000 PERSON ) AKSAIAKSAI, , KAZAKHSTANKAZAKHSTAN

Page 40: Dorce camps

KARACHAGANAK GAS STATION WORKER KARACHAGANAK GAS STATION WORKER CAMPCAMP( ( 7000 PERSON ) 7000 PERSON ) AKSAIAKSAI, KAZAKHSTAN, KAZAKHSTAN

Type of Contract: Engineering & Supply

Scope of Work: Engineering works, Building supply, Supervision, Electrical works, Mechanical works, Firealarm systems

Total Building Area : 40 000 m²Total Building Area : 40.000 m

Duration of the Work: September 2000 – March  2001

Page 41: Dorce camps
Page 42: Dorce camps

6.500 MEN TURNKEY CAMP PROJECT6.500 MEN TURNKEY CAMP PROJECTATYRAU / ATYRAU / KAZAKHSTANKAZAKHSTAN

Page 43: Dorce camps

6.500 MEN TURNKEY CAMP PROJECT6.500 MEN TURNKEY CAMP PROJECTATYRAU / KAZAKHSTANATYRAU / KAZAKHSTAN

What is the role of DORCE in Kashagan Field ?

Type of Contract: EPC

g

Scope of Work:Site survey, Engineering works , Civil works, Communication works, Electrical works, Mechanical works,Heating system, Furnishing, Landscaping

Total Building Area: 60.000 m²

Duration of the Work: September 2005 – January 2007

Page 44: Dorce camps
Page 45: Dorce camps
Page 46: Dorce camps

6 000 MEN TURNKEY CAMP PROJECT6 000 MEN TURNKEY CAMP PROJECT6.000 MEN TURNKEY CAMP PROJECT 6.000 MEN TURNKEY CAMP PROJECT HABSHAN / ABU DHABI / HABSHAN / ABU DHABI / U.A.EU.A.E/ // /

Page 47: Dorce camps

6.000 MEN TURNKEY CAMP PROJECT 6.000 MEN TURNKEY CAMP PROJECT HABSHAN / ABU DHABI / U.A.EHABSHAN / ABU DHABI / U.A.E

Type of Contract: Design & Build

Type of Work : “Habshan Camp Project“ Prefabricated buildings

Scope of Work : Building construction works, Electrical works, Mechanical works

Total Building Area :  48.000 m2

Duration of the Work: March 2010‐February 2011

Page 48: Dorce camps
Page 49: Dorce camps