dorce camps
TRANSCRIPT
www.dorce.com.tr www.dorce.com.tr
CAMP PROJECTSCAMP PROJECTSCAMP PROJECTSCAMP PROJECTS
26.000 PERSON RESIDENTIAL CITY 26.000 PERSON RESIDENTIAL CITY AL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE
26.000 PERSON RESIDENTIAL CITY 26.000 PERSON RESIDENTIAL CITY AL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE
Type of Contract: EPC
T f W kType of Work:Worker Residential City Project including Worker, technician, supervisor dormitory buildings.
Scope of Work:Scope of Work:Building construction works, Civil works, Electrical works, Mechanical works , Assembly works
Total Building Area: 230.000 m2Total Building Area: 230.000 m2
Total Site Area: 437.000 m2
Duration of the Work: 2008 (10 Months)
16.000 PERSON RESIDENTIAL CITY 16.000 PERSON RESIDENTIAL CITY AL MAFRAQ ABU DHABIAL MAFRAQ ABU DHABI UAEUAEAL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE
16.000 PERSON RESIDENTIAL CITY 16.000 PERSON RESIDENTIAL CITY AL MAFRAQ, ABU DHABI AL MAFRAQ, ABU DHABI ‐‐ UAEUAE
Type of Contract: EPC
S f W k B ildi t ti k Ci il k El t i l k M h i l k A blScope of Work: Building construction works, Civil works, Electrical works, Mechanical works , Assemblyworks
Total Building Area:64,192 m²g ,
Total Site Area:106,716 m²
D ti f th W k 2009 (10 th )Duration of the Work: 2009 (10 months)
SHAGYRLY SHOMYSHTY GAS DRILLING SHAGYRLY SHOMYSHTY GAS DRILLING AND PROCESSING FACILITYAND PROCESSING FACILITYAND PROCESSING FACILITY AND PROCESSING FACILITY BEYNAU BEYNAU ‐‐ KAZAKHSTAKAZAKHSTANN
SHAGYRLY SHOMYSHTY GAS DRILLING AND SHAGYRLY SHOMYSHTY GAS DRILLING AND PROCESSING FACILITY / BEYNAU PROCESSING FACILITY / BEYNAU ‐‐ KAZAKHSTANKAZAKHSTAN
Type of Work: Construction of Shagyrly‐Shomyshty – Central Asia Centre Main Gas Pipeline CentralBooster Compressor Station Complete with Gas Treatment Unit and Autonomous Power Plant andturkney shift workers campturkney shift workers camp.
Scope of Work: As the Main Contractor at Shagyrly‐Shomyshty gas field ; the construction of centralbooster compressor station complete with gas treatment unit autonomous power plant gas‐collectingbooster compressor station complete with gas treatment unit, autonomous power plant, gas‐collectingstation‐1 and gas‐collecting station‐2 (CBCS C/W GTU, APP, GCS‐1 AND GCS‐2) turnkey camp projectincluding production of buildings, all electrical‐mechanical works, mobilization, all construction works, allconcrete and infrastructure works, roads, landscaping, clean and waste water tanks, security systemswith cameras, all pipe connections, transportation etc.
Total Building Area : 7.793,60 m2
Total Site Area: 620.000 m2
Duration of work: August 2007 ‐ December 2008
DAEWOO WORKER CAMP & OFFICES DAEWOO WORKER CAMP & OFFICES (3400 PERSON) RUWAIS OIL(3400 PERSON) RUWAIS OIL FIELDFIELD(3400 PERSON) RUWAIS OIL (3400 PERSON) RUWAIS OIL FIELDFIELD
ABU ABU DHABI DHABI ‐‐ UAEUAE
DAEWOO WORKER CAMP & OFFICES DAEWOO WORKER CAMP & OFFICES RUWAIS RUWAIS OIL OIL FIELDABU FIELDABU DHABI DHABI ‐‐ UAEUAE
Type of Contract: EPC
T f W k W k ' R id ti l Cit f 3400 MType of Work :Worker's Residential City for 3400 Men
Scope of Work: Building construction works. Earth works. Electrical works, Mechanical works, Fire alarmsystem, Fire fighting systems, A/C units, Potable water tanks, Waste water tanksy , g g y , / , ,
Total Building Area: 37,663 m²
T t l Sit A 380 000 ²Total Site Area: 380,000 m²
Duration of the Work: November 2010 ‐ November 2011
TASIAST GOLD MINE TASIAST GOLD MINE
TASIAST GOLD MINE TASIAST GOLD MINE
Type of Contract: EPC
Type of Work : Tasiast Team Village (8.400 Person ) Construction Camp
Scope of Work : Infrastructure works Building construction works Civil works Electrical works Mechanical worksScope of Work : Infrastructure works, Building construction works, Civil works, Electrical works, Mechanical worksCommunication works, Furnishing, Gen‐sets, Transformers, Potable water tanks, Waste water tanks
Total Building Area: 90,482 m2
Total Site Area : 475.000 m2
f h k b bDuration of the Work: September 2011 ‐ October 2012
TASIAST GOLD MINE TASIAST GOLD MINE
EENINI LIFE SUPPORT CAMPLIFE SUPPORT CAMP ZUBAIR OILZUBAIR OIL FIELDFIELDEENI NI LIFE SUPPORT CAMPLIFE SUPPORT CAMP‐‐ ZUBAIR OIL ZUBAIR OIL FIELD FIELD BASRAHBASRAH‐‐ IRAQIRAQBASRAHBASRAH IRAQIRAQ
EENI LIFE SUPPORT NI LIFE SUPPORT CAMPCAMPZUBAIR ZUBAIR OIL FIELD, BASRAHOIL FIELD, BASRAH‐‐ IRAQIRAQ
Type of Contract: EPC
Type of Work : Life Support Expansion Camp ‐ Zubair Oil Field Project
Scope of Work: Infrastructure works, Civil works , Electrical works, Mechanical works,Communication works Waste water treatment plant Potable water treatment plant Asphalt roadsCommunication works , Waste water treatment plant, Potable water treatment plant , Asphalt roads,Concrete roads, Sports fields, Site security works
Total Building Area: 25.788 m2
Total Site Area:137.600 m2
Duration of the Work:March ‐ October 2012Duration of the Work:March October 2012
10 000 MEN TURNKEY WORKER CAMP10 000 MEN TURNKEY WORKER CAMP10.000 MEN TURNKEY WORKER CAMP 10.000 MEN TURNKEY WORKER CAMP PROJECT PROJECT
DOHA / QATARDOHA / QATAR
10.000 MEN TURNKEY WORKER CAMP PROJECT 10.000 MEN TURNKEY WORKER CAMP PROJECT DOHA / DOHA / QATARQATAR
Type of Contract: Construction
Scope of Work: Infrastructure works, Building construction works, Civil works, Electrical works,Mechanical works, Power plant and water treatment system, Fire alarm system
Total Building Area : 94 501 m²Total Building Area : 94.501 m²
Duration of the Work: July 2007 - December 2008
7 000 MEN CAMP7 000 MEN CAMP –– OIL AND GASOIL AND GAS7.000 MEN CAMP 7.000 MEN CAMP OIL AND GAS OIL AND GAS PROCESSING PROCESSING FACILITY FACILITY SAKHALIN SAKHALIN ISLAND ISLAND
RUSSIAN RUSSIAN FEDERATION FEDERATION
7.000 MEN CAMP 7.000 MEN CAMP –– OIL AND GAS PROCESSING OIL AND GAS PROCESSING FACILITY SAKHALIN ISLAND RUSSIAN FEDERATION FACILITY SAKHALIN ISLAND RUSSIAN FEDERATION
What is the role of DORCE in Sakhalin Island Oil Field?
Type of Contract: Design & Build
Scope of Work: Building construction works, Electrical works, Mechanical works
Total Building Area: 40.500 m²
Duration of the Work:May 2003 – November 2003
KARACHAGANAK GAS STATIONWORKERKARACHAGANAK GAS STATIONWORKERKARACHAGANAK GAS STATION WORKER KARACHAGANAK GAS STATION WORKER CAMP CAMP ( ( 7000 PERSON ) 7000 PERSON ) AKSAIAKSAI, , KAZAKHSTANKAZAKHSTAN
KARACHAGANAK GAS STATION WORKER KARACHAGANAK GAS STATION WORKER CAMPCAMP( ( 7000 PERSON ) 7000 PERSON ) AKSAIAKSAI, KAZAKHSTAN, KAZAKHSTAN
Type of Contract: Engineering & Supply
Scope of Work: Engineering works, Building supply, Supervision, Electrical works, Mechanical works, Firealarm systems
Total Building Area : 40 000 m²Total Building Area : 40.000 m
Duration of the Work: September 2000 – March 2001
6.500 MEN TURNKEY CAMP PROJECT6.500 MEN TURNKEY CAMP PROJECTATYRAU / ATYRAU / KAZAKHSTANKAZAKHSTAN
6.500 MEN TURNKEY CAMP PROJECT6.500 MEN TURNKEY CAMP PROJECTATYRAU / KAZAKHSTANATYRAU / KAZAKHSTAN
What is the role of DORCE in Kashagan Field ?
Type of Contract: EPC
g
Scope of Work:Site survey, Engineering works , Civil works, Communication works, Electrical works, Mechanical works,Heating system, Furnishing, Landscaping
Total Building Area: 60.000 m²
Duration of the Work: September 2005 – January 2007
6 000 MEN TURNKEY CAMP PROJECT6 000 MEN TURNKEY CAMP PROJECT6.000 MEN TURNKEY CAMP PROJECT 6.000 MEN TURNKEY CAMP PROJECT HABSHAN / ABU DHABI / HABSHAN / ABU DHABI / U.A.EU.A.E/ // /
6.000 MEN TURNKEY CAMP PROJECT 6.000 MEN TURNKEY CAMP PROJECT HABSHAN / ABU DHABI / U.A.EHABSHAN / ABU DHABI / U.A.E
Type of Contract: Design & Build
Type of Work : “Habshan Camp Project“ Prefabricated buildings
Scope of Work : Building construction works, Electrical works, Mechanical works
Total Building Area : 48.000 m2
Duration of the Work: March 2010‐February 2011