documentation

7
Project:Construction of five storied building complex for the Faculty of ……………….Humanities at University of Keleniya. Introduction:This is a five storied building for the faculty of Humanities at university ………………. .ofKeleniya and the total value of the project is 97 million. The work ………………...consists of construction, completion and maintenance during defects ………………...liability period of the building, having gross floor areas of approximately ………………...1880 sq.m / 20,230 sqft including a board room, lecture halls, lobbies, ………………...toilets, balconies/corridors and closed parking area etc. …………………… In addition to that water supply system, storm water and ……………sewerage disposal system, split type air conditioning system, two…………… staircases and one passenger lift are included for the building. Location :

Upload: ym-anfas

Post on 18-Feb-2016

2 views

Category:

Documents


1 download

DESCRIPTION

cdc

TRANSCRIPT

Page 1: Documentation

Project:Construction of five storied building complex for the Faculty of ……………….Humanities at University of Keleniya.

Introduction:This is a five storied building for the faculty of Humanities at university ………………. .ofKeleniya and the total value of the project is 97 million. The work ………………...consists of construction, completion and maintenance during defects ………………...liability period of the building, having gross floor areas of approximately ………………...1880 sq.m / 20,230 sqft including a board room, lecture halls, lobbies,………………...toilets, balconies/corridors and closed parking area etc.

…………………… In addition to that water supply system, storm water and ……………sewerage disposal system, split type air conditioning system, two…………… staircases and one passenger lift are included for the building.

Location :

Page 2: Documentation

Employer : The Vice Chancellor,

University of Kelaniya,Dalugama, Kelaniya

Engineer : M/S DEVECO Architects

No.09,Gothami road, Colombo 08

Contractor:Link Engineering (PVT) Ltd

……………….Galle road, ,…………… ..Dehiwala

Man Power :

Page 3: Documentation

Category No. of People

Mason 14Tiller 04Carpenter 02Electrician 04Bar bender 03Rigger 03Plumber 01Painter 08Operator 02Mechanic 01Unskilled Laborers 20

Equipment and Machinery :

Category No.ofEquipment

Concrete mixer 02Hoist- 2 Ton 02Wheel loader 01Baby dumper 01Bar cutter 01Power saw 01Poker vibrator 02

Page 4: Documentation

SIDE VIEW

FRONT VIEW

Page 5: Documentation

PARTITION WORKS IN PROGRESS AT 3 RD FLOOR .

COMMENCE RENDERING IN 4 TH FLOOR LEVEL .