document: letters in support of necr tiger

Upload: the-bulletin

Post on 02-Jun-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    1/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    2/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    3/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    4/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    5/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    6/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    7/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    8/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    9/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    10/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    11/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    12/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    13/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    14/65

    THE STATE OF NEW HAMTHE STATE OF NEW HAMTHE STATE OF NEW HAMTHE STATE OF NEW HAMPSHIREPSHIREPSHIREPSHIRE

    DEPARTMENT OF TRANSPDEPARTMENT OF TRANSPDEPARTMENT OF TRANSPDEPARTMENT OF TRANSPORTATIONORTATIONORTATIONORTATION

    April 18, 2014

    The Honorable Anthony FoxxSecretary of TransportationUnited States Department of Transportation

    West Building1200 New Jersey Avenue, SE 9th

    FloorWashington, DC 20590-9898

    Dear Secretary Foxx:

    The New Hampshire Department of Transportation strongly supports the Connecting ConneTIGER VI application submitted by the Connecticut Department of Transportation. This projecthe New England Central Railroad route, which has seen several years of investment by the FeAdministration and New England Central Railroad (NECR) on the corridor. This project wcompletion of a through multi-state/international heavy haul rail corridor that will pass Hampshire. The route also serves and connects Vermont, Massachusetts and ConnecticHampshires link to Canada. The four states recognize the regional importance of this corridoto complete this work.

    The Connecticut DOT application requests $8.2 million in TIGER funds to upgrade 56 mileEngland Central Railroad from the deep-water ocean port of New London, Connecticut/Massachusetts state line. Although this is a Rural TIGER application, which doany matching funds, the NECR is providing over $2 million in private matching funds to comple

    project, thus demonstrating their strong commitment for these necessary improvements. Thifinal link of a multi-year project to improve a north-south corridor and create the first 286,000 lfreight route in our region. The project, once completed, will connect and complement other wcompleted or in process within the region and enhance work that has been completed in New Hcompleted corridor will open business growth opportunities for local businesses as well asthrough rail distribution facilities. Additionally, this line connects with two of our state-owned shwill also benefit from this project.

    The project includes the installation of continuous welded rail and supporting infrastructure upg

    grade crossings and surface improvements, which will allow for an increase of the through capacity up to 286,000 lbs. as well as increase train operating speeds. The project will also crjobs here in New Hampshire as well as in Connecticut, Massachusetts and Vermont. The comwill allow regional, national and international connectivity. New Hampshire is heavily dependeefficient rail service to move heating fuels and road salt as well as providing service to our businesses.

    CHRISTOPHER D. CLEMENT, SR.COMMISSIONER

    JEFF ASSISTA

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    15/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    16/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    17/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    18/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    19/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    20/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    21/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    22/65

    WINDHAM REGION

    COUNCIL OF GOVERNMEN

    Chaplin Columbia Coventry Hampton Lebanon Mansfield Scotland Willington

    The Honorable Anthony FoxUS DOT1200 New Jersey Ave SEWashington DC 20590

    April 9, 2014

    RE: US DOT Tiger IV Grant: CTDOT New England Central Rail Corridor Upgrade

    Dear Secretary Fox,

    The Windham Region Council of Governments (WINCOG) is writing in support of the CTDOT Tigupgrade the infrastructure of the New England Central Railway Corridor through Eastern CT.

    As the regional planning agency representing nine towns in Eastern CT, it is a major objective to infreight rail and decrease the amount of truck traffic on our roads. I am sure I do not need to convinctransportation infrastructure is taking a significant toll on our economic resources and the ability to services at reasonable price. In addition, this project has economic impacts from New London CT, tMassachusetts and all the way through Vermont.

    Here are just a few of the benefits of this Tiger Grant:

    Enhances and leverages a current CTDOT/NECR $5 million bridge and track upgrade pro

    Existing CT Businesses can achieve shipping efficiencies by using fully loaded rail cars

    The route can relieve congestion along the Northeast Corridor

    Meets the presidents goal of providing ladders of opportunities by providing additional benefits

    Greatly expands the capabilities of the New London Deep Water Port as well as relievinthat will be generated by the port.

    In conclusion, we sincerely seek your approval of this much needed Tiger Grant and stand ready to NECR and other entities in creating a better economic environment here in Eastern Connecticut.

    Sincerely,

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    23/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    24/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    25/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    26/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    27/65

    Charles T. BlanchardTown Manager Palmer Town Build

    4417 Main Street

    Palmer, MA 01069

    Town: (413) 283-26

    Cell: (317) 667-467

    cblanchard@town

    April 22, 2014

    The Honorable Anthony FoxxSecretary of TransportationUnited States Department of Transportation

    West Building1200 New Jersey Avenue, SE 9th FloorWashington, DC 20590-9898

    Dear Secretary Foxx:

    The Town of Palmer, known as The Town of Seven Railroads would like to show oursupport for the Connecticut Department of Transportations Connecting Connecticut U

    TIGER VI application.

    The Town of Palmer is located on the New England Central Railroad (NECR), the subjeproject.

    Our Town has several important businesses that depend on this vital rail corridor, includmanufacturing, distribution and warehousing. In addition to the importance of rail freighMASSDOT is currently conducting a study on possible future passenger rail service alo

    route that could link our town with major population centers.

    The Connecticut Department of Transportation is requesting $8.2 million in funding to umiles of the New England Central Railroad from New London, CT to theConnecticut/Massachusetts state line. The project includes new heavier continuous weld

    Town of PalBondsville, Depot Village, Thorndike &

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    28/65

    network I understand that the USDOT TIGER program does not make matching funds foapplications, a requirement, the NECR is providing over $2M in matching private funds complete this $10.3M project.

    I ask that you please give this application your serious consideration.

    Sincerely,

    Charles T. Blanchard,Town Manager

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    29/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    30/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    31/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    32/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    33/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    34/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    35/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    36/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    37/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    38/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    39/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    40/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    41/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    42/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    43/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    44/65

    April 15, 20

    The Honorable Anthony Foxx

    United States Department of Transportation

    1200 New Jersey Ave SEWashington, DC 20590

    Dear Secretary Foxx:

    We write to express our strong support for the Connecting Connecticut Project U

    TIGER VI application which is sponsored by the Connecticut Department of

    Transportation to fund freight rail infrastructure improvements along the Conneroute of the New England Central Railroad, a regional corridor serving New Eng

    businesses. The main element of this request would upgrade the rail system tha

    our business to accommodate 286,000 lb. freight railcars. This project will creatnorth-south heavy rail capacity corridor in Connecticut. This route provides our

    service. It also provides the only direct rail to water access at the deep water por

    London, CT.

    Our business, which is located along the New England Central Railroad, depend

    efficient and competitive freight rail service. Rail freight is essential to retainincustomers, controlling the cost of our inputs, employing our workers and allowi

    opportunities for advancement, and our ability to solicit new business and their mneeded associated jobs and revenues and maintaining/expanding our facilitys

    contribution to the local property tax base. As the national rail freight gross rail w

    standard has increased from 263,000 lbs. to 286,000 lbs., we are finding it more

    challenging for our business. Getting this corridor upgraded will enable our combegin shipping/receiving the heavier rail freight loads, cease light loading railca

    to comply with a non-standard exception GWR and begin reaping the full econo

    benefits of modern freight railroad service. As local freight rail access to rail se

    facilities across North America is updated and made capable of handling the healoads by TIGER grants or by similar public-private co-operation, absent any sim

    update on the our route, we will continue to face competition on an increasinglyplaying field. Absent this project, we are finding ourselves left behind on an isl

    without connectivity to the full benefits of the national rail freight network.

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    45/65

    This project will complement and leverage other public-private projects that havsuccessfully accomplished along this regional corridor. To make this applicatio

    more competitive, the New England Central Railroad is providing a 20% private

    for this Rural TIGER VI application, even though none is required.

    Sincerely,

    Geoff BerwickDirector of Risk and Inventory Management

    [email protected]

    cc: Senators Blumenthal & Murphy and Congressman Courtney

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    46/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    47/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    48/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    49/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    50/65

    Secretary Anthony Foxx

    U.S. Department of Transportation

    1200 New

    Jersey Ave,

    SE

    Washington, DC

    20590

    Senator Richard Blumenthal

    72

    4 Hart Senate Office Bldg.

    Washington DC 2 51

    c o [email protected]

    4

    22

    /

    2

    0

    1

    4

    ,

    i

    t

    Jesse Marshall, Chairm

    New London Por t Aut

    181

    St

    ate

    Street

    New London, CT 0632

    Senator Chris Murphy

    303

    Hart Senate Office Bldg.

    Wa shington, DC 20510

    c o

    J [email protected].

    Congressman Joe Courtney

    2348 Raybul'll HOB

    Washington , DC 205 15

    c o [email protected]

    RE:

    Department of Transportation's National Infrastructu re Investments grant application, sim

    TIGER

    VI

    grant, to seek Federal Gover nment /US DOT financial assistance to upgrade NECR's

    CT

    model'll 286K GWR capacity

    Gentlemen:

    The New London Port Authority unanimous

    ly

    and enthusiast ica

    lly

    supports the New England C

    Application which ha s Connecticut

    DOT

    sponsorship, seeking 8,253,830.00 federal dollars (plu

    2,063.458.00 private match) for much needed incremental funding to address priority improve

    freight rail system.

    Of

    particular interest to this Authority are the long needed safety and capacity

    impr

    ove

    ments

    to

    es

    se Marshall, Chairman

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    51/65

    Dispersing trade and passengers has always been essential to the success of New London's ende

    Thames River meets the sea she affords wonderful deep water dockage and mooring for commer

    transportation and defense vessels. The proposed rail improvements are a vital means for the re

    capitalize on the global Blue Highway's potential bounty.

    We need strong safe rail connections. We need improved freight capacity.

    Decrepit bridges, aged jointed rail, low weight bearing capacity, etc. thwart

    om

    freighted comme

    New London Port Authority

    is

    tasked to cruise fonvard with a bone between

    her

    teeth , churnin

    suppolting every opportunity for Port improvement. Implementation

    of

    this projec t will enhanc

    and increase NLPA opportunities.

    We ask that you assist Connecticut DOT's efforts in reducing

    t1 l1ck

    trips and carbon emissions, c

    providing economic growth opportunities, and improving safety measmes within the statewide f

    by approving this grant request.

    ~

    esse Marshall, Chairman

    New London Port Authority

    CC: Douglas G.

    Low

    , Director of Marketing Sales, New England Central

    RR,

    A Genesee Wyo

    State Pier, New London,

    CT

    06320

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    52/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    53/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    54/65

    April 21, 2014

    Secretary Anthony FoxxU.S. Department of Transportation1200 New Jersey Ave. SEWashington, DC 20590

    Secretary Foxx:

    The City Center District is a business taxing district in downtown New London, CT. We entthe New England Central Railroad TIGER VI grant application to improve the rail line from Massachusetts border.

    Improving the NECR track capacity to handle 286,000 lb. rail cars will open many of our eamunicipalities to shipping and manufacturing companies that will take advantage of the acc

    water port in New London, the rail connections to Canada, and to points west on the CSX Massachusetts. These new businesses will create employment opportunities and add to m

    Upgrading the NECR line will expand commuter rail service in eastern Connecticut. There college students at universities along the line, mostly in rural districts and only accessible bSoutheastern Connecticut, with its many vacation destinations, is the tourism capital of Copublic transportation will permit this important economic industry to remain competitive for It enhances the opportunity for New London and Norwich to become bedroom communitie

    further development and broadening of our tax bases.

    Downtown New London has a unique transportation infrastructure. It is located on Amtrakand is serviced by Connecticuts commuter rail line. There is ferry service to Long Island, BFishers Island handling 1.5 million passengers per year. In addition, there is interstate busstation. All these public transportation services are within a radius of 300 yards and the coone mile away. The construction of the new National Coast Guard Museum on the waterfrferry terminal and train station, with its projected annual visitors of 750,000, will require tha

    transportation options are maximized.

    Upgrades to the NECR track will be an important first step to ensuring New London maintaas a transportation hub. We hope you view their application favorably.

    City of New London

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    55/65

    City of New London

    Economic Development Commission

    April 21, 2014

    Secretary Anthony FoxxU.S. Department of Transportation1200 New Jersey Ave, SEWashington, DC 20590

    Senator Richard Blumenthal724 Hart Senate Office Bldg.

    Washington, DC, 20510

    Senator Chris Murphy303 Hart Senate Office Bldg.Washington, DC 20510

    Congressman Joe Courtney2348 Rayburn HOBWashington, DC 20515

    RE: Department of Transportation's National Infrastructure Investments grant applicatioFederal Government/USDOT financial assistance to upgrade NECRs CT rail line to mo286K GWR capacity.

    Gentleman:

    The Economic Development Commission of the City of New London supports the New Central RR Grant Application, seeking $8,253,830.00 federal dollars (plus a $2,063,458private match) for much needed incremental funding to address improvements to the frsystem.

    This upgrade will allow for the development of commuter rail service from Brattleboro VNew London Connecticut. This is an extremely powerful development tool for the City oLondon. The commuter service passing by key college towns and casinos will enhanceappeal of New London as a bedroom community. This new demand will force multistoryresidential development enhancing the citys tax base.

    The NECR also connects Connecticut businesses with shipping options for raw materiafinished products via freight rail to on-dock connections at the port at New London.

    This grant will provide development that will reduce truck and car trips and therefore caemissions; create jobs, provide economic growth opportunities, and improve safety meaa commuter/freight rail system.

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    56/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    57/65

    SouthEastern onnecticut Enterp

    125 Eugene ONeill Drive, Suite 309, New London, Conn

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    58/65

    Telephone: 860-437-4659 Facsimile: 860-43E-mail:[email protected]

    15 April 2014

    The Honorable Anthony FoxxUnited States Department of Transportation1200 New Jersey Ave SEWashington, DC 20590

    Dear Secretary Foxx:

    The Southeastern CT Enterprise Region (seCTer), the regional Economic DeveDistrict for New London County CT, expresses its strong support for the ConnConnecticut USDOT TIGER VI Project application sponsored by the ConnecticDepartment of Transportation to fund rail infrastructure improvements alongregional corridor in eastern Connecticut. The main element of this request wupgrade the rail system servicing New London County, and northward to theMassachusetts line, allowing it to accommodate the North American standardlb. freight railcars. This project will create the first northsouth heavy rail capcorridor in Connecticut. This route provides for local freight rail service and ias a future passenger corridor. It also provides direct on dock railtodeep waaccess via State Pier in the port of New London, CT. It also connects with all feastern Class I railroads. These rail improvements are identified as a high prio

    project for eastern CT in the 2011 Regional Comprehensive Economic DeveloStrategy (CEDS), recognized and endorsed by the Federal Economic DevelopmAgency (EDA).

    seCTers business partners located along the New England Central Railroad defficient and competitive freight rail service, which is essential in providing injob opportunities to our citizens and revenues to our communities. As the natfreight gross rail weight standard has increased from 263,000 lbs. to 286,000

    find it ever more challenging for our businesses relying on rail to survive and A recent $5.1M publicprivate partnership between the Connecticut DepartmTransportation and the New England Central Railroad will upgrade all of the balong this route. This proposed TIGER project will complement this State/Rainvestment and will allow completion of the corridor Without access to a mod

    The TIGER funding to accomplish this project will complement and leverage o

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    59/65

    in other publicprivate projects that have been successfully completed or schealong the regional corridor in VT, NH, MA and CT. To make this application e

    competitive, the New England Central Railroad is providing a 20% private mathe Rural TIGER IV application, even though none is required. We urge your fapproval of the federal funding to move this important project forward, ensurhealthy businesses and expanding job opportunities for Eastern CT.

    Thank you very much.

    Sincerely,

    C. Stephen MacKenzieExecutive Director

    cc: Congressman Joseph Courtney District 2;Senator Christopher Murphy;Senator Richard Blumenthal;CT Governor Dannel Malloy

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    60/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    61/65

    Regional

    Leaders

    AT&T

    CL&P

    First Niagara

    Bank

    Golden

    Acorn

    Studios

    Liberty Bank

    Logistics

    Consulting

    People's

    United Bank

    Savings

    Institute

    Bank & Trust

    WILI

    The Honorable Anthony Foxx

    United States Department of Transportation1200 New Jersey Ave SE

    Washington, DC 20590

    Dear Secretary Foxx:

    We would like to express our strong support for the Connecting Connecticut USDO

    application which is sponsored by the Connecticut Department of Transportation t

    infrastructure improvements along our regional corridor in Connecticut. The mainrequest would upgrade the rail system that serves the fifteen communities of the

    accommodate the North American standard 286,000 lb. freight railcars. This projec

    north-south heavy rail capacity corridor in Connecticut. This route provides our loc

    provides direct on dock rail to water access at the deep water port of New London

    all four eastern Class I railroads.

    Our businesses and the associated jobs located along the New England Central Rai

    efficient and competitive freight rail service. Rail freight is essential to allowing ouemployment opportunities, retaining our businesses and our ability to solicit new

    much needed associated jobs and revenues. As the national rail freight gross rail w

    increased from 263,000 lbs. to 286,000 lbs., we are finding it more challenging for

    survive and expand. A recent $5.1M public-private partnership between the Conn

    Transportation and the New England Central Railroad will upgrade all of the bridge

    This TIGER project will complement and allow completion of the corridor. Without

    rail corridor, we will continue to face mounting competition on an increasingly un-

    Absent this project, we are finding ourselves left behind on an island, without conbenefits of the national rail freight network.

    This project will complement and leverage over $90M in other public-private proje

    successfully accomplished or scheduled along this regional corridor in VT, NH, MA

    application even more competitive, the New England Central Railroad is providing

    for this Rural TIGER IV application, even though none is required.

    Sincerely,

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    62/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    63/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    64/65

  • 8/11/2019 DOCUMENT: Letters in support of NECR TIGER

    65/65