1) Select product (multiple selections OK): 4) Press the button Purpose Statement This document provides an overview of features and enhancements included in Oracle Primave It is intended solely to help you assess the business benefits of upgrading and to plan y Copyright 1999, 2015 Oracle and/or its affiliates. All Rights Reserved. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may 2) Select your CURRENT release (one selection only): 3) Select your TARGET release (one selection only):

Upload: ngotram

Post on 04-May-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

1) Select product (multiple selections OK):

4) Press the button

Purpose StatementThis document provides an overview of features and enhancements included in Oracle Primavera products. It is intended solely to help you assess the business benefits of upgrading and to plan your I.T. projects.

Copyright 1999, 2015 Oracle and/or its affiliates. All Rights Reserved.

Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners.

2) Select your CURRENT release (one selection only):

3) Select your TARGET release (one selection only):

Use this tool to identify product features available to you when upgrading.

1. Select a product from the list.2. Select your current release (Current) and the release you plan to upgrade to (Target).3. Click the Run Report button.4. The tool will automatically generate a new report on a separate tab. You may use the autogenerated name for your report, or create your own.

Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners.

2. Select your current release (Current) and the release you plan to upgrade to (Target).

Click this button to package up the workbook for GA.

Populate these two columns with release info.Label displays in the list boxes on the User Input sheet.Index corresponds to entries in the Index field in the Data sheet.

Release Control ListLabel (as text) Index (as number)5.0 50006.2.1 62107.0 70008.0 80008.1 81008.2 82008.3 83008.4 840015.1 15100

Click this button to package up the workbook for GA.

Populate this column with "free" or "once and only once" products.These products will not appear in the Product select list; but they will appear one time in the report, regardless of user choices.

Free Products

Index Product Feature

8300

P6 Professional 8.3

8300

P6 Professional 8.3

8300

P6 Professional 8.3

8300

P6 Professional 8.3

8300

P6 Professional 8.3

First Release for Feature

Enhanced XML Importing and Exporting.When importing using Primavera XML or Microsoft Project XML format, you can import multiple projects as a single file. You can export multiple projects as a single file when using Primavera XML format. You can create templates when importing projects using Primavera XML format. These templates allow for granular control over global and project data.

Modifying Global Data during XML Import.You can specify the import action to take when the same global data exists in the import file and project being updated. You can use, demote, and remove codes. You can also rename codes and code values. You can use, remove, and rename user defined fields. You can use, demote, and remove calendars as well as rename them. You can map incoming resources to resource roles and specify a resource node under which to import all incoming resource data.

Online Help for P6 Professional.You have the option to use Local Help and Online Help. By default, the Online Help option will launch the Oracle Technology Network site. The F1 key and Help shortcut icons launch the Local Help by default. Set changes to the Help location and shortcut keys in Admin Preferences.

Discussion Feature in P6 Professional.Project managers can communicate about an activity with activity owners and other P6 Professional users assigned as resources to the activity.Load Resource Summary Data upon P6 Professional Startup.A user preferences setting allows you to choose whether resource summary data will load at startup.

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300P6 EPPM 8.3

8300P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

Discussion Feature.Project managers using P6 or P6 Professional can communicate with team members using P6, P6 Professional, P6 Team Member Web, and P6 Team Member for iPhone App using the Discussion feature. Project managers and team members can have a discussion about a task by posting and responding to comments. The messages are saved with the task and can be referred back to at a later time.

Add and Delete Steps in P6 Team Member Web and P6 Team Member for iPhone App.In addition to providing status on steps in a task, team members can add and delete steps. Allowing team members to add and delete steps is a project preference set by the project manager in P6.

Enhanced Filtering in P6 Team Member Web.Filtering options enable team members to limit the number of tasks displayed in their view for more efficient statusing. Team members can choose a time frame, such as Today, Tomorrow, or This week, or search on task details, such as task name, activity code, WBS, or a user-defined field.

Milestone Support for Primary Resources in P6 Team Member Interfaces.In addition to activity owners, primary resources can view and provide status on their assigned milestones.Notebook Topics in P6 Team Member Web.Team members can view notebook topics that are added to tasks in P6.Document Viewing in P6 Team Member Web.Team members can view documents that are associated with tasks in P6.Enhanced Date Control in P6 Team Member Interfaces.Team members are unable to set an actual start date before the date has occurred or set an actual finish date before the date has been reached.Star Filtering Option in E-mail Statusing Service.Team members can star a task when providing status updates using e-mail, enabling them to use the star filter when requesting a task list through e-mail.

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

E-mail Statusing Service Welcome E-mail.Project managers can send a Welcome e-mail when team members have access to the E-mail Statusing Service. This e-mail includes the e-mail address to the E-mail Statusing Service, and instructions for requesting a task list and updating the list through e-mail.

E-mail Statusing Service Request for Updates E-mail Sent by Project Managers.Project managers can send team members an e-mail request for status updates. The e-mail request includes a list of tasks for the projects specified by the project manager.

E-mail View for Progress Reporter Timesheet Users.Timesheet users can use the E-mail Statusing Service to request a list of their assigned tasks.Enhanced Filtering in P6 Team Member for iPhone App.iPhone app users can minimize the number of tasks in their current view by filtering on a time frame option: Today, This Week, or Next Week.P6 Team Member Status Approval Updates.Project managers can approve updates to step names, activity codes and user defined fields, and can view and respond to discussions while reviewing team member status updates.

P6 Team Member Status Update History.The Status Update History for Team Member interfaces displays the changes for updated activity codes or user defined fields (UDFs).Content Repository Supports CMIS.In addition to Web Content Core Capabilities and Microsoft SharePoint, P6 can support Content Management Interoperability Services (CMIS) compliant document management systems. If you have a CMIS-compliant content repository, you can connect it to P6 through the P6 Administrator Application.

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

Default Start Page.You can specify a default starting page for each User Interface View. Your users can also specify their own preferred start page in the My Preferences menu. This will save your users time when they start P6 EPPM because the application will open directly to the page they need.

Customizable Column Names in P6.You can customize column names in P6. Save these changed column names to a view and share that view with other users.Include User Views When Copying Users.Copying users copies their personal views and any multi-user views to which the user has access. This saves time when creating new users; just copy an existing user and P6 will copy their views too.

Automatic Notification When Scheduled Job Completes.There is no need to refresh the jobs status screen to see when a job is completed, a notification will arrive automatically to tell you when the job is done.Improved Selection for Job Services. You can run Job Services against Portfolios. This makes it easier for you to run jobs against the correct projects. Dynamic portfolios can select exactly the right projects at the time that the job service runs, to ensure the selection of projects is up-to-date. Also, you can select Projects in the Job Services dialog by Project Name or Project ID, and you can run Job services against any combination of Projects, EPS nodes, and Portfolios.

Sort on Multiple Columns.Sort the Activity, EPS, and Resource Assignments pages by up to five columns and save the sorting options per view.Relationship Details tab.As well as the separate Successors and Predecessors tabs, you can view details of successors and predecessors side-by-side in a single detail tab in the Activities view in P6. 

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

Easier Identification of Activity Code Hierarchical Position and Scope. The Code Value column in the Codes detail window in the Activities, EPS, and Assignments pages show the position within the code hierarchy of the code value assigned. For Activity Codes, the Code Type column shows whether the code is a Global, Project specific, or EPS specific code.

Print Without Gantt Chart in P6 Activity View.You can print the Activity Table without the Gantt Chart by showing only the Activity Table (without the Gantt) in the Activity pages.Print a Specific Date Range Using Rolling Dates.You can customize your print output by selecting Start and Finish dates using a rolling date range based on Earliest Project Start, Earliest Project BL Start, Latest Project Finish, Latest Project BL Finish, Earliest Data Date, or Current Date. You can also set a Custom Date and set a plus or minus for the number of Days, Weeks, Months, Quarters, or Years you want to print.

An Extended List of Baseline Fields is Visible in the Activities View.In the Customize Columns dialog, some extra columns are available if a baseline is assigned to the project. Actual Expense Cost, Actual Labor Cost, Actual Material Cost, Actual Nonlabor Cost, Actual Total Cost, Actual Start, Actual Finish, Early Start, Early Finish, Late Start, Late Finish, Actual Duration, Remaining Duration, Free Float, Total Float, Activity Status, Activity % Complete, Cost % Complete, Duration % Complete, % Complete Type, Units % Complete, Actual Labor Units, and Actual Nonlabor Units are visible for both the Project and User's Primary baseline.

Assigning Multiple Items in Assign Dialogs.The Assign dialog box used when assigning resources, roles, predecessor activities, or successor activities has been enhanced to allow you to select multiple items at once using Ctrl or Shift keys on your keyboard.

Find and Replace.Replace text easily in the Find and Replace dialog in the EPS, Activities, and Assignments views.

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

Choose Which Data to Copy When Pasting Activities.When pasting copied activities in the Activities page, you can select which aspects of the activities you would like to paste. When pasting the activities, unselect any or all of the following data types to remove that data from the pasted activities: Resource & Role Assignments, Relationships (including an option to keep only relationships between copied activities), Expenses, Activity Codes, Notebook Items, Steps, Work Products & Documents, and Risks.

Additional Fields Available for Filtering in the Activities, EPS, and Resource Assignments Pages.Some additional fields are available in the filter dialog in Activities, EPS, and Resources pages. They are: Last Modified Date, Last Modified By, At Completion Labor and Nonlabor Units (EPS and Activities only), Feedback from Resource, and Review Finish Date.

API and Web Services Enhancements.The API and Web Services support time sheets, discussions, dissolve activity, creating and deleting steps, activity comments, and documents. Web Services supports Primavera Unifier intergration. The API supports starring tasks in Team Member interfaces.

Enhanced XML Importing and Exporting.When importing using Primavera XML or Microsoft Project XML format, you can import multiple projects as a single file. You can export multiple projects as a single file when using Primavera XML format. You can create templates when importing projects using Primavera XML format. These templates allow for granular control over global and project data.

Modifying Global Data during XML Import.You can specify the import action to take when the same global data exists in the import file and project being updated. You can use, demote, and remove codes. You can also rename codes and code values. You can use, remove, and rename user defined fields. You can use, demote, and remove calendars as well as rename them. You can map incoming resources to resource roles and specify a resource node under which to import all incoming resource data.

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 EPPM 8.3

8300

P6 Professional 8.3

8300

P6 EPPM 8.3

8300

P6 Professional 8.3

8300

P6 Professional 8.3

Online Help for P6 Professional.You have the option to use Local Help and Online Help. By default, the Online Help option will launch the Oracle Technology Network site. The F1 key and Help shortcut icons launch the Local Help by default. Set changes to the Help location and shortcut keys in Application Settings.

Load Resource Summary Data upon P6 Professional Startup.A user preferences setting allows you to choose whether resource summary data will load at startup.Enhanced Microsoft Project Import in P6 Professional.When importing a Microsoft Project XML file, you can control what types of global and project data to overwrite when importing.UN/CEFACT Export.You can export project data from P6 Professional in the UN/CEFACT XML format. This format is used by the Unitied Nations Body for Trade Facilitation and Electronic Business.

UN/CEFACT Export.You can export project data from P6 in the UN/CEFACT XML format. This format is used by the Unitied Nations Body for Trade Facilitation and Electronic Business.P6 Professional-Unifier Integration.You can link a P6 Professional project to a Unifier project and schedule sheet using a mapping definition from Unifier. You can also assign a Cost Breakdown Structure (CBS) code from the linked Unifier project to a P6 Professional project activity. You can use the CBS code to filter which activities should be sent to Unifier.

Visualizer.Visualizer is a new feature for graphical reporting that supports Gantt charts and Timescaled Logic Diagrams. Visualizer is a continuation of the Timescaled Logic Diagram feature added to P6 Professional in the 8.0 release. Visualizer facilities the creation, customizing, saving, and printing of Gantt charts and TSLDs. Visualizer may be launched from within P6 Professional or as a standalone application.

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

P6 EPPM-Unifier Integration.You can link a P6 project to a Unifier project and schedule sheet using a mapping definition from Unifier. You can also assign a Cost Breakdown Structure (CBS) code from the linked Unifier project to a P6 project activity. You can use the CBS code to filter which activities should be sent to Unifier.

Team Member Updates to Activity Codes and User Defined Fields (UDFs).Team members using P6 Team Member Web and P6 Team Member for iPhone App can update activity codes and UDFs assigned to the project. Allowing team members to update activity codes and UDFs is a project preference set by the project manager in P6. E-mail Statusing Service users can view activity codes and UDFs; however, these fields cannot be updated through e-mail.

Team Member Work Distribution Filter.Not only can resource assignments and activity owners update their tasks using Team Member interfaces, now companies that do not resource load schedules can configure a filter and assign it to a user to distribute the responsible work. The filter can be created using a combination of Global and EPS Activity Codes, Resources, and Roles and is available from the Users page.

Team Member Module Access Changes.The Team Member module has been renamed Contributor. There is a new module access called Team Member Interfaces. This module provides access to all Team Member interfaces: P6 Team Member Web, P6 Team Member for iPhone app, and E-mail Statusing Service. The P6 Team Member for iPhone app and E-mail Statusing Service can be accessed with any module access. P6 Team Member Web can only be accessed by users with Team Member Interfaces access.

Security Policy enabled by default.The secure passwords policy is enabled by default. Users will have to choose secure passwords unless you remove this option.PDF Printing Performance Improvement.Printing to PDF is faster and more efficient. When printing from the Activities, Assignments, and EPS views, you can switch off the option to Print as Gradient, to improve printing performance.

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

Improved Reporting.New reports for BI Publisher give greater visibility of Activities, Baselines, Resource data including limits, and Earned Value.Support for User Productivity Kit (UPK).Progress Reporter can be configured to display custom content created using UPK.

Progress Reporter Support for Oracle Web Content Core Capabilities.If Web Content Core Capabilities is configured for P6, Progress Reporter users can access documents stored in the content repository. This feature was first introduced in version 8.2 Service Pack 1.

Progress Reporter Support for Multiple Databases.Progress Reporter now accesses the list of P6 configurations and databases allowing the administrator to choose the appropriate configuration. This feature was first introduced in version 8.2 Service Pack 1.

Migration Utility for Content Repository.When upgrading to 8.3, you will have to use the Migration Utility to ensure your content repository documents migrate correctly. This utility will ensure former Database IDs change to Project IDs.

Fusion Settings Enhancements in P6 Admin Application.The Integration Id and Schema version allow you to specify exactly which version of Fusion you are using.Bounce Email Address in the Admin Application.Bounced emails will be sent to the person who sent them automatically. This bounce field allows you to send bounced emails to your administrators also so they can investigate potential problems with emails.

Enhanced Supported Configurations.P6 EPPM now supports BPM 11.1.1.6, Oracle Webcenter Content Core Capabilities 11.1.1.6, WebLogic 12C, and Enterprise Manager 12C.Enhanced Language Support.P6, P6 Professional, P6 Progress Reporter, P6 Team member for iPhone, and P6 Team Member Web applications now support Korean.

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8200

P6 EPPM

8.2

Connect directly to LDAP's connection pool.P6 EPPM connects to directly to LDAPs connection pool instead of through P6’s connection pool.BPM usability enhancements.Oracle made several usability enhancements in P6 in relation to BPM 11g to make it easier to use overall. Several columns have been renamed and others now show data more consistent with the expectation of users, for example the Activity column shows the Activity Name instead of the Activity ID. Some new columns have been added and columns have been added to the list of default columns displayed.

Oracle WSM Policy Manager.If BPM 11.1.1.6 will integrate with P6 EPPM, you need to deploy the Oracle WSM Policy Manager. The policy manager ensures that P6 and BPM 11.1.1.6 connect correctly.

P6 Team Member for Android App.This new app enables team members to report status quickly and efficiently using an Android device. Team members can view and update all work currently assigned to them, including steps, codes, and UDFs. They can communicate with their project manager or other team members working on the same task using the Discussion feature or through e-mail. P6 Team Member for Android is part of the P6 Team Member interface suite, which is designed for project team members to status their activities in an easy to use interface that does not require them to learn P6.

New P6 Team Member Web Application.This new application enables team members to report status quickly and efficiently. Team members can view and update all work currently assigned to them, communicate with other team members through e-mail, and view predecessor and successor tasks. P6 Team Member Web is part of the P6 Team Member application suite, which is designed for project team members to status their activities in an easy to use interface that does not require them to learn P6. P6 Team Member Web runs on tablets as well as web browsers.

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

New P6 Team Member E-mail Statusing Service and P6 Team Member for iPhone App Support for Activity Owners.In P6, team members can now update activities that they are assigned to as activity owner. Before, team members could update only activities they were assigned to as resources.

New P6 Team Member Applications Configuration Options.In P6, project managers can control which projects have status updates staged for approval, as well as which fields to display to team members when updating their status from the E-mail Statusing Service, P6 Team Member for iPhone app, and P6 Team Member Web. This gives project managers the control they need to ensure the integrity of the schedule and that best practices are being followed.

New P6 Team Member Status Approval Process.In P6, project managers can view team member status updates before the updates are committed to the schedule. The new approval process for status changes enables them to view, update, and approve activity progress reported through the E-mail Statusing Service, P6 Team Member Web, and P6 Team Member for iPhone app to ensure the integrity of changes coming into the schedule.

New P6 Team Member Status History.In P6, when you select an activity, you can display all status changes made to the activity from P6 Team Member applications; you can also filter by activity, assignments, or steps. Displaying the history makes it easy for you to see all changes and troubleshoot any schedule problems.

New Exclusive Mode in P6.You can now open one or more projects exclusively. This enables you to prevent others from updating a project while you run reports, schedule projects, level resources, or take other actions while ensuring the project data does not change. When you open a project exclusively, only you can edit it; other users have only read access.

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

New Location Data in P6.New global enterprise data for locations enables you to create a list of locations, including the street address and the longitude and latitude. If you do not know the longitude and latitude, you can find them if you have a geolocation service connected to P6. You can also find an address based on the longitude and latitude. You can assign locations to projects, resources and activities, and you can report on data by location in P6 Analytics. You can also group, sort, and filter by location in various views. You can also import new locations into P6 from a Microsoft Excel (.xls) file.

Enhanced Microsoft Project Integration.When importing a Microsoft Project XML file, you can now update an existing project. This enables you to manage projects in Microsoft Project and bring the changes into P6 to ensure the status of the project is reflected accurately in P6. You can control what types of global and project data to overwrite when importing. You can also export P6 projects as Microsoft Project XML 2010 files, as well as import Microsoft Project 2010 files.

Enhanced Scaling Options when Printing in P6.New scaling options are available, which enable you to control how tables appear in printed output.Enhanced Event Functionality in P6.Creating or updating User Defined Field (UDF) values now trigger events. Also, when a change triggers an event, the P6 Event Notification system sends the event message to a user configured message queue. You can use the events in a client application to trigger subsequent actions. You could, for example, launch an external workflow based on the existence of a specific event.

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

Enhanced Trending in P6.The following enhancements help you manage historical data:- Project history now supports dates and durations.- Historical data now includes activity-level and WBS-level data.Use P6 to configure how you want historical data stored in P6 Analytics. In addition to project level data, you can choose to capture data at the WBS and/or activity level. You can then specify a time interval to store the data, including month, week, quarter, year, or financial period.

New Resource Creation From Users in P6.You can now create and assign a resource to an existing user in one step. This can significantly reduce the time and effort required to set up resources.Enhanced Copy User Support in P6.The following information is now copied when copying existing users, which makes it easier for administrators to manage users:- Toolbars for Activities, EPS, and Assignments views- Global user preferences- Assigned user interface views

New “Is Under” Filtering Support in P6.When filtering in the Activities, EPS, and Resource Assignments pages, you can now select an item in a hierarchy and filter on that item and everything under it. For example, you might want to see only projects that are in the Northeast region. You can select EPS is Under Northeast region and only projects under that EPS and its children appear.

New Dissolve Activities Support in P6.When you delete an activity, a chain of logical activities might be broken. You can use the new Dissolve option to delete the activity but join the predecessors and successors and create the appropriate relationships between them. The dissolve option is available from the right click menu, Actions menu, and the toolbar of the Activities view when you select a single activity that has both predecessors and successors.

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

New Column Search in P6.When customizing columns on the Activities, EPS, and Assignments pages, you can now use search to easily find the columns you need.New Cut/Copy/Paste WBS Support in P6.You can now cut, copy, and paste WBS elements on the Activities page. This helps project managers create projects quickly and efficiently.New Copy Issue Forms Support in P6.When you copy projects, create templates, or create projects from templates, issue forms are also copied.Additional Fields in Predecessor/Successor Tabs of P6.Additional fields are now available in the Predecessor and Successor tabs of the Activities page to help project managers better analyze their project schedule. The new fields are Driving, Critical, Total Float, Free Float, Early Start, Early Finish, Late Start, and Late Finish.

Project Name Column Available in the Add Activity Dialog Box in P6 Progress Reporter.When adding activities to a timesheet, you can now display the project name as a column. Exposing the project name makes it easier for team members to find tasks they want to add.

New P6 EPPM Universal Installer.The new P6 EPPM Universal Installer is now available for all of your P6 EPPM applications, other than P6 Professional. There is no longer a separate installation tool for each application, which makes it much easier to set up and customize your installation. This installer also enables you to: - Deploy all your P6 EPPM applications in WebLogic, and create a managed server.- Install, upgrade, and configure your database.- Configure P6 EPPM to work with supporting components, suchc as BPM, BI Publisher, and UCM.

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

P6 EPPM Performance Improvements.P6 EPPM performance is improved on all 3 tiers:- For the database, SQL optimizations improve query speed and reduce overall database load.- For the application server, loop reduction and short-circuit logic improve transaction time and reduce application server CPU use.- On the client (browser) side, the size of serialized objects used by applets is reduced, and the number of round trip calls is reduced, which improves performance under high latency.

These changes increase the number of objects that display in a reasonable amount of time in a number of views, including the Activity, EPS, Assignments, OBS, and User Administration views, as well as in various portlets. As a general rule, a P6 view that previously took 35 seconds to load now takes 7 seconds.

Enhanced LDAP Provisioning.When provisioning users from LDAP, you can choose to copy the settings of an existing user to new users. This can significantly reduce the time and effort required to set up new LDAP users in P6 EPPM.

Enhanced Language Support.P6, P6 Professional, P6 Progress Reporter, and P6 Team Member Web applications now support Italian.Enhanced Enterprise Manager Integration.P6 now collects significanly more metrics for display in Enterprise Manager.

Enhanced Supported Configurations.P6 EPPM now supports:- Internet Explorer 9- OBIEE 11g (11.1.1.5.0)

New Import/Export Support for Microsoft Project 2010 in P6 Professional.You can now export P6 Professional projects as Microsoft Project XML 2010 files as well as import Microsoft Project 2010 files.

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

New Line Numbering Feature in P6 Professional.You can use the new add line numbers option for each row in the Activities view, when displaying an Activity Table, Gantt Chart, or Activity Usage Spreadsheet. Line numbers appear to the left of each row in a separate column. Numbering is sequential, starting with the number 1 (one). Rows are automatically renumbered during data manipulation, such as when rows are added, deleted or when group data is expanded or collapsed. The line numbering also displays in printouts of views in the Activities window where you applied line numbers.

Installation and Configuration Enhancements in P6 Professional.You can now use a single P6 Professional installer to create your P6 Professional environment in one process. You can then connect P6 Professional to a P6 EPPM database or a P6 Professional database.

New Filtering in Timescaled Logic Diagram.You can now save filters with Timescaled Logic Diagram templates. You can apply additional filters within the Timescaled Logic Diagram application to enable you to more easily manipulate data.

New Sight Lines in Timescaled Logic Diagram.You can now display vertical sight lines for each timescale line. Sight lines are background lines that aid visual orientation. You can customize the interval frequency based on the selected date interval. For example, if you select the date interval Month, an interval frequency of 3 means that a sight line displays once every 3 months at the beginning of the month. You can choose line thickness, color, and styles for each sight line.

Enhanced Activity Code Color Coding in Timescaled Logic Diagram.You can now assign colors for activity code values in P6 Professional to be used in Timescaled Logic Diagrams. You can then modify these colors while working with diagrams; these modifications do not affect the color codings in P6 Professional.

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 EPPM

8.2

8200

P6 Professional

8.2

8200

P6 Professional

8.2

8200

P6 Professional

8.2

Enhanced Templates in Timescaled Logic Diagram.You can now save Timescaled Logic Diagram templates to the P6 EPPM database, so you can easily share them among users. You can share them as user or global templates. You can also export and import the templates to further enhance sharing. This enables you to send a template to another user, and that user can then import it into their system and use it. This saves time and helps promote consistency across an organization.

Enhanced Grouping in Timescaled Logic Diagram.You can now group activities by User Defined Field (UDF), in addition to project, WBS Path, and activity code grouping.Performance Enhancements in Timescaled Logic Diagram.The Timescaled Logic Diagram now loads data faster after you launch it from P6 Professional and also draws diagrams quicker.Enhanced Microsoft Project Import in P6 Professional.When importing a Microsoft Project XML file, you can now update an existing project. This enables you to manage projects in Microsoft Project and bring the changes into P6 Professional to ensure the status of the project is reflected accurately in P6 Professional. You can control what types of global and project data to overwrite when importing.

New Import/Export Support for Microsoft Project 2010 in P6 Professional.You can now export P6 Professional projects as Microsoft Project XML 2010 files as well as import Microsoft Project 2010 files.New Line Numbering Feature in P6 Professional.You can use the new add line numbers option for each row in the Activities view, when displaying an Activity Table, Gantt Chart, or Activity Usage Spreadsheet. Line numbers appear to the left of each row in a separate column. Numbering is sequential, starting with the number 1 (one). Rows are automatically renumbered during data manipulation, such as when rows are added, deleted or when group data is expanded or collapsed. The line numbering also displays in printouts of views in the Activities window where you applied line numbers.

8200

P6 Professional

8.2

8200

P6 Professional

8.2

8200

P6 Professional

8.2

8200

P6 Professional

8.2

8200

P6 Professional

8.2

8200

P6 Professional

8.2

Installation and Configuration Enhancements in P6 Professional.You can now use a single P6 Professional installer to create your P6 Professional environment in one process. You can then connect P6 Professional to a P6 EPPM database or a P6 Professional database.

New Filtering in Timescaled Logic Diagram.You can now save filters with Timescaled Logic Diagram templates. You can apply additional filters within the Timescaled Logic Diagram application to enable you to more easily manipulate data.

New Sight Lines in Timescaled Logic Diagram.You can now display vertical sight lines for each timescale line. Sight lines are background lines that aid visual orientation. You can customize the interval frequency based on the selected date interval. For example, if you select the date interval Month, an interval frequency of 3 means that a sight line displays once every 3 months at the beginning of the month. You can choose line thickness, color, and styles for each sight line.

Enhanced Activity Code Color Coding in Timescaled Logic Diagram.You can now assign colors for activity code values in P6 Professional to be used in Timescaled Logic Diagrams. You can then modify these colors while working with diagrams; these modifications do not affect the color codings in P6 Professional.

Enhanced Templates in Timescaled Logic Diagram.You can now save Timescaled Logic Diagram templates to the P6 EPPM database, so you can easily share them among users. You can share them as user or global templates. You can also export and import the templates to further enhance sharing. This enables you to send a template to another user, and that user can then import it into their system and use it. This saves time and helps promote consistency across an organization.

Enhanced Grouping in Timescaled Logic Diagram.You can now group activities by User Defined Field (UDF), in addition to project, WBS Path, and activity code grouping.

8200

P6 Professional

8.2

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

Performance Enhancements in Timescaled Logic DiagramThe Timescaled Logic Diagram now loads data faster after you launch it from P6 Professional and also draws diagrams quicker.Publication Services.Project and enterprise data Publication Services run in the background to ensure that as changes are made to your core P6 EPPM data, the impact of these changes is reflected in the new P6 Extended Schema, an extension of the EPPM database which includes new tables and views. A number of administrative settings exist to control the frequency and throughput of the new Publication Services, allowing the system to be fine tuned to meet the needs of your particular installation.

Real-Time Reporting.The result of Publication Services is near real-time reporting. There is no need to wait for the Extract, Transform, and Load (ETL) process to populate the Operational Data Store (ODS) with recent changes before they are reflected in Oracle Business Intelligence (BI) Publisher reports. By default, BI Publisher reports use an extended EPPMDB as their data source. As changes are made, the corresponding reporting data source tables and views in EPPMDB are automatically updated to reflect the changes, allowing for near real-time access to changed data in reports. The P6 EPPM Extended Schema that support reporting directly from the P6 database and improved storage. BI Publisher 11g support and SQL server are supported and security is improved. When you install your database, you will create a new user, PX Reporting User, which will allow you to run reports in P6.

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

Improved Storage and Direct Access.All P6 EPPM data, including spreads and calculations, are stored in tables and views, ready for reporting. When running reports in the P6 web application, the P6 EPPM database, including the P6 Extended Schema, is the default primary source for report data. The Operational Data Store (ODS) and its associated Extract, Transform, and Load (ETL) process of the P6 Reporting Database are supported, but are not required and are not installed by default. The P6 Reporting Database is a truly optional add-on component to the P6 EPPM suite, supporting P6 Analytics, third-party reporting tools, off-line analysis, and consolidation of P6 data into larger corporate data warehouses.

BI Publisher 11g Support.In addition to version 10g, P6 EPPM supports integration with BI Publisher 11g, which includes a number of report creation, content, and delivery enhancements. BI Publisher 11g includes a web-based, WYSIWYG report authoring tool that can be used to create high fidelity, pixel perfect reports. BI Publisher 11g also supports the creation of reports that combine data from more than one data source. For example, create a single report or form with data from P6 EPPM and additional data source providers such as SQL, MDX, XML, Web Services, or Microsoft Excel. Microsoft Word or Adobe Acrobat report editor plug-ins are also supported.

SQL Server Support.In addition to Oracle databases, P6 EPPM supports reporting against SQL Server databases. However, the ODS database only supports Oracle installations.Improved Security Model.The P6 security model for reporting supports using the P6 Extended Schema as the source for report data. The security model includes the PxRptUser database user, which is added automatically when you install or upgrade to P6 Release 8.1.

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

Improved Selection of Projects and Resources for Reports.When specifying resources or projects as report parameters, you can now easily organize, search, and select from groups of related projects or resources. For example, you can select all projects assigned to a specific project code or all resources assigned to a specific resource code. In the Select Project dialog box in the report parameters table of the Reports section, P6 EPPM allows you to group, search, and select projects by EPS, portfolio, or project code. In the Select Resource dialog box, you can select resources by primary role, resource code, or resource team.

Improved Resource Assignments Detail Window on the Activities Page.To enhance usability of the Assignments detail window on the Activities page in P6, additional assignment date-related fields, previously only available from the Resources section, are now available in this view. To accommodate for the number of additional fields in this detail window, you can choose to customize columns one at a time, or open the Customize Columns dialog box to select multiple columns at once.

Resource Overallocation Service.The Resource Overallocation service enables you to run a report in P6 to identify where resource demand exceeds capacity. You select the time period for which you need resource data analyzed and then the Publish Projects service updates data on all projects open in your view before the Resource Overallocation service analyzes usage data for all resources assigned to the projects open in your view. The service also pulls resource allocation data from all additional projects to which the resources are assigned, but are not currently open in your view (shown as "Other Projects" in the report). The Notification button in the application footer opens messages from the service and links to Overallocation reports. The Overallocation report lists overallocated resources and the tasks for which they are assigned, grouped by project. You can make updates to this report, including reassigning resources, changing assignment dates, updating units, or updating the remaining time/units.

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

Enhancements to the Resource Assignments Page.When you click Assign Resource in P6, the Select Resource dialog box enables you to view resources by Active Resources, All Resources, Primary Role, Resource Codes, and Resource Teams. When you click Assign Resource by Role, the Select Resource dialog box displays only the resources that have the same role type as the assignment you are filling. If you need to staff multiple assignments, you can keep the Select Resource dialog box open and simply click on another assignment to make your next staffing assignment. If you have multiple assignments that require the same resource, simply select all the assignments using Ctrl+click, and select the resource to assign

Improved Risk Categories in P6.The Risk Categories allows you to organize risk categories in a hierarchy. You can create child categories (subcategories) under a parent category enabling you to organize and group categories in a way that makes sense for risk analysis practices at your company.

Risk Threshold Enhancements.Cost impact by percentage and Schedule impact by percentage risk thresholds are available in P6 which complement the existing cost and schedule risk thresholds, renamed Cost impact by value and Schedule impact by value. Using the by percentage impact thresholds enables you to create one matrix that can be used across multiple projects where the absolute cost and schedule impacts vary. The cost impact threshold is defined as a percentage of the project's planned cost. The schedule impact threshold is defined as a percentage of the project's planned duration. Use the by value impact thresholds when creating a risk scoring matrix where absolute monetary and schedule values are known and common for all projects assigned to the matrix.

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

Risk Exposure Fields.When managing project risks using the register on the Risks page in P6, you can clearly see the dates a project is exposed to a risk and the monetary impact a risk has on the project using the risk exposure fields: Exposure Start, Exposure Finish, and Exposure (the monetary impact of the risk). Risk exposure is calculated from the values selected for the probability and cost impact of each risk. Risk exposure fields are available for individual risks and risk response plans. Use the Response Plans detail window on the Risks page to create a risk response plan to see how your mitigation actions reduce the monetary impact for the risk. Use the Project Risk Exposure field to view the total exposure for all risks identified in the project available on the EPS page, and in a scorecard, bubble chart, or histogram portfolio view portlet on the Dashboards page.

Risk Identification Fields.Identified By and Identified Date fields in P6 are available to track when a risk was identified and by whom. Knowing who identified a risk enables you to consult with the source, if necessary. The identified date is helpful in a variety of ways, including tracking the time between when the risk was identified and when it started being tracked.

Enhancements to Risk Views.In the risk register on the Risks page in P6 you can: View the new Exposure, Exposure Start, and Exposure Finish fields; Edit the Identified By and Identified Date fields; Group by all available fields (except Exposure); Cut and paste risks between projects in the risk register; Easily identify which risks have active response plans, with the Active Response Plan field; View additional activity-related fields on the Activities detail window. In the Risks detail window on the Activities page you can: View the Exposure, Exposure Start, and Exposure Finish fields; Edit the Identified By and Identify Date fields; Easily identify which risks have active risk response plans, with the Active Response Plan field. Additionally, the Project Risk Exposure and Project Risk Score values are available for analyzing data in the Portfolios section or on related dashboards. These fields are also available for viewing on the EPS page.

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

UDF Bars in the Activities Gantt Chart to Support Oracle Primavera Risk Analysis Users.A UDF Bar is available on the Activities Gantt chart in P6. Use this bar to view the current schedule against selected Activity UDF start and finish dates. UDF bars can be used to show a risk adjusted schedule using dates imported from Oracle Primavera Risk Analysis.

Improved Security for Users With the Admin Superuser Profile in P6. You can only add, edit, or delete users with the Admin Superuser profile assigned if you have the Admin Superuser profile assigned to your user.Activity Code Enhancements.To provide easier access to activity codes, each code type — EPS, Global, and Project — has its own page in P6, which you can access directly from the Enterprise Data pane.

Service Enhancements.You can view the date the project was last scheduled (Last Scheduled Date) and leveled (Last Leveled Date) in EPS views of P6 and the P6 Optional Client. Log files for the Recalculate Assignment Costs and Store Period Performance services are available in the Service Status dialog box. These log files show the name of the user running the service.

Improved Visibility of WBS UDFs in Portfolio Views in P6.You can view WBS level user-defined fields as columns in scorecards in the following locations: on dashboards, in Portfolio View portlets; on the Portfolio Analysis page, in scorecard portfolio views; on the Create Portfolio View/Portfolio View Details page.

Improved Convenience When Adding and Deleting EPS and WBS Elements.In P6, you no longer need to show all levels of the EPS or WBS to add or delete an EPS or WBS element. As long as the view is grouped by EPS on the EPS page, or WBS on the Activities page, you can add the respective elements, regardless of other grouping options you may have applied.

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

Status Updates via P6 Team Member for iPhone App.The P6 Team Member for iPhone App offers quick, convenient, and easy mobile access; you can update your status directly to P6. Focus only on what matters the most for team members, for example, you can view a list of your tasks, update the actual hours spent, and estimate your remaining hours. You are not required to install, log into a browser, or learn any of the core P6 EPPM applications. You can send e-mail or share photos about a task. The updates remote users make in the P6 Team Member for iPhone App are applied immediately in real time; live updates made in the P6 Team Member for iPhone App do not undergo review or approval before they are applied to the schedule. P6 Progress Reporter and P6 Team Member for iPhone App should not be used together; they are not compatible with each other and may produce unexpected results.

Status Updates via the E-mail Statusing Service.Team members with assignments in P6 can request a list of assigned activities directly from P6 via e-mail. This offers quick, convenient, and easy mobile access. You can update your status directly to P6. Focus only on what matters the most for team members, for example, you can view a list of your tasks, update the actual hours spent, and estimate your remaining hours. You are not required to install, log into a browser, or learn any of the core P6 EPPM applications. There are no specific device or private network requirements, however, you must follow syntax and formatting rules in your e-mail message. Updates are applied immediately in real time without undergoing review or approval. Any activity and assignment values in P6 are immediately changed without directly informing a Project Manager. P6 Progress Reporter and the E-mail Statusing Service should not be used together; they are not compatible with each other and may produce unexpected results.

Enhanced User Interface Design.The P6 navigation bar is tabbed to enable you to identify the area you are working in. Icons have been removed from the navigation bar, which increases your working area.

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100

P6 EPPM

8.1

8100P6 EPPM

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

Hosted Application Help.P6 Help and P6 Progress Reporter Help are hosted on the Oracle Technology Network by default. This ensures that the most up-to-date product help is available to application users as soon as it is posted on the Oracle Technology Network. You may still choose to host help locally by following the instructions in the P6 EPPM Administrator's Guide.

P6 Optional Client.Although P6 is now web based, there is also a desktop client which can connect to the main database; P6 Optional Client. P6 Professional Project Management (P6 Professional) continues to be a separate product that can work standalone or for workgroups, however it no longer connects to the P6 EPPM database. If you are using P6 EPPM, P6 Professional supports your offline needs. You can use import and export to move projects between the P6 EPPM and P6 Professional databases. P6 Optional Client does not include any Admin capabilities; all Admin functionality can be achieved in P6 EPPM web application.

Copy and Paste Risks in P6 Optional Client.You can copy and paste risks with activities when you paste activities into the same project from which they were copied. Copying and pasting a WBS within the same project will also copy its activities and any associated risks. Risks are not copied if you paste an activity or WBS to a different project.

Importing Risks Using XML in P6 Optional Client.You can import Risks from an XML format file.Improved Security for Users With the Admin Superuser Profile in P6. You can only add, edit, or delete users with the Admin Superuser profile assigned if you have the Admin Superuser profile assigned to your user.Service Enhancements.You can view the date the project was last scheduled (Last Scheduled Date) and leveled (Last Leveled Date) in P6 Professional.

8100

P6 Professional

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

P6 Professional no longer connects to the P6 EPPM database.If you are using P6 EPPM, P6 Professional supports your offline needs. You can use import and export to move projects between the P6 EPPM and P6 Professional databases.

Timescaled Logic Diagrams.Condense the project schedule into smaller snapshots with Timescaled Logic Diagrams. A convenient timescale logic viewer, seamlessly launched from within the P6 Professional application, facilitates the creation, customizing, saving, and printing of timescaled logic diagrams.

Customizable Toolbars in P6.An improved default arrangement of toolbars and command buttons reduces visual clutter. You can create and customize any toolbars in the client interface with the commands of most importance to your goals and assignments.

Page Breaks by Group Band.P6 Professional supports page breaks within layouts. Similar to reports, layouts can be printed and page breaks determine if output will split your charts or other data onto separate pages. Page breaks can be set manually, in Page Setup dialog boxes, or automatically based on group band values.

Apply Actuals and Summarize Project Run as Java Services.You can view the status of these services in the Job Status dialog box accessible from the Tools menu in P6 Professional and will be notified when a service completes or fails.

Auto-Refresh Grouped Data by Window.You can enable and disable automatic refresh of grouped data per window in P6. This setting applies to the active window only, and can be different for each open window.

8100

P6 Professional

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

8100

P6 Professional

8.1

Client-Web Delineation and Integration.Greater web support and ease of use without sacrificing the raw power of P6 Professional. The application's administrative functionality has been moved to the web application to allow the client interface to focus entirely on planner/scheduler functionality. You can continue to use the optional client application, P6 EPPM Professional, with its strong core scheduling features. You may prefer to migrate to and benefit from the greatly-expanded capabilities and convenience found in the P6 web application if your organization needs enterprise functionality.

Streamlined Installer.P6 Professional installs all of its files into a single directory with fewer required registry settings. (Note: certain secondary applications using the API and the optional SDK use registry settings.) The two main benefits of the installer are that its footprint is simple and that it is easier for IT administrators to deploy (e.g., you can pushinstallations over the network down to users' desktops). P6 Professional Release 8.0 and version 7.0 can be installed side-by-side. If you use the P6 SDK, you must uninstall the 7.0 version of the P6 SDK before upgrading.

Improved HTML Editor.The HTML editor In P6 Professional provides an expanded set of formatting options for use with notebook and description fields. Command Line Support.P6 EPPM supports running batch report jobs and exporting projects from a command line. Note: To view P6 Professional reports in P6, select the Store report in Work Products and Documents option when creating report batches or printing reports. See the P6 Professional Help for more information.

P6 Professional.Although P6 is now web based, there is also a desktop client which can connect to the main database; P6 Professional.

8100

P6 Professional

8.1

8000

P6 EPPM

8.0

Improved Feedback and Communication.P6 Professional Project Management provides activity-level feedback capabilities so that the project managers and schedulers can collaborate with field personnel on an activity-by-activity basis. Project managers are notified when notes have been added from the field and then may easily view and respond to the notes. The field personnel then have access to the feedback. The feedback field is also time-stamped with non-editable history to maintain an accurate audit log. This feature allows real-time communication, with accurate history, minimizing delays in the execution of project work.

Easy Web Setup, Configuration, and Administration.Routine setup, configuration, and administration tasks can be achieved using only the P6 application from a single centralized new menu with the following options: My Calendar to customize your personal work schedule; My Preferences to customize P6 for the way you prefer to work including personalizing the units, formats, views, and settings unique to each user; Application Settings to configure global application settings for data limits, earned value calculations, timesheets, IDs, and time periods; Enterprise Data to define the data entities, types, categories, and user-defined fields recognized by your industry or organization; User Access to configure who is allowed use the various modules of the P6 EPPM suite and the P6 application, and what permissions they have; User Interface Views to configure the main menus and pages of the application users of each view are permitted to access helping you enforce a consistent enterprise-wide user experience.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Web-Based User Administration.Create and administer user accounts for all P6 EPPM users via the P6 web application. Set each user's contact and login information, and configure their security privileges, profiles, access, and user interface views. Configure the management hierarchy at your organization (the organizational breakdown structure, or OBS) and manage project assignments to reflect the areas of responsibility within your entire enterprise. You can also use the P6 web application to define privileges for a set of global and project security profiles and then assign them to users to restrict access in accordance with your organization's information assurance and security policies.

Lightweight Directory Access Protocol (LDAP) support for user provisioning.You can configure, search for, and add users directly from your company's central LDAP directory using P6 in your web browser. Administrators can also batch import multiple user accounts from an LDIF file for enterprise deployments.

Single Sign-On.The P6 Web Services module supports single sign-on via Security Assertion Markup Language (SAML). One Source for All Enterprise Data.Use P6 to administer all the enterprise data used by P6 and P6 Optional Client users. Centrally manage all enterprise data grouped by category, including: Global data (Currencies, Financial Periods, Global Calendars, Overhead Codes, Timesheet Periods); Project data (Baseline Types, Funding Sources, Notebook Topics, Project Calendars, Project Codes, Project UDFs, WBS Categories, WBS UDFs); Activity data (Activity Codes, Activity UDFs, Cost Accounts, Expense Categories, Expense UDFs, Step Templates, Step UDFs); Resources category data (Assignment UDFs, Rate Types, Resource Calendars, Resource Codes, Resource Curves, Resource UDFs, Units of Measure); Risks category data (Risk Thresholds, Risk Scoring Matrices, Risk Categories, Risk UDFs); Issues category data (Issue Codes, Issue UDFs); Documents category data (Document Categories, Document Statuses, Document UDFs)

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Web-Based EPS and Project Configuration and Creation.Configure the project hierarchy at your organization (the enterprise project structure, or EPS) and use it to structure projects and control user access to project and portfolio data in P6. Project managers can use the web-based EPS features to create and edit projects, templates, preferences, baselines, and summaries. Other useful features include configuring multi-user EPS views that target key data, importing and exporting Primavera XML, Microsoft Excel, and Microsoft Project 2007 data, and creating new projects and templates directly within the EPS hierarchy.

Web-Based EPS and Project Views.Project managers have access to robust, more useful project views at the EPS level in P6. You can configure the entire EPS and monitor the status of multiple projects, all from this single page. The EPS Gantt chart view on the web is also included. It shows a flat list or grouped list of projects on a timeline. You can choose to display multiple bars, such as current dates versus baseline dates for a comparison view. You can show the timescale in increments of years (for a long-range view), quarters, months, all the way down to days (for a more granular view.)

Enhanced Portfolio Filtering in P6.Automatic filter refreshing helps keep your portfolios in sync with the latest project data, without the need for user intervention. An expanded number of filter parameters are available, offering greater precision when configuring and comparing filtered portfolios.

Schedule Preview.When hundreds or thousands of activities appear in a Gantt chart, P6 EPPM allows you to add, modify, or delete them, immediately updating the results to maximize performance. There is no need to reschedule the project in order to view the impacts of your changes. You can preview the results before applying them with Schedule Preview, which instantly generates a preview of any schedule changes locally on your PC. This allows you to see the impact of adding, deleting, or modifying activities on the overall project schedule before deciding to save the schedule changes or discard them.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Recalculate Assignment Costs.The P6 web application provides an optional command for updating resource and role assignment cost data in your project to reflect recent changes to one or more rates. Use this command during or after scheduling a project in case changes to dates cause assignments to span periods with more than one rate in effect. This command can also be used during leveling.

Project Baselines.In addition to supporting the administration of baseline types, P6 EPPM web application also enables you to convert projects into baselines and then restore baselines back into projects.

Reusable Project Templates in P6.A template is a stored copy of, or blueprint for, a project. It includes all the details, best practices, and standards your organization associates with projects of a particular type. In addition, specific WBS branches and their activities can be inserted from templates into other templates or even into projects. Organize your template projects in the EPS, assign them project codes, and provide them with descriptions to aid in reuse. Because templates and projects share a common database and user interface, it is easy to create templates from projects or to create projects from templates. You can also create projects based on other projects, and templates based on other templates. The templates feature represents a significant feature improvement and replaces Methodology Management and the Project Architect. Before upgrading, consider converting existing methodologies to projects and then after upgrade convert them from projects to templates.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Resources and Roles Interface in P6 is Completely Redesigned.The Resources section offers robust and responsive enterprise-wide resource management features. A single centralized resource page provides point-and-click access to resource, role, and team administration, assignments, detailed and high-level planning, and resource and role usage and analysis. Editable tables and supplemental windows empower you to manage enterprise resource information quickly and efficiently. You can see all resources at a glance and can make resource team assignments, primary role assignments and edit details with ease. Other highlights include: Access important enterprise data for resources directly from a convenient new menu item and dialog box without navigating away from your current work; view an assigned resource's calendar.

Improved Resource Planning and Analysis.Navigate to a central location in P6 to view and evaluate resources by project, role, resource, allocation, or your own custom filter. Toggle between resource analysis and resource planning modes.

Optimized Resource and Role Team Handling.Select the resources that make up a team faster with fewer steps using the redesigned resource team components in P6. Rather than creating and configuring new resource teams, save time by duplicating the closest matching team and editing its configuration. When you use this "copy and paste" technique for creating a resource team, all its resources are included in the new copy. You can also use copy and paste to create and manage role teams.

Qualitative Risk Management in P6.Using the Risk Register, you can assess potential risks on a project plan, associate risks with activities, assign risk probabilities, calculate impacts to schedule and cost, and develop risk response and contingency plans to mitigate risks. The application's built-in qualitative risk management features are complemented by the quantitative risk analysis features available with the full Oracle Primavera Risk Analysis solution, an optional integrated component.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Risk Scoring Matrix, Categories, and Thresholds.You can define risk probability, tolerance, and impact thresholds using the new risk scoring matrix in P6. If you are assigned to a project, you can assess risks in order to calculate relative project risk scores. This feature includes a color-coded probability and impact diagram (PID), probability threshold scale, tolerance scale, and impact severity table. Enhanced support for risk categories enables you to manage, track, and analyze your own particular conventions for grouping and managing risk. Configure color-coded assessment levels to measure the probability, cost, and schedule impacts of each risk on the risk threshold page.

P6 Reporting Database Integrated with Oracle Business Intelligence Publisher.BI Publisher is an enterprise reporting solution allowing you to design, manage, and deliver formatted documents in Microsoft Word, Excel, OpenOffice and PDF format, using familiar columnar and graphical styles. Over 30 pre-defined reports can be dynamically generated when BI Publisher accesses P6 EPPM data in the Operational Data Store (ODS). Run pre-defined reports to get started quickly or create reports via data models or templates (also includes custom layout designer). Also provided are the ODS and the Extract, Transform and Load (ETL) process, providing secure access to data in an easy to use schema. The Project Reports and My Reports portlets have been replaced with the Reports section. If you still need to view P6 Optional Client reports in a P6 portlet, you can select the Store report in Work Products and Documents option in P6 Optional Client when creating report batches or printing reports.

E-mail or save a report to a file in P6.E-mail reports to your predefined distribution lists. You can also save reports on your computer or a network server for shared access.Deliver the same P6 report in multiple formats to satisfy different needs.BI Publisher supports several file formats including HTML, PDF, Excel, PPT, MHTML, RTF, XML, and CSV. Each report can be published to all these formats or configured to only specific formats and can have a default format defined.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Schedule reports or generate ad hoc reports on-demand in P6.Schedule reports to be generated at defined intervals; once, daily, weekly or monthly. You can define multiple schedule runs for any report, each with its own interval, delivery recipients, template and parameters. You can also generate reports instantly, on-demand.

Store archives and access report histories in P6.Previous runs of a report can be saved, providing a report archiving solution to allow for access to historical reports. Organizations can configure BI Publisher to save reports for a defined time period, and individuals can access the historical reports through BI Publisher.

Adjustable Report Parameters.Report parameters can be defined in a P6 report, and passed in at runtime. This reduces the effort and cost of creating and maintaining reports. You can use parameters to filter and organize the information on a report so that a single report can meet the need of several project managers, planners and stakeholders. P6 EPPM reports also include easy lists of values you can browse to select the values you need to run your report.

Secure Access To Report Data.The new reporting capabilities of P6 provide three layers of security to ensure data is protected and individuals only have access to the reports they are permitted to run. You can hide the entire reporting section using the Enterprise Reporting module access setting. Provisioning this module exposes the reporting section and creates database views in the ODS for each user. You can also define which reports each user has access to run via the hierarchical folder structure used for organizing the reports. If you run a report which pulls project information from the ODS, it will only return data for projects to which you have access, as determined by P6 application security settings.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Oracle BPM Integration.Teams can collaborate with greater efficiency using workflows, which can be created and customized for P6, using the Oracle Business Process Management (BPM) Suite (10g or 11g). Oracle BPM supports BPMN and BPEL at all stages from modelling and implementation to run time and monitoring. P6 uses Oracle’s Unified Business Process Management (OBPM) solution to serve as the engine to automate any process related to the management of projects, programs, and portfolios. To participate in workflows you are not required to use any application other than P6. You can initiate, participate, approve, reject, and continuously monitor any project workflow process by launching its associated form from a P6 dashboard. Note: BPM is not the only solution for deploying custom workflows in P6. Also supported is the creation of an unlimited number of custom workflows using P6 Web Services and P6 Events.

Integrated LDAP Provisioning.The P6 web application includes Lightweight Directory Access Protocol (LDAP) provisioning support for seamless LDAP or SSO user authentication. You can configure, search for, and add users from your company's central LDAP directory using the P6 web application. Note: Improvements have also been made to the native, LDAP, single-sign on (SSO), API, and Oracle Access Manager (OAM) features supporting more secure user authentication for P6.

Enhanced and Expanded Job Services.All job services can now run on-demand and in real-time in P6. For example, you can run the following jobs on demand: Recalculate Assignment Costs and Store Period Performance. You can also run the following on-demand services as scheduled services in P6: Summarize Project, Schedule Project, Level Project Resources, Apply Actuals. You can configure a separate server for job services. You can no longer run recurring job services in P6 Optional Client. However, you can use the Windows command line interface to run batch reports and export projects as a service from P6 Optional Client.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Expanded Event Support for P6.An expanded number of events, triggered by interactions with various classes of objects that comprise the solution, is now supported. For example, specific types of interactions with activities, projects, EPS elements, risks, documents, jobs such as Apply Actuals, and other special operations such as copying a project will now trigger events. This improves the resources available to developers at organizations where events are used for a variety of purposes such as workflows, notifications, data warehousing, or integrations with other enterprise software.

Integration Ready.P6 is designed and tested to support major integrated enterprise management solutions, including Fusion PPM Bridge, Oracle Primavera Portfolio Management 8.0 (formerly ProSight), Oracle Enterprise Business Suite (EBS), JD Edwards, and other ERP products. Other popular integrations include: P6 Progress Reporter for timesheets; Contract Management for document management, job cost, and project control; BPM for workflows; and BI Publisher or P6 Analytics for reporting.

P6 Web Services Security Enhancements.The P6 Web Services module supports: Single sign-on via Security Assertion Markup Language (SAML); XML encryption; Digital signatures. Improvements have also been made to the native, single sign-on (SSO), LDAP, API, and Oracle Access Manager (OAM) features supporting more secure user authentication.

Supported Platforms.P6 EPPM supports: Apple Mac OS X with Safari browser for P6; Oracle Business Intelligence Publisher 10g for reporting; Oracle BPM 10g & 11g for workflows; HP Itanium database and application servers; Oracle Enterprise Manager 11g for enterprise administration.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Auto-Complete Field Values.Available on select pages and dialog boxes in P6, the Auto-Complete feature offers helpful functionality while entering new values in fields. As you key in an entry in a field that only accepts values from a predefined list of existing values, including some calendar fields, the closest single matching value is automatically selected for you. If multiple values match your input, they are displayed in a list for you to make a selection.

Customizable Toolbars.On most pages of P6, fixed toolbars appear by default wherever they are needed based on your current selection. On three of the most commonly used pages of the application, the Activities, EPS, and Resource Assignments pages, you can customize the toolbars. Optimize your productivity by hiding the commands you rarely use to make room for the ones you use most often. In addition, you can rearrange and dock toolbars on these pages by clicking and dragging.

Enhanced Activity, Assignment, and EPS Filters.Apply filters to the Activities, Assignments, and EPS pages in P6 to constrain the number of activities, resource assignments, and projects, respectively, based on precise criteria you specify. Filter enhancements include: Create, configure, and apply your own custom filters independent of the current activity view; apply multiple combinations of custom or shared filters at the same time; save the filters you want to apply with a customizable view, so they are automatically reapplied along with all the other settings stored in the view; Share filters globally with all users, designate them only for certain users, or keep them private for your own exclusive use; Cut, copy, and paste filters; Specify a greatly expanded number of filter criteria rules; Define nested logical filter rules for pinpoint accuracy when scanning rows of data.

E-mail P6 Activity Views.Instantly capture one or more projects in your current multi-user view as a hyperlink to e-mail to others so they can also view the same project, WBS, activity, and step data with all your customized settings applied.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Keyboard Shortcuts.The menus on the EPS, Activities, and Resource Assignments pages in P6 include new time-saving keyboard equivalents for important commands. The Enterprise Data pages in the administration section of the application also include keyboard equivalents for many of its popular commands (for example, press the Insert key to add a new item). Most pages and dialog boxes support Tab key traversal for easy access and navigation between fields.

Menus and Icons.The Activities, EPS, and Resource Assignments pages in P6 organize their feature-rich offering of commands within a series of standard menus titled Actions, Edit, and View. Throughout the entire suite, nearly 100 icons representing various commands have been redesigned and optimized for recognition and ease-of-use.

Redesigned Detail Windows.When a table of entries includes specific related information that supplements the data already shown on the page, P6 presents the detailed information in one or more detail windows. For added convenience, tabbed detail windows are minimized and restored collectively as a group. You do not need to open and close each detail window separately, although this level of individual customization is supported on the EPS and Activities pages. The application makes greater use of the consistent detail window design. Detail windows also appear when administering resources, user accounts, and security profiles. The EPS page includes eight detail windows with specific supporting information related to EPS elements and projects. The Activities page has an additional three detail windows for issues, risks, and general data. You can show or hide the detail windows on the Activities and EPS pages, two of the most widely used pages in the application, independantly of each other.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Completely Redesigned Online Help.Context-sensitive Online Help for P6 provides you with instant support in a time-saving structured interface. Topics include descriptions for all screen elements, icons, and fields. Key concepts, related links, step-by-step tasks, and valuable reference information are provided. Also includes a hierarchical table of contents and search feature.

UPK Multimedia Tutorials.Take advantage of the built-in integration with Oracle's User Productivity Kit (UPK) allowing you to launch context-sensitive tutorials. In addition to opening the P6 Online Help, the expanded Help menus and buttons in P6 also present options for viewing UPK multimedia simulations from within the P6 interface. As your organization grows, expand your UPK investment to include custom tutorials developed exclusively for your particular environment, training needs, or business requirements. Oracle UPK must be purchased separately to create new simulations or modify existing ones.

Tabbed Views in P6.You can switch between open layouts, screens, or views by clicking their identifying tab. Tabs can also be grouped, splitting the window, and then merged back into a single group of tabs within a window. This means that all main windows in the entire application, including Projects, Activities, and Resources, can be displayed simultaneously as tabs and can be tiled horizontally, vertically, or some combination of both.

Customizable Menus in P6.You can change the display order of menus, rearrange menu commands, delete menus and commands, and create custom menus.

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

8000

P6 EPPM

8.0

Client-Web Delineation and Integration.Greater web support and ease of use without sacrificing the raw power of P6 Professional. The application's administrative functionality has been moved to the P6 web application to allow the client interface to focus entirely on planner/scheduler functionality. You can continue to use the optional client application, P6 EPPM Professional, with its strong core scheduling features. You may prefer to migrate to and benefit from the greatly-expanded capabilities and convenience found in the P6 web application if your organization needs enterprise functionality.

Web based Enterprise Project and Portfolio Management.P6 (formerly P6 Web Access) is the main interface, incorporating global dictionaries, administrator settings, and security privileges. P6 EPPM includes a version of the desktop client that connects to the main database.

P6 Professional.Although P6 is now web based, there is also a desktop client which can connect to the main database; P6 Professional.P6 EPPM Upgrade Considerations.You should consider upgrading if any of the following are true: you have 50 or more users and plan to add more in the near future; your users need to use a web interface; you use Progress Reporter to record actuals via timesheets; you require a Content Repository; you need to use workflows (Oracle BPM); you require advanced reporting features; you need advanced portfolio and resource management capabilities; your projects benefit from integration with ERP systems. You should consider upgrading to P6 Professional R8.x (the standalone client) if any of the following are true: you have fewer than 50 users, who are primarily Project or Resource Managers, and you do not plan to add more users in the near future; you do not use application servers or web servers; most users frequently require the ability to work offline; you want to install the application locally on your computer.

8000

P6 EPPM

8.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Components or versions which are no longer supported with P6 EPPM are:JackRabbit previously used for document management; jBPM previously used for workflows; JBoss application server; WebLogic 10g application servers; Oracle HTTP 2.0 (10.1.3.2.0), IIS 6.0, and Apache 2.0 web servers; SiteMinder previously used for Single Sign-On. Workflows and reviews stored in jBPM will not be available after upgrade to P6 EPPM Release 8. Consider closing out all workflows and reviews that are in progress before upgrading. Apache JackRabbit documents data will not migrate automatically when you upgrade to P6 EPPM Release 8.0. Refer to My Oracle Support's Knowledge Articles for information on migrating JackRabbit documents to Oracle Universal Content Management. Oracle recommends that you migrate the data before upgrading to R8.0 or higher.

Improved Usability.It is easier to do routine planning and scheduling tasks (from copying baselines to adding new code values to activities and renumbering activity IDs) and to become productive very quickly using a simple Calendar view and Excel-based import/export using the P6 Web client.

Advanced Scheduling and Analysis in P6.Project managers find it easier to plan accurately, manage and communicate project details, and identify trends and key performance indicators that need to be checked. Through many new Web-based graphical options, such as a flexible network view, many customization options on the Activity Gantt view, and a progress line that shows at a glance whether activities are ahead or behind schedule, planners and schedulers can use the Web client as their primary planning and scheduling environment.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000P6 EPPM

7.0

Business Process Automation.Project portfolio management (PPM) has become a mission-critical application in project intensive organizations. P6 EPPM is a complete, open and integrated solution that easily fits into the enterprise’s software ecosystem. It includes event enablement to link project changes and updates that take place in P6 with essential enterprise business processes tied to other systems. For example, a change made to a P6 project may kick off an appropriate workflow among systems for approvals or procurement.

User Administration, Security and Deployment.Today’s business environment mandates careful tracking of ownerships costs for any investment. By lowering the cost of deploying P6 and the ongoing support, organizations are assured that their investment is being maximized while working within tightened budgets. P6 EPPM minimizes the effort required for application deployment and user administration, while taking full advantage of existing hardware and systems.

Web-Based Project Management.Oracle has made tremendous enhancements to the Oracle P6 Web client. Not only is it easier to use, whether you are a novice or an experienced user, but it includes graphics, scheduling and analysis options that will ensure that the Web client becomes the primary environment for planning and scheduling.

Improved Activity Gantt.The Activity Gantt view in P6 can be configured to ensure that all required WBS and activity-related information can be displayed, accessed and analyzed on one screen. These options in the Activity Gantt view provide greater usability, analysis and customization options, providing efficiency when creating, updating and analyzing projects.

Grouping Options In The Activity Gantt.You can group the Gantt chart in P6 by date intervals such as day, week, month and financial period.More Flexible Filter Definitions.The number of filter criteria available in P6 has been increased to 10.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000P6 EPPM

7.0

7000P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Access More Project Information From One Screen in P6.You can access additional activity detail windows for documents, codes, expenses, feedback and WBS, from the Activity Gantt view. Detail windows can be tabbed, floated, or tiled for a consistent look and feel that does not interfere with the activity table and Gantt chart, maximizing screen real estate.

Easier Activity Navigation in P6.You can jump to successor and predecessor activities in the activity detail windows.

Text Formatting in the P6 Activity Table.There are options for selecting the font and size of text in activity table.Performance improvements when displaying baseline and earned value information in P6.Bar Formatting Options.You can use the P6 Web client to create complete graphical representation of the project schedule. Display up to three bars in the Activity Gantt and customize bar size and bar label format. Bars in the Gantt can be coloured by Activity Codes. Bars can be necked for non-work time.

Progress Line.You can show a progress line on the Gantt chart in P6 Web Access to communicate variances in project progress graphically. The progress line makes it easy to see, at a glance, which activities are ahead of schedule, on schedule or behind schedule. It can be displayed with activity current bars and display schedule variance. In addition, the progress line can be drawn on top of baseline bars, plotting the progress point of each activity on its baseline bar. The progress line shows where the progress should be relative to the data date.

Improved Project Gantt Portlet.Display the baseline bar in addition to the current bar in the Project Gantt Portlet in P6 Web Access. Incorporate the updated Portlet in dashboards that adhere to industry standards. This provides an easy way to identify whether project milestones are ahead or behind schedule.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Calendar View.See the upcoming project work in a familiar calendar format in P6 Web Access. This view has the same filtering capabilities as the Activity Gantt view. It can also have the activity detail windows displayed for making resource assignments, modifying activity information, and even navigating to predecessor and successor activities. The Calendar view provides team members with an intuitive view for displaying their activities along with the required information to perform the work. You can clearly see project work occurring during specified time periods.

Activity Network View.You can view the project WBS, activities and project logic through an interactive Web-based activity network in P6 Web Access. It is easy to collapse WBS elements for a summary view, or expand WBS elements to drill down to the activity details such as steps, relationships and resource assignments. Customize activity boxes as well as specify how activities are to be grouped. In addition, non-driving relationships can be toggled on and off. This view makes it easy to analyze schedule logic at both a summary level and a detailed activity-by-activity level. It provides an alternative look into the dependencies between the various WBS elements and the project activities.

Web-Based Import and Export.You can export project plans to a variety of formats, update them offline, and then import the file back into P6 Web Access to update existing project plans. P6 EPPM provides Web-based capabilities to import and export project information using the following formats: Export to Primavera XML, Microsoft Project or Microsoft Excel; Import from Primavera XML and Microsoft Project to add new activities and/or update existing activities in the project; Import from Microsoft Excel to add new activities to the project, supporting additional import fields. Microsoft Excel can be used to add new activities to the plan and also for analysis of current project data, allowing you flexibility with the tools you use. This allows you to use familiar desktop software to list activities that will become part of a project, to update work, and to do additional project analysis.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Addressable P6 Web URL.The P6 Web client can be passed customized URLs with internal project IDs to navigate individuals directly to the project section. Custom applications and business intelligence tools can build URLs from internal project IDs and navigate individuals directly to the project section, displaying their default view with the appropriate projects opened.

AutoVue Integration for P6 Web Access.For organizations that have deployed P6 and Oracle’s AutoVue Enterprise Visualization, project-related design documents can be accessed directly from P6. AutoVue Web Version enables viewing, reviewing and collaborating on technical documents and information across the enterprise. AutoVue delivers a network-friendly method of sharing large CAD data even over low bandwidth networks. A single interface for project participants to access project schedule information, along with related design documents, to manage, communicate, and execute on the project plan more effectively.

Improved Content Management Integration for P6 Web Access.In addition to JackRabbit, P6 EPPM can use Oracle Universal Content Management (UCM) and SharePoint as a repository for project documents. Documents can be uploaded through the P6 and stored in UCM or SharePoint. You can also search documents in the content management system, as well as link documents to projects and activities. You may take advantage of existing enterprise content management systems through P6 to maintain, control and access project documents.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Work Day Definition.P6 EPPM provides a system-wide option to convert durations between hours, days, weeks, months, and years based on new calendar settings. In addition to the existing Admin Preference, each calendar has its own settings for the number of hours in a day, week, month, and year. There is also an option to determine if the conversion is based on the Admin Preference settings or each calendar’s settings. Provides more flexibility, consistency and control over viewing and communicating project time lines and duration of work in P6 Web Access and Project Management modules.

Grouping/Summary Duration Calculations.Summary and grouping band durations are calculated based on the corresponding activity- or project-level calendar. Durations that are displayed in grouping bands on layouts, views and reports are calculated based on how the view is grouped. If a view is grouped and all rows in the group use the same calendar, that calendar is used for calculating duration based on dates. If the rows do not all use the same calendar, but all belong to the same project, the project’s default calendar will be used, otherwise, the global default calendar is used to calculate durations based on dates. Project and resource level summary durations are also calculated according to their assigned calendars, that is their respective default project calendar or resource calendar. This provides more flexibility, consistency and control over viewing and communicating project time lines and duration of work in P6 Web Access.

Adding Code Values on the Fly.You can add new code values to the dictionary while assigning codes to activities in P6 Web Access, without having to navigate to the activity code dictionary. You are prompted to specify the activity code value and description. This improvement enables you to assign new codes to activities in a more efficient and productive manner, thereby reducing the time to create project plans.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Copy Baseline.A copy option is available for creating a new baseline from an existing project baseline in P6 Web Access. This option reduces the steps required to create a new baseline from an existing one, thereby making it easier to maintain multiple baselines.

Improved Feedback and Communication.P6 EPPM provides activity-level feedback capabilities so that the project managers and schedulers can collaborate with field personnel on an activity-by-activity basis. Project managers are notified in P6 Web Access or Project Management when notes have been added from the field in P6 Progress Reporter (formerly Timesheets) or Project Management, and then may easily view and respond to the notes. The field personnel then have access to the feedback. The feedback field is also time-stamped with non-editable history to maintain an accurate audit log. This feature allows real-time communication, with accurate history, minimizing delays in the execution of project work.

Events in P6.Event enablement is key for organizations wishing to automate business processes across one or multiple systems. P6 EPPM delivers events capabilities as part of the Web client, Integration API and Web Services. Organizanions may create automation within P6 and orchestrate processes across other systems in the enterprise. Events can be triggered when the following business objects are created or modified through the P6 web client, Integration API or Web Services: Activity, Project, Resource, Activity Code Assignment, Project Code Assignment, Resource Assignment, Activity Expense, Project Issues, Resource Code Assignment, Activity Step, Project Risks, User, Baseline Project, Relationship, WBS. The following operations can also be configured to trigger an event: Project Scheduling, Apply Actuals, Store Period Performance, Project Summarizing, Approving Timesheets, Run Project Architect. Automation of business processes ensures that project decisions are part of broader business processes.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Oracle Administration and Security Support for P6 Web Access.P6 EPPM supports Oracle Identity and Access Management Suite. Oracle Identity Management (OIM) assists with centralized user provisioning across multiple, disparate systems, reducing the workload and cost associated with creating users in each system independently. Oracle Access Manager (OAM) centrally manages security and access to various systems through single-sign-on, providing one common logon for all applications and removing the need to enter the login credentials for each system. This reduction in login credentials creates a more secure environment. Oracle Identity Directory provides a central resource directory repository helping you support single logon and single sign-on, reducing the cost of application management.

More Effective Communication with Oracle Primavera Support.P6 EPPM Web Access integrates with Oracle Configuration Manager (OCM) to assist Oracle Support as they help organizations deploy and maintain their P6 investment. OCM is an automated method to collect valuable configuration information to help Oracle understand customer environments.

Activity Field-Level Security.P6 EPPM Web Access incorporates field-level security for project activities. You can assign edit privileges to only the activity fields that each user is required to update, while all others are read only. The activity-level security gives the flexibility to allow the updating of fields such as actual start and finish, percent completes and remaining effort, while limiting access to other activity-level fields to read only.

Excel Import Security in P6 Web Access.The security privilege for importing from Excel has been separated from the privilege for importing XER, MS Project and P3 file types. This security option allows you to import from Excel file types only, while also ensuring that global dictionary information is not modified when importing XER, MS Project and P3 file types.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Standardized Server Platform for Group Server.The timesheet Group Server has been moved to the Java platform, removing the requirement of being a Windows-based service on a Windows server. Common and independent platform support for the timesheet server.

Improved Scalability, Performance, Availability.P6 EPPM includes technologies to improve scalability, performance and availability for P6 Web Access. Support for WebLogic JRockit JVM improves performance and scalability. Also, improved support for WebLogic clustering has been added to increase availability and scalability of the P6 solution. The Java server platform has been moved to version 6 of Java, which provides better performance and scalability for P6.

Increased Standardization for P6 Web Services:WS-Security. WS-Security provides ways to secure your services above and beyond transport level protocols such as HTTPS. Through a number of standards such as XML Encryption, and headers defined in the WS-Security standard, it allows you to pass authentication tokens between services, Encrypt messages or parts of messages, Sign messages, and Timestamp messages. P6 Web Services supports passing authentication tokens using UsernameToken Profile and timestamping messages.

Increased Standardization for P6 Web Services:WS-Policy. The WS-Policy framework provides a general purpose model and syntax to describe the policies of a Web Service. For example, you may require transport-level security for protecting web service messages. This requirement can be defined by using a policy. P6 Web Services has the ability to enforce policy assertions via the underlying CXF services framework. The policy assertions are defined in a single file called policies.xml (see user guide for enabling WS-Policy). For the shipped version of P6 Web Services we officially support policy assertions for enforcing WS-Addressing and transport level security. When transport level security is enabled (by enabling the policy), P6 Web Services will only service requests that are invoked via an HTTPS connection.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

Increased Standardization for P6 Web Services:WS-Addressing. WS-Addressing is a standardized way of including message routing data within SOAP headers. When WS-Addressing is enabled, P6 Web Services will only accept client requests that contain addressing information in the SOAP headers. One benefit of using WS-Addressing with P6 Web Services would be a case where asynchronous processing of messages is required. In this case, clients will send messages to P6 Web Services and can specify the endpoint where P6 Web Services will send the response. This endpoint can be the original endpoint that sent the request or a different endpoint.

Increased Platform Support for P6 Web Access.Firefox and Internet Explorer (IE) 8 are supported browser platforms in addition to existing IE 7 support. IE 6 support has been dropped. Oracle HTTP server is now a supported web server. Oracle Universal Content Management (UCM) is supported, in addition to existing Jackrabbit support for content management. Oracle Enterprise Linux replaces Red Hat Linux support. Oracle Express (Oracle XE) replaces Microsoft SQL Server Express for standalone desktop installations. Microsoft SQL Server 2008 has been added as a supported RDBMS. Microsoft SQL Server 2005 is also supported, however SQL 2000 has been dropped. For full details, see the tested configurations document.

P6 Web Access integration with Oracle ERP and Fusion.A project privilege, Allow Integration with ERP Systems, and two project level fields are available to support integration with Oracle ERP and Fusion products. The project-level fields are: Integrated Project, which indicates if the project is integrated with an Oracle ERP or Fusion project; Last Apply Actuals Date, which displays the most recent timesheet actuals that were applied to the project and is used to determine if new, approved timesheet data exists when P6 data is sent to the ERP system. Both these project-level fields can be display in the Projects window, Tracking window, and project reports.

Progress Reporter Administrator.You can administer Progress Reporter (formerly Timesheets) using the Progress Reporter Administrator application.

7000

P6 EPPM

7.0

7000

P6 EPPM

7.0

7000

P6 Professional

7.0

7000

P6 Professional

7.0

Branding changes.Timesheets becomes Progress Reporter. The Group Server, which hosted the Timesheets application, becomes Progress Reporter server.Licensing is replaced by module access.The Licensing tab in the Users dialog box has become the Module Access tab. Use this tab to grant access to any of the following modules of the product suite: Project Management, Progress Reporter (formerly Timesheets), Web Access Portfolios, Web Access Projects, Web Access Resources, Integration API, Web Services.

Progress Line.You can show a progress line on the Gantt chart in P6 Professional to communicate variances in project progress graphically. The progress line makes it easy to see, at a glance, which activities are ahead of schedule, on schedule or behind schedule. It can be displayed with activity current bars and display schedule variance. In addition, the progress line can be drawn on top of baseline bars, plotting the progress point of each activity on its baseline bar. The progress line shows where the progress should be relative to the data date.

Grouping/Summary Duration Calculations.Summary and grouping band durations are calculated based on the corresponding activity- or project-level calendar. Durations that are displayed in grouping bands on layouts, views and reports are calculated based on how the view is grouped. If a view is grouped and all rows in the group use the same calendar, that calendar is used for calculating duration based on dates. If the rows do not all use the same calendar, but all belong to the same project, the project’s default calendar will be used, otherwise, the global default calendar is used to calculate durations based on dates. Project and resource level summary durations are also calculated according to their assigned calendars, that is their respective default project calendar or resource calendar. This provides more flexibility, consistency and control over viewing and communicating project time lines and duration of work in P6 Project Management.

7000

P6 Professional

7.0

7000

P6 Professional

7.0

7000

P6 Professional

7.0

7000

P6 Professional

7.0

Adding Code Values on the Fly.You can add new code values to the dictionary while assigning codes to activities in P6 Project Management, without having to navigate to the activity code dictionary. You are prompted to specify the activity code value and description. This improvement enables you to assign new codes to activities in a more efficient and productive manner, thereby reducing the time to create project plans.

Copy Baseline.A copy option is available for creating a new baseline from an existing project baseline in P6 Project Management. This option reduces the steps required to create a new baseline from an existing one, thereby making it easier to maintain multiple baselines.

Remaining Late Units In The Activity Usage Histogram and Profile in P6 Project Management.The activity usage histogram has the ability to spread usage over the late dates in addition to the early dates. This late-date spread is shown as histogram bars and cumulative S-curves, and may be combined with baseline, budgeted, actual and early-date spreads. This feature improves resource analysis by modeling resource and cost utilization according to late dates.

Activity ID Renumbering.Renumbering options are available when pasting a set of activities in P6 Project Management, as well as for renumbering existing sets of activities. Options include incrementing existing numbers, auto-renumbering and replacing the prefix. This option provides greater usability and convenience when creating and modifying project plans.

7000

P6 Professional

7.0

7000

P6 Professional

7.0

7000

P6 Professional

7.0

7000

P6 Professional

7.0

Oracle Administration and Security Support for P6 Project Management.P6 EPPM supports Oracle Identity and Access Management Suite. Oracle Identity Management (OIM) assists with centralized user provisioning across multiple, disparate systems, reducing the workload and cost associated with creating users in each system independently. Oracle Access Manager (OAM) centrally manages security and access to various systems through single-sign-on, providing one common logon for all applications and removing the need to enter the login credentials for each system. This reduction in login credentials creates a more secure environment. Oracle Identity Directory provides a central resource directory repository helping you support single logon and single sign-on, reducing the cost of application management.

Excel Import Security in P6 Project Management.The security privilege for importing from Excel has been separated from the privilege for importing XER, MS Project and P3 file types. This security option allows you to import from Excel file types only, while also ensuring that global dictionary information is not modified when importing XER, MS Project and P3 file types.

Increased Platform Support for P6 Project ManagementOracle Express (Oracle XE) replaces Microsoft SQL Server Express for standalone desktop installations. Microsoft SQL Server 2008 has been added as a supported RDBMS. Microsoft SQL Server 2005 is also supported, however SQL 2000 has been dropped. For full details, see the tested configurations document.

User count.You can use the Users dialog box in P6 Project Management to display the number of users assigned to access each P6 module. This is helpful in tracking how many licenses are assigned to P6 EPPM.

7000

P6 Professional

7.0

6210

P6 EPPM

6.21

6210

P6 EPPM

6.21

6210

P6 EPPM

6.21

6210

P6 EPPM

6.21

Progress Reporter Administrator.Most Progress Reporter (formerly Timesheets) administrative settings have been removed from the Project Management module. In Admin Preferences, the Timesheet Privileges tab and most options on the Timesheets tab have been removed. You can administer Progress Reporter using the Progress Reporter Administrator application.

myprimavera has changed to Web Access.Used in the dialog boxes and fields of Project Management and Methodology Management modules, the term, myprimavera, was changed to Web Access. This is also used in URLs where myprimavera is replaced by primaveraweb.

New password policy.P6 EPPM provides enhanced security across the suite. Passwords must be a minimum of 8 characters in length, including at least one alpha and one numeric character. In the Admin Preferences dialog box, you can mark the Enable password policy checkbox to put the new password policy into effect, or leave the option unmarked and use the original password policy, which requires a password of up to 20 characters in length.

Licensing changes.The Licensing tab of the Users Dialog box in P6 Project Management provides a license for P6 Web Services. The Database Configuration dialog box provides a license summary. For information about the Database Configuration dialog box and related tasks, see the Primavera P6 Administrator's Guide. In the Contact and Systems tabs, after the license summary, there is new text that explains the types of licenses. Help > About.

Scheduling feature supports float calculation for all opened projects.You can calculate activity float based on the finish date of all open projects, as well as per project in P6 Web Access. The General tab of the Schedule Options dialog box supports the calculation of float paths for multiple open projects based on the finish date of the project, or for each, individual project. The Advanced tab of the Schedule Options dialog box supports total float and free float calculations for multiple critical paths.

6210

P6 EPPM

6.21

6210

P6 EPPM

6.21

6210

P6 EPPM

6.21

6210

P6 EPPM

6.21

6210

P6 EPPM

6.21

Updating baseline process includes expanded support for future period buckets in P6 Web Access.You can leverage update baseline functionality for projects that use future period bucket planning. Additionally, Primavera XML format supports future period buckets during import and export.

Microsoft Project 2007 support.You can share project data between P6 EPPM suite and Microsoft Project 2007 over supported standard Microsoft formats including Microsoft Project XML format. The change to XML removes the earlier requirement of having MS Project installed on the same computer as P6 to share data. MSP XML format allows you to share projects between Primavera Project Management and Microsoft Project 2002 and subsequent versions. MPP format supports the import of project data from Microsoft Project 2002 and 2003. Import of summary projects and resource-only data to Primavera Project Management is supported in MPP format from Microsoft Project 2002 and 2003. Continued support of the MPX format enables data to be shared between Primavera Project Management and other third-party applications. MDB, MPD,and MPT files are no longer supported.

Support for export of project data to earlier version of the P6 format.Using Primavera's standard XER file format, you can export project data from Project Management in P6 EPPM version 5.0 format. During export, you can select the version of the export file, allowing for collaboration and data transfer between current and previous installations of P6 EPPM.

Daily financial periods in Project Management.You can create daily financial periods by selecting the same date for the financial period start date and end date.Private database login security enhancements.Private database passwords are now encrypted with a stronger encryption algorithm. For complete details, refer to the "Changing Database Configuration Settings" chapter of the Primavera P6 Administrator's Guide.

6210

P6 Professional

6.21

6210

P6 Professional

6.21

6210

P6 Professional

6.21

6210

P6 Professional

6.21

New password policy.P6 EPPM provides enhanced security. Passwords must be a minimum of 8 characters in length, including at least one alpha and one numeric character. In the Admin Preferences dialog box, you can mark the Enable password policy checkbox to put the new password policy into effect, or leave the option unmarked and use the original password policy, which requires a password of up to 20 characters in length.

Scheduling feature supports float calculation for all opened projects.You can calculate activity float based on the finish date of all open projects, as well as per project in P6 Project Management. The General tab of the Schedule Options dialog box supports the calculation of float paths for multiple open projects based on the finish date of the project, or for each, individual project. The Advanced tab of the Schedule Options dialog box supports total float and free float calculations for multiple critical paths.

Updating baseline process includes expanded support for future period buckets in P6 Project Management.You can leverage update baseline functionality for projects that use future period bucket planning. Additionally, Primavera XML format supports future period buckets during import and export.

Microsoft Project 2007 support.You can share project data between P6 EPPM and Microsoft Project 2007 over supported standard Microsoft formats including Microsoft Project XML format. The change to XML removes the earlier requirement of having MS Project installed on the same computer as P6 to share data. MSP XML format allows you to share projects between Primavera Project Management and Microsoft Project 2002 and subsequent versions. MPP format supports the import of project data from Microsoft Project 2002 and 2003. Import of summary projects and resource-only data to Primavera Project Management is supported in MPP format from Microsoft Project 2002 and 2003. Continued support of the MPX format enables data to be shared between Primavera Project Management and other third-party applications. MDB, MPD,and MPT files are no longer supported.

6210

P6 Professional

6.21

6210

P6 Professional

6.21

6210

P6 Professional

6.21

8300

P6 Professional

8.3

8300

P6 Professional

8.3

Support for export of project data to earlier version of the P6 format.Using Primavera's standard XER file format, you can export project data from Project Management in P6 EPPM version 5.0 format. During export, you can select the version of the export file, allowing for collaboration and data transfer between current and previous installations of P6 EPPM.

Daily financial periods in Project Management.You can create daily financial periods by selecting the same date for the financial period start date and end date.Private database login security enhancements.Private database passwords are now encrypted with a stronger encryption algorithm. For complete details, refer to the "Changing Database Configuration Settings" chapter of the Primavera P6 Administrator's Guide.

ClickOnce Install.Introduced in 8.3.2. P6 EPPM users with Oracle Cloud subscriptions can use ClickOnce install to install  P6 Professional and all software components required to run P6 Professional.

Cloud Enablement.Introduced in 8.3.2. Cloud enablement for P6 professional includes several key enhancements that combine the power of P6 Professional with the versatility of the Oracle Cloud. P6 EPPM users with Oracle Cloud subscriptions can quickly install P6 Professional and all required software components using ClickOnce technology. And with the Cloud Connect server, P6 Professional can connect to the Oracle Cloud.

8300

P6 Professional

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

P6 Professional Cloud Connect Server Installation Component.Introduced in 8.3.2. P6 EPPM users (connecting to an EPPM database hosted on an Oracle DB server) can install and connect to P6 Professional using Cloud Connect Server. The Database Configuration wizard allows users to set up and configure the database connection to the Cloud Connect Server.

P6 Professional Cloud Connect Server Installation Component.Introduced in 8.3.2. P6 EPPM users (connecting to an EPPM database hosted on an Oracle DB server) can install and connect to P6 Professional using Cloud Connect Server. The Database Configuration wizard allows users to set up and configure the database connection to the Cloud Connect Server.

P6 Save Behavior.Introduced in 8.3.2. With the update to JRE 7u45, P6 EPPM save behavior has changed. Most applets in P6 used to automatically save the view's changes when leaving the view (columns, sort order, column width, etc.). However, with the new JRE version automatically saving view changes is no longer possible. To account for this, Oracle recommends you always click Save when you have made changes to a view.

Oracle Database Content Repository.Introduced in 8.3.2. If you do not want to use an external content repository, you can use the Oracle Database connected your P6 EPPM environment to store documents. You can only use this option if you are using an on-premises Oracle Database.

Copy Project runs as a service.Introduced in 8.3.2. When you select to copy a project in P6 EPPM, the process runs in the background. You will receive a notification when the process is complete.

Set Remote Mode for P6 Professional Applications in P6 EPPM.Introduced in 8.3.2. Your P6 Professional users may experience performance improvements if Update Baseline, Schedule Compare, and XML Import are performed as API Remote Mode applications. P6 EPPM Application Settings allows you to configure this.

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

8300

P6 EPPM

8.3

Filter tasks by text in P6 Team Member for Android and iOS.Introduced in 8.3.2. P6 Team Member users can use a search bar on the Task List to filter tasks by text that appears in task IDs, task names, any parent WBS element’s name up to and including the top-level (Project), code names, code values, user defined field names, or user defined field values.

Related Tasks in P6 Team Member for Android and iOS.Introduced in 8.3.2. P6 Team Member users can view their tasks’ predecessor and successor tasks and send email to resources assigned to related tasks.P6 Notebook Topics in P6 Team Member for Android and iOS.Introduced in 8.3.2. P6 Team Member users can view P6 Notebooks for additional task information produced by project managers in P6.P6 Documents in P6 Team Member for iOS.Introduced in 8.3.2. P6 Documents access allows P6 Team Member users to download documents stored in P6 content repositories to their devices and copy file paths of P6 work product documents. Users can also contact resources who created and modified documents stored in P6 content repositories.

Device and Orientation-adaptable Layout in P6 Team Member for iOS.Introduced in 8.3.2. The P6 Team Member user interface automatically adapts to maximize usability on iPhone or iPad in the horizontal or vertical viewing orientation. On iPhone, P6 Team Member users can navigate to different areas of the app. On iPad, P6 Team Member users can view several areas of the app at once. For example, iPad users can view the Task List while updating tasks in the task details area.

Work Offline with P6 Team Member on iPad.Introduced in 8.3.2. With the Go Offline option in the app menu, users can download and store all task information to their devices and work without an internet connection. If the connection to the P6 server is unexpectedly lost, data accessed during the current session will be available to edit offline. All changes saved offline are uploaded to the server when the user reconnects to the P6 server.

8300

P6 EPPM

8.3

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

Display Activity IDs in P6 Team Member for Android and iOS.Introduced in 8.3.2. Use the Display Activity ID switch in the app menu to toggle visibility of activity IDs in P6 Team Member for Android and iOS. When the Display Activity ID switch is set to On, activity IDs appear next to task names on the Task List and Task Details area.

Replace Relationships by Editing the Activity ID.When you need to modify a relationship, you do not need to delete the existing relationship and make a new one, you can simply edit the Activity ID of the predecessor or successor activity in the relationship.

Easily View the Status of Services from the EPS Page.You can access the Service Status dialog box from the EPS page. On the Actions Menu, select View Service Status to see the status of all services that you can run from the EPS page.

Easily Identify the Database in Which You Are Working.You can now see the name of the database you are logged into in My Preferences.An Easier Way to Select Multiple Items When Running BI Reports in P6.If a BI Publisher report is configured to expect multiple inputs for a parameter or field, you can select multiple items in the list of values with fewer clicks using checkboxes.

Get Field Lengths Through the API.Use the getMaxFieldLength method to find the maximum length of fields of the VarChar type. If your administrator has set lengths in P6 using the Global Preferences page of Application Settings, then these are the lengths which will be returned using getMaxFieldLength. If no maximum length has been specified in the Global Preferences page for a given field, then the default maximum length for the field will be returned.

Find the Correct Resource More Quickly and Easily.In the Select Resource dialog you can see information about a resource, including their primary role, email, phone number and location.

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400P6 EPPM

8.4

8400

P6 EPPM

8.4

See Predecessor and Successor Activities' Statuses in the Activities Page.Add the Activity Status column in the Activities Page's Predecessors and Successors tabs for better visibility into the schedule's progress.Position Columns Where You Want Them When Creating or Modifying Views.You can put columns exactly where you need them, rather than moving them around after you've added them to the list. When you move a column from the Available Columns to the Selected Columns List it will be added directly below the highlighted column in the Selected Columns list in the EPS, Activity and Assignments pages.

See Who Is Logged Into a Project.The process of opening projects exclusively is more efficient. In the Open Project box, you can select the Users button to view a list of the users who are logged into the project before you select Open Exclusively.

Expand All and Collapse All in User Access.When the Users page is grouped by Global Security Profile or User Interface View, you can expand all or collapse all in the User Access section.Assign Users to OBS Nodes More Efficiently.You can assign a user to multiple OBS nodes at one time or multiple users to an OBS. You can also assign a security profile while assigning users to OBS nodes.Update Baselines in P6 Web.P6 Web users can update baselines. The process gives you control over which activities and which details to update as well as how Resource Assignments should be updated. P6 will remember your Activity, detail and Resource Assignment preferences for next time. The process will run as a job service and when the update has been completed, you will receive a notification.

Dutch Language Support.The P6 EPPM user interface is translated into Dutch.Integrate P6 With Prime for Enhanced Risk Analysis.Send data from your P6 schedule to Prime for improved analysis of risks including Monte Carlo analysis. Once you bring the information back into P6 you can draw Gantt bars based on the information provided by the Monte Carlo analysis.

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

Integrate P6 With Unifier at Summary Sheet Level.As well as integrating P6 with Unifier schedule sheets, you can now integrate Summary Sheets via Gateway.Technology Upgrades.P6 EPPM now supports Java 8 (JDK and JRE) and Fusion Middleware 12c. Support for 32-bit platforms (for servers), Sharepoint Server 2007, all 10g Technology versions, and Java 6 (JDK and JRE) has been dropped.

Timesheets in Team Member.Resources can now enter timesheets through Team Member Web. The Timesheet approval process in P6 remains unchanged. The Progress Reporter module has been removed.

Provide Status for Other Resources in Team Member Web.Team members can now provide status for other resources in Team Member web, for example for non-labor or material resources.Filter By Resource in Team Member Web.You can filter your tasks by resource in Team Member Web.Update Notebooks in Team Member Web.You can update notebook topics assigned to your tasks so that you can share additional information on that task with your Project Manager and other team members.

Update Current Period in Team Member Web.When updating time spent on tasks, you can enter the amount of time worked since the last update in the Log Additional Time field. The extra hours you enter will automatically be added to the Time Spent.

Enhanced Sorting in Team Member Web.Sorting in Team Member web has been improved; you can sort by Task ID, Task Name, Project ID, Project Name, Start Date or Finish Date.

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400P6 Professional

8.4

8400

P6 Professional

8.4

8400

P6 Professional

8.4

Team Member for Android and iOS Are Rebranded to P6.The applications formerly known as Team Member for Android and Team Member for iOS have been rebranded and are now called P6. These mobile applications allow your team members to view and update tasks on the go on the platform which best suits them.

Integrate P6 With Prime for Scope.Synchronize WBS values between Primavera Prime's Scope Management module and P6 EPPM. Send summary activity information from P6 to Prime to determine Work Package dates.

Dutch Language Support.The P6 Professional user interface is translated into Dutch.P6 Professional Standalone Moves to SQLite.P6 Professional Standalone installs SQLite to host its database directly on your computer. The database installation is smoothly integrated into the install procedure and you can choose whether to include sample data. If you are upgrading from an earlier version of P6 Professional Standalone, your data is migrated from your old Oracle XE database into the SQLite database automatically. Some features are not supported in a P6 Professional 8.4 Standalone installation: sending notifications of Project Issues, saving layouts for other users, creating Global Change definitions for other users, updating baselines, Claim Digger (schedule compare), risk analytics, and Job Services, however you can use the Windows scheduller to invoke the command line interface to import, export and run batch reports.

Copy Project Runs as a Scheduled Job.The Copy Project process runs in the background as a scheduled job, freeing you to continue working in P6 Professional while the project is copying. Once the new copy of the project has been created, you receive a notification. This functionality is not available if P6 Professional is installed Standalone.

8400

P6 Professional

8.4

8400

P6 Professional

8.4

8400

P6 Professional

8.4

8400

P6 Professional

8.4

8400

P6 Professional

8.4

8400P6 Professional

8.4

8400

P6 Professional

8.4

8400

P6 Professional

8.4

Add Baseline Runs as a Scheduled Job.The Add Baseline process runs in the background as a scheduled job, freeing you to continue working in P6 Professional while the baseline is being created. Once the new baseline is available, you receive a notification. This functionality is not available if P6 Professional is installed Standalone.

Add Reflection Runs as a Scheduled Job.The Add Reflection process runs in the background as a scheduled job, freeing you to continue working in P6 Professional while the Reflection is being created. Once the new Reflection is available, you receive a notification. This functionality is not available if P6 Professional is installed Standalone.

Integrate P6 With Prime for Enhanced Risk Analysis.Send data from your P6 schedule to Prime for improved analysis of risks including Monte Carlo analysis. Once you bring the information back into P6 you can draw Gantt bars based on the information provided by the Monte Carlo analysis.

Integrate P6 With Unifier at Summary Sheet Level.As well as integrating P6 with Unifier schedule sheets, you can now integrate Summary Sheets via Gateway.Technology Improvements.P6 Professional now supports Java 8 (JDK and JRE). Stand-alone installation uses SLQ lite. Support for 32-bit platforms (for servers) and Java 6 (JDK and JRE) has been dropped.

Show Shift Date Interval in Visualizer.Any of the three timescales in Visualizer can now show date intervals in Shifts.Include Legend Variables in The Header or Footer in Visualizer.The legend has moved to the header and footer in Visualizer. You can add separate variables in the header and footer for the dates, bars, activity codes, and lines legends.

Select Multiple Layouts in Visualizer.You can select multiple layouts in Visualizer, using Ctrl or Alt and click, then promote them to Global or Project layouts, copy and paste them, or delete them.

8400

P6 Professional

8.4

8400

P6 Professional

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

8400

P6 EPPM

8.4

15100

P6 EPPM

15.1

Copy Bar Option in Visualizer.You can copy an existing bar to make creating layouts quicker and simpler. Copy existing bars, then modify them, to create new bar definitions.Integrate P6 With Prime for Scope.Synchronize WBS values between Primavera Prime's Scope Management module and P6 Professional. Send summary activity information from P6 to Prime to determine Work Package dates.

Team Member for Android and iOS is Rebranded to P6.Introduced in 2.1. The applications formerly known as Team Member for Android and Team Member for iOS have been rebranded and are now called P6. These mobile applications allow your team members to view and update tasks on the go on their iOS or Android device.

Dutch Language Support.Introduced in 2.1. The P6 mobile user interface is translated into Dutch on both Android and iOS platforms.Upload Images to Tasks.Introduced in 2.1. You can take a photo and attach it to a task, or upload an existing image from your Android or iOS mobile device to a task.Update Current Period.Introduced in 2.1. When updating time spent on tasks, you can enter the amount of time worked since the last update in the Log Additional Time field. The extra hours you enter will automatically be added to the Time Spent. This feature is available both in P6 for Android and P6 for iOS

Go Offline on Your iPhone.Introduced in 2.1. The Offline mode available on iPad has been extended and is available in P6 for iOS when installed on iPhones.Support for Business Process Management 12c.BPM 12c is supported. A new guide, Connecting BPM 12c to P6 has been added to the Install and Configuration library.

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

Support for Oracle Access Manager.Oracle Access Manager provides the core functionality of Web Single Sign On (SSO), authentication, authorization, centralized policy administration and agent management, real-time session management and auditing. A new guide, Configuring Oracle Access Manager for P6 EPPM Single Sign On has been added to the Install and Configuration library.

Support for Oracle Identity Federation.Oracle Identity Federation (OIF) is a complete, enterprise-level solution for secure identity information exchange between partners. OIF reduces account management for partner identities and lowers the cost of integrations through support of industry federation standards. Oracle Identity Federation protects existing IT investments by integrating with a wide variety of data stores, user directories, authentication providers and applications.

Enhanced Cloud Service Administrator's Setup Guide.The P6 EPPM Cloud Service Administrator's Setup Guide is now the Primavera Cloud Service Administrator’s Guide. The guide covers EPPM, Prime, Analytics, Gateway, Unifier, and all of the supporting applications together.

Cutting, Copying and Pasting Multiple Projects.It is possible to cut, copy, and paste more than one project, even if those projects are not in the same EPS node. Select multiple projects using shift+click or alt+click to copy or cut, then paste them into a grouping band in your view. You can still copy or cut all the projects in an EPS node by selecting the node. It is not possible to cut, copy, or paste multiple EPS nodes.

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 Professional

15.1

15100

P6 EPPM

15.1

15100

P6 Professional

15.1

Improved Column Selection in the Detail Tabs of the Activity and EPS Pages.If you need to make changes to the selection of columns which are visible in details tabs of the Activities or EPS views, you can open the Customize Columns box. The Customize Columns box is available in the Expenses, Issues, Predecessors, Successors, Relationships, Risks, and Steps details tabs in the Activities View, the General and Issues details tabs of WBSes and the Risks and Issues detail tabs in the EPS view.

More Information Available in the Relationships, Predecessors and Successors Details Tabs of the Activities View.You can show the Start, Finish and WBS ID columns in the Relationships, Predecessors, and Successors details tabs of the Activities view.

Scheduled Job summarization Error logs to show project details.(from 8.3.2) In Job summarization logs, the project details show before the error log.

Scheduled Job summarization Error logs to show project details.(from 8.3.2) In Job summarization logs, the project details show before the error log.

Greater Control Over User Access to P6 Professional and Visualizer.You can specify that a user has access to P6 Professional only, Visualizer only, or both applications. Users who had access to P6 Professional will automatically be granted access to Visualizer when the database is upgraded.

Greater Control Over User Access to P6 Professional and Visualizer.You can specify that a user has access to P6 Professional only, Visualizer only, or both applications. Users who had access to P6 Professional will automatically be granted access to Visualizer when the database is upgraded.

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 Professional

15.1

15100

P6 EPPM

15.1

Improved Web Services For Cloud Users.Greater functionality is available to Cloud users via Web Services. For example, Web Services on the Cloud now includes UpdateBaseLineOption, ResourceAssignmentUpdate, JobService, CBS, and CBSDurationSummary services.

Improved Auditing.Auditing capabilities have been added to the Application Settings page of EPPM. You can configure the auditing of inserts updates, and deletes on most tables in the database.

Integrate with Unifier with Activity Sheets.You can import actual dates from Unifier into P6 EPPM. Actual dates for activities in Unifier can be brought into the schedule in P6 EPPM. Dates are not imported, however, if they violate P6 business rules (for example if an Actual Finish date is before an Actual Start date).

Integrate with Unifier with Activity Sheets.You can import actual dates from Unifier into P6 Professional when connected to an EPPM database. Actual dates for activities in Unifier can be brought into the schedule in P6 Pro when connected to an EPPM database. Dates are not imported, however, if they violate P6 business rules (for example if an Actual Finish date is before an Actual Start date)

Greater Flexibility for Administering Gateway Integration.The Gateway tab of Application Settings has been streamlined and improved to provide more flexibility and simplicity for administrators. Configure the Gateway parameters once and then create integration parameters for each of your Gateway integrations.

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 Professional

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

Resource Bucket Planning in P6 EPPM.Plan your resource usage in greater detail in P6 EPPM. The Resource Assignment Spreadsheet is editable so that you can assign exact work estimates to resources for future work periods. Assign your resources planned and remaining units allocation in detail for coming quarters, months, weeks, days, or financial periods.

Support for WebLogic 12.1.3.WebLogic version 12.1.3 is supported for use with P6 EPPM.

Support for BPM 12.1.3.Business Process Management version 12.1.3 is supported for use with P6 EPPM.

Support for IAIK-JCE Encryption.IAIK-JCE Encryption is supported for use with P6 EPPM.

Support for IAIK-JCE Encryption.IAIK-JCE Encryption is supported for use with P6 Professional.

Greater Flexibility in Units and Duration Displays in Team Member.The Units and Durations format list has been expanded to include options for Days and Hours, in addition to Days/Hours and Hours/Minutes.

Choose to See Project Name, WBS, Both, or Neither In Team Member.You can configure your preferences so that Team Member displays the Project name, WBS name, both or neither on tasks.

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 Professional

15.1

Remove the Actual Finish from a Task in Team Member.Even once a task has been saved, you can remove the Actual Finish mark from a task in Team Member.

Clearer Visibility of Your Role on a Task in Team MemberIf your view preferences are set up to show tasks where you are the owner and tasks where you are the primary resource, Team Member provides greater clarity about which task is which by showing a different icon for each task.

Choose to See Project Name, ID, or Both in Team Member.You can select whether to view the Project Name or Project ID in Team Member.

Search for Resources In Team Member More Efficiently.When you need to find a Resource in Team Member, you can start typing the resource's Name or ID and Team Member will filter out resources which do not match the search text as you type.

Improved Export to UN/CEFACT Format.Export to UN/CEFACT includes more fields as specified by the D09B XML schema. You can use a project template to export project-specific data required by the UN/CEFACT D09B schema.

Improved Export to UN/CEFACT Format.Export to UN/CEFACT includes more fields as specified by the D09B XML schema. You can use a project template to export project-specific data required by the UN/CEFACT D09B schema.

15100

P6 EPPM

15.1

15100

P6 Professional

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

Import and Export Baselines With Projects In XML Format.When you export your project to a Primavera XML file you can now include any or all of the projects baselines. When importing from a Primavera XML file, if the file includes baselines you can choose to import any or all of those baselines.

Import and Export Baselines With Projects In XML Format.When you export your project to a Primavera XML file you can now include any or all of the projects baselines. When importing from a Primavera XML file, if the file includes baselines you can choose to import any or all of those baselines.

Enter Timesheets on the Go Using P6 for Android.The P6 for Android application includes Timesheets. View or open timesheets, add tasks or overhead tasks, report regular or overtime time, update status for your tasks, and submit or cancel the timesheet. You can also participate in discussions from a Timesheet.

Update Notebook Topics in P6 for Android.You can add to Notebook topics in P6 for Android. Your comments are added to the end of the existing topic and will be visible to other users.

Remove the Actual Finish from a Task in P6 for Android.Even once a task has been saved, you can remove the Actual Finish mark from a task in P6 for Android.

Enter Timesheets on the Go Using P6 for iOS.The P6 for Android application includes Timesheets. View or open timesheets, add tasks or overhead tasks, report regular or overtime time, update status for your tasks, and submit or cancel the timesheet. You can also participate in discussions from a Timesheet.

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 EPPM

15.1

15100

P6 Professional

15.1

Update Notebook Topics in P6 for iOS.You can add to Notebook topics in P6 for iOS. Your comments are added to the end of the existing topic and will be visible to other users.

Remove the Actual Finish from a Task in P6 for iOS.Even once a task has been saved, you can remove the Actual Finish mark from a task in P6 for iOS.

Show Start Date in the Task List in P6 for Android.The start date for a task is visible in the Task list page.

Show Start Date in the Task List in P6 for iOS.The start date for a task is visible in the Task list page.

TouchID Support in P6 for iOSYou can now log into P6 for iOS using fingerprint recognition. You must log in using SSO the first time. Then you can activate TouchID to allow P6 for iOS to authenticate your access from your fingerprint as you touch the Home button.

Tablet Support in P6 for Android.The P6 for Android app is now certified use on tablets running Android.

Visualizer is 64 bit.The Visualizer application is 64 bit. 64-bit Visualizer extends Visualizer to be able to draw larger and more complex projects than was possible in the 32-bit Visualizer.

15100

P6 Professional

15.1

15100

P6 Professional

15.100000000000000000000

Enterprise Features in P6 Professional (EPPM).When P6 Professional is connected to an EPPM database, you have access to Enterprise features which were previously only available in the P6 web application. In P6 Professional client when connected to an EPPM database, you can create, delete and modify the EPS, the OBS, the Cost Account hierarchy, Funding Sources, Project Codes and their values, and Activity Step Templates.

Import and Export Visualizer Layouts.You can share Visualizer layouts with other users using the VLF file format. Export a layout as a VLF file and import it to another system from that file.

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

000000000000000

390 2

489 3

312 4

181 5

156 6

Len(Feature) check

399 7

272 8

330 9

177 10

107 11

109 12

195 13

204 14

301 15

249 16

146 17

193 18

215 19

169 20

326 21

297 22

150 23

237 24

210 25

481 26

141 27

202 28

356 29

181 30

425 31

645 32

258 33

115 34

508 35

359 36

288 37

391 38

489 39

315 40

156 41

181 42

191 43

44

364 45

419 46

330 47

436 48

412 49

475 50

160 51

231 52

148 53

121 54

266 55

257 56

238 57

159 58

253 59

164 60

152 61

138 62

426 63

192 64

590 65

549 66

283 67

449 68

419 69

320 70

359 71

616 72

478 73

145 74

415 75

490 76

193 77

272 78

387 79

459 80

156 81

176 82

141 83

334 84

265 85

552 86

803 87

228 88

126 89

118 90

103 91

200 92

585 93

263 94

235 95

483 96

309 97

473 98

166 99

178 100

401 101

200 102

585 103

263 104

235 105

483 106

309 107

473 108

166 109

177 110

500 111

891 112

713 113

660 114

171 115

262 116

635 117

483 118

1020 119

715 120

295 121

770 122

887 123

374 124

958 125

355 126

213 127

200 128

371 129

316 130

352 131

889 132

1014 133

202 134

371 135

624 136

349 137

94 138

213 139

148 140

228 141

304 142

250 143

323 144

235 145

207 146

600 147

592 148

150 149

317 150

134 151

630 152

1017 153

698 154

309 155

114 156

909 157

624 158

600 159

303 160

607 161

393 162

206 163

991 164

825 165

238 166

488 167

500 168

689 169

994 170

176 171

305 172

327 173

326 174

461 175

720 176

919 177

471 178

625 179

593 180

490 181

340 182

281 183

468 184

482 185

892 186

244 187

458 188

334 189

1004 190

382 191

609 192

443 193

146 194

603 195

274 196

134 197

921 198

836 199

292 200

534 201

532 202

461 203

333 204

365 205

140 206

105 207

359 208

118 209

118 210

85 211

305 212

555 213

310 214

573 215

698 216

899 217

373 218

617 219

525 220

593 221

947 222

416 223

264 224

711 225

1014 226

798 227

344 228

458 229

365 230

255 231

464 232

520 233

819 234

641 235

717 236

666 237

146 238

148 239

356 240

557 241

955 242

424 243

272 244

460 245

361 246

806 247

373 248

357 249

206 250

356 251

255 252

441 253

443 254

513 255

287 256

860 257

360 258

162 259

257 260

424 261

521 262

295 263

854 264

360 265

162 266

257 267

#REF! 268

201 269

354 270

354 271

422 272

279 273

196 274

307 275

358 276

203 277

189 278

334 279

476 280

443 281

336 282

259 283

235 284

134 285

248 286

457 287

186 288

215 289

394 290

249 291

188 292

203 293

398 294

76 295

286 296

155 297

229 298

189 299

179 300

96 301

198 302

245 303

171 304

302 305

204 306

84 307

847 308

345 309

337 310

345 311

286 312

155 313

201 314

120 315

236 316

199 317

174 318

212 319

313 320

131 321

166 322

309 323

156 324

162 325

379 326

485 327

272 328

429 329

496 330

252 331

151 332

151 333

293 334

293 335

257 336

194 337

322 338

398 339

312 340

357 341

88 342

102 343

88 344

96 345

205 346

184 347

152 348

283 349

134 350

240 351

217 352

217 353

297 354

297 355

312 356

185 357

158 358

308 359

177 360

150 361

112 362

108 363

265 364

106 365

193 366

425 367

193 36800000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

0000000000000000000000000000000

000000000000000

Product Feature

First Release for

Feature