doc.: ieee 802.19-11/0110r1 submission september 2011 prabodh varshney, nokiaslide 1 802.11af...

9

Click here to load reader

Upload: bernard-underwood

Post on 18-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

doc.: IEEE /0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide af Status before September Meeting Comment resolution going on… Group had telcos on August 2 nd, 9 th, 16 th and 23 rd, and September 6 th. Minutes available in r0, r0, r0, r0, r0. Had Ad Hoc in Seoul last week. Minutes available in r0. Created the LB171 comment spreadsheet in 11-11/277r17 Created speculative draft D1.03.

TRANSCRIPT

Page 1: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 1

802.11af Liaison Report

Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.

Date: 2011-09-22

Name Company Address Phone email Prabodh Varshney

Nokia 6021 Connection Dr., Irving, TX, USA

+14699512745 [email protected]

Authors:

Page 2: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 2

Abstract

• Liaison report from 802.11af as presented to 802.19.

Page 3: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 3

802.11af Status before September Meeting

• Comment resolution going on…• Group had telcos on August 2nd, 9th, 16th and 23rd, and

September 6th. Minutes available in 11-11-1117r0, 11-11-1123r0, 11-11-1135r0, 11-11-1142r0,11-11-1181r0.

• Had Ad Hoc in Seoul last week. Minutes available in 11-11-1223r0.

• Created the LB171 comment spreadsheet in 11-11/277r17• Created speculative draft D1.03.

Page 4: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 4

Current 802.11af Status• Approved comment spreadsheet (277r17) and speculative

draft 1.03 as working draft.• Presentations related to comment resolution mainly dealing

with following MAC issues:– Network Channel Control.– Control Power Management.– Spectrum mask descriptor.– Channel Availability Query– TLV Structure

Page 5: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 5

Current 802.11af Status• Discussion in 802.11 mid plenary about 802.19.1 draft

standard. • Update on regulatory work in Canada and UK.

Information about Cambridge trail. – Forty-five day geo-location database trial begun September 19th. We

can assume that devices to be protected are present in the database.– Following document show today’s TV white space channels available

at city hall of 19 cities:• https://mentor.ieee.org/802.11/dcn/11/11-11-0499-03-00af-us-metro-mhzpo

ps.xls– It looks like wireless microphone use is a larger percentage of the totals.

Page 6: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 6

Current 802.11af Status• Document 1209r1 gives what kind of information OFCOM

would like to be exchanged between database and WSD:– From WSD to relevant dB: Location information, location accuracy,

device type, device usage, Tx mask identifier, antenna height, antenna gain, antenna profile and

– Between dB and WSD: Maximum transmit power allowed, frequency(s) of operation, period of validity, geographic limit of slave, sensing or not, sensing level, switch-off operation instruction.

– Also highlights what is covered by 802.11af and what is not.

Page 7: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 7

Current 802.11af Status• All PHY comments related to DSSS and 802.11n rejected as

group has adopted 802.11ac basis for their PHY.• Considering possibility of 4, 8, 16 MHz BW.• Approximately 250 technical comments have TG approved

resolution in this meeting. Approximately 500 technical comments (out of 892) now have resolution. All editorial (408) have TG approved resolution.

• Will not wait for 802.11ac before going to next LB.

Page 8: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 8

Plans for November Meeting

• Approve minutes from Okinawa and teleconferences• Approve draft 1.04 and spreadsheet 277r?• Approve proposals from teleconferences• Regulatory update• Complete comment resolution.• Create draft 2.0• Ask the WG to go to Letter Ballot• Telcos on Tuesdays (21:00 ET for up to 2 Hrs.).

Page 9: Doc.: IEEE 802.19-11/0110r1 Submission September 2011 Prabodh Varshney, NokiaSlide 1 802.11af Liaison Report Notice: This document has been prepared to

doc.: IEEE 802.19-11/0110r1

Submission

September 2011

Prabodh Varshney, NokiaSlide 9

Official TGaf Timeline (Updated)

• Initial Working Group Letter Ballot: January 2011• Second Working Group Letter Ballot: November 2011• Recirculation Letter Ballot: March 2012• Form Sponsor Ballot Pool: June 2012• Initial Sponsor Ballot: September 2012• Recirculate Sponsor Ballot: November 2012• Final WG/EC Approval: March 2013• RevCom/Standards Board Approval: March 2013