build safe | live safe 1 Back Table of Contents Forward DOB NOW: Build For Elevators Filings Industry Information Session Updated: 2/15/18

Upload: others

Post on 15-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 1BackTable of Contents Forward

DOB NOW: Build

For Elevators Filings

Industry Information Session

Updated: 2/15/18

Page 2: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 2BackTable of Contents Forward

Learning Objectives

• Describe DOB NOW

• Know Where to Go for Help

• Register for DOB NOW through eFiling

• Login and Navigate within DOB NOW: Build

• Create a New Job Filing

• How to Pay for Filings

• Schedule Appointments and Resolve Objections

• Print and Renew a Permit

• Submit a Post Approval Amendment (PAA)

• Request Sign Off

• Locate DOB NOW Filings in the Public Portal

Page 3: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 3BackTable of Contents Forward

Session Structure

• Presentation

• Scenarios performed in DOB NOW

• Knowledge Checks

Page 4: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 4BackTable of Contents Forward

Keeping Track of Key Points

Page 5: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 5BackTable of Contents Forward

Table of Contents

• Introduction to DOB NOW

• Key Dates and Changes

• Register for DOB NOW through eFiling

• Sign on to DOB NOW: Build

• Create a New Job Filing

• Navigating Devices

• Upload Required Documents

• Complete Statements and Signatures

• Pay Filing Fees

• Preview to File

Alteration/Replacement ApplicationMake CorrectionsReview Objections and Schedule AppointmentsAddress ObjectionsWork PermitsRenew Work PermitSubmit Post Approval Amendments (PAA)Request Sign-OffView Filings in the DOB NOW Public PortalWrap Up

Page 6: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 6BackTable of Contents Forwardbuild safe | live safe 6

Introduction to DOB NOW

Page 7: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 7BackTable of Contents Forward

DOB NOW at-a-glance

DOB NOW is an interactive, web-based portal that will enable building owners, design professionals, filing representatives, and licensees to do all business with DOB online, including:o Submit applicationso Make paymentso Schedule appointmentso Check the status of an applicationo Pull permitso Make renewals

Page 8: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 8BackTable of Contents Forward

DOB NOW Log In Screen

1 2

1. Public Portal

2. Log In to DOB NOW

Page 9: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 9BackTable of Contents Forward

DOB NOW Log In Screen

1

2

1. Link to FAQs and Public Portal User Manual

2. Link to Inspections

3. Link to Build and Safety FAQs and Resources

4. Link to BIS

5. Link to NYC Open Data

4

3 5

Page 10: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 10BackTable of Contents Forward

DOB NOW Resources

Department of Buildings websitewww.nyc.gov/dobnowinfo

Here you will find helpful links to:• Log-in and Register for DOB NOW • Take advantage of Training Tools & Classes• Find FAQs and Tip Sheets for DOB NOW Build

Click on the Links to drill down for more information in each of the categories.

Page 11: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 11BackTable of Contents Forwardbuild safe | live safe 11

Key Dates and Changes

Page 12: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 12BackTable of Contents Forward

As of December 11th, the

use of DOB NOW: Build is

mandatory for all

Elevator (ELV1) filings.

Rule Review

Page 13: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 13BackTable of Contents Forward

Rule Review

As of December 11th

2017, ELV1 paper filings

will be rejected by the

Elevators Unit.

Page 14: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 14BackTable of Contents Forward

Amusement Ride

Applications (ELV1A) will

continue to be submitted

to the Elevators unit

Rule Review

Page 15: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 15BackTable of Contents Forward

All Elevator jobs that currently have a BIS job

number will continue with the current process.

Rule Review

Page 16: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 16BackTable of Contents Forward

As of December 11th, 2017

Use of DOB NOW: BuildMandatory

Use of DOB NOW: BuildOptional

• Antenna• Curb Cut• Construction Fence• Sidewalk Shed• Supported Scaffold• Signs• Electrical• Elevators

ANCCFNSHSFSGELVT

• Plumbing• Sprinkler• Standpipe

PLSPSD

Rule Review

Page 17: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 17BackTable of Contents Forward

Elevator Filings Are Standalone Filings

Elevator filings cannot be combined with other work types

Page 18: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 18BackTable of Contents Forward

Job Filing Options for Elevators

Only one Installation type and one Device type are allowed per application

Page 19: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 19BackTable of Contents Forward

Process

Withdrawal and Superseding Requests

Required Document Deferral Request

PER11 - Manual Appointment Request

ZRD1 - Zoning Resolution Determination

L2 - Requests for Overrides, Reductions, or Waivers of Civil Penalties for Work Without a Permit and Stop Work Order Violations

Not Currently Available in DOB NOW

Submit through www.nyc.gov/dobnowhelp

Page 20: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 20BackTable of Contents Forward

CCD1 - Construction Code Determination

Applicants must send all elevator Code determination and variation requests using the revised CCD1 form to [email protected]. The revised CCD1 form and instructions can be accessed at: Form -http://www1.nyc.gov/assets/buildings/pdf/ccd1.pdf Instructionshttp://www1.nyc.gov/assets/buildings/pdf/zrd1ccd1_instr.pdf

Page 21: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 21BackTable of Contents Forward

Job Filing and Permit Numbers

Page 22: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 22BackTable of Contents Forward

Question:

When is the first day Elevator filings must be

submitted in DOB NOW: Build?

Knowledge Check

Page 23: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 23BackTable of Contents Forward

Answer:

Monday, December 11th, 2017

Knowledge Check

Page 24: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 24BackTable of Contents Forward

True or False:

Using DOB NOW for ELV1: Elevator

Applications filings after December 11th,

2017 is optional.

Knowledge Check

Page 25: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 25BackTable of Contents Forward

Answer:

False

Using DOB NOW: Build for ELV1: Elevator

Applications is mandatory beginning

December 11th, 2017.

Knowledge Check

Page 26: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 26BackTable of Contents Forwardbuild safe | live safe 26

Register for DOB NOW through eFiling

Page 27: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 27BackTable of Contents Forward

Register for eFiling

Before you can file in DOB NOW, all Stakeholders must register for eFiling.

Visit the Department of Buildings websiteto register today.

Page 28: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 28BackTable of Contents Forward

Who needs to register for eFiling?

• Property Owners

• Elevator Directors/Co-Directors

• Design Professionals

- Registered Architects

- Professional Engineers

• Filing Representatives

• Approved Elevator Inspectors

Page 29: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 29BackTable of Contents Forward

eFiling Registration – Contact Details

Page 30: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 30BackTable of Contents Forward

eFiling – Business and License

Enter License Number and Business Information

Page 31: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 31BackTable of Contents Forward

Register for eFiling

eFiler

Complete Registration Form

Click VerificationEmail

Print AuthenticationForm

Sign, Date and Seal or Notarize

Submit Application and Credentials to DOB

Receive Confirmation of Registration from DOB

Owner

Licensed Professionals, Filing Representatives

LAA, 5th floor280 Broadway *

GO

GO

* Note: Licensed professionals must bring their DOB ID card when delivering the form in person or include a copy when mailing.

Page 32: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 32BackTable of Contents Forward

Prepare to Access DOB NOW: Build

DOB recommends using DOB NOW: Build in

Internet Explorer 9

To Turn Off Pop-Up Blockers in IE9Go to Settings (the gear icon )Select Internet OptionsGo to the Privacy tabDeselect Turn On Pop Up Blockers

Page 33: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 33BackTable of Contents Forward

True/False:

The property owner must be registered in eFiling

before a filing can be submitted.

Knowledge Check

Page 34: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 34BackTable of Contents Forward

True:

Knowledge Check

• Property Owners• Filing Representatives• Design Professionals

- Registered Architects- Registered Landscape

Architects- Professional Engineers

• Elevator Director/Co Director• General Contractors• Sign Hangers• Sign Lessees

• Licensed Professionals• Inspectors

- Elevator Inspectors- Special Inspectors- Progress Inspectors

• Site Safety- Site Safety Manager- Construction

Superintendent- Site Safety Coordinator

Page 35: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 35BackTable of Contents Forward

Permissions by Role

Actions Design ProfessionalDirector/

Co Director Owner Filing Rep

Add Contacts/Delegates Add/Edit Add/Edit Add/Edit Add/Edit

ELV1 Add/Edit Add/Edit Add/Edit No Access

Plans Upload Upload Upload Add/Edit

Seals and Signatures Upload No Access No Access No Access

Other Documents Upload Upload Upload Upload

Pay Pay Pay Pay Pay

Legal Statement and Signatures

Attestation Attestation Attestation No Access

File: Initial/PAA/Corrections

No Access Access No Access No Access

Resubmit: Incomplete, Objections, QA Failed

No Access Access No Access No Access

Signoff request (ELV3) Add/Edit Add/Edit/File Add/Edit Add/Edit

Page 36: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 36BackTable of Contents Forwardbuild safe | live safe 36

Sign on to DOB NOW: Build

Page 37: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 37BackTable of Contents Forward

Access DOB NOW: Build

www.nyc.gov/dobnow

Page 38: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 38BackTable of Contents Forward

DOB NOW Log In Screen

1 2

1. Public Portal

2. Log In to DOB NOW

3. Link to FAQs and Public Portal User Manual

4. Link to Build and Safety FAQs and Resources

5. Link to Inspections

6. Link to BIS

7. Link to NYC Open Data

Page 39: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 39BackTable of Contents Forward

DOB NOW Log In Screen

1

2

1. Link to FAQs and Public Portal User Manual

2. Link to Inspections

3. Link to Build and Safety FAQs and Resources

4. Link to BIS

5. Link to NYC Open Data

4

3 5

Page 40: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 40BackTable of Contents Forward

Sign On to DOB NOW: Build

• Enter your Email and

Password that you

created in eFiling

• Click Login

Page 41: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 41BackTable of Contents Forward

Get Help

1

2

1. Can’t access youraccount? – Click forassistance with eFilingRegistration or

forgottenpassword

2. Need more help?Contact us. – To

contactthe DOB CustomerService Team

Page 42: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 42BackTable of Contents Forward

Log In Error Message

The system will direct you to the eFiling

registration site

Page 43: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 43BackTable of Contents Forward

Select DOB NOW: Build

1. Select DOB NOW: Build

1

Page 44: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 44BackTable of Contents Forward

DOB NOW: Build Dashboard

When you log in with your email, your Dashboard will open

Page 45: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 45BackTable of Contents Forward

Create New Filings

– Return to Dashboard

+ Job Filing – Create a new job filing

+ Work Permit – Request a work permit

+ AHV Permit – Request an After Hours Variance (N/A for Elevators)

+ Request LOC – Request a Letter of Completion (N/A for Elevators)

Page 46: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 46BackTable of Contents Forward

View Your Filings

• My Jobs ─ Your Existing Job Filings• My Work Permits ─ Your Work Permits• My AHV Work Permits ─ AHV Work Permits (N/A for

Elevators)

• My LOC Requests ─ Requests for Letters of Completion (N/A

for Elevators)

• My Sign Off Requests ─ Jobs that are Ready for Signoff• Job Number Search ─ Search for a Job Filing

Page 47: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 47BackTable of Contents Forward

My Jobs Dashboard Special Features

1. Filter My Jobs – Filter the list by work type

2. Column Search – Search for a value in a column

3. Column Sorter – Click the arrow to sort in ascendingor descending order

4. Column Editor – Choose the columns that are displayed

1

243

Page 48: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 48BackTable of Contents Forward

Filter My Jobs

1. Click the down arrow next to Filter My Jobs

and select the work type

2. Click Clear Filter to remove filters

1

2

Page 49: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 49BackTable of Contents Forward

Navigate from Page to Page

1. Use the navigation at the bottom of a list to

move from page to page

1

Page 50: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 50BackTable of Contents Forward

Search for a Filing

1. Enter the exact 9-digit job number

2. Click Search

1

2

Page 51: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 51BackTable of Contents Forward

View Search Results

Double-click the Job Filing ID to open the Filing

Page 52: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 52BackTable of Contents Forward

Confirming Results

Click OK to confirm the Job Number and Address

Page 53: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 53BackTable of Contents Forward

Save or Return to Dashboard

1. Save – Save your work

2. Preview to File – Perform final review of the filing

before submitting

3. View Filing – View a printable version of the

application

4. Payment History – Payments made on the filing

5. Property Profile – Information about the property

6. Dashboard – Takes you to your dashboard

Page 54: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 54BackTable of Contents Forward

View Filing Sections

On the left side of the screen are expandable tabs

1

Page 55: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 55BackTable of Contents Forward

View Job Filing Status

Status Bar displays the progress of the filing

Page 56: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 56BackTable of Contents Forward

Common Filing Status Definitions

Filing Status Description

Pre-Filing Report created but not yet filed

Applicant of Record Review

When all required information is entered and the job is ready for a final review by the applicant

Pending Plan Examiner Assignment

When the filing has been submitted and is waiting to be assigned to a PE

Plan Examiner Review The Plan Examiner reviews the filing

Permit EntireUpon successful review, the permit will be issued

Page 57: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 57BackTable of Contents Forward

Common Filing Status Definitions (cont.)

Filing Status Description

Pending Sign Off Review

When the inspection status is Pass Final for all devices listed on the application

Sign Off Review In Progress

DOB reviewing sign off request

Signed Off Complete

Page 58: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 58BackTable of Contents Forward

Notifications

• Elevator Director, Elevator Co-Director, Design

Professional , Owner, and Filing Representative

receive email notifications at critical stages in the

filing process

• Emails will come from:

DOBNOW donotreply

[email protected]

Note: If you are not seeing notifications, check your spam filter or

junk mail folder. You may want to add the email as a Safe Sender.

Page 59: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 59BackTable of Contents Forward

Question:

What is the URL for DOB NOW?

Knowledge Check

Page 60: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 60BackTable of Contents Forward

Answer:

Knowledge Check

www.nyc.gov/dobnow

Page 61: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 61BackTable of Contents Forward

True or False:

The only way for the applicant or owner to know

the status of a Job Filing is to log in to DOB NOW.

Knowledge Check

Page 62: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 62BackTable of Contents Forward

False:

Knowledge Check

Any registered eFiling user associated with the

filing will receive an email notification as the filing

advances through the process.

Page 63: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 63BackTable of Contents Forwardbuild safe | live safe 63

Create a New Job Filing

Page 64: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 64BackTable of Contents Forward

Create a New Job Filing

Job Filings can be initiated by:

• Director/Co-Director

• Design Professional

• Owner

• Filing Rep

Page 65: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 65BackTable of Contents Forward

7 Steps to Submit a Job Filing

1. Complete General Information

2. Enter Device Details

3. Upload Required Documents

4. Complete Statements and Signatures

5. Pay Fees

6. Preview to File

7. File

Page 66: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 66BackTable of Contents Forward

You're a Elevator Director creating a filing to install

a new elevator at 151 West 34th street.

Scenario

Page 67: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 67BackTable of Contents Forward

Create a New Job Filing

Click + Job Filing to initiate a new job filing

Page 68: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 68BackTable of Contents Forward

Select Elevator Work Type

1. Select Elevators

2. Click Next

1

2

Page 69: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 69BackTable of Contents Forward

Select Type of Work – New Installation

1. Select the type of work from the list. Only one can be selected.

2. Click Next

1

2

Page 70: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 70BackTable of Contents Forward

Select Device Type

1. Choose the device type. Only one device type can be selected per application.

2. Click Submit

1

2

Page 71: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 71BackTable of Contents Forward

Complete General Information Tab

Begin by completing the mandatory fields on the

General Information tab

Page 72: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 72BackTable of Contents Forward

Dynamic Forms and Business Rules

• Required fields and forms will be added to the

filing based on your selections

• The navigational tabs and red asterisks will help

guide you through completing the forms

Page 73: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 73BackTable of Contents Forward

Important Form Information

• Fields with red asterisks * are required and must be completed before submitting the filing

• Gray shaded fields are read-only and are populated from the Building Information System (BIS) or from eFilingregistration

Page 74: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 74BackTable of Contents Forward

Enter Preliminary Job Details

To save your filing and generate the job numberyou must complete the following General Information sections:

• Primary Address

• Filing Information

• Applicant Information

• Registered Design Professional (Optional)

• Owner Information

• Asbestos Abatement Compliance

• Filing Representative (Optional)

Page 75: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 75BackTable of Contents Forward

Enter Location Information

Enter Location Information

• House Number • Block

• Street Name • Lot

• Borough

Page 76: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 76BackTable of Contents Forward

Enter Applicant Information

• License Type• Applicant Email

Required fields are:

• Business Lookup

The remaining fields will auto populate with the information from eFiling

Page 77: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 77BackTable of Contents Forward

Filing Information

• Confirm Filing Includes selected earlier

• Select Building Code Year from the drop down

• Confirm Device Type selected earlier

Page 78: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 78BackTable of Contents Forward

Enter Design Professional Information

1. Input the Design Professional eFiling email address 2. Select the License Type from the dropdown

The remainder of the information auto populates from eFiling

21

Page 79: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 79BackTable of Contents Forward

Enter Owner Information

1. Enter Owner’s registered eFiling email address2. Select Owner Type

1 2

Page 80: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 80BackTable of Contents Forward

Asbestos Abatement Compliance

• Select Asbestos Abatement Compliance status by clicking the radio button next to the applicable statement.

• Asbestos abatement documentation is mandatory now for all elevator jobs

• Depending on your selection additional required fields may appear• Please Note: Directors/Co-Directors will be able to claim exemption to

providing asbestos abatement documentation if there is no penetration of the building material.

Page 81: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 81BackTable of Contents Forward

Rule Review

A Certified Asbestos Investigator (CAI) is required to submit a NYC Department of Environmental Protection (DEP) ACP5 Form prior to the issuance of an elevator permit.

http://www1.nyc.gov/assets/buildings/pdf/elevator_permit_requirements.pdf

Page 82: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 82BackTable of Contents Forward

Filing Representative

1. Click + Add Filing Representative2. Enter Filing Rep’s eFiling email address in the

pop up window3. Click Save

1

3

2

Page 83: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 83BackTable of Contents Forward

Filing Representative

• The Filing Representative’s information is saved

• To add more filing representatives, click +Add

Filing Representative, and repeat previous steps

Page 84: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 84BackTable of Contents Forward

Save the Filing

When General Information tab is completed, click Save to save your work and generate a job number

Page 85: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 85BackTable of Contents Forward

General Information - Save

The system will prompt with a notification of success and to add or update the device details. Click OK

Page 86: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 86BackTable of Contents Forward

Job Number Generates

Page 87: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 87BackTable of Contents Forward

Device Details

Click +Add New Device to generate a new device application. 8 is the maximum number of devices

Page 88: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 88BackTable of Contents Forward

Device Details

1. A tracking number will be assigned2. Click Yes to add the device to your filing and be

taken to the Device Details tab

Page 89: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 89BackTable of Contents Forwardbuild safe | live safe 89

Navigating Devices

Page 90: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 90BackTable of Contents Forward

Navigating the Device Details tabs

Expand each tab to enter details about the new device

To save your information, click Save Device

Page 91: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 91BackTable of Contents Forward

Device Information

Click Device Details The Device Information tab will expand

Page 92: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 92BackTable of Contents Forward

Machine and Machine Room

Page 93: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 93BackTable of Contents Forward

General Information

Page 94: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 94BackTable of Contents Forward

Cars and Counterweight

Page 95: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 95BackTable of Contents Forward

Hoistway Opening

Page 96: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 96BackTable of Contents Forward

Pit and Buffers

Page 97: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 97BackTable of Contents Forward

Save Device Details

To save your information, click Save Device

Page 98: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 98BackTable of Contents Forwardbuild safe | live safe 98

Upload Required Documents

Page 99: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 99BackTable of Contents Forward

Required Documents

1. Click the Documents tab

2. Document Status will be Required

Page 100: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 100BackTable of Contents Forward

• Drawings must be sealed

before uploading.

• Please write the DOB

NOW Job Number to the

plan set/drawings before

uploading

Rule Review

Page 101: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 101BackTable of Contents Forward

DPL-1 Signature and Seal Form

• Upload a scanned version of your Signature and Seal with each filing

• Use the DPL-1 form available from the Forms section of the DOB website

• Good for 1 year from signature date

Applies to Licensees with a Seal

Professional EngineersRegistered ArchitectRegistered Landscape ArchitectMaster PlumberOil Burner InstallerElectrical ContractorMaster Fire Suppression Contractor

Page 102: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 102BackTable of Contents Forward

Fee-Exempt Filings

• Owner Type determines fee-exempt status

• Selecting a fee-exempt status will add Fee Exempt Supporting Document – DOF ACRIS Reportas a Required Document

• Download a valid ACRIS report from the Dept. of Finance ACRIS system – link available on DOB home page under Related Links

Page 103: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 103BackTable of Contents Forward

Additional Supporting Documents

The applicant has the option to upload additional supporting documents

1. Expand Supporting Documents tab

2. Click +Add Document to Upload

12

Page 104: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 104BackTable of Contents Forward

Select Additional Document

1

1. Select the Document Name from the list

2. The Select Document field populates

3. Click Browse

Continue with document uploading

2

3

Page 105: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 105BackTable of Contents Forward

Upload Required Documents Demo

Page 106: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 106BackTable of Contents Forward

Click the Upload Icon

1. From the row of the document you want to

upload, click the Upload icon

Page 107: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 107BackTable of Contents Forward

Click Choose File

1. Click Choose File

1

Page 108: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 108BackTable of Contents Forward

Select File

1. Highlight document to be uploaded

2. Click Open

Page 109: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 109BackTable of Contents Forward

Upload Document

3. The Document Uploader will display the file to be attached

4. Select Upload or

5. Click Cancel to cancel the upload

3

4 5

Page 110: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 110BackTable of Contents Forward

Confirm Successful Upload

1. The system will display a confirmation message,

Document Uploaded Successfully

1

Page 111: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 111BackTable of Contents Forward

Save Documents

1. Document will appear in the Documents

section with a status of Pending

2. Click Save

Page 112: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 112BackTable of Contents Forward

Document Status

• Document must be uploaded before filing can be acceptedRequired

• Document successfully uploaded but filing has not been submittedPending

• Document has been submitted and is under DOB reviewSubmitted

• Document has been reviewed and accepted by DOBAccepted

• Document has been rejected by DOB and must be corrected and resubmitted

Rejected

Page 113: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 113BackTable of Contents Forward

• Acceptable document formats

- .PDF

- .JPEG

• File names cannot contain special characters

• Files can be no larger than 250 MBs

Rule Review

Page 114: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 114BackTable of Contents Forward

Question:

When I first upload a document, what is the

Document Status?

Knowledge Check

Page 115: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 115BackTable of Contents Forward

Answer:

Pending. It does not change to Submitted

until the filing has been Submitted to the

DOB for review.

Knowledge Check

Page 116: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 116BackTable of Contents Forwardbuild safe | live safe 116

Complete Statements and Signatures

Page 117: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 117BackTable of Contents Forward

Statements and Signatures

The following stakeholders must sign in to DOB

NOW and complete their statements and

signatures

• Applicant of Record (Elevator Director or Co-

Director)

• Design Professional

• Property Owner

Page 118: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 118BackTable of Contents Forward

Applicant’s Statement

The applicant must electronically sign by clicking the box

Page 119: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 119BackTable of Contents Forward

Design Professional’s Statements and Signatures

Design Professional must log in, upload DPL-1, affirm statements, and electronically sign the filing by checking the box

Page 120: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 120BackTable of Contents Forward

Owner Statements and Signatures

Owner must log in and complete Owner

Statements

Page 121: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 121BackTable of Contents Forward

Owner Statements and Signatures

1. Owner must check the box to affix electronic

signature to the filing

1

Page 122: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 122BackTable of Contents Forwardbuild safe | live safe 122

Pay Filing Fees

Page 123: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 123BackTable of Contents Forward

• Fees must be paid before a filing can be

submitted

• The following registered eFilers associated with a

filing can submit payments:

- Director/Co-Director

- Design Professional

- Owner

- Filing Representative

Rule Review

Page 124: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 124BackTable of Contents Forward

• You can pay by:

- eCheck

- Credit Card

- Debit Card

• Credit and Debit Card payments are subject to a

2.49% convenience fee

Rule Review

Page 125: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 125BackTable of Contents Forward

Payment Video

Click on the picture to watch the video

Page 126: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 126BackTable of Contents Forward

Payments Blocked

• If you click Pay Now and the system seems to

stall, it is probably because your browser is

blocking the Payment Portal

• You will need to update the Settings of your

internet browser to turn off pop-up blockers

and/or add DOB NOW to your Trusted Sites

Page 127: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 127BackTable of Contents Forwardbuild safe | live safe 127

Preview to File

Page 128: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 128BackTable of Contents Forward

Preview the Application

Before submitting an application to the DOB, the

Elevator Director/Co-Director must perform a

final review of the filing

Click Preview to File button in the upper left of a

filing

Page 129: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 129BackTable of Contents Forward

Notification of Missing Information

1. Pop-up notification indicating missing information2. Red exclamation point (!) will display in the section missing information3. Missing fields will be highlighted with a red outline

21

3

Page 130: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 130BackTable of Contents Forward

Complete Application Preview

1. Click Next to review all pages of the filing

2. Scroll to the bottom of each page to review the

entire page

Page 131: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 131BackTable of Contents Forward

Electronically Sign and File

1. Select the check box to electronically sign

2. Select File

Page 132: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 132BackTable of Contents Forward

View Job Filing Confirmation

A successful filing confirmation will appear

Click OK

Page 133: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 133BackTable of Contents Forward

View Confirmation Email

Page 134: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 134BackTable of Contents Forward

Plan Examiner Assignment

Page 135: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 135BackTable of Contents Forward

Question:

Who is required to click the Preview to File

button, review and confirm before

submitting a filing to the DOB?

Knowledge Check

Page 136: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 136BackTable of Contents Forward

Answer:

The Applicant of Record is required to click

Preview to File, review the application page

by page, and affix his/her electronic

signature by checking the box. Only then will

the File button become active.

Knowledge Check

Page 137: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 137BackTable of Contents Forwardbuild safe | live safe 137

Alteration/Replacement Application

Page 138: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 138BackTable of Contents Forward

You're a Licensed Professional filing a Dumbwaiter

Alteration/Replacement

Scenario

Page 139: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 139BackTable of Contents Forward

Work Type-Elevators: Alteration/Replacement

Page 140: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 140BackTable of Contents Forward

Work Type-Alteration/Replacement

Page 141: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 141BackTable of Contents Forward

Work Type - Dumbwaiter

Page 142: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 142BackTable of Contents Forward

Device Search by BIN NUMBER

You can search by Device #, Address or BIN

1. Click BIN radio buttonThe BIN Number field will appear 2. Type in the BIN Number3. Click Search & Add

1

2 3

Page 143: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 143BackTable of Contents Forward

Device Status-Color Coded

Color Coding for Device Status – DOB NOW BUILD

Device ID Status

1P12345 R-Removed

1P12345 A-Active

1P12345 J-No Jurisdiction

1P12345 W-Work in progress

1P12345 L-Deleted

1P12345 D-Dismantled

1P12345 N-Withdrawn/Unknown

1P12345 H-Housing Authorized

1P12345 S-Sealed

Page 144: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 144BackTable of Contents Forward

Device List-Active

Active devices, flagged with a green dot, can be added to an alternation/replacement filing

Page 145: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 145BackTable of Contents Forward

Device

Click OK to save the filing.

A Notificationwindow will appear.

Page 146: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 146BackTable of Contents Forward

Device List – Remove not available

The system will prompt you if a device is unavailable to select for filing

Page 147: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 147BackTable of Contents Forward

General Information - Save

When all of the General Information is complete, click Save.

Page 148: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 148BackTable of Contents Forward

Filing Number Generated

Page 149: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 149BackTable of Contents Forward

Sample-Device Details-Escalators

Page 150: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 150BackTable of Contents Forward

Sample-Device Details-Elevators

Page 151: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 151BackTable of Contents Forward

Device - Device Information

Page 152: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 152BackTable of Contents Forward

Machine and Machine Room

Page 153: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 153BackTable of Contents Forward

Device General Information-Elevators

Page 154: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 154BackTable of Contents Forward

Cars and Counterweight

Page 155: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 155BackTable of Contents Forward

Hoistway Opening

Page 156: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 156BackTable of Contents Forward

Pit and Buffers

Page 157: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 157BackTable of Contents Forward

Complete the Filing Process

1. Complete General Information

2. Enter Device Details

3. Upload Required Documents

4. Complete Statements and Signatures

5. Pay Fees

6. Preview to File

7. File

Page 158: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 158BackTable of Contents Forwardbuild safe | live safe 158

Make Corrections

Page 159: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 159BackTable of Contents Forward

Ways to Correct/Update a Filing

Method Details Submitted

Correction Allowed once a filing has been submitted but before being assigned to a Plan Examiner

DOB NOW

Post Approval Amendment

Use when changes are needed when the filing is in the Approved or Permit Entire Stage

DOB NOW

Page 160: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 160BackTable of Contents Forward

• Corrections can be made on the filing after you

have submitted but before the filing has been

assigned to a Plan Examiner

• Corrections are allowed for filings with status of:

- Pending Plan Examiner Assignment

• If corrections result in additional fees, those fees

must be paid before the filing can be resubmitted

Rule Review

Page 161: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 161BackTable of Contents Forward

The following fields will be greyed out and are not

editable once the application has been filed:

• Location Information

• Applicant Information

• Filing Review Type

• Building Type

• Property Owner’s Information

Rule Review

Page 162: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 162BackTable of Contents Forward

• While reviewing the submitted filing, the Design

Professional realizes she/he needs to update the

Building Dumbwaiter Car Inside Dimensions-

Width from 4 feet 1 inches to 5 feet 1 inches.

• Since the filing is in the Pending Plan Examiner

Assignment stage, a correction is permitted

Scenario

Page 163: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 163BackTable of Contents Forward

Locate the Filing

1. From the My Jobs tab on the Dashboard, locate the filing

Notice Filing Status is Pending Plan Examiner Assignment

1

Page 164: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 164BackTable of Contents Forward

Select Corrections from Filing Actions

1. In the Filing Actions column, select Correction

If a filing is not eligible for a correction, the option will not appear in the list

1

1

Page 165: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 165BackTable of Contents Forward

Confirm to Proceed with Correction

Click Yes to proceed with making a correction

Page 166: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 166BackTable of Contents Forward

Correction in Progress Message

The system will notify all users that a correction is

in progress

Page 167: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 167BackTable of Contents Forward

Make Correction

Make corrections

Page 168: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 168BackTable of Contents Forward

Corrections completed

Page 169: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 169BackTable of Contents Forward

Correction - Applicant’s Signature

Page 170: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 170BackTable of Contents Forward

Correction - Design Professional’s Signature

Page 171: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 171BackTable of Contents Forward

Correction - Owner’s Statements

Page 172: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 172BackTable of Contents Forward

Preview to File

1. The system will

ask you to

preview the

application

again

2. Review each

page of the filing

by clicking Next

Page 173: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 173BackTable of Contents Forward

Sign the Filing

1. Add your digital signature by checking the box

2. Click File to submit the filing

Page 174: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 174BackTable of Contents Forward

Correction-Confirmation

Page 175: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 175BackTable of Contents Forward

True or False:

Corrections are still allowed once a filing has

been assigned to a Plan Examiner as the

Plan Examiner has not started the review.

Knowledge Check

Page 176: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 176BackTable of Contents Forward

False:

Corrections are only allowed while the filing

is still awaiting assignment to a Plan

Examiner

Knowledge Check

Page 177: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 177BackTable of Contents Forwardbuild safe | live safe 177

Review Objections and Schedule Appointments

Page 178: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 178BackTable of Contents Forward

Appointments Conducted Virtually

Plan Examiner appointments for DOB NOW jobs

are conducted virtually using GoToMeeting.

Page 179: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 179BackTable of Contents Forward

You are an Applicant of Record and you receive an

email notification that the DOB has raised

objections with your filing and has requested an

appointment

Scenario

Page 180: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 180BackTable of Contents Forward

Notification of Objections

Page 181: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 181BackTable of Contents Forward

Locate and Open the Filing

1. Go to My Jobs and look for Filing Status equal

to Objections

2. Double-click the Job Number to open the

filing

12

Page 182: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 182BackTable of Contents Forward

Progress Bar Indicates Objections

A red exclamation point ! in the Plan Examiner

Review Stage is an indicator that Objections have

been raised

Page 183: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 183BackTable of Contents Forward

Locate Objections

Note: DOB Appointments section will only appear if

an appointment as been requested

Page 184: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 184BackTable of Contents Forward

• If the DOB has requested an appointment, the Applicant of Record, Filing Rep or Owner can schedule the appointment

• The Applicant of Record is a mandatory attendee

• Others associated with the filing can be added as Optional Attendees

• Only one scheduled appointment is allowed at one time

Rule Review

Page 185: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 186BackTable of Contents Forward

Schedule an Appointment

Navigate to the DOB Appointments section of the filing

• Click +Schedule Appointment

Page 186: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 187BackTable of Contents Forward

Create an Appointment

• Required Attendees – Defaults to Design Professional

• Optional Attendees – Add others associated with the filing

• Plan Examiner – Defaults to DOB Plan Examiner that raised

the objections

• Job Filing Number – Auto-populates the Job Filing

Number

Page 187: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 188BackTable of Contents Forward

Add Optional Attendees

Click Optional Attendees field and select from

individuals associated with the filing

Page 188: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 189BackTable of Contents Forward

Select Appointment Date and Time

1. Select a future Date

2. Select an Appointment Time

12

Page 189: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 190BackTable of Contents Forward

Confirm Date and Time

Once you select date and time, click Schedule

Page 190: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 191BackTable of Contents Forward

Confirm Appointment

1. Click Yes to confirm appointment date and time

2. Click Yes to confirm success

1

2

Page 191: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 192BackTable of Contents Forward

Appointment Scheduling Process

• Requested appointment slot is sent to DOB

Scheduling Coordinator

• Scheduling Coordinator creates the GoToMeeting

session and sends a calendar appointment to all

attendees containing the GoToMeeting link

Page 192: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 193BackTable of Contents Forward

GoToMeeting Plan Review

• You will need:- PC or mobile device for screen sharing- Web cam

- Phone or activated headset/microphone for audio

• Tips:- Log in early

- Set your audio preferences – dial in versus audio through your PC

- Have the access code and audio pin handy

Page 193: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 194BackTable of Contents Forward

The date for your appointment with the Plan

Examiner is approaching but you now have a

scheduling conflict. You need to cancel and

reschedule the appointment.

Scenario

Page 194: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 195BackTable of Contents Forward

Cancel and Reschedule an Appointment

Page 195: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 196BackTable of Contents Forward

Confirm Cancellation

1. Click Yes to confirm cancellation

2. Click OK at cancellation window

1 2

Page 196: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 197BackTable of Contents Forward

Schedule a New Appointment

Click +Schedule Appointment to schedule a new

appointment

Follow the previous steps to create an appointment

Page 197: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 198BackTable of Contents Forward

Cancellations Initiated by DOB

If there are technical issues with the meeting or the

DOB needs to cancel, a Scheduling Coordinator will

reach out to you via email with upcoming

availability to reschedule your appointment.

Page 198: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 199BackTable of Contents Forward

Question:

Besides the DOB Plan Examiner, who is

required to attend an Appointment?

Knowledge Check

Page 199: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 200BackTable of Contents Forward

Answer:

The Applicant of Record

Knowledge Check

Page 200: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 201BackTable of Contents Forwardbuild safe | live safe 201

Address Objections

Page 201: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 202BackTable of Contents Forward

Objections

Click the Objections/Appointment tabThe objection page will open

Page 202: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 203BackTable of Contents Forward

Reviewing the Objection

Click the arrow for the pane to expand

Page 203: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 204BackTable of Contents Forward

Replace Rejected Documents

1. Look for Document Status of Rejected

2. Click Upload icon to add the revised document

Page 204: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 205BackTable of Contents Forward

Address Objections

1. Change the Objection Status to Resolved

2. Add Comments

3. Click Save

Page 205: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 206BackTable of Contents Forward

Upload New Required Documents

The Plan Examiner may request additional documents.

If so, an objection will be issued.

1. The new required document will display in the

Required Documents section

2. Click Upload icon to upload the document

12

Page 206: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 207BackTable of Contents Forward

Resubmit Filing

1. Click Save

2. Click Resubmit button

1 2

Page 207: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 208BackTable of Contents Forward

Complete Steps to Resubmit Filing

• Complete Statements and Signatures

• Pay Fees

• Preview to File

• File

Page 208: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 209BackTable of Contents Forwardbuild safe | live safe 209

Work Permits

Page 209: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 210BackTable of Contents Forward

• Work Permit will be automatically issued upon

review, by the Plan Examiner if there are no issues

with the filing.

• The system will issue a permit listing all the

devices in the application and the status of the

filing will be set to Permit Entire.

• Permits will not be issued if the elevator

director’s/co-director’s insurance has expired.

Rule Review

Page 210: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 211BackTable of Contents Forward

Work Permit Issued

Once the filing is approved, status will change to Permit Issued and a Work Permits tab will appear in the left navigation

Page 211: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 212BackTable of Contents Forward

Print a Work Permit

Click Print Permit from within the Work Permits tab to print the work permit

Page 212: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 213BackTable of Contents Forward

Print Work Permit

1. Print from your browser (Ctrl+P)

2. Select Print to PDF to save the file

!Tip: Set to print orientation to landscape

Page 213: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 214BackTable of Contents Forwardbuild safe | live safe 214

Renew Work Permit

Page 214: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 215BackTable of Contents Forward

DOB NOW Permits must be renewed prior

to expiration

Rule Review

Page 215: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 216BackTable of Contents Forward

• The issued permit is valid for one year from the date

of issuance provided the insurance is in good

standing.

• 60 days prior to the expiration date on the permit,

the first reminder email for renewal will be sent out

to the industry users associated with the application.

• If the permit is still not renewed, a second reminder

will be sent out 30 days prior to the expiration date

on the permit.

Rule Review

Page 216: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 217BackTable of Contents Forward

Initiate Permit Renewal

1. Navigate to the Work Permits tab within the filing

2. Select Renew Permit

1

2

Page 217: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 218BackTable of Contents Forward

Complete Renewal Form

Permit information auto-populates

1. Elevator Director or Co-Director completes Statements & Signatures

2. Click Save1

2

Page 218: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 219BackTable of Contents Forward

Pay Permit Renewal Fee

1

2

1. Click Pay Now

2. Click Yes

Continue with payment process

Page 219: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 220BackTable of Contents Forward

Submit Renewal Form

Elevator Director or Co-Director clicks the Submit button

Page 220: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 221BackTable of Contents Forward

Permit Renewed

Click OK

Page 221: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 222BackTable of Contents Forward

Permit Renewed

Page 222: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 223BackTable of Contents Forwardbuild safe | live safe 223

Submit Post Approval Amendments (PAA)

Page 223: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 224BackTable of Contents Forward

• The DOB requires applicants to maintain current and accurate records of their jobs

• File a Post Approval Amendment (PAA) when you need to make updates including changes to the Scope of Work, plans, or correct an Environment Control Board (ECB) violation

• PAAs can be initiated while the status of the filing is the following:

- Permit Entire

Rule Review

Page 224: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 225BackTable of Contents Forward

While making an amendment, the following fields are not

editable:

• Filing status

• Primary Address

• Applicant information

• Design Professional Information

• Owner Information

• Devices (No device can be deleted or added, but device

information can be revised)

• Section 17 – Replacement/Modification statement

• Building Type

Rule Review

Page 225: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 226BackTable of Contents Forward

PAAs will not be allowed on the following:

• When Section 17 – Replacement and Modification statement is checked.

• If the device is Pass-Final with the disposition "Final-Issued" and no Objections

• Any device with an open inspection

• Inspections will not be allowed for any open PAA (An open PAA is defined as PAA filed to DOB and permit not yet issued).

Rule Review

Page 226: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 227BackTable of Contents Forward

After the PAA is approved the updated permit will

be available automatically for the user to print. The

only change in the permit would be the scope of

work if it was updated while doing the PAA. The

issuance and expiration dates on the permit will

remain the same as the initial permit.

Rule Review

Page 227: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 228BackTable of Contents Forward

Navigate to a Job Filing

1. Go to My Jobs tab

2. Locate the Job Filing

2

1

Page 228: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 229BackTable of Contents Forward

Select Filing Action

Select PAA from the Filing Actions field

Page 229: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 230BackTable of Contents Forward

Confirm Creation of PAA

Click Yes to create PAA

Page 230: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 231BackTable of Contents Forward

PAA Device

1. Select the check box to select the device2. Click OK

1

2

Page 231: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 232BackTable of Contents Forward

PAA Generated

A copy of the Initial filing is created and is in the Pre-Filing Status

Page 232: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 233BackTable of Contents Forward

Update and Save Job Filing

Make necessary updates to the filing

• Click Save in the upper left corner

Page 233: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 234BackTable of Contents Forward

Complete the Filing Process

1. Complete General Information

2. Enter Device Details

3. Upload Required Documents

4. Complete Statements and Signatures

5. Pay Fees

6. Preview to File

7. File

Page 234: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 235BackTable of Contents Forward

View Job Filing Confirmation

A successful filing confirmation will appear

• Click OK

Page 235: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 236BackTable of Contents Forward

View New Job Filing No.

New Job Filing Number is generated with suffix

of P1

Page 236: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 237BackTable of Contents Forward

True or False:

The process to submit a PAA is similar to

submitting the Initial job filing.

Knowledge Check

Page 237: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 238BackTable of Contents Forward

True:

Before a Design Professional can submit a

Post Approval Amendment (PAA), the

application must be completed, documents

upload, fees paid, Statements and Signatures

completed, Preview to File, sign the filing

and click Submit.

Knowledge Check

Page 238: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 239BackTable of Contents Forwardbuild safe | live safe 239

Request Sign-Off

Page 239: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 240BackTable of Contents Forward

Sign Off – For self-certified filings

• Only allowed for Replacement/Modification

filings

• Sign Off requests for self-certified filings must be

submitted in DOB NOW: Build

• Only Applicant (Elevator Director / Elevator Co-

Director) can request application sign off for self-

certification jobs.

Rule Review

Page 240: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 241BackTable of Contents Forward

Sign Off for non-self-certified filings

• When the inspection status is Pass-Final for all

devices listed in application, the system will

change the filing status to Pending Sign Off

Review

• DOB will review the Sign Off Request

• Once approved, the application status will change

to Signed Off

Rule Review

Page 241: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 242BackTable of Contents Forward

For Personal Hoist removal, when the inspections

are Pass-Final then the status of the device will be

changed from W (Work in progress) to R

(Removed).

Rule Review

Page 242: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 243BackTable of Contents Forward

Status Will Change to Signed Off

Page 243: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 244BackTable of Contents Forward

Request Sign Off

When work is completed and DOB Inspections

assign a Pass-Final status to each device included

on the permit. You may request Sign-off for the

job filing.

Page 244: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 245BackTable of Contents Forward

Request for Signoff for Self-Certified Filings

For self-certified filings, the Elevator Director/Co-Director must request Sign Off1. From the My Jobs tab on your Dashboard, go to

the filing column Filing Actions, click Select Action dropdown arrow

2. Click Request Signoff

Page 245: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 246BackTable of Contents Forward

Confirm Signoff Request

Click Yes to confirm

Page 246: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 247BackTable of Contents Forward

Self-Certified Sign Off Request

• General Information

• Test Information

• Statements and Signatures

Page 247: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 248BackTable of Contents Forward

Test Information-Inspection Results

• The inspection results have to be Satisfactory before the request can be submitted.

• The user can enter any Inspection date from the date the permit was issued and the current date. The system will not allow the user to enter any date before the permit issuance date and any future date.

Page 248: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 249BackTable of Contents Forward

Sign Off Request – General Information

Complete Inspecting Agency Information

1. Enter Email Address

2. Select License Type

3. Complete Inspection Confirmation

Page 249: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 250BackTable of Contents Forward

Sign Off Request – General Information

Complete Witnessing Agency Information1. Enter Email Address2. Select License Type3. Select Business from Business LookUp field

Page 250: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 251BackTable of Contents Forward

Sign Off Request – General Information

Owner Contact information auto-populates

Page 251: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 252BackTable of Contents Forward

Save General Information

Click Save to save your work

Page 252: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 253BackTable of Contents Forward

Navigate to Test Information Tab

Click on Test Information to expand the tab

Page 253: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 254BackTable of Contents Forward

Enter Test Information

Complete Test Information

• Enter Inspection/Test Date

• Select Inspection Result

Page 254: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 255BackTable of Contents Forward

Save Test Information

Click Save to save your work

Page 255: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 256BackTable of Contents Forward

Expand Statements and Signatures

Click on Statements and Signatures to expand the

tab

Page 256: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 257BackTable of Contents Forward

Complete Statements and Signatures

Complete

Statements and

Signatures

• Inspecting

Agency

• Owner

Page 257: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 258BackTable of Contents Forward

Request for Signoff-Save

When the Sign Off Request is complete, the Elevator Director can click the Submit button Enter the information and Click Save

Page 258: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 259BackTable of Contents Forward

Sign Off Request Initiated

The status of filing is set to “Signoff Request Initiated”

Page 259: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 260BackTable of Contents Forward

My Sign Off Requests Tab

• Sign Off Requests will appear on the My Sign Off

Requests Dashboard

• Email notifications will be sent when Sign Off is complete

Page 260: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 261BackTable of Contents Forwardbuild safe | live safe 261

View Filings in the DOB NOW Public Portal

Page 261: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 262BackTable of Contents Forward

DOB NOW Home Page

Page 262: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 263BackTable of Contents Forward

Research Using the Public Portal

• Unregistered users can access DOB NOW filings on the public portal• Search by

- Address- Building Identification Number (BIN)- Borough, Block, Lot- Device

Page 263: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 264BackTable of Contents Forward

Enter Search Criteria and Click Search

Page 264: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 265BackTable of Contents Forward

View Property Profile and Filing History

Page 265: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 266BackTable of Contents Forward

View Property Profile

Property Notifications

Main and Alternative Addresses

Building Information

Environmental Details

Build and Safety Filings

Tax Status

Page 266: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 267BackTable of Contents Forward

Job Filings-Elevators

Page 267: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 268BackTable of Contents Forward

Click Tabs to Expand Details

Page 268: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 269BackTable of Contents Forward

True or False

A user ID and login are required to access the DOB

NOW Public Portal

Knowledge Check

Page 269: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 270BackTable of Contents Forward

False

Anyone can access the DOW NOW Public Portal at

www.nyc.gov/dobnow

Knowledge Check

Page 270: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 271BackTable of Contents Forwardbuild safe | live safe 271

Wrap Up

Page 271: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 272BackTable of Contents Forward

Learning Objectives Met

Describe DOB NOW

Know Where to Go for Help

Register for DOB NOW through eFiling

Login and Navigate within DOB NOW: Build

Create a New Job Filing

Schedule Appointments and Resolve Objections

Print and Renew a Permit

Submit a Post Approval Amendment (PAA)

Request Sign Off

Locate DOB NOW Filings in the Public Portal

Page 272: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 273BackTable of Contents Forward

Review of Key Points

Page 273: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 274BackTable of Contents Forward

DOB NOW Log In Screen

1 2

1. Public Portal

2. Log In to DOB NOW

Page 274: DOB NOW: Build · 15.02.2018  · Industry Information Session Updated: 2/15/18. build safe | live safe Table of Contents Back Forward 2 Learning Objectives ... live safe Table of

build safe | live safe 275BackTable of Contents Forward

DOB NOW Log In Screen

1

2

1. Link to FAQs and Public Portal User Manual

2. Link to Inspections

3. Link to Build and Safety FAQs and Resources

4. Link to BIS

5. Link to NYC Open Data

4

3 5