do it yourself method statement

45
DO IT YOURSELF METHOD STATEMENT By TECH-DRY (INDIA) PVT. LTD., No.769, 1 st Cross, 1 st Stage, Indiranagar, Bangalore 560 038 Phone: 25255294 / 25255406 / 25289159 E-mail – [email protected]

Upload: akshay-meshram

Post on 24-Nov-2014

764 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Do it yourself Method statement

DO IT YOURSELF METHOD

STATEMENT

By

TECH-DRY (INDIA) PVT. LTD., No.769, 1st Cross, 1st Stage, Indiranagar, Bangalore 560

038Phone: 25255294 / 25255406 / 25289159

E-mail – [email protected]

Page 2: Do it yourself Method statement

Items for Waterproofing1. Retaining Walls & Floor.2. Podium Slab with Gutter (Hard & Soft

Scopes)3. * Toilets / Balconies (4” Sunken)

* Utilities / Servants Toilet (9” Sunken)4. * Flat Terrace.

* Curved Roofs.5. OHT’s 6. Sumps7. Expansion Joints8. Detailing for

* Construction Joints* Bore Packing* Beam & Block work joints.* Slab Cracks.

Page 3: Do it yourself Method statement

EVOLUTION OF TREATMENT EVOLUTION OF TREATMENT METHODOLOGYMETHODOLOGY

1. Cleaning

2. Defect Removal

3. Permeability reduction

4. Bonding Layers

5. Slope making with water resistant concrete

6. Permeability reduction

7. Water repellency

8. Protective coatings

Page 4: Do it yourself Method statement

Soling

PCCProtekta SB

Protekta Base

Protekta Abrasion resist

Foot

ing

RCC

Construction Joint

Protekta Flex Joint

Ret

aini

ng W

all

Protekta BaseProtekta Plastofelt

Protekta Abrasion resist

Soling

Retaining Floor

Injection / Grouting Protekta Grip

Page 5: Do it yourself Method statement

Retaining Wall & FloorRetaining Wall:Treatment on + ve side:• Brush / spray application of impregnation product called

Protekta Base which fills the fine pores with crystalline silicate growth, coverage 2 Sq. M / Ltr.

• Brush application of one coat of Protekta Flexjoint on the construction joint only. Thickness of application will be approx. 0.5 mm.

• Plastering at the Starter Joint, Construction joints and any other defects like honeycombs, tie-rod locations etc with polymer sealant 500 modified mortar.

• Brush coat of Protekta Plastofelt primer• Brush coat of Protekta Plastofelt to provide a very strong

coating to resist hydrostatic pressure.• Brush coat of Protekta Top Seal Coat as hard layer. After the

application of this layer, plastering is not required.Treatment on –ve side: ·    Injections/Grouting at starter joint & construction joints with

Protekta Grip / Protekta Hydro Grout.

Page 6: Do it yourself Method statement

FloorTreatment on + ve side:• After PCC has been laid, grout Protekta SB mixed

with Protekta SS and catalyst at regular intervals of every 1 M center to center. This grout material has property of expanding when it comes in contact with water. It forms a water impervious layer and prevents travel of water to the top of PCC.

• Spray of Protekta Base on PCC surface towards porosity reduction.

• Application of a slurry prepared with Protex B & Protekta SLM. This layer is a hard layer & will be abrasion resistant.

• A coat of Protekta Ceal 540 on concreteTreatment on –ve Side• Injection/grouting at a regular intervals at all joints

between floor and column joints and construction joints

Page 7: Do it yourself Method statement

Podium Slab with Gutter (Hard & Soft Scapes)

Podium SlabAssumptions Made:• Gradient is provided in the slab at the time

of casting.• Water from this sloped surface flows into

the Gutters.• Ridge points are at the Podium Slab,

midway between the Gutters on either side.

Page 8: Do it yourself Method statement

Treatment Steps• Brush / spray application of crystallisation/gel formation

product called Protekta Base which fills the fine pores with crystalline silicate growth, coverage 2 Sq. M / Ltr.

• Brush application of one coat of Protekta Flexjoint on the construction joint only. Thickness of application will be approx. 0.5 mm.

• Plastering 6” wide at the construction joints.• Brush coat of Protekta Plastofelt to provide a very strong

flexible coating.• Application of Protekta Abrasion resist as hard layer. After

the application of this layer, plastering is not required.• Injections/Grouting at construction joints/cracks from below.

• Optional, a coat of Protekta Procoat or Protekta Wall Top

• Please note that we have not suggested any plastering on our treatment since the final surface is abrasion resistant.

Page 9: Do it yourself Method statement

Gutter Treatment• Brush / spray application of crystallisation/gel formation

product called Protekta Base which fills the fine pores with crystalline silicate growth, coverage 2 Sq. M / Ltr.

• Brush application of one coat of Protekta Flexjoint on the construction joint only. Thickness of application will be approx. 0.5 mm.

• Plastering 6” wide at the construction joints.• Brush coat of Protekta Plastofelt to provide a very strong

flexible coating.• Application of Protekta Abrasion resist as hard layer. After

the application of this layer, plastering is not required.• Injections/Grouting at construction joints/ Cracks from below.

Slope Creation:• With M20 grade Concrete laid to slope.

Page 10: Do it yourself Method statement

Sunken Toilet – 4”Sunken

Page 11: Do it yourself Method statement

Protekta Base.

Protekta- Sealant F500 mortar packing

Protekta Flex Joint

Protekta Durocoat

Protekta Unicoat

Sunken Toilet – 4”Sunken

Page 12: Do it yourself Method statement

RCC Slab

Protekta Base Protekta Durocoat

Tiles

Sunken Toilet – 4”Sunken

Page 13: Do it yourself Method statement

Sunken Toilet – 4” SunkenCleaning:•Surface cleaning by wire brush, removing loose mortar, dirt, grime etc followed by water cleaning using Protekta Cleaning Agent.•Testing by ponding water for 48 hours to know surface defects.Defect Removal:Construction Joint / Crack Repair / Through Hole:•Packing beam and hollow block joint•Create “V” groove to ½ “ depth and clean the surface with cleaning agent.•Pouring of Protekta Base up to the neck of the groove followed by water washing.•Pour additional Protekta Base at areas were ingress is too much.•Remove excess Protekta Base from the surface and clean it again with wire brush•Brush coat Protekta Flexjoint.•Packing the groove with silica sand mixed with Protekta Sealant 400 in the ratio of 1:2 and brush coat Protekta Flexjoint at the same areas after 24 hrs.•Chemical Grouting by Protekta Seal ABC. (If Required)•Block Honeycombs / Voids if excessive leakage found by chemical grouting.

Page 14: Do it yourself Method statement

• Spray of crystallization product called Protekta Base with a lowpressure pump followed by water curing for 2 to 3 times at

intervals of 2 hours between each curing (Coverage 2 to 2.5 Sq.M./ Ltr.)

• Spray excessive Protekta Base at weak areas.• Spread Protekta Durocoat slurry (Brush application) Slope Making /Filling:• Slope making with M20 grade concrete (using 12 mm & 20 mm

jelly, mix ratio 1:1). Following additive to be mixed. – Emulsion KR2 towards water resistance (125ml per cement

bag)• After 24 hours of curing, re-spray of Protekta Base with low

pressure pump.• Packing the floor / Wall joints with Protekta Sealant 500 mixed

with Cement.• Brush coat of Protekta Unicoat at Floor and Wall joints up to

300 mm of wall surface.• Final testing for 7 days

Waterproofing

Page 15: Do it yourself Method statement

Bore packingBore packing* Brush coat of Protekta Base followed by Protekta Flexjoint surrounding the bore area.* Coat Protekta Flexjoint and smear silica sand for better adhesion between PVC pipe and concrete* Provide shuttering from bottom after pipe is installed.* Fill up the bore with Protekta Sealant 500 based mortar using 6mm down size jelly.* Brush coat of Protekta Flexjoint above the Protekta Sealant 500 based mortar to ensure sealing of pipe to screed joint.* Testing of 24 hours.* After tile laying fill the gap around the pipe with Protekta Sealant 500 based mortar and brush coat of Protekta Flexjoint.* Final testing for 7 days.

Page 16: Do it yourself Method statement

RCC Slab

Plastering

CopingProtkta BaseProtekta Durocoat

Weep H

oleSunken Toilet –

9”Sunken

Page 17: Do it yourself Method statement

Sunken Toilet – 9” SunkenCleaning:  •Surface cleaning by wire brush, removing loose mortar, dirt, grime. Testing by ponding water for 48 hours to know surface defects.Defect Removal:Construction Joint / Crack Repair:•Packing beam and hollow block joint.•Create “V” groove to ½” depth and clean the surface with cleaning.•Pour into of Protekta Base up to the neck of the groove followed by water. •Pour additional Protekta Base at areas were ingress is too much.•Remove excess Protekta Base from the surface and clean it again with brush coat of Protekta Flexjoint.•Packing the groove with silica sand mixed with Protekta Sealant 400.•Block Honeycombs / Voids if excessive leakage found by chemical.

Page 18: Do it yourself Method statement

Porosity Reduction:        Spray of crystallization product called Protekta Base with a low pressure.        Spray excessive Protekta Base at weak area.Surface Preparation:        Spread a slurry (Brush application) Protekta

Durocoat on the slab and wall up to 300 mm above floor level.        Plastering with C:M 1:4 creating gradient towards

weep hole. Protekta KR2 to be added to mortar at 125 ml/bag of cement.        Spray of Protekta Base.        Curing cum testing for 7 days.Area Calculation:Floor + Wall up to 300 mm above floor level.

Contd…

Page 19: Do it yourself Method statement

RCC Slab

Protex A Protekta FlexjointProtekta Sealant F500 based concrete

Tiles

Bore Packing Bore Packing Sunken Toilet 4 “ sunken Sunken Toilet 4 “ sunken

Page 20: Do it yourself Method statement

Bore packing in the wall:·        Clean the surface thoroughly.·        Brush coat of Protekta Base.·        Brush coat of Elastomeric coating, Protekta Flexjoint around the pipe·        Application of Protekta Durocoat slurry on the bore surface.·        Packing the bore with M20 grade concrete by using 12 mm downsize jelly. Protekta KR2 to be added in the concrete·        Brush coat of Protekta Base·        Brush coat of Protekta Flexjoint.·        Curing for 7 days. 

Page 21: Do it yourself Method statement

Protekta Base.

Protekta- Sealant F500 mortar packing

Protekta Flex Joint

Protekta Durocoat

Protekta Unicoat

Beam & Block Wall Joints.

Page 22: Do it yourself Method statement

RCC Slab

Para

pet w

all

Rai

n W

ater

Pip

e

Protekta Base Duracoat SlurryCoping M20 Grade

concrete

PlasteringCoping

Protekta Unicoat

Terrace

Page 23: Do it yourself Method statement

Terrace/Terrace GardenPre Treatment Steps:   Chip off loose mortar and clean the surface thoroughly.Defect Removal:   Construction joint will be treated by making groove, stagnating Protekta Base and Water Wash. Filling the groove with F400 mortar.   Brush coat of Elastomeric coating Protekta Flexjoint only on the construction joint.Porosity Reduction:  Brush application of impregnation product called Protekta Base which fills the fine pores with crystalline silicate growth. Coverage 2 Sq. M/Ltr. of Protekta Base. Making coping by polymer modified mortar at slab and parapet wall junction.

Page 24: Do it yourself Method statement

oSurface Preparation & Slope Making:        Brush application of Protekta Durocoat slurry to a thickness of approximate 1 mm. This slurry coating has a very special chemical, which impregnates through pores and capillaries. It is water based product and can be applied on moist surfaces. Slope Making • With M20 concrete mixed with Emulsion KR2 in proportion of 125 ml/bag of cement. Average thickness estimated – 65 mm to 75 mm. • M-20 Grade RMC supplied free of cost.Waterproofing        Spray of Protekta Base.        Curing for 7 days.    Spray of Protekta G towards water repellency

Contd…

Page 25: Do it yourself Method statement

Pre Treatment Steps:       Chip off loose mortar and clean the surface thoroughly.Defect Removal:       Construction joint will be treated by making groove, stagnating Protekta Base and Water Wash. Filling the groove with F400 mortar.       Brush coat of Elastomeric coating Protekta Flexjoint only on the construction joint.Porosity Reduction:       Brush application of impregnation product called Protekta Base, which fills the fine pores with crystalline silicate growth. Coverage 2 Sq. M/Ltr. of Protekta Base.       Making coping by polymer modified mortar at slab and parapet wall junction. Surface Preparation & Slope Making:       Brush application of Protekta Duracoat slurry to a thickness of approximate 1 mm. This slurry coating has a very special chemical, which impregnates through pores and capillaries. It is water based product and can be applied on moist surfaces. Slope Making        With M20 concrete mixed with Emulsion KR2 in proportion of 125 ml/bag of cement. Average thickness estimated – 65 mm to 75 mm.        M-20 Grade RMC supplied free of cost @ 0.075 Cu. M/Sq. M Waterproofing       Spray of Protekta Base.       Curing for 7 days.       Spray of Protekta G towards water repellency.       Brush coat of Protekta Unicoat as additional protective coating.

 

TERRACE / PODIUM SLAB WITH LANDSCAPING [WATERPROOFING + SCREEDING + ELASTOMERIC COATING]

Page 26: Do it yourself Method statement

Concrete

Con

stru

ctio

n Jo

int

Protekta Flex Joint

Protekta BaseProtex B Slurry

Plastering

Protekta Unicoat

Coping

Water Tank

Page 27: Do it yourself Method statement

Waterproofing & Plastering

Protekta Base Protekta Unicoat

Protekta Duracoat Protekta G

Gro

utin

g on

star

ter/c

onstr

uctio

n

joint

RCC Slab

OH WATER TANK/SWIMMING POOL/SUMP (INSIDE SURFACE) WATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATING

NOT TO SCALE G

rout

ing

on st

arte

r/con

struc

tion

joint

Page 28: Do it yourself Method statement

Defect Removal:        Grouting of slab and beam joint with Protekta SB Grout OR Protekta Hydrogrout.        Testing by water stagnation for 48 hours.        Re-grouting if seepage / dampness is noticed.        Surface cleaning by wire brush, removing loose mortar, dirt, grime etc followed by water cleaning using cleaning agent.        Coving the slab and wall joint using polymer modified mortar.Porosity Reduction:        Brush application of impregnation product called Protekta Base, which fills the pores with crystalline silicate growth. Covering 2 Sq. M/Ltr. Of Protekta Base.Surface Preparation:        Brush application of Protekta Duracoat slurry to a thickness of approximate 1 mm. This slurry coating has a very special chemical, which impregnates through pores and capillaries. It is water-based product and can be applied on moist surfaces. Sprinkle Sand to keep the surface rough for plastering/concreting.

OH WATER TANK/SWIMMING POOL/SUMP (INSIDE SURFACE)WATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATING]

[

Page 29: Do it yourself Method statement

For Floor:        Concreting with M20 mix using (12 mm jelly) average thickness 50 mm.        Emulsion KR2 to be added to increase water resistance (125 ml per cement bag)For Wall:        Specialized plastering with an average thickness of 15 mm to 18 mm.        Emulsion KR2 to be added to increase water resistance (125 ml per cement bag)        Curing for two weeks.Waterproofing:        Spray of Protekta Base.        Spray of Protekta G towards water repellency.        Brush coat of Protekta Unicoat on the entire surface. Coverage (1.5 to 2 Sq. M / Ltr.) surface area.         Sprinkle Silica Sand to keep the surface rough for plastering. [If required] Note: One coat of Protekta Unicoat for inner surfaces of STP, which is a acid alkali resistant coating.

Page 30: Do it yourself Method statement

For Floor:·     Concreting with M20 mix using (12 mm & 20 mm

jelly, ratio 50:50) average thickness 50 mm.For Wall:·     Specialized plastering with an average thickness of

18 mm to 20 mm.·     Emulsion KR2 to be added to increase water

resistance (125 ml per cement bag)·     Curing for two weeks.Waterproofing:·     Spray of Protekta Base.·     Brush coat of Protekta Unicoat on the entire

surface. Coverage(1.5 to 2 Sq. M / Ltr.) surface area.

Page 31: Do it yourself Method statement

Waterproofing up to 200 mm above finished floor level. Block Work 20 mm plaster mixed with Emulsion KR2 (sloped to weep hole) Brick bat Coba Protekta Duracoat

50 mm Screed r Protekta Base Grouting No. Item Toilet Utility

01. Sunken Depth 250 mm 150 mm 02. Waterproofing ht. Above Finished Floor level 300 mm 300 mm 03. Waterproofing Plaster thickness 20 mm 20 mm 04. Screed Thickness 50 mm 50 mm 05. Brickbat thickness 175 mm 75 mm

RCC Slab

Floor Slab

Sunken Toilet/Utility Waterproofing + Brickbat + Screed

Weep Hole O

Bore packing as detailed

Covi

ng w

ith p

olym

er m

odifi

ed m

orta

r

Page 32: Do it yourself Method statement

Sunken Area Waterproofing – Toilet/Utility/Balcony [200mm Sunk] Pre-treatment steps:• Surface cleaning by wire brush, removing loose mortar, dirt,

grime.• Testing by ponding water for 48 hours to know surface defects.Defect Removal:Construction Joint / Crack Repair• Packing beam and hollow block joint.• Create “V” groove to ½” depth and clean the surface with

cleaning.• Pour into of Protekta Base up to the neck of the groove followed

by water.• Pour additional Protekta Base at areas were ingress is too much.• Remove excess Protekta Base from the surface and clean it again

with brush coat of Protekta Flexjoint.• Packing the groove with silica sand mixed with Protekta Sealant

400.• Chemical Grouting by Protekta Seal ABC (If Required)• Block Honeycombs / Voids if excessive leakage found by chemical.Porosity Reduction:• Spray of Crystallization product called Protekta Base with a low

pressure.• Spray excessive Protekta Base at weak area.

Page 33: Do it yourself Method statement

Surface Preparation:• Spread a slurry (Brush application) Protekta Duracoat on

the slab and wall up to 300 mm above finished floor level.Floor & Wall Plastering:• Plastering with C:M 1:4. In the floor creating gradient

towards weep hole. Protekta KR2 to be added to mortar at 125 ml/bag of cement.

• Spray of Protekta Base.• Curing cum testing for 7 days.Area Calculation = Floor + Wall up to 300 mm above

finished floor level.

Bore packing in the wall:• Clean the surface thoroughly.• Brush coat of Protekta Base.• Brush coat of Elastomeric coating, Protekta Flexjoint

around the pipe• Application of Protekta Duracoat slurry on the bore surface.• Packing the bore with M20 grade concrete by using 12 mm

downsize jelly. Protekta KR2 to be added in the concrete• Brush coat of Protekta Base• Brush coat of Protekta Flexjoint.• Curing for 7 days

Page 34: Do it yourself Method statement

Waterproofing & Plastering

Coving with polymer modified cement mortar with 500 Sloped screed Protekta Base Protekta Unicoat Protekta G Protekta Duracoat

Gro

utin

g on

star

ter/c

onstr

uctio

n jo

int

RCC Slab

PLANTER BOX WATERPROOFING WATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATING

NOT TO SCALE

Gro

utin

g on

star

ter/c

onstr

uctio

n joi

nt

Page 35: Do it yourself Method statement

PLANTER BOX WATERPROOFINGWATERPROOFING + SCREEDING /PLASTERING + ELASTOMERIC COATINGSunken Toilet (100 mm Sunk)• Surface cleaning by wire brush, removing loose mortar, dirt, grime

etc followed by water cleaning using Protekta Cleaning Agent.• Testing by ponding water for 48 hours to know surface defects.Defect Removal:a. Construction Joint / Crack Repair / Through Hole:• Packing beam and hollow block joint• Create “V” groove to ½” depth and clean the surface with cleaning

agent.• Pouring of Protekta Base at areas were ingress is too much.• Remove excess Protekta Base from the surface and clean it again

with wire brush.• Brush coat Protekta Flexjoint.• Packing the groove with silica sand mixed with Protekta Sealant

400 in the ratio of 1:2 and brush coat Protekta Flexjoint at the same areas after 24 hours.

b. Chemical Grouting by Protekta Seal ABC. (If Required)• Block Honeycombs / Voids if excessive leakage found by chemical

grouting.Porosity Reduction:• Spray of crystallization product called Protekta Base with a low

pressure pump followed by water curing for 2 to 3 times at intervals of 2 hours between each curing (Coverage 2 to 2.5 Sq.M. / Ltr)

• Spray excessive Protekta Base at weak areas.

Page 36: Do it yourself Method statement

Surface Preparation:• Spread Protekta Duracoat slurry (Brush application)Concreting:• Filling with M20 grade concrete (using 12 mm & 20 mm jelly, mix

ration 2:1). Following additives to be mixed.• Add Protekta Emulsion KR2 towards water resistance (125ml per

cement bag)Waterproofing:• Aftter 24 hours of curing, re-spray of Protekta Base with low-

pressure pump• Packing the floor / wall joints with Protekta Sealant 500 mixed

with cement.• Brush coat of Protekta Unicoat at floor and wall joints up to 300

mm of wall surface.• Final testing for y days.Area CalculationFor Waterproofing = Floor + Wall up to 300 mm above finished

floor levelFor Concreting = Floor only

Bore Packing:• Brush coat of Protekta Base followed by Protekta Flexjoint

surrounding the bore area.• Coat Protekta Flexjoint and smear silica sand for better adhesion

between PVC pipe and concrete.

Page 37: Do it yourself Method statement

RCC Slab

Protekta EJR Thermocol Packing

Protekta Flexjoint

Sealant 400 Mortar + Non-stick tape

Expansion Joint

Page 38: Do it yourself Method statement

Expansion JointHorizontal Expansion Joint:       Removal of thermocole / Shalitex board up to 20 mm from top & Clean the surface thoroughly       Brush coat of Protekta Sealant 400 Special as primer on side walls.\• Application of Special Sealant 400 based mortar on top of thermocole / Shalitex Board       Fill the joint with Protekta EJR (H) up to top (in multiple fills of app. 3 mm to 4 mm each fill)       Application of mortar prepared with sealant 400.• Concreting / Plastering as mechanical protection.Vertical Expansion Joint:        Removal of thermocole / Shalitex board up to 15 mm from top &

Clean the surface thoroughly        Brush coat of Protekta Sealant 400 Special as primer.         Filling the joint with EJR Vertical        Brush coat of Protekta Abrasion result as mechanical protection

Page 39: Do it yourself Method statement

Construction Joint / SlabCracksProtekta Flexjoint

F400 Mortar Packing

Crystallization Gel of Protekta Base

Construction Joint Crack

Page 40: Do it yourself Method statement

Construction Joint / Slab Cracks• Create “V” groove to ½ “ depth and clean the

• surface with cleaning agent.• Pouring of Protekta Base up to the neck of the

groove followed by water washing.• Pour additional Protekta Base at areas was

ingress is too much.• Remove excess Protekta Base from the

surface and clean it again with wire brush.• Brush coat Protekta Flexjoint.• Packing the groove with silica sand mixed with

Protekta Sealant 400 in the ratio of 1:2 and brush coat Protekta Flexjoint at the same areas after 24 hrs

Page 41: Do it yourself Method statement

Products Used1. Grouting Products:

• Protekta SB• Protekta Hydrogrout• Protekta ABC• Protekta Grip (2 component)

2. Crystallisation / Gel Formation:

• Protekta Base.

Page 42: Do it yourself Method statement

• Bonding Layer* Protekta Duracoat* Protekta Sealant 500

• Admixtures:* Protekta Emulsion KR2* Protekta GL – 8* Anti Shrinkage AC – 1

• Water Repellency:* Protekta G* Protekta Micro emulsion.

Page 43: Do it yourself Method statement

•Elastomeric Coating:* Protekta Flexjoint.* Protekta Unicoat.

•Abrasion Resistant Layer:* Protekta Abrasion

•Polymers for Mortar modifying:* Protekta Sealant 400* Protekta Sealant 500

Page 44: Do it yourself Method statement

Dow

n ta

nk p

ipe

Waterproofing Treatment

Construction Joint Repair

COMBO SOLUTION FOR THERMAL INSULATION 

Additional Thermal insulation layer [Protekta KP]

Waterproofed Lightweight Concrete Average thickness 75 mm to 100 mm

50 mm

Coving

Parapet Wall

Page 45: Do it yourself Method statement

TREATMENT DETAILSI. WATERPROOFING:

- Chipping, Cleaning & Testing.- Defect Removal : Repair of Construction Joints.

: Honeycomb / Hollowness- Crystallisation application.- 2 coats of Polyurea Eleastomeric coatings.

II. SLOPE CREATION WITH THERMAL INSULATION MATERIAL:- Density = 780 Kg/Cu. M- Strength = > 10 mpa- Av. Thickness = 100 mm- Thermal Conductivity = 0.125 Kcal/hrs/m2/C

III. PLASTERING LAYER OF 15MM TO 18 MM- 1:4 Mix.- Emulsion KR2 added.- Fibre mesh applied

IV. Additional Thermal Shield:- 2Coats of Protekta Thermal Flexicoat.- Thermal Conductivity = 0.032 Kcal/hrs/m2/C

- Average thickness = 1 mm to 1.5 mm.