dnv quick reference

Upload: aekjay

Post on 03-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Dnv Quick Reference

    1/2

    PT TD ENERGY SERVICESHeartline Centre Bldg 5th Fl,

    Jl. Permatasari No. 1000

    Villa Permata, Lippo Karawaci

    Tangerang 15810 Indonesia

    Phone : +62 21 55658270

    Fax : +62 21 55657271

    DefinitionofanOffshoreContainer

    Portableunitwithamaximumgrossmassof25,000kgs(55,000lbs)forrepeateduseinthe

    transportofgoodsorequipment,ashandledinopenseasto/fromorbetweenfixedand/or

    floatinginstallationsandships.

    DesignReview(CaseApproval)

    Fordesignreviewthefollowingdocumentationshouldbesubmitted:

    Drawings

    Dimensions

    Materials

    Welddetails

    Weights

    Slingangle

    Calculations

    CaseApprovalisjobspecificforaknownbatchandonlyvalidforthatbatch.

    Ifthe intention istomanufactureseveralovera period of timeTypeApprovalshouldbe

    requested.Thiswouldbevalidfor4years,andcanberenewedforlongerifrequired.

    Materials

    Thedesigntemperatureofthecontainermustbeaminimumof20C;

    therefore, the materials chosen should be suitable for this temperature range, have the

    requiredductility,befullykilled,andhavenoageingproperties.

    FabricationSurveys

    DNV has defined inspection points and competent, trained Surveyors with extensive

    experienceinthecertificationofOffshoreContainers.

    WeldingProcedures,WelderQualification

    Welding Procedures and Welder Qualifications must meet the following recognized

    standardsforDNVapproval:

    ASMEIX

    AWSD1.1

    BSEN287pt1

    BSEN288pt3

    NB.AllproceduresarerequiredtohaveCharpyImpacttestsatWCL,FL,FL+2&FL+5

    LoadTesting

    Forapproval,aprototypefromeachdesignbatchrequiresfullprototypetestswitnessedby

    DNVasfollows:

    DropTest@GrossWeight

    [email protected]

    [email protected]

    Subsequentcontainersrequireonlythe4pointlift,batchtestedasperBSEN12079

    (ExceptionbeingprototypetestswhichareonlyvalidforthesameFabricator)

  • 7/28/2019 Dnv Quick Reference

    2/2

    PT TD ENERGY SERVICESHeartline Centre Bldg 5th Fl,

    Jl. Permatasari No. 1000

    Villa Permata, Lippo Karawaci

    Tangerang 15810 Indonesia

    Phone : +62 21 55658270

    Fax : +62 21 55657271

    Slings

    TheSlingiscertifiedaspartoftheContainerandshouldbekeptwiththeContaineratall

    times.Asthedesigntemperatureisaminimumof20C,theslingcomponentsshouldbe

    TypeApproved,however,componentssuppliedwith3.1Bcertificatesmaybeaccepted.The

    grossweightshouldincludetheweightofthesling.

    FinalInspection

    After the painting and fitting of the markings, a DNV Surveyor will carry out the final

    inspectionandreviewofasbuiltdocumentation.

    If successful, the DNV decal will be affixed and a DNV Inspection Release Report and

    OffshoreContainerCertificatewillbeissued.

    BSEN12079(1999):DNVapprovaltoDNV2.71automaticallyincludesapprovaltoBSEN

    12079.

    IMO: DNV 2.71 also complies with IMO Circular MSC I Circ. 860 "Guidelines for the

    ApprovalofOffshoreContainershandledinOpenSeas"

    IMDG:DNV2.71Recognized&acceptedbyIMDGforthetransportationofdangerous

    goods.

    DNV2.71OffshoreServiceContainers:Standardforelectrical,HVAC,PA,Alarms,Passive

    PFP,Fire&GasDetection,etc.

    UKOOAGuidelinesforthesafepacking&HandlingofCargotoandfromOffshorelocations

    Issue11SSUE2Nov2002:RecognizesuseofDNV2.71&BSEN12079fornewfabrications.

    QualitySystemCertification:FabricatorsofOffshoreContainersarerequiredtoimplement

    aqualitysystemapprovedtoIS09002.

    PeriodicInspectionsandAddedValue

    DNV 2.71/BS EN 12079 are based on annual inspection cycles using these standards,

    approximately66%savingsaregeneratedoverthelifetimeofacontainerwhencomparedto

    othermethodsofinspectioncertification.

    OtheradvantagesofDNV2.71

    CertifiedContainers:

    Stronger

    FewerRepairs

    LongerLasting

    HighResaleValue

    BetterQuality

    SaferUnitMaybeusedworldwide

    ModificationsandRepairs

    Allmodifications&repairstoprimarystructureshouldbecarriedoutwithDNVinvolvement

    toretainthecontainercertification.

    (Source:Informationcompiledfromwww.dnv.comandDNV2.71)