Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Onyx Gas Capture and Flaring Onyx Gas Capture and Flaring ProjectProject
Alexandria, Egypt Alexandria, Egypt
Amr Abdel-Aziz, Ph.D. Integral Consult,
Egypt
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
BackgroundBackground
Onyx Alexandria is owned by Veolia Environment
Veolia is Ranked 1st in Europe and 2nd worldwide in the field of solid waste collection and disposal
Operates in 33 countries with 68,000 employees
Onyx AlexandriaOnyx Alexandria
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
BackgroundBackground
18 district served with a total area of 7,200 km2
2,700 t/d to be collected, part composted and the
remaining is landfilled Biogas collection and leachate treatment systems
should be installed
No biogas capture rate specified in the contract
ContractContract
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Location of LandfillsLocation of Landfills Borg El Arab (All seasons except summer) El Hammam (Summer season)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Project DescriptionProject Description
A biogas collection system is installed
Collected biogas is utilized for leachate treatment
Onyx is not obliged to collect excess methane not needed for leachate treatment
Will install additional 3 flaring units of capacity 1,500 m3/h each to flare excess methane
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Project DescriptionProject Description
Biogas CollectionBiogas Collection Leachate CollectionLeachate Collection
Leachate TreatmentLeachate Treatment
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline – AM0002Baseline – AM0002
Onyx is responsible for all aspects of the landfill
Contract awarded through a competitive bid
Onyx should collect the biogas (no specific quantity)
quantity used for leachate treatment is the baseline
No other landfill in Egypt collects and flares biogas
No generation of electricity using the captured landfill
gas occurs (may be considered in the future)
ApplicabilityApplicability
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - ApplicationFirst order decay model – IPCC guidelines
y to0t
t)k(ytcontract,oyprojected, e*Waste*L*kCH4
CH4projected,y: Methane projected to be generated during a given yearK: Decay rate
Lo: m3 CH4 / t MSW
Wastecontract,t: Waste projected to be lanfilled at year t
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
K depends on local conditions e.g. temp., moisture content of MSW, pH, and nutrients
IPCC guidelines ranges from 0.005 to 0.4 per year
US EPA 0.1 for wet conditions
Moisture content in Alexandria waste is 60%
K assumed 0.05 for conservativeness
Assumption of kAssumption of k
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
12
16*F*DOC*DOC*MCFL fo
MCF Methane correction factor assumed 1
DOC Degradable organic carbon assumed 0.19 (IPCC recommends 0.21 for Egypt)
DOCf Fraction of organic carbon converted to landfill gas (assumed 0.77)
F Fraction of CH4 in landfill gas (assumed 0.5)
Estimation of LEstimation of Loo
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
0.E+00
1.E+07
2.E+07
3.E+07
4.E+07
2002 2003 2004 2005 2006 2007Year
Meth
an
e (
m3/y
r) .
y to0t
t)k(ytcontract,oyprojected, e*Waste*L*kCH4
W03 W04 W05W06
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
-5,000,000
10,000,00015,000,00020,000,00025,000,00030,000,00035,000,00040,000,00045,000,00050,000,000
2000 2002 2004 2006 2008 2010 2012 2014 2016Year
Met
han
e (m
3)
Projected Methane Generated - BAProjected Methane Generated - BA
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
Projected Methane Generated - HAProjected Methane Generated - HA
0
5000000
10000000
15000000
20000000
25000000
30000000
2000 2002 2004 2006 2008 2010 2012 2014 2016
Year
Met
han
e (m
3)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
Methane Needed for Leachate and Methane Needed for Leachate and 20% of Generated Methane - BA20% of Generated Methane - BA
-1,000,0002,000,0003,000,0004,000,0005,000,0006,000,0007,000,0008,000,0009,000,000
10,000,000
2000 2002 2004 2006 2008 2010 2012 2014 2016Year
Met
hane
(m3)
CH4 Needed for Leachate
20% of Generated CH4
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
Methane Needed for Leachate and Methane Needed for Leachate and 20% of Generated Methane - HA20% of Generated Methane - HA
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
2000 2002 2004 2006 2008 2010 2012 2014 2016
Year
Met
hane
(m3)
CH4 Needed for Leachate20% of Generated Methane
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
Baseline Methane Emissions (m3)Baseline Methane Emissions (m3)
0
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
2005 2007 2009 2011 2013 2015Year
Met
han
e (m
3)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - ApplicationBaseline - Application
Baseline Methane Emissions (t CO2e)Baseline Methane Emissions (t CO2e)
0100,000200,000300,000400,000500,000600,000700,000800,000900,000
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
Year
Em
iss
ion
s t
CO
2e
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Baseline - AdjustmentBaseline - Adjustment
yyprojected,yproject, FP*CH4CH4
contract
actual
ycontract,
yactual,ycontract,ybaseline, R
R*
Waste
Waste*CH4CH4
yyprojected,ycontract, FD*CH4CH4
CH4contract,y: Methane required to be flared each year as per contractFD: Fraction of methane collected in baseline
CH4baselinr,y: Methane specified in contract adjusted by actual waste and actual % CH4 in LFG
R: Fraction of CH4 in LFG
Project Project
FP: Fraction of methane collected in projectCH4flared,y Actual methane flared during year y
yflared,CH4Correct
Correct
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
AdditionalityAdditionality
The baseline emissions are based on the approval of the leachate treatment system
For other landfills, systems approved by the government are passive collection system (max. efficiency 20%)
No regulations for biogas collection -- only guidelines which does not mandate the use of specific technology
Additional flaring equipment additional costs No expected additional revenues continue business as usual is most attractive course of action
Economic
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Emission ReductionEmission Reduction
ERy: GHG reduction in t CO2e
ER_CH4y: Methane emission reduction in m3
CF: 0.000662 t CH4/m3 CH4
GWP_CH4: 21 (Global warming potential for CH4)
GWP_CH4*CF*ER_CH4ER yY
ybaseline,yflared,y CH4CH4ER_CH4
Project Baseline
CH4flared,yCH4baseline,y
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Emission ReductionEmission Reduction
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
2005 2007 2009 2011 2013 2015Year
Met
han
e (t
CO
2e)
Annual Emission Reduction (t CO2e)Annual Emission Reduction (t CO2e)
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Emission ReductionEmission Reduction
e21to11.5y tCO241,864,469,076 -1,647,255 6,580,572ER_CH4
Project Baseline
6,580,572 t CO2e
1,647,255 t CO2e
Corrected by monitoring CH4 flar ed Corrected by monitoring actual waste and % CH4
in LFG
CO2 from Electricity Generated on-site
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Monitoring MethodologyMonitoring Methodology
Applicability
– Project activities that reduce green house emissions through landfill gas capture and flaring
– Baseline established by a public concession contract
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Monitoring MethodologyMonitoring MethodologyMonitoring emissions from project activity
– Measured LFG (c) % CH4 in LFG (c) Temp. (c) Pressure (c) SW disposed (d)
– Calculated Amount of methane flaring for baseline (a) Amount of methane collected in addition to baseline (a) CO2e reduced (a)
a annual, d daily, c continuous
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Monitoring MethodologyMonitoring Methodology
Quality Control / Quality Assurance Procedures
– Procedure for equipment calibration
– Will be included in ISO 9000/14000 certification process
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Contract duration is 15 years
Started in October 2001 and ends in October 2016
Project expected to start in June 2005
11 y 4 m will remain in contract duration
First crediting period is 7 years
Crediting PeriodCrediting Period
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Flaring will also destroy compounds in the biogas such as VOCs
Negative impacts of methane:
– Odour– Risk of explosion
Negative impacts of VOCs – Odour
– Toxicity
– Carcinogenic
– Photochemical reactivity O3 health effects and damage to crops and plants
Environmental ImpactsEnvironmental Impacts
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
PDD: Final Draft
Financing Situation: Self Financed
DNA Approval: Preliminary approval
Project Implementation: Not yet
Project StatusProject Status
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Bioreactor Landfills at Greater Bioreactor Landfills at Greater Cairo Cairo
PIN
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Waste is actively degraded rather than decomposed slowly
Leachate will be recirculated and monitored
Gas generated will be collected and flaredA pilot project has been implemented at Waffa and
Amal Landfill in Cairo and is currently under evaluation
Project DescriptionProject Description
Djerba Carbon Exhibition Djerba, September 22-24, 2004
Onyx Gas Capture and Flaring Project
Crediting Period: 14 years.
Project Start Date: 2006
Annual CERs Expected: 430,000 (average)
Total expected CERs: 6.5 M
Expected CERsExpected CERs