division monitoring, evaluation, & plan adjustment …eskwela, phil-iri, yds,best-math, gulayan...

374
DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT (DMEPA) 1

Upload: others

Post on 27-Mar-2020

50 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DIVISION

MONITORING,

EVALUATION,

& PLAN

ADJUSTMENT(DMEPA)

1

Page 2: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

One DepEd. One PAMPANGA.

Page 3: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DMEPA

Page 4: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

MEPA

STATUS OF FD's PROGRAMS

& PROJECTS

*PHYSICAL ACCOMPLISHMENTS

STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

FOR THE QUARTER

ISSUES AND RESOLUTIONS BY

CATEGORY

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

for SPECIAL PROGRAMS

& PROJECTS

MEPA

Page 5: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

MEPA

Monitoring, Evaluation, &

Plan Adjustment (MEPA)

is both a strategy and a

mechanism, is participative

and collaborative, and

involves the collection,

validation, analysis, and

reporting of appropriate,

relevant, and accurate

information necessary for the

adjustment of work plans and

strategies.

• Provides the division

management:

information on the

implementation of the

programs and projects which

serve as basis for plan adjustment

information on the

organizational health and

performance which serve as

basis in determining appropriate

strategies and interventions to

improve organizational

effectiveness & resource support

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 6: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

MEPA

In line with the MEPA system institutionalization

in the department, the periodic (quarterly) monitoring

and evaluation of the progress of the division using

the MEPA Technology is necessary to continuously

improve the delivery of education services to

achieve desired results and sustainability of education

outcomes, and to enhance organizational

performance for effective and efficient fulfillment of

the division mandate.

Page 7: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 7

• Individual, team, & organizational effectiveness

Organizational Effectiveness

Page 8: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 8

• Availability and adequacy of resource requirements

Organizational Resource Support

Page 9: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Post DMEPA

DMEPA Proper

Pre-DMEPA

Page 10: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Pre-DMEPA

• Data collection • Consolidation of

FD’s accomplishments

• Reporting of Balances, Reasons for Variance

• Value -Added Contributions

• Lessons Learned

DMEPA Proper

• Validation of quantitative & qualitative information gathered by the IMET

• Reporting

Post DMEPA

• Adjustment of Plans

• Report writing

Page 11: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

ORGANIZATIONALEFFECTIVENESS

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 12: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

STATUS OF FD's PROGRAMS & PROJECTS

*PHYSICAL ACCOMPLISHMENTS

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 13: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Regulatory

& Developmental

Services to

Private Schools

Service Delivery

Curriculum

Page 14: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Curriculum

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 15: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Education Policy

Development Program

Objective: Ensured the full implementation of the articulated basic education curriculum including its contextualization , indigenization, integration and

innovation by leading in the validation and production of at least 16 learning materials in the

different learning areas/curricular/special programs in Grades 3 and 4 and in anchoring instruction on

learners' creativity at the end of FY

Page 16: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 16

Program / Project / Activity:

• Creation of localized, indigenized, contextualized materials in Grades 3 & 4 (16)

Physical Accomplishments

Page 17: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

16

Physical Accomplishments

Page 18: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Education Policy

Development Program

Objective: Managed the monitoring and evaluation of division learning outcomes, SHS learners' higher

education and employability readiness of 84 Senior High Schools

Page 19: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 19

Program / Project / Activity:

• Validation of 83 4th Quarter Periodic Tests across 8 learning areas

Physical Accomplishments

Page 20: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

254 83 83 83 83 100% 100%

Physical Accomplishments

Page 21: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 21

Program / Project / Activity:

• Monitoring of Quarterly Examination Results

Physical Accomplishments

Page 22: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

4 2 2 100%

Physical Accomplishments

Page 23: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 23

Program / Project / Activity:

• Validation of Least Mastered Skills and Test Item Analysis in 83 subjects of EPSs

Physical Accomplishments

Page 24: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

249 83 83 83 83 100% 100%

Physical Accomplishments

Page 25: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 25

Program / Project / Activity:

• Validation of low performing schools within the district / cluster for appropriate actions / interventions

Physical Accomplishments

Page 26: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

120 120 120 100%

Physical Accomplishments

Page 27: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 27

Program / Project / Activity:

• Collation of competencies difficult to teach in elementary and secondary across 8 learning areas for appropriate actions

Physical Accomplishments

Page 28: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

83 83 83 100%

Physical Accomplishments

Page 29: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 29

Program / Project / Activity:

• Development of interventions by subject-focused for EPSs

Physical Accomplishments

Page 30: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

80 8 8 11 10 100% 100%

Physical Accomplishments

Page 31: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 31

Program / Project / Activity:

• Development of interventions by subject-focused for PSDSs

Physical Accomplishments

Page 32: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

99 33 57 100%

Physical Accomplishments

Page 33: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 33

Program / Project / Activity:

Tracer Study:

NC Holder (3783)

Work (3369)

College (13 876)

Entrepreneurship (70)

School Leavers (140)

Graduates (17 454)

Physical Accomplishments

Page 34: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 35: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Education Policy

Development Program

Objective: Approved educational research (applied and action) that are anchored to the Reformulated Regional Research Agenda V

2 to improve teacher quality, instruction, school management and leadership of 438 public elementary schools, 117 junior high

schools, and 87 senior high schools

Page 36: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 36

Program / Project / Activity:

• Conduct of action /applied research

Physical Accomplishments

Page 37: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

5 1 1 4 2 100% 100%

Physical Accomplishments

Page 38: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 38

Program / Project / Activity:

• Validation / approval of action / applied researches on curriculum

Physical Accomplishments

Page 39: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 29 25 29 25 100% 100%

Physical Accomplishments

Page 40: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 40

Program / Project / Activity:

• Evaluation of educational researchers (applied and action) submitted to the division office to improve learning outcomes

Physical Accomplishments

Page 41: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 33 33 180 84 100% 100%

Physical Accomplishments

Page 42: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 42

Program / Project / Activity:• Submission of Research Proposals

for BERF

Physical Accomplishments

Page 43: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

20 5 5 5 5 100% 100%

Physical Accomplishments

Page 44: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 44

Program / Project / Activity:

• Evaluation of Innovations

Physical Accomplishments

Page 45: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 4 4 5 6 100% 100%

Physical Accomplishments

Page 46: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Education Policy

Development Program

Objective: Approved the coordination and integration of the provision of Technical Assistance

to facilitate the improvement of teacher quality, instruction, school management and leadership

and the development of better schools to 438 public elementary schools, 117 junior high schools, and 87

senior high schools at the end of the FY

Page 47: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 47

Program / Project / Activity:

• Technical Assistance on Instructional Supervision / Curriculum Implementation / SIP / AIP / resource generation for EPSs

Physical Accomplishments

Page 48: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

900 200 200 261 422 100% 100%

Physical Accomplishments

Page 49: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 49

Program / Project / Activity:

• Technical Assistance on Instructional Supervision / Curriculum Implementation / SIP / AIP / resource generation for PSDSs

Physical Accomplishments

Page 50: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

2,970 660 660 833 864 100% 100%

Physical Accomplishments

Page 51: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 51

Program / Project / Activity:

• Crafting of training proposals and oversee the implementation

Physical Accomplishments

Page 52: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

22 2 13 2 13 100% 100%

Physical Accomplishments

Page 53: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 53

Program / Project / Activity:

• Monitoring of special programs (SSES / SSC, SPFL, SPS, DAP-ELLN, SPED, Multigrade, ALIVE / Madrasah, IPED,KCEP, SPJ, OHS, Phil-IRI, YDS, Best-Math, Gulayan sa Paaralan) for EPSs

Physical Accomplishments

Page 54: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

132 33 33 60 194 100% 100%

Physical Accomplishments

Page 55: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 55

Program / Project / Activity:

• Monitoring of special programs (SSES / SSC, SPFL, SPS, DAP-ELLN, SPED, Multigrade, ALIVE / Madrasah, IPED, KCEP, SPJ, OHS,YDS,Best-Math) for PSDSs, BrigadaEskwela, Phil-IRI, YDS,Best-Math, Gulayan saPaaralan) for PSDSs

Physical Accomplishments

Page 56: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1089 363 867 100%

Physical Accomplishments

Page 57: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 57

Program / Project / Activity:

• Technical Assistance on 10 Special Co-Curricular Competitions within the fiscal year with at least 20 winnings in regional / national competitions

Physical Accomplishments

Page 58: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

10 4 1 4 1 100% 100%

20 9 16 100%

Physical Accomplishments

Page 59: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 59

Program / Project / Activity:

• Coordination of service requests for technical support of DCP equipment to warranty providers

Physical Accomplishments

Page 60: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 2 2 2 2 100% 100%

Physical Accomplishments

Page 61: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 61

Program / Project / Activity:

• Processing of requests for DepEd Email Accounts

Physical Accomplishments

Page 62: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 352 352 #DIV/0! 100%

Physical Accomplishments

Page 63: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 63

Program / Project / Activity:

• Provision of technical assistance to Division Office and schools in the different ICT programs and projects

Physical Accomplishments

Page 64: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 22 22 100%

Physical Accomplishments

Page 65: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 65

Program / Project / Activity:

• Preparation of Memorandum of Agreement (MOA) between Donor and Donee as requested

Physical Accomplishments

Page 66: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 1 1 100%

Physical Accomplishments

Page 67: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 67

Program / Project / Activity:

• Assistance in the conduct of Nutritional Assessment

Physical Accomplishments

Page 68: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 1 1 100% 100%

Physical Accomplishments

Page 69: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 69

Program / Project / Activity:

• Assistance in the conduct of School-Based Deworming Program

Physical Accomplishments

Page 70: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 71: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 71

Program / Project / Activity:

• Assistance in the conduct of School-based Immunization (SBI) Program

Physical Accomplishments

Page 72: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 73: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Education Policy

Development Program

Objective: Ensured the integration of the themes of the creative school

framework across all learning areas

Page 74: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 74

Program / Project / Activity:• 1. Creation of Creative/Innovative Programs of EPSs

1.1 Project TEKNO 1.2 Project CITIZEN 1.3 Project MATH/BEST Math School Program 1.4 Project E-Makabasa1.5 Balanced Reading Program for English & Filipino 1.6. Putting up of SPJ for Secondary 1.7 Investigatory Projects in Science & Lesson Exemplars 1.8 E-Summer Youth Camp for Select Junior & Senior HS students 1.9 3 ACTS of Goodness/Tindahan ng Katapatan (EsP) 2.0 Project (-TEACH 2.1 EPP Model School /TLE Model Schools TLE Teachers' Qulalifications (NC II)/Integration of Organic Farming Practices in Agriculture 2.2 Takbo Para sa Libro (LRMS)

Physical Accomplishments

Page 75: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

12 3 6 3 6 100% 100%

Physical Accomplishments

Page 76: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 76

Program / Project / Activity:

• Integration of creative schools framework in all elementary & secondary schools

Physical Accomplishments

Page 77: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

557 557 557 100%

Physical Accomplishments

Page 78: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 78

Program / Project / Activity:

• Attendance to convergence / advocacy programs for strategies, alternative delivery models, etc.

Physical Accomplishments

Page 79: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

8 7 7 100%

Physical Accomplishments

Page 80: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 80

Program / Project / Activity:

• Organized Convergence with TEIs to produce better teachers

Physical Accomplishments

Page 81: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 82: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Service Delivery

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 83: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Facilitated the budget preparation to support the implementation of the K to 12

curriculum and operations of the division office by obtaining the 100% level of approval for

endorsement to Department of Budget and Management (DBM)

Page 84: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 84

Program / Project / Activity:

• Submission of FARS and BEDS online thru the http://urs.dbm.gov.ph

Physical Accomplishments

Page 85: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 4 4 4 4 100% 100%

Physical Accomplishments

Page 86: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 86

Program / Project / Activity:

• Consolidation of Budget Proposal for the ensuing year

Physical Accomplishments

Page 87: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 88: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 88

Program / Project / Activity:

• Preparation of Special Budget Request for unfunded filled positions

Physical Accomplishments

Page 89: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 2 2 100%

Physical Accomplishments

Page 90: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 90

Program / Project / Activity:

• Coordination with all Program takers the budget allocation received from Regional & Central office and the evaluation of their Work & Financial Plan (as they come)

Physical Accomplishments

Page 91: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 6 11 6 11 100% 100%

Physical Accomplishments

Page 92: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 92

Program / Project / Activity:

• Stage 1: Awareness & Foundation Course for ISO 9001:2015

Physical Accomplishments

Page 93: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 5 5 100%

Physical Accomplishments

Page 94: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Ensured the maintenance of the effectiveness and continual improvement of the SDO QMS by achieving the ISO Certification at

the end of the FY

Page 95: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 95

Program / Project / Activity:

• Stage 1: Awareness & Foundation Course for ISO 9001:2015

Physical Accomplishments

Page 96: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 97: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 97

Program / Project / Activity:

• Stage 2: Documentation System for ISO 9001:2015

Physical Accomplishments

Page 98: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 99: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 99

Program / Project / Activity:

• Stage 3: Risk Assessment for QMS & Practice for Good Housekeeping

Physical Accomplishments

Page 100: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 101: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 101

Program / Project / Activity:

• Stage 4: Internal Quality Audit

Physical Accomplishments

Page 102: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 103: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 103

Program / Project / Activity:

• Stage 4: Internal Quality Audit

Physical Accomplishments

Page 104: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 105: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 105

Program / Project / Activity:

• Stage 5: Final Audit for ISO Alignment

Physical Accomplishments

Page 106: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1

Physical Accomplishments

Page 107: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 107

Program / Project / Activity:

• Stage 6: Surveillance Audit

Physical Accomplishments

Page 108: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1

Physical Accomplishments

Page 109: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 109

Program / Project / Activity:

• Stage 7: Surveillance Audit with Harmonized Internal Auditing with IQA Team

Physical Accomplishments

Page 110: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1

Physical Accomplishments

Page 111: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 111

Program / Project / Activity:

• Stage 8: Surveillance Audit

Physical Accomplishments

Page 112: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

3

Physical Accomplishments

Page 113: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 113

Program / Project / Activity:

• Facilitation in the creation and validation of PMs and WIMs

Physical Accomplishments

Page 114: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

219

Physical Accomplishments

Page 115: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Evaluated and approved the establishment of public schools learning centers of the based on the R.A. 9155 at the end of the

FY

Page 116: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 116

Program / Project / Activity:

• Recommendation for the establishment of public schools

Physical Accomplishments

Page 117: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 5 5 100%

Physical Accomplishments

Page 118: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Improved the relevance of the implementation of policies by releasing four (4)

localized policies on the improvement of teacher quality, instruction, school management

and leadership in the SDO at the end of the FY

Page 119: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 119

Program / Project / Activity:

• Criteria for OIC (Secondary Schools) / Designation of OIC in schools

Physical Accomplishments

Page 120: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 121: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 121

Program / Project / Activity:

• New policy on receiving documents (Records Unit)

Physical Accomplishments

Page 122: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 123: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 123

Program / Project / Activity:

• Submission of liquidation directly to the Accounting Unit

Physical Accomplishments

Page 124: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 125: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 125

Program / Project / Activity:

• Directive on preparation of Financial Data Entry System or FINDES (Cashier)

Physical Accomplishments

Page 126: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 127: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Ensured compliance with national standards in recruitment, selection and training of

staff and performance evaluation of SDO employees at the end of FY

Page 128: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 128

Program / Project / Activity:

• Evaluation and open-ranking of applicants for hiring / promotion (Non-teaching, MTs, HTs, related teaching)

Physical Accomplishments

Page 129: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 2 4 2 4 100% 100%

Physical Accomplishments

Page 130: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 130

Program / Project / Activity:

• Publication of Vacant Positions

Physical Accomplishments

Page 131: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 35 64 35 64 100% 100%

Physical Accomplishments

Page 132: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 132

Program / Project / Activity:

• Conduct of Initial Evaluation of Qualification of Applicants for Division Personnel Selection Board (PSB) Deliberation and Open Ranking

Physical Accomplishments

Page 133: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 6 4 6 4 100% 100%

Physical Accomplishments

Page 134: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 134

Program / Project / Activity:

• Processing of Appointments of Teaching and Non-teaching Personnel:● Original● Promotion● Transfer● Re-appointment● Re-employment.

Physical Accomplishments

Page 135: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 455 1209 455 1209 100% 100%

Physical Accomplishments

Page 136: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 136

Program / Project / Activity:

• Preparation of memoranda and advisory pertaining to human resource actions

Physical Accomplishments

Page 137: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 11 31 11 31 100% 100%

Physical Accomplishments

Page 138: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 138

Program / Project / Activity:

• Personnel Action on Requests for ERF and Reclassification

Physical Accomplishments

Page 139: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 207 207 100%

Physical Accomplishments

Page 140: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 140

Program / Project / Activity:

• Updating of PSIPOP in the Government Manpower Information System (GMIS): No. of teachers included in the plantilla

Physical Accomplishments

Page 141: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 285 1137 285 38 100% 3%

Physical Accomplishments

Page 142: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 142

Program / Project / Activity:

• Cleansing of all elementary schools' plantilla

Physical Accomplishments

Page 143: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

33 33 33 100%

Physical Accomplishments

Page 144: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 144

Program / Project / Activity:

• Processing of monetary and non-monetary benefits. (Salaries, PBB, PIB, PEI, Step Increment, Phil health, etc.)

Physical Accomplishments

Page 145: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 1562 1562 100%

Physical Accomplishments

Page 146: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 146

Program / Project / Activity:

• Conduct of Division Seminar on SBM: Higlighting the Key Elements of Effective Leadership & Governance

Physical Accomplishments

Page 147: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 148: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 148

Program / Project / Activity:

• Issuance of permit to conduct need-based trainings at the end of the calendar year

Physical Accomplishments

Page 149: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 54 67 54 67 100% 100%

Physical Accomplishments

Page 150: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 150

Program / Project / Activity:

• Conduct of one (1) leadership development training for school heads within the calendar year: Leadership and Management in the 21st Century Series: The School Head as Effective Communicator

Physical Accomplishments

Page 151: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 152: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 152

Program / Project / Activity:

• Facilitation and conduct of Youth Leadership Camp and Indoor Youth Leadership Training for Teachers

Physical Accomplishments

Page 153: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

2 2 2 100%

Physical Accomplishments

Page 154: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 154

Program / Project / Activity:

• District and Cluster Adopt-a-School Program Coordinators Conference

Physical Accomplishments

Page 155: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 156: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 156

Program / Project / Activity:

• District and Cluster Brigada Eskwela (BE) Coordinators Conference

Physical Accomplishments

Page 157: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 158: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 158

Program / Project / Activity:

• Provision of seminar / training on research

Physical Accomplishments

Page 159: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

2 1 1 1 1 100% 100%

Physical Accomplishments

Page 160: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 160

Program / Project / Activity:

• Conduct of Division Research Congress

Physical Accomplishments

Page 161: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1

Physical Accomplishments

Page 162: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 162

Program / Project / Activity:

• Conduct of Induction Program for Non-teaching personnel (SDO Proper & schools)

Physical Accomplishments

Page 163: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 164: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 164

Program / Project / Activity:

• Seminar on CAV for Private Schools

Physical Accomplishments

Page 165: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 166: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Recommended for approval the reclassification /

conversion / upgrading of items of teachers and officials at the district and division levels at the end of FY

Page 167: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 167

Program / Project / Activity:

• Processing of reclassification, conversion, & upgrading of items

Physical Accomplishments

Page 168: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 93 84 93 84 100% 100%

Physical Accomplishments

Page 169: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 169

Program / Project / Activity:

• Preparation of appointments of personnel whose items were converted, reclassed, & updated

Physical Accomplishments

Page 170: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 53 53 100%

Physical Accomplishments

Page 171: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Managed education data needed in planning by monitoring the updating of the learners'

profile in the EBEIS both for public and private schools and by attaining 100% completion of the

learners' profile of the438 public elementary schools, 117 junior high schools, and 87 senior high schools at the beginning and end of the school year

Page 172: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 172

Program / Project / Activity:

• Completion of updated learner's profile of 438 public elementary, 117 public secondary (JHS/SHS), 172 private schools and 2 SUCs for End Of School Year (EOSY) 2017-2018 inventory in the LIS

Physical Accomplishments

Page 173: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

727 727 727 100%

Physical Accomplishments

Page 174: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Managed effective allocation and utilization of

human, physical and financial resources of the SDO within the

prescribed period

Page 175: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 175

Program / Project / Activity:

• Identification of competencies

Physical Accomplishments

Page 176: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 177: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 177

Program / Project / Activity:

• Conduct of training needs assessment

Physical Accomplishments

Page 178: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 179: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 179

Program / Project / Activity:

• Updating of 201 files

Physical Accomplishments

Page 180: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 181: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 181

Program / Project / Activity:

• Agreement on percentage of performance KRAs & designation

Physical Accomplishments

Page 182: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 183: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 183

Program / Project / Activity:

• Deployment of employees

Physical Accomplishments

Page 184: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 185: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 185

Program / Project / Activity:

• Monitoring of the construction of classrooomsunder 2018 Basic Education Facilities Fund (BEFF) for 40 schools

Physical Accomplishments

Page 186: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 6 6 100%

Physical Accomplishments

Page 187: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 187

Program / Project / Activity:

• Evaluated the Repair of Classrooms for 66 schools under 2018 DepEd BEFF

Physical Accomplishments

Page 188: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 60 60 100%

Physical Accomplishments

Page 189: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 189

Program / Project / Activity:

• Crafting & implementation of Div. ICT Plan

Physical Accomplishments

Page 190: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 191: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 191

Program / Project / Activity:

• Crafting & implementation of Div. Physical Facilities Plan

Physical Accomplishments

Page 192: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 193: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 193

Program / Project / Activity:

• Crafting & implementation of Maintenance Plan for Equipment, Furniture & Fixtures

Physical Accomplishments

Page 194: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 195: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 195

Program / Project / Activity:

• Crafting & implementation of Maintenance Plan for Service Vehicles

Physical Accomplishments

Page 196: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 197: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 197

Program / Project / Activity:

• 5S Implementation

Physical Accomplishments

Page 198: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 199: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 199

Program / Project / Activity:

• Utilization of Notice of Cash Allocation (NCA) received and payment of Obligated amount

Physical Accomplishments

Page 200: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 5 9 5 9 100% 100%

Physical Accomplishments

Page 201: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 201

Program / Project / Activity:

• Submission of Bank Reconciliation Statement to Commission on Audit (COA) within 10 days upon receipt of bank statement from the Authorized Government Depository Bank (AGDB)

Physical Accomplishments

Page 202: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 3 3 0 0 0% 0%

Physical Accomplishments

Page 203: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 203

Program / Project / Activity:

• Consolidation and submission of Quarter, Semi-Annual and Annual Financial Reports to Deped Regional Office Proper

Physical Accomplishments

Page 204: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

6 1 2 1 2 100% 100%

Physical Accomplishments

Page 205: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 205

Program / Project / Activity:

• Preparation of Special Budget Request for unfunded filled positions

Physical Accomplishments

Page 206: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 2 2 100%

Physical Accomplishments

Page 207: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 207

Program / Project / Activity:

• Efficient Budget Utilization

Physical Accomplishments

Page 208: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

6600 1650 1650 1822 2319 100% 100%

Physical Accomplishments

Page 209: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Established and maintained systems for accountability in utilizing

resources of the SDO within the prescribed period

Page 210: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 210

Program / Project / Activity:

• Release of Salaries, Allowances and other benefits of employees

Physical Accomplishments

Page 211: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 651 1023 651 1023 100% 100%

Physical Accomplishments

Page 212: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 212

Program / Project / Activity:

• Record and update daily cash records

Physical Accomplishments

Page 213: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

48 12 12 12 12 100% 100%

Physical Accomplishments

Page 214: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 214

Program / Project / Activity:

• Receipt and Deposit Collection

Physical Accomplishments

Page 215: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 258 411 258 411 100% 100%

Physical Accomplishments

Page 216: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 216

Program / Project / Activity:

• Prepare and Submit reports:Collection & deposit (Bureau of Treasury, Centrally-managed Project, Provident Fund)Checks / ADA issuedReport of Accountability for Accountable Forms

Physical Accomplishments

Page 217: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 39 411 39 411 100% 100%

Physical Accomplishments

Page 218: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 218

Program / Project / Activity:

• Remittance of Government / Personal share to GSIS

Physical Accomplishments

Page 219: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 22 115 22 115 100% 100%

Physical Accomplishments

Page 220: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 220

Program / Project / Activity:

• Conduct of procurement and acquisition of goods and services:Agency Procurement Request (APR) Purchase Request(PR) Purchase Order (P.O) Memorandum of Agreement/Contract Job Orders

Physical Accomplishments

Page 221: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 40 166 43 166 100% 100%

Physical Accomplishments

Page 222: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 222

Program / Project / Activity:

• Receipt & inspection of supply / ies by the end users to be delivered within the target date. Inspection and Acceptance Report (IAR)

Physical Accomplishments

Page 223: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 40 45 41 45 100% 100%

Physical Accomplishments

Page 224: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 224

Program / Project / Activity:

• Issuance and distribution of deliveries within the target date Requisition and Issue Slip(RIS)Report of Supplies and Materials Issued (RSMI)

Physical Accomplishments

Page 225: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 450 476 457 476 100% 100%

Physical Accomplishments

Page 226: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 226

Program / Project / Activity:

• Maintenance of updated inventory record of properties within the prescribed period (Report on Physical Count of Inventory or RPCI / Report on Physical Count of Property Plant & Equipment or RPCPPE) district / cluster

Physical Accomplishments

Page 227: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

160 40 40 40 40 100% 100%

Physical Accomplishments

Page 228: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 228

Program / Project / Activity:

• Management of disposal of unserviceable materials and properties as per request by the accountable officer within the target date (Ispection & Inventory Report on Unserviceable Property or IIRUP)

Physical Accomplishments

Page 229: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 10 7 10 7 100% 100%

Physical Accomplishments

Page 230: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 230

Program / Project / Activity:

• 100% of Total MOOE Allocation of Non-Implementing Units is downloaded thru Cash Advance

Physical Accomplishments

Page 231: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

2308 577 577 570 544 99% 94%

Physical Accomplishments

Page 232: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 232

Program / Project / Activity:

• 100% of Total downloaded cash advance is fully liquidated

Physical Accomplishments

Page 233: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

2308 577 577 456 427 79% 74%

Physical Accomplishments

Page 234: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Performed oversight functions in the implementation of laws, policies,

programs, rules and regulations of 438 public elementary schools, 117 junior high schools,

and 87 senior high schools within DepEdresponsibility in the SDO at the end of the FY

Page 235: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 235

Program / Project / Activity:

• Technical Assistance in the Conduct of PISA Main Survey:Testing of Computer UnitsActed as Technical Staff during Main Survey

Physical Accomplishments

Page 236: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

6 6 6 100%

Physical Accomplishments

Page 237: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 237

Program / Project / Activity:

• Monitoring of Programme for International Student Assessment (PISA) 2018 Main Survey

Physical Accomplishments

Page 238: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 239: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 239

Program / Project / Activity:

• Preparation of School Report Card (SRC) Report

Physical Accomplishments

Page 240: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1110 555 555 100%

Physical Accomplishments

Page 241: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 241

Program / Project / Activity:

• Monitoring of Division Oplan Balik Eskwela(OBE)

Physical Accomplishments

Page 242: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 243: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 243

Program / Project / Activity:

• NAT 12 Monitoring

Physical Accomplishments

Page 244: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 245: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 245

Program / Project / Activity:

• QATAME of Division trainings, seminars

Physical Accomplishments

Page 246: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 17 17 100%

Physical Accomplishments

Page 247: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 247

Program / Project / Activity:

• Crafting of Assessment Test monitoring tool

Physical Accomplishments

Page 248: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 249: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 249

Program / Project / Activity:

• Consolidation and Submission of Adopt-a-School Program (ASP) Quarterly Report

Physical Accomplishments

Page 250: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

160 40 40 40 40 100% 100%

Physical Accomplishments

Page 251: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 251

Program / Project / Activity:

• Formalization of initial agreements and unities with groups and organizations and other external partners

Physical Accomplishments

Page 252: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 253: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 253

Program / Project / Activity:

• Initiation of new partnership agreements with external partners for joint undertakings

Physical Accomplishments

Page 254: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 2 2 100%

Physical Accomplishments

Page 255: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 255

Program / Project / Activity:

• Meeting for partnership formation with Academe and other institutions to develop SDO capacity

Physical Accomplishments

Page 256: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

2 2 2 100%

Physical Accomplishments

Page 257: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 257

Program / Project / Activity:

• Capacity building project of SDO registered guidance counselors and designated guidance teachers

Physical Accomplishments

Page 258: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 259: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 259

Program / Project / Activity:

• Refinement of School DRRM monitoring tool that focuses on data related to the 3 pillars

Physical Accomplishments

Page 260: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 261: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 261

Program / Project / Activity:

• Conduct of quarterly multi-hazard drills

Physical Accomplishments

Page 262: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 263: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 263

Program / Project / Activity:

• Revision of the SDO-formulated DRRM Orientation module by merging it with the DRRMS -related modules

Physical Accomplishments

Page 264: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 265: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 265

Program / Project / Activity:

• Conduct of Bantay Presyon Para Sa GuroProject in schools

Physical Accomplishments

Page 266: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

555 150 150 150 150 100% 100%

Physical Accomplishments

Page 267: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 267

Program / Project / Activity:

• Conduct of Health and Nutrition Education through trainings, orientations and lectures on different health and nutrition-related issues like HIV, AIDS, NDEP, Teenage Pregnancy, Mental Health, Feminine Hygiene, Deworming and Essential Health Care

Physical Accomplishments

Page 268: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

9 2 3 2 3 100% 100%

Physical Accomplishments

Page 269: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 269

Program / Project / Activity:

• Monitoring of the implementation of different health and nutrition programs:SBFPNDEP (Barkada Kontra Droga, Random Drug Test)ARHWinSTobacco Control ProgramUMDCBantay Presyon Para Sa Guro ProjectTeachers Health Welfare Enhancement ProgramSchool-based DewormingSchool-based ImmunizationWeekly Iron Folic AcidPhysical Examination (delegates, newly-hired teachers, etc.)

Physical Accomplishments

Page 270: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

48 12 12 12 12 100% 100%

Physical Accomplishments

Page 271: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 271

Program / Project / Activity:

• Conduct of tooth extraction / treatment (as requested)

Physical Accomplishments

Page 272: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 40 40 100%

Physical Accomplishments

Page 273: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 273

Program / Project / Activity:

• Conduct of Dental Health Education & Check Up

Physical Accomplishments

Page 274: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

350 105 35 180 49 100% 100%

Physical Accomplishments

Page 275: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 275

Program / Project / Activity:

• Coordination of GSP activities

Physical Accomplishments

Page 276: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

135 45 45 100%

Physical Accomplishments

Page 277: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 277

Program / Project / Activity:

• Coordination of BSP activities

Physical Accomplishments

Page 278: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

180 45 45 45 45 100% 100%

Physical Accomplishments

Page 279: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 279

Program / Project / Activity:

• Administration of national, regional, & division assessment tests

Physical Accomplishments

Page 280: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 1 4 1 2 100% 50%

Physical Accomplishments

Page 281: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 281

Program / Project / Activity:

• 2018 Brigada Eskwela (BE) Advocacy and Promotion (BE Kick-off Ceremony and Caravan)

Physical Accomplishments

Page 282: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 283: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 283

Program / Project / Activity:

• Search for Division BE Best Implementers

Physical Accomplishments

Page 284: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

1 1 1 100%

Physical Accomplishments

Page 285: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 285

Program / Project / Activity:

• Conduct of Universal Medical and Dental Check-up (UMDC)

Physical Accomplishments

Page 286: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

80 40 40 40 40 100% 100%

Physical Accomplishments

Page 287: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 287

Program / Project / Activity:

• Conduct of Vision and Auditory Examination

Physical Accomplishments

Page 288: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

80 40 40 40 40 100% 100%

Physical Accomplishments

Page 289: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 289

Program / Project / Activity:

• Conduct of Tooth Extraction

Physical Accomplishments

Page 290: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 40 8 40 8 100% 100%

Physical Accomplishments

Page 291: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 291

Program / Project / Activity:

• Conduct of the Orientation on School Based Feeding Program School Year 2017-2018

Physical Accomplishments

Page 292: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

33 33 33 100%

Physical Accomplishments

Page 293: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 293

Program / Project / Activity:

• Validation of Annual Physical Examination Results

Physical Accomplishments

Page 294: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

40 40 40 100%

Physical Accomplishments

Page 295: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

General Administration

and Support

Objective: Resolved cases involving teachers, school officials and staff

serving in the SDO

Page 296: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 296

Program / Project / Activity:

• Evaluation of administrative complaints / grievances filed in the SDO and provision of appropriate action as prescribed by rules

Physical Accomplishments

Page 297: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 20 15 20 15 100% 100%

Physical Accomplishments

Page 298: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 298

Program / Project / Activity:

• Issuance of certification of no pending administrative case for various purposes

Physical Accomplishments

Page 299: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 412 1157 412 1157 100% 100%

Physical Accomplishments

Page 300: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 300

Program / Project / Activity:

• Issuance of Special Orders (CNM/CSM/ CNNM/ CSNM) as requested

Physical Accomplishments

Page 301: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 33 80 33 80 100% 100%

Physical Accomplishments

Page 302: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 302

Program / Project / Activity:

• Conduct of fact finding, preliminary and formal investigations within the period prescribed by the rules

Physical Accomplishments

Page 303: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 10 3 10 3 100% 100%

Physical Accomplishments

Page 304: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 304

Program / Project / Activity:

• Conduct of grievance hearings

Physical Accomplishments

Page 305: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 7 5 7 5 100% 100%

Physical Accomplishments

Page 306: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 306

Program / Project / Activity:

• Performance of on-site investigations

Physical Accomplishments

Page 307: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 3 1 3 1 100% 100%

Physical Accomplishments

Page 308: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Regulatory

& Developmental

Services to Private

Schools

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 309: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

Basic Education Inputs Program

Objective: Evaluated and recommended for approval the

request for schedule of fees of the 166 private schools in the SDO.

Page 310: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 310

Program / Project / Activity:

• Endorsement of Application for Increase in School Fees

Physical Accomplishments

Page 311: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 30 30 100%

Physical Accomplishments

Page 312: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 312

Program / Project / Activity:

• Approval of Notation for School Fees

Physical Accomplishments

Page 313: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

ANNUAL

TARGET

TARGETSPHYSICAL

ACCOMPLISHMENTS% ACCOMPLISHED VS.

TARGET(No. of Planned Outputs

per Quarter)

(No. of Outputs

Achieved to Date)

Q1 Q2 Q1 Q2 Q1 Q2

100% 177 177 100%

Physical Accomplishments

Page 314: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Physical Accomplishments

FUNCTIONAL

DIVISION

TARGETSPHYSICAL

ACCOMPLISHMENTS%

ACCOMPLISHED

VS. TARGETS

(No. of

Planned

Outputs per

Quarter)

(No. of Outputs

Achieved to

Date)

Q1 Q2 Q1 Q2 Q1 Q2

CID 2036 1357 2814 1971 100% 100%

OSDS 5979 11379 6031 10763 97.81% 88.71%

SGOD 1217 1504 1440 1569 100% 99.87%

Total 9232 14252 10285

(131)

14315

(1287) 98.58% 90.96%

STATUS OF PHYSICAL ACCOMPLISHMENTS BY FDs

Page 315: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

CONSOLIDATED STATUS

OF PHYSICAL

ACCOMPLISHMENTS BY FD

0

2000

4000

6000

8000

10000

12000

Q1 Q2 Q1 Q2 Q1 Q2

(No. of Planned Outputs per Quarter) (No. of Outputs Achieved to Date)

TARGETS PHYSICAL ACCOMPLISHMENTS % ACCOMPLISHED VS. TARGETS

Chart Title

CID OSDS SGOD

Page 316: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 317: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

OBJECTIVES

NAME OF

PROGRAMS

AND

PROJECTS

UNACCOMPLISHE

D OUTPUTS

REASONS FOR THE

BALANCE

STATUS OF THE

BALANCE TO

DATE*

Q1 Q2 Q1 Q2 Q1 Q2

Ensured

compliance with

national

standards in

recruitment,

selection and

training of staff

and

performance

evaluation of

SDO employees

at the end of FY.

Updating of

PSIPOP in the

Government

Manpower

Information

System (GMIS):

No. of teachers

included in the

plantilla

1099 Problem with the

system (System

owned by DBM;

Depends on the

availablity of the

system)

Forwarded

to the next

quarter

TABLE 1-F: STATUS OF PROGRAMS & PROJECTS’ BALANCE FOR THE QUARTER

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 318: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

OBJECTIVES

NAME OF

PROGRAMS

AND

PROJECTS

UNACCOMPLISHE

D OUTPUTS

REASONS FOR THE

BALANCE

STATUS OF THE

BALANCE TO

DATE*

Q1 Q2 Q1 Q2 Q1 Q2

8. managed

effective allocation

and utilization of

human, physical

and financial

resources of the

SDO within the

prescribed period.

Submission of Bank

Reconciliation

Statement to

Commission on Audit

(COA) within 10 days

upon receipt of bank

statement from the

Authorized

Government

Depository Bank

(AGDB)

3 3 Late issuance of

bank statement

by Landbank

Late issuance of

bank statement by

Landbank

Forwarded

to the next

quarter

(Depends on

the

availability of

bank

statement)

Forwarded to

the next

quarter

(Depends on

the availability

of bank

statement)

Page 319: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

OBJECTIVES

NAME OF

PROGRAMS

AND

PROJECTS

UNACCOMPLISHE

D OUTPUTS

REASONS FOR THE

BALANCE

STATUS OF THE

BALANCE TO

DATE*

Q1 Q2 Q1 Q2 Q1 Q2

9. established

and maintained

systems for

accountability in

utilizing

resources of the

SDO within the

prescribed

period.

100% of Total

MOOE Allocation

of Non-

Implementing Units

is downloaded thru

Cash Advance

7 33 Some school

heads do not

liquidate on time

despite the

SDO's

interventions to

encourage on-

time liquidation

July MOOE was

downloaded in Q2

(bec. of the new

process on

disbursement, i.e.

Use of checks

instead of ATM)

Forwarded

to the next

quarter

Forwarded to

the next

quarter

Page 320: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

OBJECTIVES

NAME OF

PROGRAMS

AND

PROJECTS

UNACCOMPLISHE

D OUTPUTS

REASONS FOR THE

BALANCE

STATUS OF THE

BALANCE TO

DATE*

Q1 Q2 Q1 Q2 Q1 Q2

9. established

and maintained

systems for

accountability in

utilizing

resources of the

SDO within the

prescribed

period.

100% of Total

downloaded cash

advance is fully

liquidated

121 150 Previous cash

advance not

liquidated

Previous cash

advance not

liquidated

Forwarded

to the next

quarter

Forwarded to

the next

quarter

Page 321: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

OBJECTIVES

NAME OF

PROGRAMS

AND

PROJECTS

UNACCOMPLISHE

D OUTPUTS

REASONS FOR THE

BALANCE

STATUS OF THE

BALANCE TO

DATE*

Q1 Q2 Q1 Q2 Q1 Q2

10. performed

oversight functions in

the implementation of

laws, policies,

programs, rules and

regulations of 438

public elementary

schools, 117 junior

high schools, and 87

senior high schools

within DepEd

responsibility in the

SDO at the end of the

FY.

Administration of

national, regional, &

division assessment

tests

2 Few registrants

(Recommended to

take the exam in SDO-

City of San Fernando)

Examiners

already

endorsed to

another division

Page 322: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

VALUE-ADDED CONTRIBUTIONS

FOR THE QUARTER

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 323: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

CID Hiring of Teachers,

Interview &

Observation in the

Demo-Teaching

Checking of School

Forms

Sacrificing other

tasks/time

management in

Basic Education

Interfacing with

SGOD; Support to

CO's activities

Monitoring other

programs (SBM) &

SHDP Application

Projects Validation

Team

Screening and Hiring

of Teachers

Being results-

focused

Time management

VALUE-ADDED CONTRIBUTIONS

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 324: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

Resource speakership in

the Regional Level

Speakership on CO,RO

and Division Trainings

Self-management Self Management and

Leadership Skills

Monitoring of private

schools

Speakerships in RO &

SDO

Time management Interfacing activity /

Support to other functional

divisions

Serving as member of the

PRAISE Committee

Screening and Hiring of

Teachers

Passion for service &

teamwork

Time management

Page 325: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

Checking of class programs Analysis of Low Performing

Schools and Least Mastered

Skills for Interventions

Passion for service &

teamwork

Interfacing activity / Support to

other functional divisions

SBM Validation and SHDP

Application Project, PRAISE

Committee

Interfacing activity / Support to

other functional divisions

Oplan Balik-Eskwela

Monitoring and Brigada

Eskwela Best Implementers

Interfacing activity / Support to

other functional divisions

Page 326: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

Monitoring of Private

Schools

Interfacing activity / Support to

other functional divisions

Memberships in SGLC,

LCPC, Co-Chairs of LSB

etc.

Time management

Attendance to Provincial

Council for SPED and

Kindergarten Teachers

Time management

Attendance to Regional

Convergence

Interfacing activity / Support to

other functional divisions

Page 327: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

OSDS

Admin.

Services

Submission of the AIP for

SEF on time

Availability of records

Submission of Status of

Implementation Report for

SEF on time for SGLG

Compliance of concerned

officials

Submission of Agency

Action Plan on AOMs

recommendations for CY

2017

Approval of the SDS,

leadership fo the ASDS

(Elem.) cooperation of

concerned school officials,

teachers and PTAs

Page 328: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

Admin.

ServicesConduct of on-site

validation activities for

school heads and

designated TICs for

possible reclassification

of positions

Availability of Committee

Members and support of

the Supply Unit

Conduct of disposal

activities

Availability of Committee

Members and support of

the Supply Unit

Preparation of Special

Orders, Plans, etc. for the

ISO certification of the

SDO

Interfacing and consultation

with Division document

controller

Page 329: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

HRMU DIVISION WORKSHOP ON

THE USE OF ENTERPRISE

HUMAN RESOURCE

INFORMATION SYSTEM (E-

HRIS) AND ENCODING OF

Epds OF SCHOOL

PERSONNEL

Interfacing with Other Units

(Supply, Admin. Office, ITO, HRD);

Support from the Agency Head

DISTRICT PERSONNEL

AUDIT, RECONCILIATION AND

UPDATING OF THE

REMAINING UNFILLED ITEMS

OF THE PERSONAL

SERVICES ITEMIZATION AND

PLANTILLA OF PERSONNEL

(PSIPOP) UNDER THE WEB-

BASED APPLICATION

SYSTEM (GMIS)

Teamwork from the technical

working group who conducted

validation and personnel audit;

Support from the Agency Head,

AO-V and ASDS (Elem)

Page 330: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

LEGAL Resource Speakership APPSHP invitation during

their capacity building

Procedure Manuals for

ISO

ISO

Quality Forms for ISO ISO

New PDFs for ISO ISO

Page 331: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

ICT Acted as Resource Speaker

in the Division Roll-Out in

the Implementation of the

Enterprise Human Resource

Information System.

Provided resources and

information to participants in

the said Division Roll-Out.

SGOD

SMM&E

Checking of School Forms Checking of School Forms Interfacing with CID;

Support to FD's activities

Interfacing with CID; Support

to FD's activities

HRDSSpeakerships in RO & SDO Review of Revised

Assessment Tool on SBM;

Crafting of standards & tool

on Leadership

Interfacing activity / Support

to other functional divisions

Updating of SBM Framework

& Assessment Tool

Page 332: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

VALUE-ADDED

CONTRIBUTIONS

FD /

ADMIN

& BFD

VALUE-ADDED CONTRIBUTIONS REASONS FOR ACHIEVING THEM

Q1 Q2 Q1 Q2

RESEARCHConduct of GAD and Values

Formation-Related Seminars

Review of Procedural Manuals

(PMs) & Work Instruction

Manuals (WIMs)

Coordination with requesting

school for needs assessment as

basis for the provision of

seminars/talks, 2. Preparation of

powerpoint presentations

International Organization for

Standardization (ISO) Certification

SocMobPerformance of functions in the

BAC activities as Secretariat

member

Speakerships in SDO Support to the procurement

activities of the office

Interfacing activity / Support to

other functional divisions

Checking of School Forms Interfacing with CID; Support to

FD's activities

Preparation of slide decks

Performance of functions in the

BAC activities as Secretariat

member

Support to the procurement

activities of the office

Page 333: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

ISSUES AND RESOLUTIONS BY CATEGORY

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 334: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 334

ISSUES

AND RESOLUTIONS

ISSUES AND RESOLUTIONS BY CATEGORY

2ND QUARTER

CATEGORY OF ISSUES

ISSUES WITHIN

THE UNIT'S

CONTROL

PROPOSED

RESOLUTION

ISSUES FOR

ATTENTION OF

HIGHER

MANAGEMENT /

EXTERNAL

STAKEHOLDERS

PROPOSED

RESOLUTION

OR ACTION

SOUGHT FROM

MGT

TECHNICAL Difficulty in collating /

analyzing data

particularly in late

submission of

schools and other

functional units.

Improve processes,

coordination and

communication plan

(E.g. Use of ICT in

submission of

reports)

Feedback in LR

Portal utilization.

Creation of feedback

feature in LR portal.

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 335: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 335

ISSUES

AND RESOLUTIONS

CATEGORY OF ISSUES

ISSUES WITHIN

THE UNIT'S

CONTROL

PROPOSED

RESOLUTION

ISSUES FOR

ATTENTION OF

HIGHER

MANAGEMENT /

EXTERNAL

STAKEHOLDERS

PROPOSED

RESOLUTION

OR ACTION

SOUGHT FROM

MGT

TECHNICAL Internet reliability problemI.T.O shall take

action

Unavailability of

internet connection

due to late issuance

of billing statement

from the service

provider

Connect to other

unit/office

Request for online

billing statement from

the service provider

Lack of Personnel To hire or assign

personnel with

computer skills

Page 336: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 336

ISSUES

AND RESOLUTIONS

CATEGORY OF ISSUES

ISSUES WITHIN

THE UNIT'S

CONTROL

PROPOSED

RESOLUTION

ISSUES FOR

ATTENTION OF

HIGHER

MANAGEMENT /

EXTERNAL

STAKEHOLDERS

PROPOSED

RESOLUTION

OR ACTION

SOUGHT FROM

MGT

TECHNICAL No buildable space for

other schools with

classroom shortage

Replace dilapidated

classrooms to High Rise

buildings to maximize

utilization of limited

space

Limited budget allocation for

the schools needing additional

classrooms and major repair

To increase the

budgetary allocation

intended for classroom

construction and repair

Right of way problems

on the location of other

schools sites for projects

implementation

To provide hauling cost

in the Program of Works

Page 337: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 337

ISSUES

AND RESOLUTIONS

CATEGORY OF ISSUES

ISSUES WITHIN

THE UNIT'S

CONTROL

PROPOSED

RESOLUTION

ISSUES FOR

ATTENTION OF

HIGHER

MANAGEMENT /

EXTERNAL

STAKEHOLDERS

PROPOSED

RESOLUTION

OR ACTION

SOUGHT FROM

MGT

TECHNICAL Limited number of

Textbooks and Answer

Sheets provided (NAT

12)

Ensure sufficiency of

test materials

Exam rescheduled; Gr.

12 students already

graduated)

Test administration

should be done

during the school

year

Updating of the PSIPOP

depends on the

availability of the GMIS

and internet connection

Subscribe to a faster

internet connectivity

(higher MBPS)

Page 338: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 338

ISSUES

AND RESOLUTIONS

CATEGORY OF ISSUES

ISSUES WITHIN

THE UNIT'S

CONTROL

PROPOSED

RESOLUTION

ISSUES FOR

ATTENTION OF

HIGHER

MANAGEMENT /

EXTERNAL

STAKEHOLDERS

PROPOSED

RESOLUTION

OR ACTION

SOUGHT FROM

MGT

INSTITUTIONAL More focused

attention to value

added contributions.

Adjustment of

number of TA during

sumer and June.

Prioritization of mandates

(Agreement is 70% KRA

& 30% other designation)

Consideration in

adjusting targets.

Poor time

management of

school heads

Coaching of

concerned school

heads

Poor planning w/c

results to poor

procurement

Reprimand

concerned SHs

Page 339: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 339

ISSUES

AND RESOLUTIONS

CATEGORY OF ISSUES

ISSUES WITHIN

THE UNIT'S

CONTROL

PROPOSED

RESOLUTION

ISSUES FOR

ATTENTION OF

HIGHER

MANAGEMENT /

EXTERNAL

STAKEHOLDERS

PROPOSED

RESOLUTION

OR ACTION

SOUGHT FROM

MGT

FINANCIAL Late CO downloading of

funds.

PMPP and Project

Proposals should be ready

for implementation once

CO-funds are

downloaded.

Partnership with LGUs / NGOs

for project implementation.

Appeal to CO for earlier

downloading of ALS/ IPED

funds.

ENVIRONMENTAL /

INFRASTRUCTURE

Lesser number of

Community Learning

Centers to accommodate

ALS learners.

ALS mobile teachers are

requested to go to gasak

farms / homes where the

ALS learners are.

Partnership with external

stakeholders for funding of

CLCs.

Inclusion in the SDO /

LGUs / NGOs budget in

buildig CLCs.

Stock room for delivered

instructional materials from

RO, CO.

Building of store room and

implementation of stock

plan

Inclusion of building of store

room/ big room for LRMDS in

the AIP, PPMP and request of

SDO to CO.

Building of store room/ big

room for LRMDS.

Page 340: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 340

ISSUES

AND RESOLUTIONS

CATEGORY OF ISSUES

ISSUES WITHIN

THE UNIT'S

CONTROL

PROPOSED

RESOLUTION

ISSUES FOR

ATTENTION OF

HIGHER

MANAGEMENT /

EXTERNAL

STAKEHOLDERS

PROPOSED

RESOLUTION

OR ACTION

SOUGHT FROM

MGT

ENVIRONMENTAL /

INFRASTRUCTURE

No enough storage

for document

safekeeping

Page 341: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

LESSONS LEARNED

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 342: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 342

LESSONS LEARNED

LIST OF LESSONS LEARNED

2ND QUARTER

DIVISIONS LESSONS LEARNED

OSDS The ISO journey of the SDO is not just for fulfillment

of a mandate but a commitment of the entire

organization to improve processes and systems to

provide quality service.

The ISO certification is the answer to the quest for

organizational alignment (of purpose, people, &

processes)

CID Prioritization of mandates is necessary over the

value added contribution to improve schools'

curriculum implementation and delivery of basic

education services.

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 343: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 343

LESSONS LEARNED

DIVISIONS LESSONS LEARNED

Technical Assistance (TA) should be provided to

schools and learning centers.

Interfacing is necessary for analysis of data gathered

to craft better interventions to address schools' poor

learning outcomes

Work beyond the call of duty in order to submit real

and on-time data to other functional divisions.

OSDS

ADMIN. SERVICES

Availability of data facilitate preparation of reports.

Early compliance of concerned officials/employees

contribute to meeting time frames.

Page 344: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 344

LESSONS LEARNED

DIVISIONS LESSONS LEARNED

RECORDS ISO is vital to the improvement of records and file

management through the implementation of document

tracking system.

HRMO Remove all excuses for failure.

Build a gung-ho culture of learning and innovation.

Interfacing is necessary to improve the delivery of

education services.

Find ways to share the helm.

Human resources are the most important resources of an

organization, hence, there is a need to take care of and

build our people while taking care of the organizational

health.

Page 345: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 345

LESSONS LEARNED

DIVISIONS LESSONS LEARNED

ICT There is a need to improve the technological

infrastructure and process, systems related to ICT

ICT is an integral part of an organization's life.

PROPERTY & SUPPLY Effective procurement results from effective planning.

ICT plays a vital role in supply & inventory management.

SMM&E ISO contributes to the success of an organization.

Work is overwhelming; Be responsible.

Assist co-workers; Never make them feel you're

superior.

Page 346: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 346

LESSONS LEARNED

DIVISIONS LESSONS LEARNED

HRD There’s a lot of work to be done, take each work one at a time.

Plan and prepare ahead of time.

We should always strive for quality output.

PHYSICAL FACILITTIES There is a need for effective and efficient project monitoring to

ensure the structurally and physically safe buildings.

Accurate and updated data from schools should be provided for

the purpose of analyzing school needs.

RESEARCH In the face of the huge tasks of evaluating research / inovation

studies, both proposed and completed, it is important to stop

once in a while and smell the flowers along the way.

Research & innovation contribute to the improvement of

teaching-learning processes and governance,

Page 347: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 347

LESSONS LEARNED

DIVISIONS LESSONS LEARNED

YFP Proper coordination is vital in conducting Division

wide youth activity.

The best way to prepare the leaders of tomorrow is to

prepare the young of today.

Collaboration and cooperation is essential in the

success of the activity.

Page 348: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION 348

LESSONS LEARNED

LESSONS LEARNED COMMON TO ALL THE DIVISIONS

2ND QUARTER

The ISO journey of the SDO is not just for fulfillment of a mandate but a

commitment of the entire organization to improve processes and systems to

provide quality service.

The ISO certification is the answer to the quest for organizational alignment

(of purpose, people, & processes)

Availability of data facilitates preparation of reports.

ICT is an integral part of an organization's life.

Prioritization of mandates is necessary over the value added contribution.

Page 349: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

EDUCATION RESOURCE

SUPPORT

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 350: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Status of Personnel Requirements

and Deployment

UPDATE OF PERSONNEL

REQUIREMENTSMEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 351: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

STATUS OF PERSONNEL REQUIREMENT AND DEPLOYMENT

DO FUNCTIONAL UNITS

No. of Personnel with

Plantilla for the Division

No. of Personnel Detailed

in the Division

Casual/Contractual/JO

Employees

Total

3rd LevelTechnical

Staff

Support

Staff3rd Level

Technical

Staff

Support

Staff3rd Level

Technical

Staff

Support

Staff

OSDS 3 12 18 0 0 0 0 0 0 33

▪ ADMINISTRATIVE SERVICE 01 73 0 0 0 0 0 7 81

▪ FINANCE 00 27 0 0 0 0 0 2 29

SGOD 049 0 0 0 0 0 0 1 50

CID 051 1 0 0 0 0 0 0 52

TOTAL 1 109 114 0 0 0 0 0 10 234

UPDATE OF PERSONNEL

REQUIREMENTS

Page 352: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

UPDATE OF PERSONNEL

REQUIREMENTS

Page 353: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

OSDS SGOD CID

3rd Level 3 0 0

Technical Staff 12 49 51

Support Staff 113 1 1

0

20

40

60

80

100

120

No. of Personnel with Plantilla for the Division

UPDATE OF PERSONNEL

REQUIREMENTS

Page 354: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

OSDS SGOD CID

3rd Level 0 0 0

Technical Staff 0 0 0

Support Staff 16 0 0

0

2

4

6

8

10

12

14

16

18No. of Personnel Detailed in the Division

UPDATE OF PERSONNEL

REQUIREMENTS

Page 355: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

OSDS SGOD CID

3rd Level 0 0 0

Technical Staff 0 0 0

Support Staff 14 1 0

0

2

4

6

8

10

12

14

16

Casual/Contractual/JO Employees

UPDATE OF PERSONNEL

REQUIREMENTS

Page 356: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

• Enrolment:

KINDER – 33, 605

ELEM. – 173, 526

JHS – 104, 446

SHS – 24, 601

Total: 336, 178

356

Page 357: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

• TEACHERS:

ELEM. – 7, 041

JHS – 4, 198

SHS – 1, 031

Total: 12, 270

357

Page 358: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

• NO. OF SCHOOLS:

ELEM. – 438

JHS – 117

SHS – 87

358

Page 359: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

• NO. OF SCHOOL HEADS:

ELEM. – 376

JHS – 115

Total: 491

359

Page 360: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

UTILIZATION OF SDO MOOE & GAA FUNDS

for SPECIAL PROGRAMS

& PROJECTS

MEPA STATUS OF PROGRAMS AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED CONTRIBUTIONS

ISSUES AND RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCESUPPORT

UTILIZATION OF SDO MOOE & GAA FUNDS

STATUS OF FD's PROGRAMS & PROJECTS

Page 361: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

Current

Appropriations

Page 362: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

CURRENT

APPROPRIATIONS

Page 363: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

CURRENT

APPROPRIATIONS

Project / Program / ActivitiesAppropriation /

Allotment Obligations Unobligated Balance BUR

1 General Management & Supervision - DO 24,063,000.00 1,620,381.82 22,442,618.18 7%

2 Human Resource Development for

Teaching & Non-Teaching

9,388,000.00 2,337,544.00 7,050,456.00 25%

3 Elementary 171,953,000.00 53,174,257.99 118,778,742.01 31%

4 Secondary 33,435,000.00 9,603,408.36 23,831,591.64 29%

5 planning, monitoring, evaluation of schools

to be conducted by DRRM Coordinators

195,600.00 195,600.00 0%

MEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 364: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Project / Program / ActivitiesAppropriation /

Allotment Obligations Unobligated Balance BUR

6 Board & lodging : Finalization of 2018 plans

2019-2021 3 year agenda

264,000.00 264,000.00 - 100%

7 Conduct of random drug testing in schools 154,400.00 124,760.00 29,640.00 81%

8 Repair of classrooms 93,417,529.91 - 93,417,529.91 0%

9 Conduct of 2017 Nat'l Competition on

Storybook writing for K-Grade 3 teachers

10,000.00 - 10,000.00 0%

10 MOOE-SHS 38,122,000.00 12,794,547.91 25,327,452.09 34%

CURRENT

APPROPRIATIONS

Page 365: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Project / Program / ActivitiesAppropriation /

Allotment Obligations

Unobligated

BalanceBUR

11 Conduct of Contingency Planning

Workshop for DRRM

Coordinators of Division

27,667.00

-

27,667.00 0%

12 Capital Outlay 1,000,000.00 249,860.00 750,140.00 25%

TOTAL 372,030,196.91 80,168,760.08 291,861,436.83 22%

CURRENT

APPROPRIATIONS

Page 366: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

CURRENT

APPROPRIATIONS

Page 367: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Project / Program /

Activities

Appropriation /

Allotment Obligations

Unobligated

BalanceBUR

1 General Management & Supervision -

DO

24,063,000.00 7,527,153.22 16,535,846.78 31%

2 Human Resource Development for

Teaching & Non-Teaching

9,388,000.00 4,776,220.70 4,611,779.30 51%

3 Elementary 171,953,000.00 92,003,331.79 79,949,668.21 54%

4 Secondary 33,435,000.00 18,200,740.97 15,234,259.03 54%

5 planning, monitoring, evaluation of

schools to be conducted by DRRM

Coordinators

195,600.00 6,084.00 189,516.00 3%

CURRENT

APPROPRIATIONSMEPA STATUS OF PROGRAMS

AND PROJECTS’ BALANCE

FOR THE QUARTER

VALUE-ADDED

CONTRIBUTIONS

ISSUES AND

RESOLUTIONS

LESSONS LEARNED

EDUCATION RESOURCE

SUPPORT

UTILIZATION OF SDO

MOOE & GAA FUNDS

STATUS OF FD's

PROGRAMS & PROJECTS

Page 368: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Project / Program / ActivitiesAppropriation /

Allotment Obligations

Unobligated

BalanceBUR

6 board & lodging : Finalization of 2018

plans 2019-2021 3 year agenda

264,000.00 264,000.00 - 100%

7 conduct of random drug testing in

schools

154,400.00 132,852.00 21,548.00 86%

8 repair of classrooms 93,417,529.91 88,267,208.96 5,150,320.95 94%

9 conduct of 2017 Nat'l Competition on

Storybook writing for K-Grade 3

teachers

10,000.00 - 10,000.00 0%

10 MOOE-SHS 38,122,000.00 19,511,636.03 18,610,363.97 51%

CURRENT

APPROPRIATIONS

Page 369: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Project / Program / ActivitiesAppropriation /

Allotment Obligations

Unobligated

BalanceBUR

11 Conduct of Contingency Planning

Workshop for DRRM Coordinators of

Division

27,667.00 - 27,667.00 0%

12 Capital Outlay 1,000,000.00 997,270.00 2,730.00 100%

13 Maintenance of Nurseries, Crop

Museums

1,140,000.00 850,000.00 290,000.00 75%

14 Cash Allowance 29,046,500.00 28,845,500.00 201,000.00 99%

15 IPED 657,000.00 9,865.00 647,135.00 2%

16 50% SBFP SY 2018-2019 30,383,640.00 30,383,640.00 0%

CURRENT

APPROPRIATIONS

Page 370: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Project / Program / Activities Appropriation /

Allotment

Obligations Unobligated

Balance

BUR

17 repair & rehab of San Pedro II ES 1,195,200.00 1,195,200.00 0%

18 teaching aid & transpo allowance for

ALS MT & DALSC for FY 2018 (DepEd

Order No. 50, s.2017)

2,647,400.00 2,647,400.00 0%

19 SHA Fiscal Year 2018 11,016,556.02 947,989.07 10,068,566.95 9%

20 50% SBFP SY 2018-2019 30,383,640.00 30,383,640.00 0%

Total 448,116,492.93 262,339,851.74 185,776,641.19 59%

CURRENT

APPROPRIATIONS

Page 371: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

The institutionalization of MEPA

(system, process, tools) promotes

the culture of quality and

accountability in the division.

MEPA provides objective

information on the status of

implementation of PAPs,

performance, progress, &

accomplishments of the

FDs / SDO necessary for

plan adjustment.

Page 372: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Results should be communicated

to all functional / support divisions

to develop a sense of ownership

and to sustain efforts for

continuous development.

Division MOOE needs to

be judiciously, effectively

& efficiently managed.

Page 373: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

DepEd Pampanga is committed to own our QMS as our way of life and

enliven our organizational identity by:

1. Conforming with the regulatory and all applicable ISO 9001:2015

requirements.

2. Providing quality services to our customers inspired by our Happy Galing

Lingkod advocacy.

3. Addressing and resolving all external and internal issues relevant to our

operations and strategic directions, thus, creating on-standard results.

4. Determining and conforming with the applicable regulatory requirements

of interested parties to sustain customer’s satisfaction.

5. Improving continually our QMS by eliminating operational inefficiencies

to best serve our purpose.

QUALITY POLICY

Page 374: DIVISION MONITORING, EVALUATION, & PLAN ADJUSTMENT …Eskwela, Phil-IRI, YDS,Best-Math, Gulayan sa Paaralan) for PSDSs Physical Accomplishments. DEPARTMENT OF EDUCATION ANNUAL TARGET

DEPARTMENT OF EDUCATION

Dakal pung Salamat!

374