STATE TRANSPORTATION IMPROVEMENT PROGRAM

Division 3BrunswickDuplinNew HanoverOnslowPenderSampson

PENDER

NEWHANOVER

BRUNSWICK

ONSLOW

SAMPSON

DUPLIN

421

117

258

17

421

421

17

701

40

50

11

904

130

133

903

210

24

411

50

53

172

41

211

111

403

87

Leland

Jacksonville

Wilmington

AV-5744

AV-5739

AV-5733

AV-5742

B-5638

B-5629

B-5634

B-4439

B-5640

B-4440B-5540

B-4813

B-4636

B-5623

B-4814

B-5305

B-5308

B-5628

B-5631

B-5633

B-4638

B-5621

B-4637

B-5630

B-5635

B-5641

B-5625

B-5650

B-4929

B-5645

B-5643

B-4844

W-5602

U-5704

U-5792

U-5719U-5728

I-5878

U-5716 U-5508

U-5734

U-5869

U-3338B

U-5729

EB-5736

R-5023C

U-3831AU-3831B

EB-5765

U-5862

U-5731 U-3338C

R-5701

U-5787

U-5788

U-5789

EB-5764

R-5023B

U-5790

R-3601

EB-5600

R-3432

U-4902B

U-5739

U-5791U-5793

U-4902C

U-5736

U-4902D

U-5733I-5779

U-4751

I-5720

U-5863R-2633BA

U-5702B

R-2514B

R-5021

U-5702A

U-5732

R-2303D

I-5840 I-5721

U-5741

U-4906

I-5302

I-5778

I-5722I-5815

I-5357

I-5760

I-5780

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 3

0 10 205Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADPROJECTED ROUTEMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS; GARVEE BOND FUNDING $31.05 M FOR SEGMENT AA; PAYBACK FY 2010-2021 - GARVEE BOND FUNDING $50 M FOR SEGMENT BA; PAYBACK FY 2013-2024 - GARVEE BOND FUNDING $100 M FOR SEGMENT BB; PAYBACK FY 2013-2024

R-2633* 847844 683914US 17 SOUTH OF NC 87 IN BRUNSWICK COUNTY TO I-40 IN NEW HANOVER COUNTY. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

20.2 NHP CG 3405 AA CG 3405 AA CG 3405 AA CG 3405 AA CG 3405 AA 3405CG AA NHP CG 5125 BA CG 5125 BA CG 5125 BA CG 5125 BA CG 5125 BA 5125CG BA5125CG BA5125CG BA CG 5125 BA CG 5125 BANHP CG 10250 BB CG 10250 BB CG 10250 BB CG 10250 BB CG 10250 BB 10250CG BB10250CG BB10250CG BB CG 10250 BB

AA NC 87 SOUTH OF BISHOP TO US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY - COMPLETETRNAB NC 87 SOUTH OF BISHOP TO US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY - COMPLETEBA US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY TO SR 1430 (CEDAR HILL ROAD) - UNDER CONSTRUCTIONTRNBB SR 1430 (CEDAR HILL ROAD) TO WEST OF US 421 NORTH OF WILMINGTON - UNDER CONSTRUCTIONTRNBC US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY TO WEST OF US 421 NORTH OF WILMINGTONCA WEST OF US 421 NORTH OF WILMINGTON TO WEST OF NC 133 - COMPLETECB WEST OF NC 133 TO US 117 - COMPLETECC US 117 TO EAST OF I-40 SOUTH OF CASTLE HAYNE - COMPLETE

BRUNSWICKNEW HANOVER

I-140/US 17(WILMINGTONBYPASS)

UNDER CONSTRUCTION

R-3601 41011 41011NC 133/SR 1472 (VILLAGE ROAD) INTERCHANGE TO THE US 421/NC 133 INTERCHANGE. ADD ADDITIONAL LANES ON NORTH AND SOUTHBOUND LANES AND WIDEN BRIDGE NO. 107 AND BRIDGE NO. 108.

1.5

TRN

BRUNSWICKNEW HANOVER

US 17/US 74/US 76

PLANNING/DESIGN IN PROGRESS

R-5021 64228 500SR 1500 (MIDWAY ROAD) TO NC 87. WIDEN TO MULTI-LANES.

6.6

DIV

STP 10038R R 10037 STP 2850U STP M 203 STP C 13533 C 13533 C 13534

BRUNSWICK NC 211

UNDER CONSTRUCTION

R-3432 15124 15124SR 1184 (OCEAN ISLE BEACH ROAD) TO NC 179. CONSTRUCT TWO LANES ON NEW LOCATION.

2.8

TRN

BRUNSWICK SR 1163(GEORGETOWNROAD)

UNDER CONSTRUCTION

R-3324 42626 42626NC 211 TO NC 87 AT SR 1525 (BETHEL ROAD). TWO LANE CONNECTOR ON NEW LOCATION.

1.2BRUNSWICK NEW ROUTE

URBAN PROJECTSU-5862 7130SR 1357 (SMITH AVENUE. UPGRADE

INTERSECTION TO INTERCHANGE.

REG

T 1380R T 5750C

BRUNSWICK US 17(SHALLOTTE BYPASS)

U-5788 592SR 1173 (VILLAGE ROAD) TO WALL STREET. UPGRADE ROADWAY.

0.4

DIV

T R 50 T C 542

BRUNSWICK US 17 BUSINESS(MAIN STREET)

U-5534 12339 1207WILMINGTON URBAN AREA MPO STP-DA PROGRAM.

DIV

STPDA 125R R 125 R 125 R 125 R 125 R 125 125R125R125R R 125 R 125L 125R R 125 R 125 R 125 R 125 R 125 125R125R125R R 125 R 125STPDA 381C C 381 C 381 C 381 C 381 C 381 381C381C381C C 381 C 381L 381C C 381 C 381 C 381 C 381 C 381 381C381C381C C 381 C 381

BRUNSWICKNEW HANOVERPENDER

VARIOUS

U-5525 3000 250WILMINGTON URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.

DIV

STPDA 200PE PE 200 PE 200 PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200L 50PE PE 50 PE 50 PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50

BRUNSWICKNEW HANOVERPENDER

VARIOUS

FEDERAL BRIDGE PROJECTSB-5627 1595REPLACE BRIDGE NO. 11 OVER ORTON

POND CREEK.HF

HFB R 145 HFB 1450C

BRUNSWICK NC 87

B-5642 935REPLACE BRIDGE NO. 65 OVER HOOD CREEK.

HF

HFB 85R HFB 850C

BRUNSWICK NC 87

3-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-4438 1096 8REPLACE BRIDGE NO. 47 OVER BRANCH OF JUNIPER CREEK.

HF

HFB R 95 HFB M 18 HFB C 975

BRUNSWICK NC 211

B-5624 693REPLACE BRIDGE NO. 57 OVER JUNIPER CREEK.

HF

HFB R 60 HFB M 8 HFB 625C

BRUNSWICK NC 211

B-5638 1386REPLACE BRIDGE NO. 22 OVER MERCERS MILL POND.

DIV

STPOFF 65R STPOFF 28M STPOFF 646C647C

BRUNSWICK SR 1112(SUNSET HARBORROAD S.E.)

B-5634 1088REPLACE BRIDGE NO. 55 OVER BRANCH LITTLE SHALLOTTE RIVER.

DIV

STPOFF R 51 STPOFF M 24 STPOFF C 1013

BRUNSWICK SR 1140(OXPEN ROAD S.W.)

B-4439 1498 5REPLACE BRIDGE NO. 100 OVER BRANCH JUNIPER CREEK.

DIV

STPOFF 135R STPOFF 8M STPOFF C 675 C 675

BRUNSWICK SR 1342(MAKATOKA ROAD)

B-4440 1208 60REPLACE BRIDGE NO. 163 OVER MULBERRY BRANCH.

DIV

STPOFF 80R STPOFF 21M STPOFF C 1000 STPOFF 47U

BRUNSWICK SR 1349(BRIDGER ROAD)

B-5540 555REPLACE BRIDGE NO. 202 OVER BRANCH OF SHALLOTTE RIVER.

DIV

STPOFF R 50 STPOFF M 5 STPOFF C 500

BRUNSWICK SR 1357(SMITH AVENUE)

B-4928 1155REPLACE BRIDGE NO. 28 OVER MILL CREEK.

HF

HFB R 105 HFB C 1050

BRUNSWICK SR 1432(OLD MILL ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5622 601REPLACE BRIDGE NO. 181 OVER STURGEON CREEK.

HF

HFB 55R HFB C 546

BRUNSWICK SR 1437(OLD FAYETTEVILLEROAD)

B-5637 1870REPLACE BRIDGE NO. 208 OVER STURGEON CREEK.

HF

HFB 170R HFB 1700C

BRUNSWICK SR 1472(VILLAGE ROAD)

B-5311 885REPLACE BRIDGE NO. 104 OVER MIDDLE SWAMP.

HF

HFB R 80 HFB M 5 HFB C 800

BRUNSWICK SR 1500(MIDWAY ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5640 455REPLACE BRIDGE NO. 123 OVER BRANCH LOCKWOOD FOLLY RIVER.

DIV

STPOFF R 21 STPOFF M 7 STPOFF C 427

BRUNSWICK SR 1504(OLD LENNONROAD S.E.)

3-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5629 1376REPLACE BRIDGE NO. 40 OVER MILLS CREEK.

DIV

STPOFF 66R STPOFF 1310C

BRUNSWICK SR 1515(OLD MILL CREEK/OLD MILL CREEKROAD S.E.)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5103 18251 16251DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4903 378 378ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 3 PROJECT MITIGATION.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5203 5164 5164DIVISION 3 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

INTERSTATE PROJECTSI-5779 501.2 MILES EAST OF SR 1912 (BLIND BRIDGE

ROAD) TO 0.4 MILES EAST OF SR 1102 (WARDS ROAD). PAVEMENT REHABILITATION.

4.3SW

NHPIM C 50 DUPLIN I-40

I-5778 140SAMPSON COUNTY LINE TO US 117. PAVEMENT REHABILITATION.

9.6SW

NHPIM C 140 DUPLIN I-40

3-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

I-5720 1000SAMPSON COUNTY LINE TO SR 1341 (PENNY BRANCH ROAD). PAVEMENT REHABILITATION.

4SW

NHPIM C 1000 DUPLIN I-40

ALL SECTIONS COMPLETE. GARVEE BOND FUNDING $10.8 MILLION; PAYBACK FY 2007 - FY 2018

I-5001 48848 46199JOHNSTON-SAMPSON COUNTY LINE (MILE POST 340) TO US 117(MILE POST 390) IN PENDER COUNTY. MILL AND RESURFACE.

50 NHP CG 883 B CG 883 B CG 883 B

A MILEPOST 390 TO MILEPOST 369.4 - COMPLETEAB MILEPOST 369.4 TO MILEPOST 348.5 - COMPLETEB MILEPOST 348.5 TO MILEPOST 340 - COMPLETETRN

DUPLINPENDERSAMPSON

I-40

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-2303* 402775 187438WEST OF SR 1006 (MAXWELL ROAD/CLINTON ROAD) IN CUMBERLAND COUNTY TO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION.

39.7 T C 9445 B T C 11675 C C 11675 C T C 13799 D C 13798 D T 7250R E T 554M E T 26400C E T 13900R F T 1841M F T 105000C F

A WEST OF SR 1006 (MAXWELL ROAD/CLINTON ROAD) IN CUMBERLAND COUNTY TO SR 1853 (JOHN NUNNERY ROAD) - UNDER CONSTRUCTIONTRNB SR 1853 (JOHN NUNNERY ROAD) IN CUMBERLAND COUNTY TO SR 1404 (DOWDY ROAD) IN SAMPSON COUNTY - UNDER CONSTRUCTIONTRNC SR 1404 (DOWDY ROAD) TO SR 1303 (MITCHELL LOOP ROAD) - UNDER CONSTRUCTIONTRND SR 1303 (MITCHELL LOOP ROAD) TO US 421/US 701/SR 1296 (SUNSET AVENUE) - UNDER CONSTRUCTIONTRNDA WEST OF SR 1262 TO EAST OF US 421 - COMPLETEE US 421/US 701/SR 1296 (SUNSET AVENUE) TO WEST OF SR 1920 (MOLTONVILLE ROAD)F WEST OF SR 1920 (MOLTONVILLE ROAD) IN SAMPSON COUNTY TO I-40 IN DUPLIN COUNTY

CUMBERLANDDUPLINSAMPSON

NC 24

FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1202A SR 1115 (BOB STROUD ROAD) TO NC 24. WIDEN NC 241 TO MULTI-LANES WITH IMPROVEMENTS TO NC 11 AND NC 24.

DUPLINLENOIR

NC 241

FEDERAL BRIDGE PROJECTSB-5639 1705REPLACE BRIDGE NO. 36 OVER MAXWELL

CREEK.HF

HFB 155R HFB 1550C

DUPLIN NC 11

B-5534 1400REPLACE BRIDGE NO. 82 OVER BURNT COAT CREEK.

HF

HFB R 125 HFB C 1275

DUPLIN NC 111

B-4501 1031 6REPLACE BRIDGE NO. 325 OVER BRANCH OF NE CAPE FEAR RIVER.

HF

HFB R 100 HFB C 925

DUPLIN SR 1004(SUMMERLINSCROSSROAD ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5630 657REPLACE BRIDGE NO. 25 OVER ISLAND CREEK.

DIV

STPOFF R 31 STPOFF 626C

DUPLIN SR 1102(WEST CHARITYROAD)

UNDER CONSTRUCTION

B-5143 1026 1026REPLACE BRIDGE NO. 408 OVER STEWARTS CREEK.

DIV

DUPLIN SR 1105(CARLTON CHAPELCHURCH ROAD)

3-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5647 1430REPLACE BRIDGE NO. 52 OVER ROCK FISH CREEK.

HF

HFB 130R HFB 1300C

DUPLIN SR 1135(PROVIDENCECHURCH ROAD)

B-5303 1505 100REPLACE BRIDGE NO. 45 OVER ISLAND CREEK.

HF

HFB R 130 HFB C 1275

DUPLIN SR 1162(BAY STREET)

B-5625 1059REPLACE BRIDGE NO. 230 OVER GROVE SWAMP.

DIV

STPOFF R 50 STPOFF 1009C

DUPLIN SR 1301(STOKES STREET)

DIVISION PURCHASE ORDER CONTRACT

B-5635 657REPLACE BRIDGE NO. 107 OVER NAHUNGA SWAMP.

DIV

STPOFF R 31 STPOFF C 626

DUPLIN SR 1307(VEACH'S MILL ROAD)

B-5648 1375REPLACE BRIDGE NO. 137 OVER BRANCH OF NORTHEAST CAPE FEAR RIVER.

HF

HFB 125R HFB 1250C

DUPLIN SR 1534(DRUMMERSVILLE ROAD)

B-4502 856 6REPLACE BRIDGE NO. 144 OVER PANTHER CREEK.

HF

HFB R 75 HFB C 775

DUPLIN SR 1704(KITTY NOECKER ROAD)

B-5632 1791REPLACE BRIDGE NO. 187 OVER NINE MILE CREEK.

HF

HFB R 165 HFB 1626C

DUPLIN SR 1828(CYPRESS CREEK ROAD)

B-5641 1148REPLACE BRIDGE NO. 201 OVER ISLAND CREEK.

DIV

STPOFF R 55 STPOFF C 1093

DUPLIN SR 1946(NORTHEAST ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5103 18251 16251DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4903 378 378ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 3 PROJECT MITIGATION.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5203 5164 5164DIVISION 3 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

3-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

I-5840 900PENDER COUNTY LINE TO 0.4 MILE EAST OF US 117. PAVEMENT REHABILITATION.

6.3SW

NHPIM C 900 NEW HANOVER I-40

I-5357 8600SOUTH OF NC 210 (MILE POST 408.6) IN PENDER COUNTY TO END OF I-40 (MILE POST 420) IN NEW HANOVER COUNTY. PAVEMENT REHABILITATION.

11.4

SW

NHPIM 8600C NEW HANOVERPENDER

I-40

I-5721 6550PENDER COUNTY LINE TO SR 2048 (GORDON ROAD). PAVEMENT REHABILITATION.

6.3SW

NHPIM C 6550 NEW HANOVER I-40

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS; GARVEE BOND FUNDING $31.05 M FOR SEGMENT AA; PAYBACK FY 2010-2021 - GARVEE BOND FUNDING $50 M FOR SEGMENT BA; PAYBACK FY 2013-2024 - GARVEE BOND FUNDING $100 M FOR SEGMENT BB; PAYBACK FY 2013-2024

R-2633* 847844 683914US 17 SOUTH OF NC 87 IN BRUNSWICK COUNTY TO I-40 IN NEW HANOVER COUNTY. FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

20.2 NHP CG 3405 AA CG 3405 AA CG 3405 AA CG 3405 AA CG 3405 AA 3405CG AA NHP CG 5125 BA CG 5125 BA CG 5125 BA CG 5125 BA CG 5125 BA 5125CG BA5125CG BA5125CG BA CG 5125 BA CG 5125 BANHP CG 10250 BB CG 10250 BB CG 10250 BB CG 10250 BB CG 10250 BB 10250CG BB10250CG BB10250CG BB CG 10250 BB

AA NC 87 SOUTH OF BISHOP TO US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY - COMPLETETRNAB NC 87 SOUTH OF BISHOP TO US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY - COMPLETEBA US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY TO SR 1430 (CEDAR HILL ROAD) - UNDER CONSTRUCTIONTRNBB SR 1430 (CEDAR HILL ROAD) TO WEST OF US 421 NORTH OF WILMINGTON - UNDER CONSTRUCTIONTRNBC US 74/US 76 EAST OF MALMO IN BRUNSWICK COUNTY TO WEST OF US 421 NORTH OF WILMINGTONCA WEST OF US 421 NORTH OF WILMINGTON TO WEST OF NC 133 - COMPLETECB WEST OF NC 133 TO US 117 - COMPLETECC US 117 TO EAST OF I-40 SOUTH OF CASTLE HAYNE - COMPLETE

BRUNSWICKNEW HANOVER

I-140/US 17(WILMINGTONBYPASS)

UNDER CONSTRUCTION

R-3601 41011 41011NC 133/SR 1472 (VILLAGE ROAD) INTERCHANGE TO THE US 421/NC 133 INTERCHANGE. ADD ADDITIONAL LANES ON NORTH AND SOUTHBOUND LANES AND WIDEN BRIDGE NO. 107 AND BRIDGE NO. 108.

1.5

TRN

BRUNSWICKNEW HANOVER

US 17/US 74/US 76

URBAN PROJECTSU-5869 6940US 17 (SOUTH 17TH STREET) TO COVIL

AVENUE. CONSTRUCT A ROAD DIET.1.34

DIV

NHP R 100 NHP C 6840

NEW HANOVER US 17 BUSINESS

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDIES ONLY

U-4902 14317 867COLONIAL DRIVE TO SR 1402 (PORTERS NECK ROAD). ACCESS MANAGEMENT IMPROVEMENTS.

8.6 NHP R 125 B NHP C 3250 B NHP R 125 C NHP C 1700 C 1700C C NHP R 250 D NHP C 3150 D 3150C D

A SR 1272 (NEW CENTRE DRIVE) TO MARTIN LUTHER KING JR., BOULEVARD - COMPLETEB COLONIAL DRIVE TO SR 1272 (NEW CENTRE DRIVE)REGC MARTIN LUTHER KING JR., BOULEVARD TO SR 1409 (MILITARY CUTOFF ROAD)SWD SR 1409 (MILITARY CUTOFF ROAD) TO SR 1402 (PORTERS NECK ROAD)SW

NEW HANOVER US 17 BUSINESS(MARKET STREET)

U-5792 25110US 117/NC 132 (COLLEGE ROAD). CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.

DIV

NHP R 4860 NHP 10125C10125C

NEW HANOVER US 74(MARTIN LUTHERKING, JR. PARKWAY)

U-5710 25110SR 1409 (MILITARY CUTOFF ROAD) INTERSECTION. CONVERT AT-GRADE INTERSECTION TO AN INTERCHANGE.

2

SW

NHP R 2430 2430R NHP 6750C6750C C 6750

NEW HANOVER US 74(EASTWOOD ROAD)

U-5731 15500US 17/ US 421, CONSTRUCT A FLY-OVER AND FREE FLOW RAMP AT INTERCHANGE

REG

NHP 3000R NHP C 12500

NEW HANOVER US 74

3-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-5729 10206US 421 (BURNETT AVENUE) TO US 117 (SHIPYARD BOULEVARD). UPGRADE ROADWAY.

1.6

REG

NHP R 2293 NHP U 275 NHP C 7638

NEW HANOVER US 421(CAROLINA BEACH ROAD)

U-5734 9952US 17 BUSINESS / US 76/ US 421 (CAPE FEAR MEMORIAL BRIDGE) TO US 421 (BURNETT BOULEVARD). WIDEN TO MULTI-LANES.

1

REG

NHP 2168R NHP 260U NHP 7524C

NEW HANOVER US 421(SOUTH FRONT STREET)

U-5859 15500NC 132 (SOUTH COLLEGE ROAD). CONSTRUCT FLYOVERS AT INTERSECTION.

DIV

NHP 3000R NHP 6250C C 6250

NEW HANOVER US 421(CAROLINA BEACH ROAD)

U-5790 9574NC 132 (SOUTH COLLEGE ROAD) TO SANDERS ROAD. WIDEN EXISTING ROADWAY AND CONSTRUCT FLYOVERS AT US 421 AND NC 132.

1.1

DIV

NHP R 1525 NHP U 183 NHP C 7866

NEW HANOVER US 421(CAROLINA BEACH ROAD)

U-5702 86745SR 2048 (GORDON ROAD) TO US 421 (CAROLINA BEACH ROAD). ACCESS MANAGEMENT AND TRAVEL TIME IMPROVEMENTS.

9.7 NHP 15000R A NHP 140U A NHP 19680C A C 6560 ANHP 2150R B NHP 215U B NHP 32250C B C 10750 B

A SR 2048 (GORDON ROAD) TO US 117 (SHIPYARD BOULEVARD) ACCESS MANAGEMENT AND TRAVEL TIME IMPROVEMENTS.SWB US 117 (SHIPYARD BOULEVARD) TO US 421 (CAROLINA BEACH ROAD), ACCESS MANAGEMENT AND TRAVEL TIME IMPROVEMENTS.SW

NEW HANOVER NC 132(COLLEGE ROAD)

U-5704 48000WILSHIRE BOULEVARED TO US 117 (SHIPYARD BOULEVARD), ACCESS MANAGEMENT AND TRAVEL TIME IMPROVEMENTS INCLUDING INTERCHANGE WITH US 76 (OLEANDER DRIVE).

2

SW

NHP 8000R NHP 30000C C 10000

NEW HANOVER NC 132(COLLEGE ROAD)

U-5863 28897I-140/US 17 (WILMINGTON BYPASS TO SR 1310 (DIVISION DRIVE). WIDEN TO MULTI-LANES.

3.7

REG

T 965R T 116U T C 13908 C 13908

NEW HANOVER NC 133(CASTLE HAYNEROAD)

PLANNING/DESIGN IN PROGRESS

U-3338 66871 26916RANDALL PARKWAY TO US 74 (MLK, JR. PARKWAY) IN WILMINGTON. WIDEN TO MULTI-LANES.

3.2 STP 6400C B C 6400 B C 6400 B STP R 7825 C STP U 1030 C STP C 11900 C

B RANDALL PARKWAY TO US 74 (MLK, JR. PARKWAY) - RIGHT OF WAY IN PROGRESSTRNC SR 1175 (KERR AVENUE) INTERCHANGE AT US 74 (MLK, JR. PARKWAY)REG

NEW HANOVER SR 1175(KERR AVENUE)

PLANNING/DESIGN IN PROGRESS

U-4751* 142124 8203SR 1409 (MILITARY CUTOFF ROAD) TO US 17 IN WILMINGTON. MULTI-LANES ON NEW LOCATION.

4

SW

T 45000R T 650U T M 3271 T C 21250 C 21250 C 21250 21250C

NEW HANOVER SR 1409(MILITARY CUTOFFROAD EXTENSION)

U-3831 18795 374NC 132 INTERCHANGE RAMP TO WEST OF US 17 BUSINESS (MARKET STREET) IN WILMINGTON. WIDEN TO MULTI-LANES.

2.4 T R 100 A T C 1000 A STP 4200R B STP C 13100 B STP M 21 A

A NC 132 INTERCHANGE RAMP TO SR 2270 (WOOD SORRELL ROAD)DIVB SR 2270 (WOOD SORRELL ROAD) TO WEST OF US 17 (MARKET STREET)DIV

NEW HANOVER SR 2048(GORDON ROAD)

3-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

U-5534 12339 1207WILMINGTON URBAN AREA MPO STP-DA PROGRAM.

DIV

STPDA 125R R 125 R 125 R 125 R 125 R 125 125R125R125R R 125 R 125L 125R R 125 R 125 R 125 R 125 R 125 125R125R125R R 125 R 125STPDA 381C C 381 C 381 C 381 C 381 C 381 381C381C381C C 381 C 381L 381C C 381 C 381 C 381 C 381 C 381 381C381C381C C 381 C 381

BRUNSWICKNEW HANOVERPENDER

VARIOUS

U-5525 3000 250WILMINGTON URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.

DIV

STPDA 200PE PE 200 PE 200 PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200L 50PE PE 50 PE 50 PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50

BRUNSWICKNEW HANOVERPENDER

VARIOUS

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1503A US 17 BUSINESS (MARKET STREET). CONVERT AT-GRADE INTERSECTION TO AN INTERCHANGE.

0NEW HANOVER US 74(EASTWOOD ROAD)

FEASIBILITY STUDY IN PROGRESS

FS-1003B SANDERS ROAD TO NC 132 (COLLEGE ROAD). WIDEN ROADWAY.

NEW HANOVER US 421(CAROLINA BEACH ROAD)

FEDERAL BRIDGE PROJECTSB-4590 4519 9REPLACE BRIDGE NO. 29 OVER SMITH

CREEK.HF

HFB R 410 HFB C 4100

NEW HANOVER NC 133

UNDER CONSTRUCTION

B-4591 1981 1981REPLACE BRIDGE NO. 4 OVER ISLAND CREEK.

DIV

NEW HANOVER SR 1002(HOLLY SHELTERROAD)

B-5236 1152 100REPLACE BRIDGE NO. 19 OVER LORDS CREEK.

HF

HFB R 175 HFB U 77 HFB C 800

NEW HANOVER SR 1100(RIVER ROAD)

B-5649 660REPLACE BRIDGE NO. 78 OVER MOTT CREEK.

HF

HFB 60R HFB 600C

NEW HANOVER SR 1242(NORMANDY PLACE)

RIGHT OF WAY IN PROGRESS

B-5103 4480 180REPLACE BRIDGE NO. 35 OVER ABANDONED RAILROAD.

DIV

NHPB 4300C NEW HANOVER SR 1627(3RD STREET)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5103 18251 16251DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

3-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4903 378 378ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 3 PROJECT MITIGATION.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

HAZARD ELIMINATION PROJECTS

UNDER CONSTRUCTION

W-5132 502 502US 117/NC 132 (COLLEGE ROAD). CONSTRUCT A RIGHT TURN LANE ON US 76 WEST-BOUND ONTO US 117/NC 132.

NEW HANOVER US 76(OLEANDER DRIVE)

UNDER CONSTRUCTION

W-5306 1360 1360US 117/NC 132 (COLLEGE ROAD) IN CASTLE HAYNE. CONSTRUCT A ROUNDABOUT.TRN

NEW HANOVER NC 133

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5203 5164 5164DIVISION 3 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-2514* 214808 66708MULTI-LANES NORTH OF JACKSONVILLE TO NEW BERN BYPASS. WIDEN TO MULTI-LANES WITH BYPASSES OF BELGRADE, MAYSVILLE AND POLLOCKSVILLE ON NEW LOCATION.

22.1 T 10175C B C 10175 B C 10175 B C 10175 B T 16150C C C 16150 C T 25033C D C 25033 D C 25034 D

A MULTI-LANE SECTION NORTH OF JACKSONVILLE TO SOUTH OF BELGRADE - COMPLETEB SOUTH OF BELGRADE TO NORTH OF MAYSVILLE - RIGHT OF WAY IN PROGRESSTRNC NORTH OF MAYSVILLE TO SOUTH OF NC 58 - RIGHT OF WAY IN PROGRESSTRND SOUTH OF NC 58 TO THE NEW BERN BYPASS - RIGHT OF WAY IN PROGRESSTRN

JONESONSLOW

US 17

R-5023 5087 3187SR 1135 (MORNINGSIDE ROAD) TO WEST OF SR 1109 (HOLLY SHELTER ROAD). WIDEN TO THREE LANES.

4.2 STP 1140C B STP 760C C

A SR 1135 (MORNINGSIDE ROAD) TO SR 1116 (ONSLOW PINES ROAD) - COMPLETETRNB SR 1116 (ONSLOW PINES ROAD) TO SR 1105 (HAWS RUN ROAD) - RIGHT OF WAY IN PROGRESSTRNC SR 1105 (HAWS RUN ROAD) TO WEST OF SR 1109 (HOLLY SHELTER ROAD) - RIGHT OF WAY IN PROGRESSTRN

ONSLOW NC 53(BURGAW HIGHWAY)

URBAN PROJECTSU-5728 465SR 1308 (BELL FORK ROAD). IMPROVE

INTERSECTION.

REG

NHP R 90 NHP C 375

ONSLOW US 17 BUSINESS(MARINE BOULEVARD)

UNDER CONSTRUCTION

U-2107 1080 1080US 17 SOUTH TO US 17 NORTH. LANDSCAPING.

E LANDSCAPINGTRN

ONSLOW US 17(JACKSONVILLEBYPASS)

3-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

PLANNING/DESIGN IN PROGRESS

U-4007 193150 81734US 17 BUSINESS (JACKSONVILLE BYPASS) TO SR 1326 (DRUMMER KELLUM ROAD) IN JACKSONVILLE. ADD ADDITIONAL LANES AND CONSTRUCT ROUTES ON NEW LOCATION.

1.4 NHP 34775R C NHP 26300C C NHP 32345R D NHP 16600C D NHP R 270 E NHP C 1126 E

A SR 1308 (BELL FORK ROAD) TO EAST OF SR 1470 (WESTERN BOULEVARD) - COMPLETEB COUNTRY CLUB ROAD TO SR 1470 (WESTERN BOULEVARD) - UNDER CONSTRUCTIONC WESTERN BOULEVARD TO FAIRWAY DRIVED US 17, FAIRWAY DRIVE TO DRUMMER KELLUM ROADE US 17 AT NC 53 (WESTERN BOULEVARD) AND SR 1406 (PINEY GREEN ROAD). UPGRADE INTERSECTIONS.SW

ONSLOW US 17

U-5735 25824SR 1130 (OLD MAPLEHURST ROAD). CONSTRUCT INTERCHANGE AND ASSOCIATED IMPROVEMENTS TO MCAS NEW RIVER MAIN GATE.REG

NHP R 4620 NHP C 21204

ONSLOW US 17(WILMINGTON HIGHWAY)

U-5739 14614SR 1212 (PONY FARM ROAD) TO NC 53 (BURGAW HIGHWAY). CONSTRUCT SUPERSTREET.

2.2

REG

NHP 1750R NHP 210U NHP 12654C

ONSLOW US 258(RICHLANDS HIGHWAY)

U-5719 1860SR 1219 (BLUE CREEK ROAD)/SR 1396 (RIDGE ROAD). REALIGN INTERSECTIONS TO FORM ONE AT-GRADE INTERSECTION.

0.5

SW

NHP R 360 NHP 1500C

ONSLOW US 258(RICHLANDS HIGHWAY)

PLANNING/DESIGN IN PROGRESS

U-5508 2270 100NC 53 (WESTERN BOULEVARD). UPGRADE INTERSECTION AND DRAINAGE.

0.5

SW

STP R 420 STP C 1750

ONSLOW NC 24(LEJEUNE BOULEVARD)

U-5741 54029NC 24 BUSINESS (JOHNSON BOULEVARD) TO JACKSONVILLE URBAN AREA BOUNDARY. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.

5.2

REG

NHP R 14040 NHP U 1685 NHP 38304C

ONSLOW NC 24(LEJEUNE BOULEVARD)

U-5716 37416US 258 (RICHLANDS HIGHWAY) INTERSECTION. CONVERT AT-GRADE INTERSECTION TO INTERCHANGE.

2

SW

NHP R 1095 1095R NHP 11742C11742C C 11742

ONSLOW NC 24

U-5736 14195US 17 (MARINE BOULEVARD) TO NC 24 (LEJUENE BOULEVARD). CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.

2.6

REG

NHP R 663 NHP U 80 NHP 13452C

ONSLOW NC 53(WESTERN BOULEVARD)

U-5733 30204US 258 (RICHLANDS HIGHWAY) TO SR 1308 (GUM BRANCH ROAD). CONSTRUCT EXTENSION OF NC 111 ON NEW LOCATION.

3.5

REG

T 1084R T 130U T 28990C

ONSLOW NC 111(CATHERINE LAKE ROAD)

U-5319 422 12SR 1470 (WESTERN BOULEVARD) IN JACKSONVILLE. INSTALL DUAL LEFT TURN MOVEMENT FOR SOUTHBOUND SR 1308.TRN

HP 65R HP 345C

ONSLOW SR 1308(GUM BRANCH ROAD)

PLANNING/DESIGN IN PROGRESS

U-4906 10643 184EAST CITY LIMITS OF RICHLANDS TO SR 1322 (SUMMERSILL SCHOOL ROAD). WIDEN TO THREE LANES.

7.5

TRN

STP 1000R STP 59M STP 9400C

ONSLOW SR 1308(GUM BRANCH ROAD)

U-5793 53016SR 1322 (SUMMERSILL SCHOOL ROAD) TO JACKSONVILLE URBAN AREA BOUNDARY.WIDEN EXISTING ROADWAY.

6.2

DIV

T 20668R T 2480U T 14934C C 14934

ONSLOW SR 1308(GUM BRANCH ROAD)

3-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025URBAN PROJECTS

UNDER CONSTRUCTION

U-3810 82763 82763US 17 TO NC 24 IN JACKSONVILLE. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.

6.6ONSLOW SR 1406(PINEY GREEN ROAD)

U-5791 79907NC 53 (WESTERN BOULEVARD) TO US 17 (NEW BERN HIGHWAY). WIDEN TO MULTI-LANES, PART ON NEW LOCATION.

DIV

T 10987R T 1318U T 22534C C 22534 C 22534

ONSLOW SR 2714(JACKSONVILLE PARKWAYEXTENSION)

U-5787 3357NC 53 (WESTERN BOULEVARD) TO MCDANIEL DRIVE. CONSTRUCT ROADWAY ON NEW LOCATION.

DIV

T R 1648 T U 198 T C 1511

ONSLOW SR 2715(TRADE STREET)

UNDER CONSTRUCTION

U-5168 7644 7644COMPUTERIZED SIGNAL SYSTEM.ONSLOW JACKSONVILLE

U-5789 698JACKSONVILLE PARKWAY. IMPROVE INTERSECTION.

DIV

T R 135 T C 563

ONSLOW NC-53(WESTERN BOULEVARD)

FEASIBILITY STUDIES

FEASIBILITY STUDY IN PROGRESS

FS-1103A SR 1308 (BELL FORK ROAD) TO SR 1406 (PINEY GREEN ROAD). CONSTRUCT MEDIAN, ACCESS MANAGEMENT IMPROVEMENTS, ITS, AND DRAINAGE IMPROVEMENTS.

6.6ONSLOW NC 24

FEASIBILITY STUDY IN PROGRESS

FS-1003A US 17 TO NC 24. CONSTRUCT MEDIAN, ACCESS MANAGEMENT IMPROVEMENTS, AND DRAINAGE IMPROVEMENTS.

ONSLOW NC 53(WESTERN BOULEVARD)

FEASIBILITY STUDY IN PROGRESS

FS-1203B US 17 TO NORTH SHORE DRIVE. WIDEN TO MULTI-LANES.

ONSLOW NC 210

FEDERAL BRIDGE PROJECTSB-5652 1400REPLACE BRIDGE NO. 33 OVER WOLF

SWAMP.HF

HFB 125R HFB C 1275

ONSLOW US 17 NORTHBOUND LANE

B-5650 6722REPLACE BRIDGE NO. 7 OVER NORTHEAST CREEK.

SW

NHPB 320R NHPB 3201C C 3201

ONSLOW NC 24 WESTBOUND LANE

B-5626 1100REPLACE BRIDGE NO. 31 OVER SANDY RUN SWAMP.

HF

HFB R 100 HFB 1000C

ONSLOW NC 50

B-5636 1059REPLACE BRIDGE NO. 71 OVER HARRIS CREEK.

DIV

STPOFF R 50 STPOFF C 1009

ONSLOW SR 1109(HARRIS CREEKROAD)

B-5309 1980REPLACE BRIDGE NO. 10 OVER WHITE OAK RIVER.

DIV

STPOFF 180R STPOFF C 900 C 900

ONSLOW SR 1333(EMMETT LANE)

3-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5103 18251 16251DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4903 378 378ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 3 PROJECT MITIGATION.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

HAZARD ELIMINATION PROJECTSSF-4903F 220 25SR 1109 (HOLLY SHELTER ROAD).

REALIGNMENT AND LANE CONSTRUCTION.TRN

HRRR 195C ONSLOW NC 53

W-5602 3210CAMP LEJEUNE GATE TO NC 210. CONVERT TWO LANE ROADWAY TO THREE LANE ROADWAY WITH A TWO WAY LEFT TURN LANE.

REG

HSIP R 10 HSIP C 3200

ONSLOW NC 172

COMBINE LET WITH W-5322 AND W-5228

W-5106 4730 207MILE POST 3.13 TO SR 1500 (STARLING ROAD). WIDEN TO THREE LANES.

1.4

DIV

HSIP 2000R HSIP 23M HSIP 2500C

ONSLOW SR 1501(SANDRIDGE ROAD)

COMBINE LET WITH W-5106 AND W-5228

W-5322 2500SOUTH OF SR 1661 (FOXTRACE LANE) TO NORTH OF SR 1698 (SAVANNA COURT). WIDEN TO A THREE LANE SECTION.DIV

HSIP 500R HSIP 2000C

ONSLOW SR 1501(SANDRIDGE ROAD)

COMBINE LET WITH W-5106 AND W-5322

W-5328 2550BUCKHEAD ROAD TO MILE POST 3.13. WIDEN TO A THREE LANE SECTION.

DIV

HSIP 500R HSIP 2050C

ONSLOW SR 1501(SANDRIDGE ROAD)

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5203 5164 5164DIVISION 3 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

INTERSTATE PROJECTS

ALL SECTIONS COMPLETE. GARVEE BOND FUNDING $10.8 MILLION; PAYBACK FY 2007 - FY 2018

I-5001 48848 46199JOHNSTON-SAMPSON COUNTY LINE (MILE POST 340) TO US 117(MILE POST 390) IN PENDER COUNTY. MILL AND RESURFACE.

50 NHP CG 883 B CG 883 B CG 883 B

A MILEPOST 390 TO MILEPOST 369.4 - COMPLETEAB MILEPOST 369.4 TO MILEPOST 348.5 - COMPLETEB MILEPOST 348.5 TO MILEPOST 340 - COMPLETETRN

DUPLINPENDERSAMPSON

I-40

I-5302 7150US 117 (MILE POST 389.5) TO NC 53 (MILE POST 398.9). PAVEMENT REHABILITATION.

9.4SW

NHPIM C 3575 C 3575 PENDER I-40

3-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025INTERSTATE PROJECTS

I-5357 8600SOUTH OF NC 210 (MILE POST 408.6) IN PENDER COUNTY TO END OF I-40 (MILE POST 420) IN NEW HANOVER COUNTY. PAVEMENT REHABILITATION.

11.4

SW

NHPIM 8600C NEW HANOVERPENDER

I-40

I-5722 5000SR 1501 (RIVER ROAD) TO SR 1509 (STAG PARK ROAD). PAVEMENT REHABILITATION.

11.3SW

NHPIM C 5000 PENDER I-40

I-5760 55002 MILES EAST OF SR 1509 (STAG PARK ROAD) TO NEW HANOVER COUNTY LINE. PAVEMENT REHABILITATION.

12.4SW

NHPIM C 5500 PENDER I-40

I-5815 42910.8 MILE EAST OF SR 1501 (RIVER ROAD / NORTH CHUBB ROAD) TO 2 MILES EAST OF SR 1509 (STAG PARK ROAD). PAVEMENT REHABILITATION.

11.3SW

NHPIM C 4291 PENDER I-40

RURAL PROJECTSR-5701 775US 117 BUSINESS (WALKER

STREET/WILMINGTON STREET). CONSTRUCT ROUNDABOUT.REG

L R 150 T C 625

PENDER NC 53

URBAN PROJECTSU-5732 19410SR 1582 (WASHINGTON ACRES ROAD) TO SR

1563 (SLOOP POINT LOOP ROAD). CONVERT TO SUPERSTREET.

5.5

REG

NHP R 4724 NHP U 567 NHP 14119C

PENDER US 17

U-5534 12339 1207WILMINGTON URBAN AREA MPO STP-DA PROGRAM.

DIV

STPDA 125R R 125 R 125 R 125 R 125 R 125 125R125R125R R 125 R 125L 125R R 125 R 125 R 125 R 125 R 125 125R125R125R R 125 R 125STPDA 381C C 381 C 381 C 381 C 381 C 381 381C381C381C C 381 C 381L 381C C 381 C 381 C 381 C 381 C 381 381C381C381C C 381 C 381

BRUNSWICKNEW HANOVERPENDER

VARIOUS

U-5525 3000 250WILMINGTON URBAN AREA METROPOLITAN PLANNING ORGANIZATION PLANNING ALLOCATION AND UNIFIED WORK PROGRAM.

DIV

STPDA 200PE PE 200 PE 200 PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200L 50PE PE 50 PE 50 PE 50 PE 50 PE 50 50PE50PE50PE PE 50 PE 50

BRUNSWICKNEW HANOVERPENDER

VARIOUS

FEDERAL BRIDGE PROJECTSB-5644 522REPLACE BRIDGE NO. 15 OVER SILL'S

CREEK.HF

HFB 47R HFB 475C

PENDER NC 11

B-4929 64585 2335REPLACE BRIDGE NO. 16 OVER INTRACOASTAL WATERWAY.

0.8

REG

T 11250R T 4400U T M 200 T C 15467 C 15467 C 15466

PENDER NC 50/NC 210

DIVISION PURCHASE ORDER CONTRACT

B-5653 834REPLACE BRIDGE NO. 14 OVER TURKEY CREEK.

HF

HFB 76R HFB C 758

PENDER NC 133

B-5156 3565 100REPLACE BRIDGE NO. 28 OVER LONG CREEK.

HF

HFB R 315 HFB C 3150

PENDER NC 210

B-5646 1210REPLACE BRIDGE NO. 20 OVER LYON CREEK.

HF

HFB 110R HFB 1100C

PENDER SR 1104(CANETUCK ROAD)

B-5645 1152REPLACE BRIDGE NO. 68 OVER SILL'S CREEK.

DIV

STPOFF R 55 STPOFF C 1097

PENDER SR 1306(OLD MILL ROAD)

3-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5304 1225 100REPLACE BRIDGE NO. 203 OVER SILL'S CREEK.

HF

HFB R 100 HFB C 1025

PENDER SR 1324(CROOKED RUNROAD)

B-5643 1537REPLACE BRIDGE NO. 79 OVER LONG CREEK.

DIV

STPOFF R 73 STPOFF 732C C 732

PENDER SR 1336(HORSE BRANCH ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5103 18251 16251DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4903 378 378ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 3 PROJECT MITIGATION.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5203 5164 5164DIVISION 3 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

INTERSTATE PROJECTSI-5780 280JOHNSTON COUNTY LINE TO 1.8 MILES EAST

OF SR 1904 (PINE RIDGE ROAD). PAVEMENT REHABILITATION.

20.2SW

NHPIM C 280 SAMPSON I-40

I-5723 22600.6 MILES EAST OF SR 1211 (MORGAN ROAD) IN JOHNSTON COUNTY TO 2 MILES EAST OF JOHNSTON COUNTY LINE IN SAMPSON COUNTY. PAVEMENT REHABILITATION.

12.6

SW

NHPIM C 2260 JOHNSTONSAMPSON

I-40

ALL SECTIONS COMPLETE. GARVEE BOND FUNDING $10.8 MILLION; PAYBACK FY 2007 - FY 2018

I-5001 48848 46199JOHNSTON-SAMPSON COUNTY LINE (MILE POST 340) TO US 117(MILE POST 390) IN PENDER COUNTY. MILL AND RESURFACE.

50 NHP CG 883 B CG 883 B CG 883 B

A MILEPOST 390 TO MILEPOST 369.4 - COMPLETEAB MILEPOST 369.4 TO MILEPOST 348.5 - COMPLETEB MILEPOST 348.5 TO MILEPOST 340 - COMPLETETRN

DUPLINPENDERSAMPSON

I-40

3-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-2303* 402775 187438WEST OF SR 1006 (MAXWELL ROAD/CLINTON ROAD) IN CUMBERLAND COUNTY TO I-40 IN DUPLIN COUNTY AT WARSAW. FOUR LANES DIVIDED, PART ON NEW LOCATION.

39.7 T C 9445 B T C 11675 C C 11675 C T C 13799 D C 13798 D T 7250R E T 554M E T 26400C E T 13900R F T 1841M F T 105000C F

A WEST OF SR 1006 (MAXWELL ROAD/CLINTON ROAD) IN CUMBERLAND COUNTY TO SR 1853 (JOHN NUNNERY ROAD) - UNDER CONSTRUCTIONTRNB SR 1853 (JOHN NUNNERY ROAD) IN CUMBERLAND COUNTY TO SR 1404 (DOWDY ROAD) IN SAMPSON COUNTY - UNDER CONSTRUCTIONTRNC SR 1404 (DOWDY ROAD) TO SR 1303 (MITCHELL LOOP ROAD) - UNDER CONSTRUCTIONTRND SR 1303 (MITCHELL LOOP ROAD) TO US 421/US 701/SR 1296 (SUNSET AVENUE) - UNDER CONSTRUCTIONTRNDA WEST OF SR 1262 TO EAST OF US 421 - COMPLETEE US 421/US 701/SR 1296 (SUNSET AVENUE) TO WEST OF SR 1920 (MOLTONVILLE ROAD)F WEST OF SR 1920 (MOLTONVILLE ROAD) IN SAMPSON COUNTY TO I-40 IN DUPLIN COUNTY

CUMBERLANDDUPLINSAMPSON

NC 24

FEDERAL BRIDGE PROJECTSB-4635 3335 10REPLACE BRIDGE NO. 9 OVER SOUTH RIVER

OVERFLOW.HF

HFB R 300 HFB C 3025

SAMPSON US 13

B-4636 4490 200REPLACE BRIDGE NO. 56 OVER SIX RUNS CREEK.

SW

NHPB R 390 NHPB C 1300 1300C1300C

SAMPSON NC 24

UNDER CONSTRUCTION - DIVISION PURCHASE ORDER CONTRACT (DPOC)

B-4930 2465 2465REPLACE BRIDGE NO. 66 OVER SIX RUNS CREEK.REG

SAMPSON NC 903

B-4813 1102 1REPLACE BRIDGE NO. 18 OVER CRANE CREEK.

DIV

STPOFF R 100 STPOFF M 1 STPOFF C 500 C 500

SAMPSON SR 1004(EDMOND MATTHISROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5623 660REPLACE BRIDGE NO. 85 OVER GREAT COHARIE CREEK OVERFLOW.

DIV

STPOFF R 31 STPOFF 629C

SAMPSON SR 1214(BOYLIN BRIDGE ROAD)

B-4814 2635 101REPLACE BRIDGE NO. 102, BRIDGE NO. 103 AND BRIDGE NO. 104 OVER LITTLE COHARIE CREEK.

DIV

STPOFF R 210 STPOFF U 23 STPOFF M 1 STPOFF C 2300

SAMPSON SR 1233(AUTRYVILLE ROAD)

B-4637 2381 111REPLACE BRIDGE NO. 326 AND BRIDGE NO. 327 OVER LITTLE COHARIE CREEK AND BRIDGE NO. 325 OVER LITTLE COHARIE CREEK OVERFLOW.

DIV

STPOFF R 220 STPOFF C 2050

SAMPSON SR 1409(OLD SALEMBURGROAD)

B-5306 1255 100REPLACE BRIDGE NO. 122 OVER BIG SWAMP.

HF

HFB R 105 HFB C 1050

SAMPSON SR 1414(MINNIE-HALL ROAD)

B-5305 1155REPLACE BRIDGE NO. 123 OVER BIG SWAMP.

DIV

HFB R 105 HFB C 1050

SAMPSON SR 1430(CARROLL STOREROAD)

3-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-5308 1160REPLACE BRIDGE NO. 152 OVER CAESAR SWAMP.

DIV

STPOFF R 105 STPOFF M 5 STPOFF C 525 C 525

SAMPSON SR 1455(PAYTON DANIELS ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5631 873REPLACE BRIDGE NO. 169 OVER JERNIGAN'S MILL RACE.

DIV

STPOFF 42R STPOFF 831C

SAMPSON SR 1620(TIMOTHY ROAD)

B-4638 866 10REPLACE BRIDGE NO. 195 OVER MERKLE SWAMP.

DIV

STPOFF R 80 STPOFF M 1 STPOFF C 388 C 387

SAMPSON SR 1703(CHURCH ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5651 995REPLACE BRIDGE NO. 214 OVER KILL CREEK.

HF

HFB 90R HFB C 905

SAMPSON SR 1706(KORNEGAY TOWNROAD)

B-5633 1819REPLACE BRIDGE NO. 194 OVER GREAT COHARIE CREEK.

DIV

STPOFF 87R STPOFF 1732C

SAMPSON SR 1746(KEENER ROAD)

B-5310 1658REPLACE BRIDGE NO. 188 OVER WARD SWAMP.

HF

HFB R 150 HFB M 8 HFB C 1500

SAMPSON SR 1817(BRADSHAW ROAD)

B-5307 755 150REPLACE BRIDGE NO. 376 OVER BEAVERDAM CREEK.

HF

HFB R 55 HFB C 550

SAMPSON SR 1838(BEAMON STREET)

B-5621 2280REPLACE BRIDGE NO. 248 OVER SIX RUNS CREEK.

DIV

STPOFF R 109 STPOFF 1085C1086C

SAMPSON SR 1904(PINE RIDGE ROAD)

B-4815 1498 1REPLACE BRIDGE NO. 3 OVER BEAVERDAM CREEK.

HF

HFB R 135 HFB M 12 HFB C 1350

SAMPSON SR 1933(BEAMON WOODSROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5103 18251 16251DIVISION 3 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

B-5628 860REPLACE BRIDGE NO. 164 OVER BRANCH OF MINGO SWAMP.

DIV

STPOFF R 41 STPOFF 819C

SAMPSON 1005(GREEN PATH ROAD)

MITIGATION PROJECTS

IN PROGRESS

EE-4903 378 378ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 3 PROJECT MITIGATION.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

3-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5203 5164 5164DIVISION 3 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BRUNSWICKDUPLINNEW HANOVERONSLOWPENDERSAMPSON

VARIOUS

3-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

NON HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS

AV-5739 558APPROACH CLEARING AT RUNWAY 5 AND RUNWAY 23.

0

DIV

T C 502 O C 56

BRUNSWICK CAPE FEARREGIONAL (SUT)

AV-5742 1201RUNWAY PROTECTION ZONE 2 - RUNWAY 24 LAND ACQUISITION.

0

DIV

T R 1081 O R 120

BRUNSWICK ODELL WILLIAMSONMUNICIPAL AIRPORT (60J)

BICYCLE AND PEDESTRIAN PROJECTSU-5527 3372 281WILMINGTON URBAN AREA MPO

TRANSPORTATION ALTERNATIVES PROGRAM.

DIV

TAP 25R R 25 R 25 R 25 R 25 R 25 25R25R25R R 25 R 25L 6R R 6 R 6 R 6 R 6 R 6 6R6R6R R 6 R 6TAP 200C C 200 C 200 C 200 C 200 C 200 200C200C200C C 200 C 200L 50C C 50 C 50 C 50 C 50 C 50 50C50C50C C 50 C 50

BRUNSWICKNEW HANOVERPENDER

VARIOUS

FERRY PROJECTS

UNDER CONSTRUCTION

F-5301 980 980CEDAR ISLAND, SOUTHPORT AND FORT FISHER DOCKS. REPLACE DOLPHINS.

TRN

BRUNSWICKCARTERETNEW HANOVER

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTA-6121 286 40CAPITAL

HF

FNU 246CP BRUNSWICK BRUNSWICK TRANSITSYSTEM, INC.

TK-6112 2492 712ADMINISTRATION

HF

FNU 356O O 178 O 178 O 178 O 178 O 178 178O178O178O FNU

BRUNSWICK BRUNSWICK TRANSITSYSTEM, INC.

PUBLIC TRANSPORTATION PROJECTSTA-6185 366 61CAPITALHF

FNU 305CP DUPLIN DUPLIN COUNTY

TG-6111 8 8ROUTINE CAPITALHF

FNU DUPLIN DUPLIN COUNTY

TK-6177 2922 834ADMINISTRATION

HF

FNU 416O O 209 O 209 O 209 O 209 O 209 209O209O209O FNU

DUPLIN DUPLIN COUNTY

TQ-6156 100OPERATING ASSISTANCE

HF

FEPD 50O L 50O

DUPLIN DUPLIN COUNTY

AVIATION PROJECTSAV-5702 3500REHABILITATE GA APRON NORTH.

SW

T 500C O 3000C

NEW HANOVER WILMINGTONINTERNATIONAL (ILM)

AV-5704 2400UPGRADE AIRFIELD LIGHTING VAULT.

SW

T C 500 O C 1900

NEW HANOVER WILMINGTONINTERNATIONAL (ILM)

AV-5730 5000EXTEND RUNWAY 6-24PHASE 1

SW

T C 500 O C 4500

NEW HANOVER WILMINGTONINTERNATIONAL (ILM)

AV-5713 1500PIPE DITCHES IN FBO #2 AREA.

SW

T C 500 O C 1000

NEW HANOVER WILMINGTONINTERNATIONAL (ILM)

3-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

EB-5764 1138TH STREET TO US 76 (OLEANDER DRIVE). CONSTRUCT SIDEWALK.

0.73

DIV

TAP 10PE L 2PE TAP C 81 L C 20

NEW HANOVER US 76(WOOSTER STREET)

EB-5765 148SR 2208 (NEW TOWN DRIVE) TO DANNY PENCE DRIVE. CONSTRUCT MULTI-USE PATH.

0.28

DIV

TAP 12PE L 3PE TAP C 107 L C 26

NEW HANOVER NC 132(NORTH COLLEGE ROAD)

PLANNING, DESIGN, RIGHT OF WAY, AND CONSTRUCTION BY CITY OF WILMINGTON

EB-5600 1040HOSPITAL PLAZA TO INDEPENDENCE BOULEVARD. CONSTRUCT MULTI-USE PATH.

1.7

DIV

STPEB PE 86 L PE 21 STPEB C 746 L C 187

NEW HANOVER SR 1219(SOUTH 17THSTREET)

EB-5543 226OGDEN ELEMENTARY SCHOOL TO SR 1986 (OYSTER DRIVE). CONSTRUCT MULTI-USE PATH.

TRN

DP 16R L 4R DP 165C L 41C

NEW HANOVER SR 1403(MIDDLE SOUND LOOPROAD)

U-5527 3372 281WILMINGTON URBAN AREA MPO TRANSPORTATION ALTERNATIVES PROGRAM.

DIV

TAP 25R R 25 R 25 R 25 R 25 R 25 25R25R25R R 25 R 25L 6R R 6 R 6 R 6 R 6 R 6 6R6R6R R 6 R 6TAP 200C C 200 C 200 C 200 C 200 C 200 200C200C200C C 200 C 200L 50C C 50 C 50 C 50 C 50 C 50 50C50C50C C 50 C 50

BRUNSWICKNEW HANOVERPENDER

VARIOUS

UNDER CONSTRUCTION - OTHER FUNDING - $525 FROM BLUE CROSS BLUE SHIELD, $75 FROM STATE FUNDS

EB-5544 1338 1338WILMINGTON. CONSTRUCT BICYCLE AND PEDESTRIAN ACCOMODATIONS ON SOUTH 17TH STREET, WALTMOOR ROAD, AND BETHEL ROAD.TRN

NEW HANOVER GARY SHELLCROSS-CITY TRAIL

EB-5719 209PARK AVENUE TO MCMILLAN AVENUE. CONSTRUCT BICYCLE LANE.

0.4

DIV

TAP PE 18 L PE 4 TAP C 150 L C 37

NEW HANOVER PEACHTREE AVENUE

FERRY PROJECTS

UNDER CONSTRUCTION

F-5301 980 980CEDAR ISLAND, SOUTHPORT AND FORT FISHER DOCKS. REPLACE DOLPHINS.

TRN

BRUNSWICKCARTERETNEW HANOVER

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTG-4796 800ROUTINE CAPITAL - BUS STOP SHELTERS,

BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC.

DIV

STPDA 200C STPDA C 100 FUZ 100C C 50 C 50 C 50 C 50 C 50 50C50C50C

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TG-5243 428PREVENTATIVE MAINTENANCE.

DIV

L 44C C 22 C 22 STPDA 170C C 170

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

3-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TG-5246 1324ADA COMPLEMENTARY PARATRANSIT.

DIV

L 132C C 66 C 66 STPDA 530C C 265 C 265

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TM-6137 636OPERATING ASSISTANCE

HF

JARC 318O L 318O

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TN-5135 116DESIGN, ENGINEER, AND INSTALL 8 BUS STOP SHELTERS

HF

FNF 93CP L 23CP

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TN-6108 1872 798OPERATING ASSISTANCE - NEW FREEDOM

HF

FNF 716O O 358 NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TN-6121 738OPERATING

HF

FNF 738O NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TO-4751 78562 21232OPERATING ASSISTANCE

HF

FUZ 9776O O 4888 O 4888 O 4888 O 4888 O 4888 4888O4888O4888O SMAP 1690O O 845 O 845 O 845 O 845 O 845 845O845O845O

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TP-5111 3298 560PLANNING ASSISTANCE - 5303

HF

FMPL 552CP CP 412 CP 412 CP 412 CP 412 CP 412 42CP42CP42CP NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TP-5110 300 100PLANNING ASSISTANCE - SHORT RANGE DEVELOPMENT

HF

FUZ CP 100 CP 100 NEW HANOVER CAPE FEAR PUBLIC TRANSPORTATIONAUTHORITY

TQ-6513 680OPERATING ASSISTANCE

HF

FEPD 170O O 85 O 85 L 170O O 85 L CP 85

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TS-5103 326 86SAFETY & SECURITY - MIN. 1% SET ASIDE

HF

FUZ 48CP CP 24 CP 24 CP 24 CP 24 CP 24 24CP24CP24CP NEW HANOVER CAPE FEAR PUBLICTRANPORTATIONAUTHORITY

TG-5225 1256 271ROUTINE CAPITAL-BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.HF

FUZ 275CP CP 140 CP 141 CP 142 CP 143 CP 144 NEW HANOVER JACKSONVILLE TRANSIT

3-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TA-6552 460CAPITAL - REPLACEMENT VEHICLE

HF

FNF 460CP NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TA-5134 478REPLACEMENT HYBRID BUS

HF

JARC 386CP L 92CP

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TA-6516 771 290CAPITAL

HF

FNU 481CP NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TG-5244 1256PREVENTIVE MAINTENANCE

HF

FBUS 502CP CP 251 CP 251 L 126CP CP 63 CP 63

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TG-5245 3216PREVENTIVE MAINTENANCE

HF

FUZ 1206CP CP 603 CP 603 L 402CP CP 201 CP 201

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TK-6176 3251 901ADMINISTRATION

HF

FNU 590O O 220 O 220 O 220 O 220 O 220 220O220O220O FNU

NEW HANOVER CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

AVIATION PROJECTSAV-5733 750DESIGN AND CONSTRUCT RUNWAY 23

HOLDING APRON.

REG

T C 300 O C 450

ONSLOW ALBERT J. ELLISAIRPORT (OAJ)

BICYCLE AND PEDESTRIAN PROJECTSEB-5736 530US 17 (MARINE BOULEVARD) TO SR 1336

(HENDERSON DRIVE), CONSTRUCT SIDEWALK ON BOTH SIDES WHERE NONE EXISTS

1.6

DIV

TAP 32PE L 8PE L R 20 TAP C 376L C 94

ONSLOW SR 1308(GUM BRANCH ROAD)

EB-4705 1550LEJEUNE BOULEVARD GREENWAY, SOUTH SIDE OF NC 24 (LEJEUNE BOULEVARD), MONTFORD POINT ROAD TO U-5132 GREENWAY TERMINI.

1.5TRN

STPEB 1550C ONSLOW JACKSONVILLE

PUBLIC TRANSPORTATION PROJECTSTQ-6157 250OPERATING ASSISTANCE - PURCHASE OF

SERVICE

HF

FEPD 200CP L 25CP S 25CP

ONSLOW CAPE FEAR PUBLICTRANSPORTATIONAUTHORITY

TA-4943 2280 1092EXPANSION BUSHF

FUZ 252CP CP 130 CP 132 CP 136 CP 138 CP 140 260CP ONSLOW JACKSONVILLE TRANSIT

TA-4944 3425 1407REPLACEMENT BUSHF

FUZ 229CP CP 119 CP 121 CP 123 CP 127 CP 129 390CP390CP390CP ONSLOW JACKSONVILLE TRANSIT

3-30 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TD-4904 7412 1629FACILITY - TRANSIT CENTER - DOWNTOWNHF

FUZ 1005CP CP 530 CP 607 CP 651 CP 699 CP 752 513CP513CP513CP ONSLOW JACKSONVILLE TRANSIT

TD-4905 2032 928FACILITY - PARK & RIDEHF

FUZ CP 552 552CP ONSLOW JACKSONVILLE TRANSIT

TG-5220 268 31JACKSONVILLE TRANSIT - MOBILITY MANAGEMENTHF

FUZ 64CP CP 33 CP 33 CP 34 CP 36 CP 37 ONSLOW JACKSONVILLE TRANSIT

TG-5109 1528 330PREVENTIVE MAINTENANCEHF

FUZ 244Oc Oc 131 Oc 138 Oc 145 Oc 108 Oc 108 108Oc108Oc108Oc ONSLOW JACKSONVILLE TRANSIT

TG-5225C 195 31MOBILITY MANAGEMENTHF

FUZ 64CP CP 33 CP 33 CP 34 ONSLOW JACKSONVILLE TRANSIT

see amendment #1 of 2012-2018 STIP

TO-4923 11506 2504OPERATING ASSISTANCE

HF

FUZ 1428O O 781 O 829 O 879 O 694 O 694 694O694O694O SMAP 334O O 167 O 167 O 167 O 156 O 156 156O156O156O

ONSLOW JACKSONVILLE TRANSIT

TP-5102 459 129PLANNING ASSISTANCE - 5303HF

FMPL 66CP CP 33 CP 33 CP 33 CP 33 CP 33 33CP33CP33CP ONSLOW JACKSONVILLE TRANSIT

see amendment #1 for 2012-2018 STIP

TP-4908 547 92PLANNING ASSISTANCE - 5307HF

FUZ 92PL PL 46 PL 46 PL 46 PL 46 PL 46 41PL46PL46PL ONSLOW JACKSONVILLE TRANSIT

see amendment #1 for 2012-2018 STIP

TS-5114 171 51SAFETY & SECURITY - MIN. 1% SET ASIDEHF

FUZ 24CP CP 12 CP 12 CP 12 CP 12 CP 12 12CP12CP12CP ONSLOW JACKSONVILLE TRANSIT

TT-4907 1970 813TECHNOLOGY - VEHICLE TRACKING, FARE COLLECTION, PASSENGER INFORMATION, DATA COMMUNICATIONS, TRAFFIC SIGNAL PRIORITY

HF

FUZ 311CP CP 162 CP 166 CP 169 CP 172 CP 177 ONSLOW JACKSONVILLE TRANSIT

TA-6204 675 384CAPITAL

HF

FNU 291CP JONESONSLOWPAMLICO

ONSLOW UNITED TRANSIT

TK-6150 3034 866ADMINISTRATION

HF

FNU 432O O 217 O 217 O 217 O 217 O 217 217O217O217O FNU

JONESONSLOWPAMLICO

ONSLOW UNITED TRANSIT

TM-6140 30OPERATING ASSISTANCE

HF

JARC 15O L 15O

ONSLOW ONSLOW UNITED TRANSIT

TN-6119 32OPERATING ASSISTANCE

HF

FNF 16O L 16O

ONSLOW ONSLOW UNITED TRANSIT

TO-6137 71 71VETERAN TRANSPORTATION AND COMMUNITY INITIATIVE II GRANTHF

FBUS ONSLOW ONSLOW UNITED TRANSIT

TA-6248 EXPANSION - LIGHT TRANSIT VEHICLE

HF

JONESONSLOWPAMLICO

TRANSPORTATION ADMIN.

AVIATION PROJECTSAV-5744 5383LAND ACQUISTION PHASE IV FOR ROADWAY

RELOCATION, ROADWAY RELOCATION, RUNWAY EXTENSION - PHASE 1 (850 LF).

0

DIV

T C 4845 O C 538

PENDER HENDERSON FIELD (ACZ)

3-31 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 3

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025BICYCLE AND PEDESTRIAN PROJECTS

U-5527 3372 281WILMINGTON URBAN AREA MPO TRANSPORTATION ALTERNATIVES PROGRAM.

DIV

TAP 25R R 25 R 25 R 25 R 25 R 25 25R25R25R R 25 R 25L 6R R 6 R 6 R 6 R 6 R 6 6R6R6R R 6 R 6TAP 200C C 200 C 200 C 200 C 200 C 200 200C200C200C C 200 C 200L 50C C 50 C 50 C 50 C 50 C 50 50C50C50C C 50 C 50

BRUNSWICKNEW HANOVERPENDER

VARIOUS

PUBLIC TRANSPORTATION PROJECTSTA-6252 236 42CAPITAL

HF

FNU 194CP PENDER PENDER ADULT SERVICES, INC.

TK-6152 1673 475ADMINISTRATION

HF

FNU 238O O 120 O 120 O 120 O 120 O 120 120O120O120O FNU

PENDER PENDER ADULT SERVICES, INC.

PUBLIC TRANSPORTATION PROJECTSTA-6536 65CAPITAL

HF

FNU 53CP L 6CP S 6CP

SAMPSON SAMPSON COUNTY

TK-6162 2212 632ADMINISTRATION

HF

FNU 316O O 158 O 158 O 158 O 158 O 158 158O158O158O FNU

SAMPSON SAMPSON COUNTY

3-32 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project