Offshore Pipelines Emergency Repair Capability Enhancement
Diverless Services : (2014-17)
Rakesh KumarSr Pipeline Engineer
![Page 2: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/2.jpg)
14” – 4 numbers30” – 3 numbers4” – 1 number
Pipeline Inventory in SEIC
![Page 3: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/3.jpg)
Pipeline Failure - Offshore
Leak Rupture
Fix Hydro Clamp Section replacement-connectors
Diving Spread >10mtShallow Barge 1-10mt
No Resources during Ice Condition – Dec to May
Ice Class Vessel, Work Class ROV, Diverless Equipments
Current strategy
![Page 4: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/4.jpg)
Currently available OIL States Equipments-Diver assisted
Leak ClampConnector
MAF
![Page 5: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/5.jpg)
Emergency pipes stocked in Kholmsk (fully refurbished)
Stored in Kholmsk
![Page 6: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/6.jpg)
Offshore Pipeline Emergency Documents
1 5600-Z-90-04-P-0017-00 Rev 02 Pipelines Emergency Response Plan (PA-A to Chaivo)2 5600-Z-90-04-P-0016-00 Rev 02 Pipelines Emergency Response Plan (PA-B to Chaivo)
3 5600-Z-90-04-P-0018-00 Rev 02 Pipelines Emergency Response Plan (LUN-A to OPF)4 2000-S-00-N-P-3272-00 Rev 06 PA-A Emergency Response Procedure5 4000-S-90-04-P-0007-00 Rev 03 Lun-A Emergency Response Procedure6 3000-S-90-04-P0008-00 Rev 02 PA-B Emergency Response Procedure7 4000-S-56-43-P-0001-00 Rev 01 MEG Tie-In Spool Contingency Plan - Replacement with
Flexible Pipe
8 5025-S-90-90-P-0004-00 Rev 0 MEG Tie-In Spool Contingency Plan - Diving Workscope
9 5600-S-90-01-T-0019-00 Rev P1 Pipeline Repair Strategy
![Page 7: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/7.jpg)
Ice during March near platforms
![Page 8: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/8.jpg)
With both connectors placed the spoolpiece (flanged section) replacement is descending.
The connector on the left has been set. The connector on the right was pulled to the replacement section by the tightening of the nuts on the replacement flange.
The concrete protective coating has been removed. The pipeline has been cut in two places and the deteriorated section is being hoisted away.
The ends of the pipeline have been cleaned more than the length of the connector.
REPAIR OF PIPELINE SECTION USING MECHANICAL CONNECTOR
![Page 9: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/9.jpg)
Standard Diverless Spread
![Page 10: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/10.jpg)
Diverless Spread-Lowering Frame
Lowering Frame
![Page 11: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/11.jpg)
Diverless SpreadCoating Removal Units
![Page 12: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/12.jpg)
Diverless SpreadWeld Seam Removal
![Page 13: Diverless Services Pipelines](https://reader035.vdocuments.us/reader035/viewer/2022062523/58f1cd641a28ab256b8b459f/html5/thumbnails/13.jpg)
Diverless Spread1. Oil States equipments (clamps, MAF, connectors and
handling tools) –SEIC
2. Remote Diverless Spread: HireH FramesExcavation toolsPipeline Cutting and concrete removal toolsROV special tooling with manipulatorPipeline retrieval tools
3. Vessel and Logistics – SEIC
-to improve with 100ton