    Line Protection ConceptsREx670

    Parameswaran.S, Sr. Engineer, Application , PG-GAS , ABB India Ltd 13.04.2016

  • 7/26/2019 Distance 130416

    2/61

    Overview

    Transmission Lines and Classifications

    Protection Scheme

    Distance Protection

    Differential Protection

    Power Swing Block

    Back Up Protection

    Directional Over Current

    Over Voltage

    Supplementary Functions Auto Reclose (1ph and 3 ph)

    Synchro-check.

    Month DD, Year | Sl ide 2

    ABB Group

  • 7/26/2019 Distance 130416

    3/61

    Line Protection DistanceOverview

    Month DD, Year | Sl ide 3

    ABB Group

    X X

    79

    21

    85

    68

    67/67N

    51/51N

    50STB

    DR

    59/27

    60

    25

    BUS

    BPT BPT

    BUS

    52 52CT CT

    LPT LPT

  • 7/26/2019 Distance 130416

    4/61

    Line Protection DifferentialOverview

    Month DD, Year | Sl ide 4

    ABB Group

    X X

    79

    DR

    59/27

    60

    25

    BUS

    BPT BPT

    BUS

    52 52CT CT

    LPT LPT

    87

    67 / 67N

    51 / 51N

    DR

  • 7/26/2019 Distance 130416

    5/61

    Line Classification

    Classification depends on

    Source to Line Impedance Ratio (SIR)

    Nominal Voltage

    IEEE C37.113 119

    Source Impedance Ratio

    Month DD, Year | Sl ide 5

    ABB Group

    Line Type SIR

    Short Line > 4

    Medium Line 0.5 to 4

    Long Line < 0.5

  • 7/26/2019 Distance 130416

    6/61

    Line Protection

    Short Line

    Differential Protection

    Distance Protection with Permissive Over Reach or Blockingscheme.

    Medium Line

    Distance Protection with Permissive Under Reach or Permissive Over Reach

    Back up Over current protection (Directional or Non Directional)

    Optional over-voltage and differential protection

    Application

    Month DD, Year | Sl ide 6

    ABB Group

  • 7/26/2019 Distance 130416

    7/61

    Line Protection

    Long Line

    Distance Protection with Permissive Under Reach optionalPermissive Over Reach

    Back up Over current protection (Directional or Non

    Directional) Over-voltage

    Optional differential protection

    Application

    Month DD, Year | Sl ide 7

    ABB Group

  • 7/26/2019 Distance 130416

    8/61

    DistanceMeasuring Principle

    Month DD, Year | Sl ide 8

    ABB Group

    X X

    BUS BUS

    Z and the measuredzero sequence current is below the set value 3I0

  • 7/26/2019 Distance 130416

    51/61

    Fuse FailConfiguration and Settings

    Month DD, Year | Sl ide 51 ABB Group

    Settings shown areinformative only, notto be used for sitecommissioningdirectly without priorvalidationby ABB

    Configuration shownare informative onlyand not to be adoptedfor commission

    without prior validationby ABB

  • 7/26/2019 Distance 130416

    52/61

    Scheme CommunicationConfiguration and Settings

    Month DD, Year | Sl ide 52 ABB Group

    Settings shown areinformative only, notto be used for sitecommissioningdirectly without priorvalidationby ABB

    Configuration shownare informative onlyand not to be adoptedfor commission

    without prior validationby ABB

  • 7/26/2019 Distance 130416

    53/61

    Application ConfigurationDifferential Protection RED670

    Month DD, Year | Sl ide 53 ABB Group

    Configuration shownare informative onlyand not to be adoptedfor commissionwithout priorvalidation by ABB

  • 7/26/2019 Distance 130416

    54/61

    Parameter SettingDifferential Protection

    Month DD, Year | Sl ide 54 ABB Group

    Settings shown areinformative only, notto be used for sitecommissioningdirectly withoutvalidating.

  • 7/26/2019 Distance 130416

    55/61

    Case Study 1Normal Operation AR, Fault

    Month DD, Year | Sl ide 55 ABB Group

    Fault in line, and main CB not ready for AR, but Tie CBs AR issuccessful.

  • 7/26/2019 Distance 130416

    56/61

    Case Study 1Impedance Locus during first fault

    Month DD, Year | Sl ide 56 ABB Group

    Impedance Locus enters zone 1 and trips CB instantaneously

  • 7/26/2019 Distance 130416

    57/61

    Case Study 1Fault during reclaim time

    Month DD, Year | Sl ide 57 ABB Group

    Fault during reclaim time, all the three phases of Tie CB is opened

  • 7/26/2019 Distance 130416

    58/61

    Case Study 1Impedance Locus during second fault

    Month DD, Year | Sl ide 58 ABB Group

    Impedance Locus enters zone 1 and trips CB instantaneously

  • 7/26/2019 Distance 130416

    59/61

    Power Swing Block

    Power swing may occur when

    Heavily loaded line gets disconnected

    A big generator trips

    Wrong Synchronizing

    Month DD, Year | Sl ide 59 ABB Group

  • 7/26/2019 Distance 130416

    60/61

    Power SwingImpedance Locus Movement

    Month DD, Year | Sl ide 60 ABB Group

  • 7/26/2019 Distance 130416

    61/61