dispatch checking procedure scp v5

Upload: denzel-edward-cariaga

Post on 03-Apr-2018

228 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    1/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.PR-GIA-DA-3

    Page1

    DOCUMENT TOP SHEETRevision No.

    0.0

    Effectivity Date

    ISSUE STATUS ORIGINATORS/INITIALS

    DESCRIPTION/ DETAILS OF CHANGE DATE ISSUED

    A First Issue

    TITLE PROCEDURE FOR DISPATCH AUDIT OF OUTGOING DELIVERIES ANDMATERIAL TRANSFERS

    PURPOSETo define the procedure in handling dispatch audit of outgoing deliveries andmaterial transfers

    SCOPE Start: Receipt of Delivery Receipt (DR), or Material Transfer Report (MTR)

    End: Review and analysis of dispatch reports

    COVERAGE SCP Balayan

    OWNERSHIP

    Group Division Unit

    PHC Internal Audit Dispatch Audit

    SIGNATORIES POSITION SIGNATURE /

    DATEPrepared By:

    R. D. SalazarSenior

    Audit Supervisor

    Reviewed By:

    G.Y. Pechayco Audit Head

    IMPORTANT. Any proposed change in

    this document must be coursed through

    the owner of the document with the use of

    a Policy/ Procedure Change Notice

    (PPCN). Document Control Center

    (DCC) is solely authorized to reproduce

    and distribute copies of this document.

    DOCUMENT CONTROL STAMP

    CONTROLLED COPY # :

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    2/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 2 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    CONTROLLED DISTRIBUTION

    DOCUMENT CONTROL UNIT (DCU) AUTHORIZEDRECIPIENT

    AREAS COVERED BY DCU

    Off.of the Pres.-COO PSCC Off. of the Pres. PSCC

    Off.of the Pres.-COO-PMPI/ SFPI Off. of the Pres.PMPI, SalesBP, SSD, SFPI-Sales

    Off.of the Pres.-COO-SCP Off. Of the Pres.-SCP

    Off.of the EVP-Corp. Services Off. Of the EVP-Corp. Services

    SCP Balayan All Depts. In SCP- Admin Bldg.

    PSCC Cabuyao All Depts. In PSCC-Cabuyao Plant

    PMPI- Carmona All Depts. In PMPI-Carmona Plant

    PMPI Cebu All Depts. In PMPI-Cebu Plant

    SCP-Technical Services SCP-TSD; also, SCP-Production, Engineering,Maintenance, QA/QC, Plant Logistics

    SCP- Finance SCP Finance, Sales-IM

    PSCC/ PMPI Finance Finance PSCC/ PMPI

    Group Treasury PHC Group Treasury & Controllership HRMD HRMD, Corp. Legal

    Sales DM Sales-DM, Customer Service-DM

    Marketing Marketing Services, Marketing Research

    Logistics Purchasing(Central & Strategic), Traffic, IMPEX

    SFPI All Depts. In SFPI Plant

    Sales IM Sales IM

    SCP Materials Management SCP Raw Materials, General Stores,Warehouse

    Group Internal Audit Group Internal Audit

    Systems and Procedures(Document Control Center)

    (Master Copy) Off. Of the Chairman, S&P

    Special Copy(ies):SPECIAL COPY NUMBER NAME AREA

    Number of Controlled Copies:

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    3/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 3 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    TASK RESPONSIBILITY REF./ SPEC.1.0 Receive any of the following transfer or delivery:

    Delivery Receipt (DR)

    Material Transfer Receipt (MTR)

    Dispatch Auditor

    2.0 Check for clarity of details written on the DR / MTR

    3.0 Check for completeness of the signatories

    4.0 Receive truck / crated products for checking

    4.1 Inspect for completeness and clarity of labelsand tags on the loaded items

    4.2 Check quantity and specification of finishedgoods/ materials if tallied with what isindicated in the DR or MTR

    Refer to WorkInstructions (WI)5 and 6

    4.3 Check weight and record result using theWeighing Report Form(1)

    (1)Refer to Annex 1 forsample form and WI 1

    4.4 Crated products are checked based on theattached tag signed by the Dispatch Auditorwho verified the sheets before it was wrapped.

    (This activity is applicablefor crating products only)

    4.5 Record all inspection done using the followingforms:

    Daily Dispatch Checking Report(2)( )

    Refer to Annex 2 forsample form and WorkInstruction 2

    Countsheet(3) Dispatch Auditor( )

    Refer to Annex 3 forsample form

    Dispatching Discrepancy Report(4)(To be accomplished for discrepancies

    found)

    Dispatch Auditor

    Dispatch Auditor

    (4)Refer to Annex 4 for

    sample form and WI 4

    4.6 Sign DR/MTR to confirm verification of itemsfor delivery DR Forward all DR copies to Gate Guard

    through Truck Driver MTR Detach the white copy for filing

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    4/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 4 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    4.7 Check the number of pallets, coil saddle, anddunnages if tallied with what is indicated in thePallet Lumber Issuance Receipt(PLIR).

    PLIR Detach the green copy for filing andforward the other copies the Gate Guardthrough Truck Driver

    Dispatch Auditor

    5.0 Prepare a monthly summary report on the following:

    Monthly Dispatch Checking Report

    (MDCR)

    (6)

    Submit this report to the PHC VicePresident, Plant Manager, and MMD Head

    (6)Refer to Annex 6 for

    sample format

    Dispatch Discrepancy SummaryReport(5)Submit this report to the departmentresponsible for the discrepancy, MMDHead, and Plant Accounting

    (5)Refer to Annex 5 for

    sample format

    6.0 Review and analyze reports

    Plant Manager

    6.1 Analyze occurrences of discrepancies anddetect any trend

    6.2 Make a recommendation or suggestions, incoordination with the involved personnel, inorder to help solve the problem

    6.3 Submit this report to the Chairman.

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    5/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 5 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    ANNEX 1WEIGHING REPORT FORM

    (Please see next page for the Work Instruction of this Form)

    Dispatch AuditWeighing Report

    DateTrucking Co.

    Plate No.

    Gross Wt. In MetricTons

    Tare Wt. In MetricTons

    Net Weight In MetricTons

    Delivery Receipts

    Remarks

    BBBB

    CCCC

    DDDD

    EEEE

    FFFF

    GGGG

    HHHH

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    6/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 6 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    WORK INSTRUCTION 1

    WEIGHING REPORT FORM

    CODE INSTRUCTION ACCOMPLISHEDBY

    A Enter date

    Dispatch Auditor

    B Identify the name of the trucking companyC Identify the Plate No. of the truck to be weigh

    D Enter Gross Weight of truckE Enter Tare Weight of truckF Compute and enter the Net WeightG Note the Delivery Receipt No. (DR No.) corresponding to the

    loaded itemsH Provide total weight computation for the pallet and dunnages to

    be deducted on the difference of DR/MTR weight againstactual weight.

    1. Weigh empty truck and print result at the back of the form which is to be countersigned bythe dispatch auditor

    2. Record result as Tare Weight at Code E

    3. Load truck with items listed on the Delivery Receipt4. Weigh loaded trucks and print result at the back of the form which is to be countersigned by

    the dispatch auditor5. Record result as Gross Weight at Code D6. Deduct Tare Weight from the Gross Weight to get the Net Weight. Record result at Code F7. Countersign Net Weight Result8. Compute the weight of the Pallets/ Dunnages/ Packaging Materials used and deduct from

    the Net Weight. Plant Accounting Supervisor to check the computation on the Pallet andDunnages made by Dispatch Audit and countersign the net weight.

    9. Weight discrepancy for investigation can only be determined when a set of acceptedtolerance is established. In view of the changing parameters of the actual coil thickness and

    the set theoretical weight in the computerized inventory system, an evaluation and study onthe acceptable tolerance must be established at the plant.

    10. If the accepted tolerance is established and weight discrepancy exists, the Dispatch Auditorwill present his Countsheet to the Plant Accounting Supervisor to check the source of thesheets under contention and determine if the theoretical weight used in the preparation ofthe Delivery Receipt is correct or the tagged weight of coil is the same with the Productionrecord.

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    7/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 7 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    ANNEX 2DAILY DISPATCH REPORT

    (Please see next page for the Work Instruction of this form)

    CCCCBBBB DDDD IIIIHHHHGGGGFFFFEEEE

    JJJJ

    KKKK

    LLLL

    MMMM

    NNNN

    OOOO

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    8/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 8 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    WORK INSTRUCTION 2

    DAILY DISPATCH CHECKING REPORT

    CODING INSTRUCTION ACCOMPLISHEDBY

    A Enter reference documentation (DR, MTR, etc.)

    Dispatch Auditor

    B Enter the total tonnage of items loaded

    C Enter the total quantity of items loadedD Enter the loading starting and ending time

    E Identify the Customer/ Company NameF Identify the type of items loaded

    G Enter the discrepancy found

    H Identify the Trucking Company and the Plate No. of the truck underaudit

    I Obtain signature of the driver

    J Provide any related remarks/ notes relevant to the activityK Identify the Philsteel ABU to which the audit is being doneL Enter the name of the assigned dispatch auditor

    M Enter the date of auditN Provide the working schedule of the dispatch auditor assigned

    O Identify the no. of pages accomplished

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    9/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 9 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    ANNEX 3COUNTSHEET

    (Please see next page for the Work Instruction of this Form)

    AAAA

    BBBB

    FFFF

    EEEE

    DDDD

    CCCC

    IIIIHHHH

    GGGG

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    10/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 10 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    WORK INSTRUCTION 3

    COUNTSHEET FORM

    CODING INSTRUCTION ACCOMPLISHEDBY

    A Enter the date

    Dispatch Auditor

    B Note the Delivery Receipt No. (DR No.) corresponding to the itemsloaded

    C Identify the name of trucking companyD Identify the Plate No. of the truck under auditE Indicate the specification (e.g. GL x 915 x 2440 FS)

    F Note the quantity of items to be loaded and its corresponding tag no.G Compute for the running total of the quantity

    H Obtain signature of driver to confirm the correctness of the count Truck Driver

    I Provide any remarks/notes relevant for the activity Dispatch Auditor

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    11/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 11 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    ANNEX 4DISPATCHING DISCREPANCY REPORT

    (Please see next page for the Work Instruction of this Form)

    AAAA

    KKKK

    JJJJ

    IIII

    HHHH

    GGGG

    FFFF

    EEEE

    DDDD

    CCCC

    LLLL

    MMMM

    BBBB

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    12/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 12 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    WORK INSTRUCTION 4DISPATCHING DISCREPANCY REPORT FORM

    CODING INSTRUCTION ACCOMPLISHEDBY

    A Assign Control No. which must be sequential

    Dispatch Auditor

    B Enter the date of accomplishmentC Identify the Philsteel ABU to which the discrepancy is directedD Identify the involved departmentE Choose from the list which product was found to have

    discrepancy. Specify on others portion if not found on the listF Provide details on the discrepancy foundG Provide any remarks/ notes relevant to this activityH Identify if Warehouse Inventory has been affected by the

    discrepancy foundI Enter name and corresponding designation, and sign LoaderJ Enter name and corresponding designation, and sign Finishing Line

    Personnel, QA/QC

    InspectorK Enter name and sign

    Dispatch AuditorL Note the Delivery Receipt No. (DR No.) or Job Order No. (JO

    No.) related to the items loadedM Provide the verification time

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    13/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 13 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    ANNEX 5DISPATCH DISCREPANCY SUMMARY REPORT

    TYPE GAUGE WIDTH ENGT C/P CLASS QTY OTHERS09/12/10 SCP ACCD-1-611 FCL 128697 XQ 0.50 915 7 CORR PRIME -1 T#667151/S2/08-24-10

    09/06/10 SCP ACCD-1-612 FVG 129514 GLP 0.40 915 7 CORR PRIME 1 A. ALDAY

    09/08/10 SCP ACCD-1-613 FVG 128747 PZ 1.00 1220 8 PLAIN PRIME -1 T#664867/S2/08-31-10

    09/13/10 SCP ACCD-1-614 FVG 128747 PZ 1.20 1220 8 PLAIN PRIME 1 A. ONA

    09/13/10 SCP ACCD-1-615 FVG 128747 PZ 1.10 1220 8 PLAIN PRIME -1 T#664857/S1/08-31-10

    09/17/10 SCP ACCD-1-616 GVG 0 ZL 0.30 915 12 CORR PRIME -1 CRATING T#631216/S2/09-14-10

    09/20/10 SCP ACCD-1-617 FVG 129359 ZL 0.30 915 8 CORR PRIME 1 A. ALDAY

    09/21/10 SCP ACCD-1-618 GVG 0 ZL 0.30 915 10 CORR PRIME -2 T#620795/S3/09-09-10

    09/22/10 SCP ACCD-1-619 FVG 0 GLP 0.40 915 10 CORR PRIME 1 T#631071TO72/S3/09-11

    09/25/10 SCP ACCD-1-620 FVG 129649 PZ 0.50 1220 8 PLAIN PRIME 1 A. ALDAY

    09/23/10 PMPI CEBU ACCD-1-001C TRJ 385274 L.W 0.40 1133 8 S.TILE PRIME O. POLBOS

    09/23/10 PMPI CEBU ACCD-1-002C SVA 0 T.RED 0.40 305 12 V. GUTTER PRIME O. POLBOS

    09/29/10 PMPI CEBU ACCD-1-003C TRJ 385341 L.W 0.40 1133 8 SPANDEK PRIME 1 O. POLBOS

    ERRONONEOUS LOADING

    ERRONONEOUS LOADING

    DATE PLANT DDR NO. DA REF.SPECIFICATION DISCREPANCY R / I

    PROD'N SHIFT

    WORK INSTRUCTION 5

    METHOD OF CHECKING PRODUCTS - SHEETS

    NUMBER INSTRUCTION ACCOMPLISHEDBY

    1 Check the sheets for any damages and improper loading

    Dispatch Auditor

    2 Check tags attached to sheets for the specification (If available)3 Check ink markings to determine actual specification for alternate

    verification in the absence of tag (if possible)4 Count the sheets by counting the number of index (One index is equal

    to 5 sheets) per stack.

    5Pry the index of sheets at the corner to ensure that it is compose of 5sheets. Mark the index with over and under 5 sheets, it should even outwhen the total quantity is computed.

    6 Record the quantity in the Countsheet and compute the sum for eachspecification.

    7 Compare the number of sheets checked against the indicated quantityin the Delivery Receipt or Materials Transfer Receipt.

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    14/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 14 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    ANNEX 6MONTHLY DISPATCH CHECKING REPORT

    Delivery Qty. Weight Delivery Qty. Weight Delivery Qty. Weight Delivery Weight Delivery Weight Delivery Weight

    1 - - - - - - - - - 56 1,717.55 1 7.32 57 1,724.87

    2 254 54,002 659.27 18 379 37.55 22 587 315.16 10 528.42 8 22.50 312 1,562.91

    3 61 18,027 110.65 - - - - - - - - 4 20.89 65 131.54

    4 182 36,902 154.84 - - - - - - - - - - 182 154.84

    5 115 658,133 2,845.35 5 17,438 138.59 2 2 6.15 - - 9 248.10 131 3,238.19

    612 767,064 3,770.11 23 17,817 176.14 24 589 321.30 66 2,245.97 22 298.81 747 6,812.34

    Note: Number of deliveries stated above includes sheets, coils, materials transfer and scrap hauling. - -

    Coils MTR Scrap

    Qty. Mt. Mt. Mt. Mt. Sheets Mt.

    1 19,056 86.20 - - - 19,056 86.20

    2 8,492 57.08 - - - 8,492 57.083 15,800 276.51 174.96 - 12.57 15,800 464.03

    4 - - - - - - -5 - - - 966.50 7.32 - 973.826 47,781 459.56 140.20 528.42 9.93 47,781 1,138.12

    7 18,752 98.82 5.32 - 14.04 18,752 118.188 107,335 514.60 - - 84.12 107,335 598.729 17,846 68.63 - - - 17,846 68.63

    10 140,279 591.28 - - 64.05 140,279 655.3311 181,680 834.72 0.83 - 86.43 181,680 921.98

    12 227,860 958.85 - - 20.35 227,860 979.2013 - - - 751.06 - - 751.06

    784,881 3,946.25 321.30 2,245.97 2 98.81 784,881 6,812.34

    ANALYSIS OF DISCREPANCY OCCURRENCE

    1. Number of Discrepancy Occurrence Dec-10 Jan-11 Feb-10 Mar-10 Apr-10 May-10 Jun-10 July-10 Aug-10 Sept-10 Oct-10 Nov-10 Dec-10

    PSCC - Cabuyao 1 0 0 0 7 2 1 1 0 1 0 0 0

    PMPI - Carmona 0 0 0 0 0 0 0 0 0 0 0 0 2

    SFPI - Bulacan 0 0 0 0 0 0 0 0 0 0 0 0 0

    PMPI - Cebu 0 0 0 0 0 0 0 0 0 3 0 0 0

    SCP - Balayan

    Materials Management Department 4 24 3 3 4 14 11 9 16 4 8 5 4

    Production - Finishing Line 4 7 3 1 3 48 19 13 22 4 3 8 7

    Technical Services Department 0 1 0 0 0 0 0 0 0 2 1 0 0Total 8 32 6 4 7 62 30 22 38 10 12 13 11

    SCP-Balayan

    Total

    PSCC-Cabuyao

    PMPI-Carmona

    SFPI-Bulacan

    PMPI-Cebu

    MATERIALSTRANSFER

    SCRAP TOTALPrime Seconds

    Alvarez, Sebastain

    Bables, MelchorBantatua, Francisco

    Monthly Dispatch Checking Report

    MONTH: December 2010

    Plant

    SHEETSCOILS

    Cabiling, JoelDayag, JoelGallardo, Ford

    Lindog, Richard

    Dispatch Auditor

    Total

    Total

    Oliva, MarioTabiolo, Vinson

    Sheets

    Gonzales, GerardoButad, Jimmy

    Jonson, TeodoroLopez, Francisco

    INTERNAL AUDIT GROUP

  • 7/28/2019 Dispatch Checking Procedure SCP v5

    15/15

    POLICIES AND PROCEDURES

    PHILSTEEL GROUP OF COMPANIES

    Document No.

    PR-GIA

    Page

    Page 15 of 15

    TITLE

    PROCEDURE FOR DISPATCH AUDIT OF OUTGOINGDELIVERIES AND MATERIAL TRANSFERS

    DEALERS MARKET AND INDUSTRIAL MARKET

    Revision No.

    0.0

    Effectivity Date

    EVP-COO (SCP) PRESIDENT COO (PMPI/ SFPI)

    DOCUMENT

    CONTROL STAMP

    PRESIDENT - COO (PSCC)

    EVP- CORP. SERVICES CHAIRMAN - CEO

    WORK INSTRUCTION 6METHOD OF CHECKING PRODUCTS COILS

    NUMBER INSTRUCTION ACCOMPLISHEDBY

    1 Check the coils for any damages or improper loading

    Dispatch Auditor

    2 Check the number of coils and the tag for the coil number, specification

    and weight.3 Record the specification and weight of the coils in the Countsheet.4 Compare the verified information from coil tag against the indicated

    information in the Delivery Receipt or Materials Transfer Receipt.