disclaimer
DESCRIPTION
Disclaimer The following slides are from my viewpoint only and are not necessarily the view point of The Boeing Company or it’s management. John (J.D.) Drollinger Integrated Validation The Boeing Company. - PowerPoint PPT PresentationTRANSCRIPT
04/19/23
Disclaimer
The following slides are from my viewpoint only and are not necessarily the view point of The Boeing Company or it’s management
04/19/23
John (J.D.) Drollinger Integrated Validation The Boeing Company
For the last 9 years J.D. has supported the implementation of a large-scale business process re-engineering plan, dealing with design, planning, manufacturing and quality. His main responsibility is in integrated validation, where he has worked backward from managing the end user simulation activity to his current assignment which is managing the Integrated Unit Test that supports the application developers.
04/19/23
Integrated Unit Test Daily status meeting
Date 2004Conference Room – Virtual
Meeting number: For WebEx meetings
Meeting password: For WebEx meetings
Teleconference: For WebEx meetings
Host Key For WebEx meetings
04/19/23
Current Release Schedule
Build Start Install Checkout Test Start Freeze Date Test Stop & Pass notes Move Sheets due
Test Plan “Current Release” IUT Test Plan “Current Release” IUT Issues
Future Activity Environment
… Future release
Test planning dates Test execution dates
Integrated Unit test Environment #1 Stop Light Status
Stop Light Status
Stop Light Status
04/19/23
Issues with IUT
Date Issue Resolution Ticket Comments Date Resolved
Reported By
Outage
1
2
3
4
5
6
7
8
9
10
11
12
04/19/23
Metrics
93%
7%
Passed
Failed
Environment / Release Regression Tests
93%
7%
Passed
Failed
Environment / Release Total Tests
Environment / Release RFC Tests
92%
8%
Passed
Failed
04/19/23
Big thanks to Yvonne for helping me with this pitch.
Thanks to Ed. For the donuts today!
Congrats! To Tamie who’s dog won the Fly ball meet.
Kudos
04/19/23
IUT 0830 Yesterday date Meeting Notes
This is what happened yesterday Review any action items.
04/19/23
93%
7%
Passed
Failed
Environment / Release Regression Tests
93%
7%
Passed
Failed
Environment / Release Total Tests
Environment / Release RFC Tests
92%
8%
Passed
Failed
04/19/23
Release IUT Program Test Results
Regression testing 495 out of 534 steps passed. 39 steps no status given (See next chart for detail)
RFC testing 224 Total 205 Passed 3 Failed with new PR written 16 No status given (See next chart for detail)
Issues 32 Issues created and resolved
Of the 32 issues created 16 used BARS tickets for tracking and resolution documentation.
All exit criteria met.
04/19/23
No status given breakdown
Regression test (39 total steps) Application A 21 (Test steps planned but not executed) Application B 18 (Test steps planned but not executed)
RFC’s (16) Application B 2 (PR A, PR B)
Application C 7 (PR C, PR D, PR E, PR F, PR G, PR H,PR I)
Application D6 (PR J, PR K, PR L, PR M, PR N, PR O)
Application E 1 (PR P)
04/19/23
IUT Exit Criteria
The Integrated Unit Test Plan has been executed.
All IUT regression test scripts have been successfully executed.
Outstanding issues and defects have been documented and communicated.
The release is free of user defined Severity 1 defects.
Build output documents are updated, accurate and complete.