(427202) Radio Regulations Board Geneva, 6 – 10 November 2017 Document RRB17-3/DELAYED/1-E 25 October 2017 Original English Director, Radiocommunication Bureau SUBMISSION BY THE ADMINISTRATION OF INDIA REQUESTING AN EXTENSION OF THE DATE OF BRINGING INTO USE OF FREQUENCY ASSIGNMENTS TO THE INSAT-EXK82.5E SATELLITE NETWORK The attached delayed submission from the Administration of India requesting an extension of the regulatory period for the bringing into use of frequency assignments to the INSAT-EXK82.5E satellite network is for the consideration of the Radio Regulations Board. The attachment corrects an error that was introduced during the facsimile transmission of the information contained in Document RRB17-3/6, notably the re-introduction of paragraph c) in section 4 that was lost during the transmission. Attachment 1

Upload: others

Post on 14-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Director, Radiocommunication Bureau - ITU · activities of fully indigenous cryogenic stage of GSLV Mk Ill which occurred in the first week of March 2017 were beyond the control of

(427202)

Radio Regulations Board Geneva, 6 – 10 November 2017

Document RRB17-3/DELAYED/1-E 25 October 2017

Original English

Director, Radiocommunication Bureau

SUBMISSION BY THE ADMINISTRATION OF INDIA REQUESTING AN

EXTENSION OF THE DATE OF BRINGING INTO USE OF FREQUENCY

ASSIGNMENTS TO THE INSAT-EXK82.5E SATELLITE NETWORK

The attached delayed submission from the Administration of India requesting an extension of the

regulatory period for the bringing into use of frequency assignments to the INSAT-EXK82.5E

satellite network is for the consideration of the Radio Regulations Board.

The attachment corrects an error that was introduced during the facsimile transmission of the

information contained in Document RRB17-3/6, notably the re-introduction of paragraph c) in

section 4 that was lost during the transmission.

Attachment 1

Page 2: Director, Radiocommunication Bureau - ITU · activities of fully indigenous cryogenic stage of GSLV Mk Ill which occurred in the first week of March 2017 were beyond the control of

- 2 -

RRB17-3/DELAYED/1-E

(427202)

Attachment 1

Page 3: Director, Radiocommunication Bureau - ITU · activities of fully indigenous cryogenic stage of GSLV Mk Ill which occurred in the first week of March 2017 were beyond the control of

- 3 -

RRB17-3/DELAYED/1-E

(427202)

Page 4: Director, Radiocommunication Bureau - ITU · activities of fully indigenous cryogenic stage of GSLV Mk Ill which occurred in the first week of March 2017 were beyond the control of

- 4 -

RRB17-3/DELAYED/1-E

(427202)

_____________