    Directive009

    Directive 009: CasingCementing MinimumRequirements

    July 1990

    Effective June 17, 2013, the Energy Resources Conservation Board(ERCB) has been succeeded by the Alberta Energy Regulator (AER).

    As part of this succession, the title pages of all existing ERCB directivesnow carry the new AER logo. However, no other changes have beenmade to the directives, and they continue to have references to theERCB. As new editions of the directives are issued, these referenceswill be changed.

    Some phone numbers in the directives may no longer be valid. ContactAER Inquiries at 1-855-297-8311 or [email protected].

  • 8/10/2019 Directive 009

    2/17

    Directive0

    Casing Cementing MinimumRequirements

    July 1990

    Effective January 1, 2008, the Alberta Energy and Utilities Board (EUB)has been realigned into two separate regulatory bodies, the EnergyResources Conservation Board (ERCB), which regulates the energyindustry, and the Alberta Utilities Commission (AUC), which regulates

    the utilities industry.

    As part of this realignment, the title pages of all existing EUB directivesnow carry the new ERCB logo. However, no other changes have beenmade to the directives, and they continue to have references to EUB.As new editions of the directives are issued, these references will bechanged.

  • 8/10/2019 Directive 009

    3/17

    ENERGY RESOURCES CONSERVATION BOARD

    Directive 009: Casing Cementing Minimum Requirements

    July 1990

    Published by

    Energy Resources Conservation Board640 5 Avenue SW

    Calgary, Alberta

    T2P 3G4

    Telephone: 403-297-8311

    Fax: 403-297-7040

    [email protected]

    Web site: www.ercb.ca

    mailto:[email protected]://www.ercb.ca/http://www.ercb.ca/mailto:[email protected]
  • 8/10/2019 Directive 009

    4/17

  • 8/10/2019 Directive 009

    5/17

    ALBERTA ENERGY AND UTILITIES BOARD

    Guide 9: Casing Cementing Minimum Requirements

    July 1990

    Published by

    Alberta Energy and Utilities Board640 5 Avenue SW

    Calgary, Alberta

    T2P 3G4

    Telephone: (403) 297-8311

    Fax: (403) 297-7040

    Web site: www.eub.gov.ab.ca

  • 8/10/2019 Directive 009

    6/17

    u

    asing

    ementing

    Minimum Requirements

    lberta

    Energy and

    Utilities oard

  • 8/10/2019 Directive 009

    7/17

    . .

    ' -

    .

    asing ementing

    Minimum Requirements

    Important Message

    The

    EUB is updating

    publications

    that

    pre-dated

    the

    amalgamation of the Energy Resources Conservation Board

    (ERCB) and

    the

    Public Utilities Board (PUB) in 1995.

    The

    Alberta Energy

    and

    Utilities

    Board (EUB) takes the

    place

    of

    any references to the

    ERCB, PUB,

    or their full names.

    Major revisions

    to EUB documents are

    occurring

    as part of

    regulatory

    re-engineering and streamlining initiatives.

    In

    some cases, older publications

    are

    withdrawn or integrated

    into new ones.

    his

    document

    has not yet

    gone through the

    revision process. Please

    consult

    the

    latest

    Acts

    and

    Regulations to interpret and apply legal requirements.

    To find

    out

    a

    current contact

    name

    for

    this

    publication,

    please call 297-8311.

  • 8/10/2019 Directive 009

    8/17

    ENERGY RESOURCES

    CONSERVATION BOARD

    GUIDE

    SERIES

    July

    1990

    Edition

    Published by

    Energy

    Resources Conservation

    Board

    640 Fifth Avenue W

    Calgary Alberta

    T2P G4

    Telephone 403) 297-8311

    Facsimile

    403)

    297-7040

  • 8/10/2019 Directive 009

    9/17

    CONTENTS

    Page No

    1

    INTRODUCTION

    1

    2

    THE

    REGUL TIONS

    3

    3

    CEMENTING REQUIREMENTS 5

    3.1

    Conductor Pipe

    5

    3.2 Surface

    Casing

    5

    3.3 product ion

    Intermediate

    and Liner

    casing

    5

    4

    SPECIAL

    CEMENTS

    7

    4.1

    Foam

    Cement

    7

    4.2 Thermal Cement

    7

    5

    METHOD OF DETERMINING

    REQUIRED

    CEMENT

    TOP

    TT CHMENT

    1

    Map of

    Required Cement

    Tops

    TT CHMENT

    2

    Example Cement Report

    Form

    9

  • 8/10/2019 Directive 009

    10/17

    INTRODU TION

    The purpose

    of t i s guide

    i s

    to outline casing cementing

    requirements

    in

    accordance

    with

    sections

    6080

    and

    6 090

    of

    the

    oi l

    and Gas

    Conservation

    Regulations

    This

    guide:

    o quotes

    the

    relevant sections of the

    regulations;

    o outlines the method for determining the required

    cement tops

    when

    cementing

    casing;

    o outlines

    cementing requirements for casing;

    o

    outlines

    Board

    requirements

    for the

    use

    of

    special

    cements such as

    foam

    and thermal cements

    http://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdf
  • 8/10/2019 Directive 009

    11/17

    3

    2 THE REGULATIONS

    The regulat ions governing the

    cementing

    of

    casing

    for wells

    in Alberta are

    the

    oil and

    Gas

    Conservation

    Regulations ,

    sections

    6.080(4)

    and

    (6)

    and

    6.090,

    as

    quoted

    below.

    2.1 section

    6.080

    (4) Where the

    required

    surface casing se t t ing depth

    i s

    less

    than

    (a) 180

    metres,

    or

    (b) 25 metres below any aquifer which is a

    source of useable water

    the

    casing

    s t r ing

    next

    to

    the

    surface casing

    shal l

    be

    cemented

    ful l

    length.

    NOTE: The in tent

    of

    section 6.080(4) above i s

    to

    ensure the

    protection

    of

    useable groundwater by the adequate cementing

    of production

    and/or intermediate

    casing in l ieu of the

    requirement to se t deeper surface casing.

    11 6) The l icensee

    shall ensure that surface

    casing i s

    cemented ful l length from the depth

    prescribed

    by

    the

    Board

    before

    any

    r i l l ing i s commenced more

    than 10 metres beyond the prescribed set t ing

    depth.

    2.2

    section

    6.090

    The

    Licensee shall cement

    casing

    as

    prescribed by

    the

    Board's Guide G-9, Casing Cementing - Minimum

    Requirements, as amended from

    time

    to time, unless

    the Board,

    (a) exempts the

    Licensee

    from the

    requirements, or

    (b)

    prescribes

    another

    method

    for

    cementing the casing for a par t icular

    well

    or area.

    http://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdfhttp://www.eub.ca/docs/requirements/actsregs/ogc_reg_151_71_ogcr.pdf
  • 8/10/2019 Directive 009

    12/17

    5

    3 CEMENTING REQUIREMENTS

    The l icensee i s responsible for the

    satisfactory

    cementing

    of casing,

    as

    required by the

    oi l and

    Gas Conservation

    Regulations.

    These

    requirements

    are

    summarized

    below:

    3.1

    Conductor pipe

    where required for well

    control)

    a) The conductor

    pipe

    shall be cemented ful l

    length

    by

    the

    circulat ion

    method.

    b)

    I f the

    cement job

    fa i l s

    to

    retain i t s

    integri ty,

    then dri l l ing shall be suspended and

    remedial

    action

    undertaken.

    c) The

    hole

    diameter shall be a t leas t 100 ro larger

    than

    the

    diameter

    of the pipe.

    3.2 Surface

    casing

    a) Surface

    casing shall

    be

    cemented

    ful l

    length.

    b) I f cement returns are not obtained a t surface

    or

    the cement level in the annulus drops, then the

    cement top shall

    be determined and

    the appropriate

    ERCB Area Office contacted to discuss

    remedial

    action.

    c)

    i l lers

    or additives

    tha t

    reduce

    the

    compressive

    strength

    shall not

    be used

    in the cement.

    d) Surface casing shall be

    adequately

    centralized

    a t

    the

    top

    and

    bottom and

    a t 50-metre

    intervals .

    3.3

    Production, Intermediate,

    and

    Liner

    Casing

    a)

    Cement shall

    not

    be pumped down the

    annulus

    from

    surface

    unless

    approved by a Board

    representative.

    b) The minimum cement top shall be determined

    as

    outlined

    in

    section 5 of th is guide.

    c)

    The

    required

    cement volume shall be based

    on

    hole-size measurements, taken from a cal iper

    log,

    plus a minimum

    of

    20

    per

    cent excess.

    n

    exemption

    from the 20

    per

    cent excess requirement may be

    granted upon application.

  • 8/10/2019 Directive 009

    13/17

    6

    d)

    e)

    The use of f i l l e r s and/or additives

    to

    the cement

    system is acceptable only i f the

    compressive

    strength

    of the

    mixture i s

    a t leas t

    3500 kPa af ter

    curing

    for 8

    hours

    a t the

    temperature of the

    uppermost hydrocarbon bearing zone.

    The

    temperature

    of the

    zone

    referred

    to

    in

    item

    d)

    should be calculated

    using

    a

    surface

    temperature of

    4.4C

    and

    a 2.7C/100 m

    temperature

    gradient where

    the actual

    temperature

    i s unknown.

    f) stage cementing programs,

    which

    will resul t in an

    open-hole

    uncemented)

    interval behind casing,

    shal l

    be approved by a

    Board

    representative.

    g)

    Liners

    shal l be cemented ful l

    length.

    h) During the cementing operation, flow

    returns

    shal l

    be

    visually

    monitored. f

    cement

    returns are not

    obtained

    a t

    surface

    when cementing ful l length,

    or

    i f

    displaced

    dri l l ing f luid returns indicate tha t

    the

    required

    cement top may not have been obtained,

    a cement-top locating

    log shall

    be run. The log

    and

    a proposed remedial

    cementing

    program

    shal l

    be

    submitted to the

    Board

    within

    60 days of

    r ig

    release, or

    prior

    to commencement of completion

    operations.

    i) Full detai l s of the cementing operation

    shal l

    be

    recorded and submitted

    to the

    Board

    ei ther

    on the

    tour reports

    or

    on a

    casing cement report simi

    l i a r

    to

    the

    example

    in the

    Attachment 2.

    j) The casing shal l

    be

    adequately centralized. On

    intermediate and production casing, central izers

    shal l

    be placed a t the top and bottom

    of

    a l l

    productive formations and a t

    50-metre

    intervals

    to

    the required cement

    top.

  • 8/10/2019 Directive 009

    14/17

  • 8/10/2019 Directive 009

    15/17

    9

    5 METHOD OF DETERMINING REQUIRED

    CEMENT

    TOP

    In order to determine the required cement top

    in

    a given

    area

    refer

    to the Map

    of Alberta (Attachment

    1) and

    follow

    the steps outlined

    below.

    (a) In

    al l cases

    i f less

    than

    180

    metres

    of surface

    casing

    has been

    run,

    or

    casing is not set

    more than

    25 metres below any aquifer which contains

    useable

    water,

    .the

    intermediate or production casing

    shal l

    be

    cemented ful l length. This requirement will take

    precedence over the required cement top in the map

    (Attachment 1) or on the licence.

    (b) Refer to the map, which identif ies the required

    cement

    tops

    by

    township, range, and meridian.

    (c)

    Using the

    example of:

    Township: 36, Range: 24,

    west

    of the 4th

    Meridian,

    the required cement top

    i s

    100

    metres

    above the

    top of

    the

    viking and/or

    any

    shallower potential

    hydrocarbon-bearing zone .

    (d)

    Should the

    township

    and range

    be blank,

    then the

    appropriate ERC Area

    Office shall

    be

    contacted

    af ter

    the

    well

    has

    been

    dril led

    and

    evaluated

    to

    obtain

    approval of the l icensee 's

    proposed

    cement

    top.

    (e) The cement top requirements shown on the map are

    subject to change, and prior i ty shall be

    given to

    requirements

    specified on the well l icence,

    or

    by a

    Board representative.

    (f) Requests for a

    relaxation

    or change in

    the required

    cement top will not

    normally

    be considered

    prior

    to

    the dri l l ing and evaluation of a well; however

    provided

    good offset data exists , requests will be

    evaluated, but

    may

    not

    be

    granted.

    g)

    All

    requests must be supported

    by log or sample

    interpretation, or other

    data

    from

    offset wells

    or

    the

    well

    being

    dri l led.

    These

    requests should be

    directed to the appropriate ERC Area Office as far

    in advance

    of

    the

    cementing operation as possible.

    f

    log

    evaluation

    indicates

    a shallower

    hydrocarbon-bearing zone than the required cement

    top, t shall be

    covered

    and the Board notif ied

    accordingly.

  • 8/10/2019 Directive 009

    16/17

  • 8/10/2019 Directive 009

    17/17

    ATTACHMENT

    2

    C SING ND CEMENTING REPOR

    lI

    ..

    E I YR

    I

    0

    ITol

    TUlE

    I YR

    I

    0

    I

    WElLIWIE (COI.lPLMJ

    UNIQUE

    LD.

    LE

    t.SD

    SEC

    1WP ReE

    W

    -

    UCENCEE AGENT UCENCE NO.

    -

    w

    3:

    UCENCEE

    REP

    COmRACTOR NlD RIC NO.

    .

    BIT

    SIZE

    AVf:1I}I; HOLE SIZE

    (CAlJPER)

    lOYAL.

    DEPTH

    m

    1

    KELLY

    BUSHINC

    mm

    mm

    0

    CDIENT lOP RQU1REIIENT

    I REQUIRED CDIENT

    \IOLUU

    1110100 lYPE NlD DENSITY

    m

    3

    SIZE

    INTERVAL.

    UNEAR

    c.\SWC

    CONNECI1ON

    NUIoIl ER

    COWENIS

    (mm)

    m)

    DENSnY.

    GRIDE

    TYPE

    OF .IOCNl S

    (NEW ? USED

    1

    CI IS

    CASING

    M;

    PER

    UCENCE OR APPRfNAL.

    1

    IF

    NOT,

    YMf

    1

    z

    Fl.CI.t.T COLINl MAKE

    SF:r1J

    SItO IoIAKE

    I T AT

    m

    CENTRAIJZERS -

    NO.

    AND

    DEPTH ST IJ

    SCRAlCHEIIS -

    NO.

    AND

    DEPTH ST AT

    CASING

    REC1PROCA IED

    1

    J OTAm)

    1

    STAGE

    TOOL -

    MAKE/DEPTH

    m I TAGE

    NO.

    1

    m

    I

    TAG

    NO.

    2

    mTD

    mTD

    m

    COIENl1NG

    COIIPANY

    OPERATOR

    TYPE

    IDDITMS

    TDIH:s YOLLJUE

    DENSI1Y

    IIIX WAlER 1HEORETICAL 1NlERVAL.

    et)

    m

    3

    )

    (Iog/m

    3

    )

    emJ)

    em)

    CI

    z

    ;:::

    z

    UJ

    PREfUJSH VOWIoIE TYPE

    I

    STNn'

    I

    FINISH

    loll)(

    CDIENT

    YCLIJUE

    I

    START

    I

    fINISH

    :l:

    w

    I I

    m

    3

    I

    tJ

    I

    DISPI.ACEI.IENT VOW ..

    E lYPE

    I

    START

    I

    fINISH PWC DOWN PftESSURE

    I l1IoIE

    I

    I I

    IcPo I

    ClRCULAllNC

    PRESSURES

    Fl.CI.t.T

    HElD

    1

    kPc

    kPc

    kPc

    GOOD

    RETURNS

    lIiROUGHOUT JOB?

    CflIENT REI\JItNS ?

    AIoIQUNT m

    3

    1

    FALLBACK

    I

    SAIoIPLES

    TAKEN ?