Page 1: Direct Electrical Heating verdens ledende innen offshore ... · PDF fileDirect electrical heating ... The Riser Cable supplies power from the platform down to the sea bed. ... Skarv

Direct Electrical Heating

Global�expert�in�cables�and�cabling�systems

Dig

italtr

ykke

t hos

thor

esen

gra

fisk

as /

04.

12.0

9 /

600

ex

Nexans Norway AS er ledende leverandør av kraft-, tele-, installasjons- og varmekabler i Norge, og er blant verdens ledende innen offshore kontrollkabler og høyspente sjøkabler. Selskapet har hovedkontor i Oslo,

produksjonsanlegg på Rognan, Namsos, Langhus, Karmøy og i Halden. Selskapet har ca 1 100 ansatte og erorganisert i tre divisjoner: Energi, Tele- og Installasjonskabel og Energinett. Du finner flere opplysninger hvis du

klikker deg inn på www.nexans.no

Nexans Norway AS, Innspurten 9 - Postboks 6450 Etterstad - 0605 Oslo - Telefon: 22 88 61 00 - Telefax: 22 88 61 17 - E-post: [email protected] NORWAY AS forbeholder seg retten til å gjøre kabeltekniske endringer uten varsel, da våre produkter er under stadig utvikling.

8517_nexans_brosjyre_A4 26.01.12 10:22 Side 4

Page 2: Direct Electrical Heating verdens ledende innen offshore ... · PDF fileDirect electrical heating ... The Riser Cable supplies power from the platform down to the sea bed. ... Skarv

Direct electrical heating (DEH) is a flow assurance technology developed to safeguard the well stream through the pipeline to the platform. The pipe is heated by running alternating current through the steel in the pipe. Nexans pioneered the development of this technology in cooperation with Statoil and SINTEF more than 20 years ago, and has been the worldwide leader in DEH systems ever since.

Direct Electrical Heating SystemDirect electrical heating (DEH) is a complete technical solution for heating pipelines, eliminating the problems associated with plug formation.

DEH Riser CableThe Riser Cable supplies power from the platform down to the sea bed. It can be designed for one or more systems and may include hydraulic tubes and signal cables. The cable is designed, produced and tested by Nexans.

Modern oil installations typically have multiple wells tied back to a single floating structure, strategically located near the wells. The oil/gas exits the well at high temperature and high pressure, and must be kept warm in its natural form to prevent hydrates or wax from clogging

DEH is an eco-friendly, chemical-free system, which greatly reduces the need for methanol cleansing on the platform. This allows substantial savings in space and weight topside. By use of electrical power, the pipeline is heated to stay above critical temperature in the event of production shut-down or low production rates.

DEH allows continuous operation of the production system and can be turned on when required.

Proven technologyDirect Electrical Heating has successfully been installed at a number of fields in the Norwegian Sea. The DEH system comprises DEH riser cable, Armoured Feeder Cable, DEH Piggyback Cable with Integrated Protection System (IPS), and associated mechanical accessories.

Armoured Feeder CableThe Armoured Feeder Cable connects the DEH Riser Cable to the pipeline and to the Piggyback Cable. The cable contains two conductors, one connected to the pipeline at the platform end and the other connected to the piggyback cable.

DEH Piggyback Cable The DEH Piggyback Cable conducts current from the platform end to the well. At the well, the Piggyback Cable is connected to the pipeline

and the current returns to the platform end through the steel in the pipeline in parallel with the sea water. The Piggyback Cable is strapped tightly to the pipeline to achieve maximum effect and it has an integrated fibre-optic system for continuous monitoring along the entire length.

Integrated Protection System (IPS) The IPS surrounds the piggyback cable and protects it from external loads, such as trawl boards and abrasion.

up the pipeline. Pipelines are therefore thermally insulated to ensure flow during normal production.

There can be many kilometres between the well and the platform, leading to heat loss in the oil/gas. In the event of production shut-down, the product in the

pipeline will cool over time. This can lead to the formation of wax or hydrate plugs when the temperature drops below a critical level. This will in effect render the pipeline useless.

The challenge

Direct Electrical Heating

The Solution

Page 3: Direct Electrical Heating verdens ledende innen offshore ... · PDF fileDirect electrical heating ... The Riser Cable supplies power from the platform down to the sea bed. ... Skarv

Pioneer work in DEH developmentNexans began the development of DEH in partnership with their partners in the early 1990s.Our extensive experience in cables and equipment for the energy industry provided a basis for our system expertise. • Through participation in technical qualification work and in the development of all systems in operation in the North Sea, Nexans has developed cables and equipment for DEH based on the special demands the technology imposes.

• The cables in a DEH system are operated in a different way than a traditional subsea cable used for power transmission. The DEH cables are subject to cyclical operation and high operating temperatures. This involves new challenges in terms of the lifetime of the insulation system. Moreover, the cable that runs along the pipeline cannot have metal screening or armouring because this reduces the efficiency of the pipe-heating system. • There are large mechanical loads on the cable, for example from trawling and pipe movements.

• The DEH system produces a certain electrical current in the water and this must be taken into account when planning adjacent equipment, both in terms of corrosion and effects on signal cables.• Nexans’ long experience of umbilical- and offshore cables has formed the basis for more than 15 years of development focused particularly on DEH. Cables and components are subject to different loads during installation and operation than conventional offshore products. All design, testing and production is carried out by Nexans.

Background

References

Project Year of Installation Pipeline

Åsgard 2000 10” 13%Cr, 6 off, 6-8.5 km

Huldra 2001 8” 13%Cr, 16 km

Kristin 2004 10” 13%Cr, 6 off, 6-6.7 km

Urd 2005 12.5” Carbon steel with Clad, 9 km

Ormen Lange 2006* 30” Carbon, 2 off, 20 km

Tyrihans 2007/8 16 and 18” Carbon steel with Clad, 42 km

Morvin 2008/9 10.5” 13%Cr, 20 km

Alve 2008 12” Carbon steel with Clad, 16 km

Skarv 2010/11 12” Carbon with Clad, 13 km

Skuld 2012 12/14” Carbon with Clad, 25 km (approx)

Page 4: Direct Electrical Heating verdens ledende innen offshore ... · PDF fileDirect electrical heating ... The Riser Cable supplies power from the platform down to the sea bed. ... Skarv

Dig

italtr

ykke

t hos

thor

esen

gra

fisk

as -

1203

5 |

02.

2012

| 5

00 e

x

Global�expert�in�cables�and�cabling�systems

Dig

italtr

ykke

t hos

thor

esen

gra

fisk

as /

04.

12.0

9 /

600

ex

Nexans Norway AS er ledende leverandør av kraft-, tele-, installasjons- og varmekabler i Norge, og er blant verdens ledende innen offshore kontrollkabler og høyspente sjøkabler. Selskapet har hovedkontor i Oslo,

produksjonsanlegg på Rognan, Namsos, Langhus, Karmøy og i Halden. Selskapet har ca 1 100 ansatte og erorganisert i tre divisjoner: Energi, Tele- og Installasjonskabel og Energinett. Du finner flere opplysninger hvis du

klikker deg inn på www.nexans.no

Nexans Norway AS, Innspurten 9 - Postboks 6450 Etterstad - 0605 Oslo - Telefon: 22 88 61 00 - Telefax: 22 88 61 17 - E-post: [email protected] NORWAY AS forbeholder seg retten til å gjøre kabeltekniske endringer uten varsel, da våre produkter er under stadig utvikling.

8517_nexans_brosjyre_A4 26.01.12 10:22 Side 4

Nexans Norway AS is a leading supplier of power, telecommunications, installations and heating cables in Norway, and is among the world’s leading manufacturers of offshore control cables and high-voltage

submarine cables. The company’s head office is in Oslo, and it has manufacturing plants at Rognan, Namsos, Langhus, Karmøy and Halden. The company has approx. 1,360 employees.

More information on www.nexans.no.

Nexans Norway AS, Innspurten 9 - Postboks 6450 Etterstad - NO-0605 Oslo - Telephone: +47 22 88 61 00 E-mail: [email protected]