Page 1: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY
Page 2: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators, and manager. It is not surprising, then, that a control engineer may know more about the plant than perhaps any other individual associated with it.“

F. Greg Shinskey, "Energy Conservation Through Control" Academic Press, Inc. 1978

DIGITAL FEEDWATER CONTROL

PROJECTS

FOR

TENNESSEE VALLEY AUTHORITY

Page 3: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Major Topics

• Operational and Maintenance Challenges in Existing Nuclear Plants

• Cost vs. Benefits of Digital Systems

• Digital Feedwater Controls Implemented with TVA

• Post Upgrade Challenges

3

Page 4: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Operations Challenges

• Improving Reliability and Assurance of Continued Operations

• Reducing Single Points of Vulnerability (SPV)

• Replace Aging or Poorly Performing Equipment

• Reduction of Unplanned Downtime/Outages

• Reduction of Manual Operator Interaction

• Operations Acceptance

4

Page 5: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Maintenance Challenges

• Reduction of Equipment Cost• Reduction of Equipment Maintenance Time• Reduction of Surveillance Testing • Replacement of Obsolete Analog and Digital

Controls

5

Page 6: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

6

Cost vs. Benefit

Cost

– Assumed Scope and Cost of the Upgrade

– Spares– Re-Training

Benefit

– Staffing Impact– Spare Parts Cost– Testing Requirements– Consolidate Training– Risk Reduction– Additional Diagnostic

Capabilities– Operational Flexibility– Plant Performance

Page 7: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Plant Performance

Digital systems and Advanced Controls can provide tighter, more efficient control

• Improved Cycle Efficiency• Reduced Fuel Expense for Same Generation• Increased Operating Margin• Reduced Instrument Uncertainties

7

Page 8: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Advanced Digital Controls for Feedwater Systems at TVA

• Single Points of Vulnerability Elimination• Fault Tolerant Control Processing

• Redundant Control Networks

• Redundant Inputs and Outputs

• Redundant Sensor Algorithms

• Integrated 1E/3E Advanced Controls Philosophy

8

Page 9: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Redundant Sensor Algorithms• Allow the system to suffer a partial or complete loss of one of the

redundant input signals with minimal upset to plant operations

• Signals monitoring the same process variable are brought into digital controller on separate I/O devices (segregation of measurements)

• Signals are monitored for health and deviation tolerance from other values

• A faulted/suspect signal is bypassed, allowing for maintenance of the offending device, while operations continue

• If no valid signal is detected, control action is blocked, fail safes imposed, and controls transferred to manual

9

Page 10: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

PWR – Redundant Signals

Slide 10

FT FT

FT FT

LT

LT

LT

Page 11: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Dual Transmitter Input Algorithm

11

Upside• Upon Failure of Signal, the bad

signal can be bypassed and control may continue using healthy signal

• Optionally may block control actions

• Can optionally choose average, high or low select.

• Conditional Alarming

Downside• Deviation between signals

requires operator interaction to select best signal

Page 12: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Dual Transmitter Input Algorithm with Arbiter (Voter)

12

Upside• Same as Basic Dual Input

Algorithm

• Uses Arbiter Signal as “tracking” value to automatically select healthy signal when one deviates

Downside• Limited applications, Arbiter

signal not often availableTVA Implementations Steam Flow Feedwater Flow

Page 13: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Triple Transmitter Input Algorithm

13

Upside• Upon Failure of Signal, the bad signal

can be bypassed and control may continue using healthy signal

• Optionally may block control actions if two or more signals fail

• Can optionally choose average, high or low select.

• Deviation of one signal is measured against the other two to automatically select healthy signal if one begins to deviate

TVA Implementations Main Steam Pressure Feedwater Pressure Steam Generator Level

Page 14: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Segregation of Redundant Signals

Slide 14

Page 15: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Control Scheme

Operations Engineering/Maintenance

Fault-tolerant Network

Digital Control System Overview

Measure and Control

Page 16: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Original Bench Handstations

Slide 16

Page 17: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

New Bench Handstation

• Fully interactive with digitally resident, more robust control

strategies

• Fully functional in absence of Workstation or Dual Network.

Slide 17

Page 18: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

New Feedwater Process Graphic

• Mimics Bench functionality

• Seamless Parallel Controls

• Reduces training by providing equivalent control with display integration

Slide 18

Page 19: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Control & Measure

Operations Engineering/Maintenance

Fault-tolerant Network

Digital Control System Overview (with new Handstation)

New Handstation

• Allows for continued operation in presence of multiple control system failures

Page 20: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Traditional Single Element / Three Element Control for Steam Generator Level

• Single element control (SG Level) at low power using only Start-Up Bypass valve to maintain level.

• Above ~25% power, three element control engaged using Steam Flow, Feedwater Flow, and Main Feedwater Regulatory Valve

• Operator intensive manual procedure to transfer from single element bypass valve to three element main valve as reactor moved up through 20-25% power

• Similar operator intensive manual procedure for reactor power decrease

• Many unplanned trips with manual procedures

20

Page 21: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Enhanced Single Element / Three Element Control for Steam Generator Level

• Startup Bypass FW Valve and Main FW Valve are split ranged such that they automatically sequence as if there is one full range valve.

• Three element control transfer can be enabled at a much lower level, improving dynamic performance

• Advanced controls automatically sequence single element to three element over this split range valve.

• No operator manual action is required, controls transfer over at a consistent reactor power, both increasing and decreasing

• Automatic transfer to single element upon loss of all Steam Flow or all Feedwater flow signals, allowing for SG level to be maintained while maintenance can be performed on the offending signals

• If Steam Generator Level signals are lost, the controls of the valves revert to manual

21

Page 22: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Enhanced Single Element / Three Element Control

22

Page 23: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Post Upgrade Operations Challenges

• Training

• New Failure Modes

• New Interaction

23

Page 24: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

Maintenance Challenges

• New/Changing Calibration requirements, techniques

• Documentation

24

Page 25: DIGITAL FEEDWATER CONTROL PROJECTS FOR TENNESSEE  VALLEY AUTHORITY

TVA Improvements:

• ~30 SPV removed per Unit

• Automated transfer from startup valves to main valves with improved effect on Steam Gen Level

• Failure of BOTH Steam Flows at 100% power, controls remained in AUTO (1E)

• Additional Data available on plant computer as a result of upgrade aided troubleshooting in multiple events

• Automated FW Pump balancing on startup of second pump

• Extensive simulator work allowed for minimal tuning during startup

Summary