STATE OF INDIANA
INDIANA UTILITY REGULATORY COMMISSION
IN THE MATTER OF AN ORDER APPROVING ADVISORY COMMITTEE RECOMMENDATIONS PURSUANT TO INDIANA CODE CHAPTER 8-1-26.
) ) )
APPROVED:
ORDER OF THE COMMISSION
AUG 08 2012
Indiana Code chapter 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission' s Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.
The Cases received pursuant to Indiana Code chapter 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.
Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission hereby UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is hereby directed to prepare and send notice to the parties advising them of the determination.
IT IS SO ORDERED.
ATTERHOLT, LANDIS, MAYS AND ZIEGNER CONCUR; BENNETT ABSENT:
APPROVED: AUG 082m2
I hereby certify that the above is a true and correct copy of the Order as approved.
~di/9toG BreIldaA.H()Wt; , Secretary to the Commission
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: Calumet Civil Contractors Operator: Citizens Gas
Case No.: 413
Date of Advisory Meeting: June 26,2012
Statutes Allegedly Violated: L Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
2. 3.
mechanized equipment
----------------------------------------Recommended Penalty: 1. \~\~VV;~ \c+Aer 2. 0 :J 3.
~o Violation Violation No Violation
Violation No Violation
Additional Information: _\:.L:L""",)~a~V~~ r..lo..ea..J\..I....-~o.~b~~~hl.::::::::lo....{...::..CLS..:&:=::....----
APPROVE~ (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: Milestone Contractors, LP Operator: Vectren
Case No.: ·452
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
mec~anized equipment 2. Jsij ( LIf?
~o Violation Violation No Violation
3. ____________________ Violation NoViolation
Recommended Penalty: 1. \0 Cue r. '!0'j \ e±kr 2. ________________________ __ 3. ________________________ __
Additional Information: i;~~ D Jo:s+a.)n.:::,. \ A )g -euV't-kr a \ ?->!
APPROVED~ -(initialed) Rick Slagle Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: Fox Contractors Operator: NIPSCO
Case No.: 528
Date of Advisory Meeting: June 26,2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
mechanized equipment
----------------------------------------c;;.;ony-o Violation
Violation No Violation 2. 3. _______________________ Violation No Violation
Recommen~ed Penalty: 1. \f\ J (};fV\ \~ 2. ) 3.
Additional Information: --------------------------------
APPROVED:~ (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: D.R. Watson Company
Case No.: 723
Operator: Vectren
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
mechanized equipment C;;;a;o~No Violation Violation No Violation 2.
3. ____________________ Violation No Violation
Recommended Penalty: 1. (l)(bj-~ \rwr 2. 3.
Additional Infornlation: -5"--1\..=~.;:;;;C);;..:,......;::Le==----=-ab~"'""'\j",<a~J"..+.~.:.-.=-· __ _
APPROVE~:k (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: Milestone Contractors, LP Operator: Vectren
Case No.: 768
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
~o Violation mechanized equipment 2. ___________________ Violation No Violation 3. ___________________ Violation No Violation
Recommended Penalty: 1. \J (If n ~ \ e j.+
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: American Residential Services Operator: Vectren
Case No.: 840
Date of Advisory Meeting: June 26,2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
mechanized equipment ~NO Violation 2. ____________________ Violation No Violation 3. _____________________ Violation NoViolation
Additional Information: S \OM Lc ruJ§ ~/{\ ~ . --~~~0~\r=~--~~~~~~~~--
APPROVE~ (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: D.R. Watson Company
Case No.: 879
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated:
Operator: Vectren
1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with ~o Violation mechanized equipment 2. ___________________ ~OViOlatiOn 3. Violation No Violation
Recol1l{llended Penalty: I 1. f 1 ) (Q r otNJ (clk r-
\Yv \ 2. " 3.
Additional Information: -S~' 1...1.,;\ O~%~\;~-=.,;-, -.Io:-Qjli-\{)";"';';\ ..:...;:3=-k~:;..;...I\{\_~~ __
APPROVE~ (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: Miller Pipeline Operator: Vectren
Case No.: 1171
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
cYi;~o Violation 2. Violation No Violation
mechanized equipment
3. ___________________ Violation NoViolation
Recommende~ Penal~:
1. \\ 1 Q Y),), r:5 2. ____________________________________________ __ 3. __________________________ _
Additional Information: _5~\~%~rl~L==____.,;q~b:&:.=...deJlc:ooI_I_I~(It.-h-...,;S=---
APPROVE~ (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: C-Tech Corporation Operator: Vectren
Case No.: 1717
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
mechanized equipment Qiola~No Violation 2. ____________________ Violation No Violation 3. ____________________ Violation NoViolation
Reco~ended Penalty\ I
;: W ~ ":> I-CW 3. _______________________________________________ __
Additional Information: ~~....L+\ QioQ;,"=;:ce+~~" _--.::Q~b~~~~l..;;,..a ........ ~~. --
APPROVE~ (initialed) ~gle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: Dan Cristani Excavating Operator: Vectren
Case No.: 1810
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
mechanized equipment
Violation No Violation 2. 3. ___________________ Violation No Violation
Recommended Penalty:
1. WO£O~ 2. 3.
Additional Information: _S ...... ~\ ..... ~_=+-~ ___ Q..::.......b~:fe~..,QA.~1N-\..J..-.>o,.;~~.---
APPROVED: b ... (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: Ironclad Excavting Operator: NIPSCO
Case No.: 1970
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-16(g): Failure to provide notice of excavation Glati~o Violation 2. _______________________ Violation No Violation 3. Violation No Violation
Reco~mend~d Penalty·\ }}:: 1. lh Jet \{\'j\ {\() t~ 2.' - ~ 3. ________________________________________________ __
Additional Information: -----------------------------
APPROVED" -~ (initialed) ~gle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: SEI Excavating Operator: Vectren
Case No.: 2016
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with
mechanized equipment ~ 0 Violation Violation No Violation 2.
3. _____________________ Violation No Violation
Recommended Penalty: 1. \» \ elf v\ '\ 0:@\ \ Gllif
t
2. .J 3.
Additional Information: ------------------------------
APPROVED::t;; (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: James H Drew Incorporated Operator: Citizens Gas
Case No.: 2243
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-16(g): Failure to provide notice of excavation ~n)o Violation 2. ___________________ Violation NoViolation 3. ___________________ Violation NoViolation
Recommended Penalty:
~: I.h.)(UY)\'j \eMlf 3. ________________________ __
Additional Information: \ l J Q...xy-U\ ~'bs\cJ 0.-~ ~y~~~~~-~~~-===~~----
APPROVE~~ (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: John Hall Construction Inc. Operator: Vectren
Case No.: 2277
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-:-20(b): Failure to maintain two (2) feet clearance with
~NO Violation mechanized equipment 2. ___________________ Violation No Violation 3. ___________________ Violation NoViolation
Recommended Penalty: 1. lk J G. l)} \ (\Q\ \ eili c 2. -.J 3. _________________________ ___
Additional Information: ~ S \. G.f) U.c O))';)-ta)i\S.
APPROVE~ (initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to lURe
Excavator: Brian Pfaehler Operator: Vectren
Case No.: 2697
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-16(g): Failure to provide notice of excavation C;ola~o Violation 2. ____________ ------- Violation No Violation 3. Violation No Violation
RecomInfnded Penalty: 1. \U~vY\~ 2. ________________________________ __
\eAdu= 3. ~ _________________________ __
Additional Information: _S"",,--"-\ ~~~LL=-=_--.;:;;Clb=..;",:,""""~ ....... , ~'=-';....~-=;..:;.., __
(initi . ck Slagle Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: Ben Bush Operator: Vectren
Case No.: 2709
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-16(g): Failure to provide notice of excavation ~~o Violation 2. __ --'-_________________ Violation No Violation 3. Violation No Violation
Recommended Penalty: . 1. \b)Q.x-~\~ 2. _______________________________________________ ___ 3. ________________________________________________ ___
Additional Information: _S---"'-~\-=~~?J+\...t-___ o.b~=__s.__u..W~L-Q;c;....:.....:1 (L~S,",,-t _
APPROVE~:~;-(initialed) Rick Slagle
Chairman
-
Indiana Underground Plant Protection Advisory Committee Recommendation to IURC
Excavator: Atlas Excavating Operator: Vectren
Case No.: 2742
Date of Advisory Meeting: June 26, 2012
Statutes Allegedly Violated: 1. Ie 8-1-26-20(b): Failure to maintain two (2) feet clearance with ~
mechanized equipment ~No Violation
2. Violation No Violation 3. Violation No Violation
Additional Information: -----------------------------------
APPROVED=~ (initialed) Rick Slagle
Chairman