Kuwait Environmental Remediation Program (KERP) :
Risk Based Approach Process
Presented by
Dhari AlGharabally
Team Leader Soil Remediation Support
www.kockw.com
Team Leader Soil Remediation Support
Aberto De La Roche
Aisha-Al
Date: 17-19 / November 2015
22nd International Petroleum Environmental
Conference, Denver, CO
Kuwait Environmental Remediation Program (KERP) :
Risk Based Approach Process
Presented by
AlGharabally
Remediation SupportRemediation Support
De La Roche
Al-Barood
19 / November 2015
22nd International Petroleum Environmental
Conference, Denver, CO
Outline
• About Kuwait and Kuwait
• KERP Features / UN Claims
• KERP-Key milestones
• Original vs. Revised plan
www.kockw.com
• Original vs. Revised plan
• Risk based approach and
• KERP challenges
• KERP Projects planning
Outline
Kuwait Oil Company
Claims
plan
2
plan
and risk assessment
planning and time frame
www.kockw.com
www.kockw.com
3
www.kockw.com
www.kockw.com
4
Population about 4 million
Total area 17,820
6,880 sq mi
Population about 4 million
Total area 17,820 km2 (157th)
•• Employees : Employees :
�� ~ 6,000 KOC Staff~ 6,000 KOC Staff
�� ~ 50,000 Contractor staff~ 50,000 Contractor staff
•• Spread over 3 AssetsSpread over 3 Assets
�� South and East KuwaitSouth and East Kuwait
�� West KuwaitWest Kuwait
www.kockw.com
www.kockw.com
�� North KuwaitNorth Kuwait
•• Producing Assets Producing Assets
�� 21 Gathering Centers21 Gathering Centers
�� 4 Booster stations4 Booster stations
�� ~1647 Well heads~1647 Well heads
�� 2 Water Injection Plants2 Water Injection Plants
�� 2 Water 2 Water disposal plantsdisposal plants5
1934 – KOC was Founded
1946 – First Oil Shipment
1980 – Parent Company (KPC) was Formed
1990 – Suspended Operations (Invasion)
www.kockw.com
19
40
19
30
19
60
19
50
19
80
19
70
1938 – Oil in Burgan Field
Full Ownership
In 1975
1991 – The Oil Fires (more than 700 wells were detonated)
Parent Company (KPC) was Formed
Suspended Operations (Invasion) 4 MM B /D
By 2020
20
00
19
90
20
10
20
20
1995 Reached
2 MM B /D
The Oil Fires (more than 700 wells were detonated)
2009 Reached
3MM B /D
Capacity
www.kockw.com
http://earthobservatory.nasa.gov/Featu
res/ShuttleRetrospective/page8.php
(NASA photographs STS037-152-
91 and STS-039-72-60.)
In February 1991, near the end ofthe Gulf War, Iraqi troopssystematically destroyed and setfire to 750 oil wells across Kuwait.Approximately 4 to 6 millionbarrels of crude oil and 70 to100 million cubic meters ofnatural gas burned each day forweeks.weeks.
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
www.kockw.com
KERP - PROJECT BACKGROUND
• After the Gulf war, in February 1991, Kuwait’s
were damaged and set on fire, resulting
contamination of the land.
• Contamination of the environment occurred
spreading over the land surface and penetrated
subsurface to varying depths and formation
www.kockw.com
• Gushing oil and combustion products from oil
as heavy black smoke.
• After 24 years, these large oil lakes and oil
piles (~26 million cubic meters of heavily oil
soils) still exist in KOC oil field areas.
• This Unique Programme is currently
environmental inland cleanup in the world
PROJECT BACKGROUND
Kuwait’s oil wells
resulting in oil
occurred from oil
penetrated the soil
of oil lakes.
oil fires as well
oil contaminated
oil contaminated
the largest
world.
KOC-KERP CLAIM AWARDS
Coastal Trenches
Coastal & Marine
Total Funds :$ 4 million
KOC Funds : $ 4 million
www.kockw.com
Coastal & Marine Resources
KOC Funds : $ 4 million
KERP CLAIM AWARDS
Coastal Deposits
Coastal Oil Trench
23,025 m3Total Funds :$ 4 million
KOC Funds : $ 4 millionCoastal Oil Deposits
8,319 m3
Weathered Oil layers
4,202 m3
KOC Funds : $ 4 million
KOC-KERP CLAIM AWARDS
Remediation of Total Funds : $
KOC Funds : $
Wellhead Pits
www.kockw.com
Remediation of areas in and
around wellhead pits and Tarcrete
KOC Funds : $
KERP CLAIM AWARDS
Wellhead pits
116,000 m3
Total Funds : $ 640 million
KOC Funds : $ 170 million
Tarcrete
116,000 m3
Tarcrete
250,000 m3
KOC Funds : $ 170 million
Total Funds :$ 2.2 Billion
KOC-KERP CLAIM AWARDS
Wet Oil Lakes Dry Oil Lakes
www.kockw.com
Remediation of:
Dry and wet oil lakes
Contaminated piles
Total Funds :$ 2.2 Billion
KOC Funds : $ 1.9 Billion
Wet Oil lakes
4.56 Mm3Total Funds :$ 2.2 Billion
KERP CLAIM AWARDS
Dry Oil Lakes Soil Piles
Dry Oil Lakes
8.92 Mm3
Contaminated Piles
12.22 Mm3
Total Funds :$ 2.2 Billion
KOC Funds : $ 1.9 Billion
VOLUME PER CLAIM
25,700,000 m3
Contamination Volume
Claim
454
www.kockw.com
Claim
450
Claim
259
Wet Oil
Lakes, Dry Oil
Lakes &
Contaminated
Piles
VOLUME PER CLAIM
366,000 m3
Contamination Volume m3
Wellhead Pits &
Tarcrete
27
35,546 m3
Coastal
Trenches, Deposits, Weath
ered Layers
KERPKERP-- KEY MILESTONESKEY MILESTONES
2006
MOU
2010
KOC
2012
www.kockw.com
Kuwait Gov. established
KNFP
MOU between KNFP and
KOC
KOC established
Soil Remediation
Group
KEY MILESTONESKEY MILESTONES
Amec
2012 2015
established
Remediation
AmecFoster
wheeler
appointed as PMC
Approval of KERP Strategy
Original direction was
disposal
ORIGINAL PLAN ORIGINAL PLAN
www.kockw.com
CONTAMINATED SOIL
ORIGINAL PLAN ORIGINAL PLAN
Is this the legacy we
want to leave?
Landfills
Risk Based Treatment
KERP STRATEGY
TOTAL REMEDIATION SOLUTION
www.kockw.com
Approach
40%
Treatment
50%
TPH 1% to 3%TPH
Re-used or Treatment
KERP STRATEGY
TOTAL REMEDIATION SOLUTION
Re-used or recycled or
Disposal
Treatment
50%
10%
TPH 2% to 10% TPH > 10%
Why Risk-Based Approach is
important element in KERP?
www.kockw.com
Based Approach is
important element in KERP?
RISK BASED APPROACH
www.kockw.com
RISK BASED APPROACH
RISK ASSESSMENT
Risk assessment is a tool to evaluate
environment.
Quantitative Risk Assessment is used
goals and prioritize areas.
Risk => Hazard X Exposure X Receptor
www.kockw.com
RISKHazard
Receptor
RISK ASSESSMENT
potential risks to human health and the
to develop remediation/corrective target
RISKExposure
Receptor
RISK ASSESSMENT
CONCEPTUAL SITE MODEL
Conceptual Site Model (CSM) - Typical Oil Exploration Site
www.kockw.com
RISK ASSESSMENT
CONCEPTUAL SITE MODEL
Typical Oil Exploration Site
ure
Funds
Management
Obtaining Current
Data
KEY CHALLENGES KEY CHALLENGES
www.kockw.com
ChallengesChallenges
UXO/ EOD
Management
Selection of proven
Technologies
unds
Management
KEY CHALLENGES KEY CHALLENGES
ChallengesChallenges
Contracts Strategy
Current Projects
Landfill NK
1.7Mm3
Excavation
& Transportation
NK
1.7 Mm3
KERP Projects PlanningKERP Projects Planning
Landfill SEK
0.5 Mm3
Excavation
& Transportation
SEK
0.5 Mm3
www.kockw.com
Enabling Projects
Risk Based
Approach9.2 Mm3
Site Soil
Characterization
1.7 Mm3
UXO Project
0.5 Mm3
Short Term ProjectsTreatment
Process NK
400,000m3
Sludge
Studies
KERP Projects PlanningKERP Projects Planning
Treatment
Process SEK300,000m3
Long Term/Future Projects
Treatment
Processes
9.7Mm3
Recovery for
Disposal/Re-use1.4Mm3
Landfill
2.8Mm3
OTHER STAKEHOLDERS
KERP TIME FRAME
www.kockw.com
STAKEHOLDERS
KMOD
KEPA
PAAF
MEW
KERP TIME FRAME
Thank
Kuwait Oil Company
www.kockw.com
Kuwait Oil CompanyPreserving the future of Kuwait
www.kockw.com
Dhari [email protected]
(857) 540-8410 USA (end of Nov)
+965 99703370 Kuwait
Thank you
Kuwait Oil Company
38
Kuwait Oil Companyfuture of Kuwait
www.kockw.com
8410 USA (end of Nov)
+965 99703370 Kuwait