Disconnect DG Interconnections Checklist (Interconnecting Customer) Project Name Project No. 1. PRIOR TO SYSTEM IMPACT STUDY (SIS) Application Complete All required project information has been provided to the T&D Utility. Including PSCAD models, One-line diagrams, site plans, etc. Scoping meeting complete System Impact Study Agreement (SISA) Executed System Impact Study Deposit received by the T&D Utility. 2. PRE-CONSTRUCTION – DESIGN PHASE Interconnection Agreement has been fully executed and project has successfully completed all necessary cluster and impact studies. Funds for the system impact study and required system upgrades have been provided to the T&D Utility. ISO-NE PPA (Proposed Plan Application) has been approved or submitted to ISO New England. ROW has been defined and easements in place, if applicable. T&D Utility detailed design and construction schedule has been provided with estimated “COD” (Commercial Operations Date) defined. Construction agreement executed for line work, if applicable. All necessary permits and approvals obtained; could include but not limited to: Dig Safe Town Permit DEP Permit Landowner Easements 3. CONSTRUCTION Construction Changes have been captured through “RFI” (Request for Information) and deemed acceptable by the T&D Utility Project team. Construction Completion Certificate has been provided to the T&D Utility. MUST be Signed by the local electrical inspection authority. Installation is complete and compliant with all national codes and standards (IEEE 1547, UL 1741 SA & ISO-NE SRD etc.). Copy of the FINAL stamped PE Drawings (As-builts) with final relay/ inverter test report has been provided to the T&D Utility Engineer for review. 4. COMMISSIONING Site Inspection Complete. (T&D Eng verification of all site data matches planned/ final design requirements, all equipment and devices both utility and interconnecting customer are properly labeled and tagged) Witness test points have been confirmed, accepted and in accordance with IEEE 1547, ISO-NE SRA and T&D utility requirements. Relay test reports provided, and match firmware studied or have been captured through “RFI” and accepted by the T&D Utility Project team. T&D Utility customer service contacted to set up all load billing information. 5. PRE-ENERGIZATION “COD” (COMMERCIAL OPERATIONS DATE) Certificate of acceptance (Construction Completion Certificate acceptance letter) has been received from the T&D Utility Liability Insurance requirements have been provided to the T&D Utility. Reimbursement’s received and/ or final invoice for system upgrades have been provided and paid to the T&D Utility. Operations Requirements Guide has been provided, reviewed and understood by the interconnecting customer. (Tripping of POI, Important contacts, who to notify, scheduled outage requirements etc.) NEB (Net Energy Billing) or Procurement Agreement has been fully executed (Must be received 60 days prior to commercial operation). Versant- DG Interconnections Checklist-Rev 2

Upload: others

Post on 08-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DG Interconnections Checklist · Including PSCAD models, One-line diagrams, site ... with final relay/ inverter test report has been provided to the T&D ... (T&D Eng verification

Disconnect DG Interconnections Checklist (Interconnecting Customer)

Project Name Project No. 1. PRIOR TO SYSTEM IMPACT STUDY (SIS)Application Complete ☐

All required project information has been provided to the T&D Utility. Including PSCAD models, One-line diagrams, site plans, etc. ☐

Scoping meeting complete ☐

System Impact Study Agreement (SISA) Executed ☐

System Impact Study Deposit received by the T&D Utility. ☐

2. PRE-CONSTRUCTION – DESIGN PHASEInterconnection Agreement has been fully executed and project has successfully completed all necessary cluster and impact studies. ☐

Funds for the system impact study and required system upgrades have been provided to the T&D Utility. ☐

ISO-NE PPA (Proposed Plan Application) has been approved or submitted to ISO New England. ☐

ROW has been defined and easements in place, if applicable.

T&D Utility detailed design and construction schedule has been provided with estimated “COD” (Commercial Operations Date) defined. ☐

Construction agreement executed for line work, if applicable. ☐

All necessary permits and approvals obtained; could include but not limited to: • Dig Safe ☐

• Town Permit ☐

• DEP Permit ☐

• Landowner Easements ☐

3. CONSTRUCTIONConstruction Changes have been captured through “RFI” (Request for Information) and deemed acceptable by the T&D Utility Project team. ☐

Construction Completion Certificate has been provided to the T&D Utility. MUST be Signed by the local electrical inspection authority. ☐

Installation is complete and compliant with all national codes and standards (IEEE 1547, UL 1741 SA & ISO-NE SRD etc.). ☐

Copy of the FINAL stamped PE Drawings (As-builts) with final relay/ inverter test report has been provided to the T&D Utility Engineer for review. ☐

4. COMMISSIONINGSite Inspection Complete. (T&D Eng verification of all site data matches planned/ final design requirements, all equipment and devices both utility and interconnecting customer are properly labeled and tagged) ☐

Witness test points have been confirmed, accepted and in accordance with IEEE 1547, ISO-NE SRA and T&D utility requirements. ☐

Relay test reports provided, and match firmware studied or have been captured through “RFI” and accepted by the T&D Utility Project team. ☐

T&D Utility customer service contacted to set up all load billing information. ☐

5. PRE-ENERGIZATION “COD” (COMMERCIAL OPERATIONS DATE)

Certificate of acceptance (Construction Completion Certificate acceptance letter) has been received from the T&D Utility ☐

Liability Insurance requirements have been provided to the T&D Utility. ☐

Reimbursement’s received and/ or final invoice for system upgrades have been provided and paid to the T&D Utility. ☐

Operations Requirements Guide has been provided, reviewed and understood by the interconnecting customer. (Tripping of POI, Important contacts, who to notify, scheduled outage requirements etc.) ☐

NEB (Net Energy Billing) or Procurement Agreement has been fully executed (Must be received 60 days prior to commercial operation). ☐