V2.0 CLIENT: DUBAI ELECTRICITY & WATER AUTHORITY DEWA EMISSION REDUCTION PROGRAMME OVERVIEW • Provide DEWA with an extensive analysis of the company’s carbon emissions • Creation of a system that continuously monitors, controls and manages GHG emissions • Facilitate the development of an emission reduction plan and policy • Tailored emission reduction strategy for DEWA to support a low carbon economy APPROACH • Tools were introduced to help monitor, control & manage GHG emissions • DEWA’s DSM activities were assessed from the perspective of emissions and their impact on climate change • The Energy Audit & Carbon Capture & Storage (CCS) was handled by the subcontractor – Tractebel Engineering PROJECT STATUS Project Start Date: June 2013 Project Duration: 1 year Project Status: Completed and Handed Over Meet the Team: Fazil Abdul Rahiman Clemens Ploechl Rachel Bartz PRJ-0031 PROJECT NUMBER Emission Reduction Strategy In Line with Green Economy for Sustainable Development Adopt Best World Class Practices to Achieve Emission Reductions SNAP SHOT

Upload: trinhngoc

Post on 31-Aug-2018

229 views

Category:

Documents


0 download

TRANSCRIPT

V2.0

CLIENT: DUBAI ELECTRICITY & WATER AUTHORITY

DEWA EMISSION REDUCTION

PROGRAMME

OVERVIEW• Provide DEWA with

an extensive analysis of the company’s carbon emissions

• Creation of a system that continuously monitors, controls and manages GHG emissions

• Facilitate the development of an emission reduction plan and policy

• Tailored emission reduction strategy for DEWA to support a low carbon economy

APPROACH• Tools were

introduced to help monitor, control & manage GHG emissions

• DEWA’s DSM activities were assessed from the perspective of emissions and their impact on climate change

• The Energy Audit & Carbon Capture & Storage (CCS) was handled by the subcontractor – Tractebel Engineering

PROJECT STATUSProject Start Date: June 2013Project Duration: 1 yearProject Status: Completed and Handed Over

Meet the Team:

Fazil Abdul Rahiman

Clemens Ploechl

RachelBartz

PRJ-0031

PROJECT NUMBER

Emission Reduction StrategyIn Line with Green Economy for Sustainable DevelopmentAdopt Best World Class Practices to Achieve Emission Reductions

SNAPSHOT

V2.0

PROJECT OVERVIEW

In line with DEWA’s initiatives on sustainability and commitment to the Green Economy for Sustainable Development, the Emission Reduction Programme (ERP) provided DEWA with an extensive analysis of the company’s carbon emissions. Dubai Carbon will develop an ERP that meets DEWA’s needs and fits its strategy for a sustainable future. The project covers all DEWA activities including power and water generation, transmission and distribution for electricity and water, Demand Side Management (DSM), commercial offices & fleets etc.

CLIENT’S CHALLENGEHistorically, there has been a misconception that being environmentally responsible is inherently more expensive; and this is because the traditional economic models do not take into account the co-benefits of reducing GHG emissions. Obtaining these benefits is the main driver for the DEWA ERP. Dubai Carbon was therefore appointed to assist DEWA in designing and developing carbon emission reduction strategies that result in competitive advantages, mitigate environmental impacts and enhance social well-being by balancing economic profitability.

OUTCOME• DEWA’s strengths and areas of

improvement with regards to emissions levels

• Development of plans, policies and best practices for emission reductions; ultimately setting emission reduction targets

• Create a framework that continuously monitors emissions and implements measures aimed at reducing energy consumption and costs through a targeted ERP

• Evaluate the DEWA planned DSM from an ERP perspective

• Emission reduction awareness drive through DEWA

PROJECT APPROACHThe project was based on PRINCE 2, which provides a project management approach that has been standardized internationally. The methodology has two key documents that define the project structure and approach:• Project Product Description

(Work Packages Overview)• Product Flow Diagram

(Project Workflow)

CLIENT: DUBAI ELECTRICITY & WATER AUTHORITY

DEWA EMISSION REDUCTION

PROGRAMME