Development Tracking Report First Quarter 2016 The Development Tracking Report provides a summary of county-wide residential and commercial development activity for the First Quarter of 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur during the current quarter and compares these trends to previous quarters. Purpose January 1, 2016 - March 31, 2016 Office (GFA) Retail (GFA) Other (GFA) Residential: Total (Units) Residential: Multi- family (Units)* Single Family Detached (Units) Hotel (Rooms) Completions - - - 41 - 41 - Construction Starts - 8,900 - 98 51 47 - Approvals** 1,810,173 126,530 - 978 978 - 200 Demolitions 262,983 6,683 2,250 38 - 38 - Summary of Development Statistics for 1Q 2016 GFA = Gross Floor Area. GFA is measured in Square Feet. Community Planning, Housing & Development Produced by the Department of Community Planning, Housing and Development: Planning Division, Center for Urban Design and Research. June 2016 *The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes. **Includes Phased Development Site Plan (PDSP) projects. Site Plan #439: Washington Vista 63 residential units. Columbia Pike Village Center (FBC/UP): 81,530 sq. ft. retail and 365 residential units. Site Plan #2: The Altaire Demolition of 400 Army Navy Drive. Site Plan #422: Rosslyn Plaza PDSP 1,810,173 sq. ft. office, 45,000 sq. ft. retail, 550 residential units, and 200 hotel rooms. Completions 41 Single Family Homes were completed in the first quarter. Construction Starts Gaslight Phase III (by-right): 37 residential units in Rosslyn. Transitional Shelter for SP #432 in Rosslyn. Pentagon Centre (SP #297) Building D: Structured Parking with 8,900 square feet of retail. Demolitions 400 Army Navy Drive (paperclip building) for SP #2 in Crystal City. Multiple property demolitions for 10th Street Flats (UCMUD) in Clarendon. Approvals Rosslyn Plaza PDSP (SP #422): 1,810,173 sq. ft. office, 45,000 sq. ft. retail, 550 residential units, and 200 hotel rooms. Washington Vista (SP #439): 63 residential units in Rosslyn. Columbia Pike Village Center (FBC/UP): 81,530 sq. ft. retail and 365 residential units. Development Summary Highlights The Rosslyn Plaza PDSP was approved by the County Board in the first quarter of 2016. At full build-out, this 7.65 acre area will contain up to 2,531,660 GFA of residential, hotel, office, and retail uses. Multiple buildings were demolished during the first quarter, allowing for construction of the Altaire in Crystal City and 10th Street Flats in Clarendon. When completed, these projects will add over 597 multi-family residential units to Arlington’s housing supply. The County Board approved the Columbia Pike Village Center, a form based code project which will which will add a new grocery store and 365 residential units to Columbia Pike. SP = Site Plan FBC = Form Based Code PDSP = Phased Development Site Plan BR = By-Right UP = Use Permit

Upload: others

Post on 20-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Development Tracking Report First Quarter 2016

The Development Tracking Report provides a summary of county-wide residential and commercial development activity for the First Quarter of 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur during the current quarter and compares these trends to previous quarters.

Purpose

January 1, 2016 - March 31, 2016

Office (GFA) Retail (GFA) Other (GFA) Residential: Total (Units)

Residential: Multi-family (Units)*

Single Family Detached (Units)

Hotel (Rooms)

Completions - - - 41 - 41 -

Construction Starts - 8,900 - 98 51 47 -

Approvals** 1,810,173 126,530 - 978 978 - 200

Demolitions 262,983 6,683 2,250 38 - 38 -

Summary of Development Statistics for 1Q 2016

GFA = Gross Floor Area. GFA is measured in Square Feet.

Community Planning, Housing & Development

Produced by the Department of Community Planning, Housing and Development: Planning Division, Center for Urban Design and Research. June 2016

*The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes.

**Includes Phased Development Site Plan (PDSP) projects.

Site Plan #439: Washington Vista63 residential units.

Columbia Pike Village Center (FBC/UP):81,530 sq. ft. retail and 365 residential units.

Site Plan #2: The AltaireDemolition of 400 Army Navy Drive.

Site Plan #422: Rosslyn Plaza PDSP1,810,173 sq. ft. office, 45,000 sq. ft. retail, 550 residential units, and 200 hotel rooms.

Completions• 41 Single Family Homes were completed in the first quarter.

Construction Starts• Gaslight Phase III (by-right): 37 residential units in Rosslyn.• Transitional Shelter for SP #432 in Rosslyn.• Pentagon Centre (SP #297) Building D: Structured Parking with

8,900 square feet of retail.

Demolitions• 400 Army Navy Drive (paperclip building) for SP #2 in Crystal City.• Multiple property demolitions for 10th Street Flats (UCMUD) in Clarendon.

Approvals• Rosslyn Plaza PDSP (SP #422): 1,810,173 sq. ft. office, 45,000 sq. ft.

retail, 550 residential units, and 200 hotel rooms.• Washington Vista (SP #439): 63 residential units in Rosslyn. • Columbia Pike Village Center (FBC/UP): 81,530 sq. ft. retail and 365

residential units.

Development Summary

Highlights• The Rosslyn Plaza PDSP was approved by the County Board in the first quarter of 2016. At full build-out, this 7.65 acre area will contain

up to 2,531,660 GFA of residential, hotel, office, and retail uses.

• Multiple buildings were demolished during the first quarter, allowing for construction of the Altaire in Crystal City and 10th Street Flats in Clarendon. When completed, these projects will add over 597 multi-family residential units to Arlington’s housing supply.

• The County Board approved the Columbia Pike Village Center, a form based code project which will which will add a new grocery store and 365 residential units to Columbia Pike.

SP = Site Plan FBC = Form Based Code PDSP = Phased Development Site Plan BR = By-Right UP = Use Permit

Page 2: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office

1Q3Q2Q

2014

1Q4Q3Q2Q1Q 3Q2Q1Q 4Q

2011 2012

4Q

2013

1Q

2.0

2Q-0.5

0

0.5

1.0

1.5

3Q 4Q 1Q 2Q 3Q

2015

4Q

2016

Gros

s Fl

oor

Area

(GF

A)in

mill

ions

of S

quar

e Fe

et

-80,000

-40,000

0

40,000

80,000

120,000

1Q3Q2Q 2Q1Q

20141Q4Q3Q2Q1Q

20163Q2Q1Q 4Q

2011 20124Q

20131Q 2Q 3Q4Q3Q

20154Q

Retail

Gros

s Fl

oor

Area

(GF

A)

Hotel

-200

0

200

400

600

800

1,000

1Q2Q 2Q 4Q3Q

20141Q 4Q3Q2Q 4Q3Q2Q1Q 4Q

2011 20124Q

20131Q 3Q 1Q 2Q 3Q

20151Q

2016

Room

s

Development Tracking Report First Quarter 2016

Commercial Quarterly Development Trends

*

*Demolition of the Federally owned Navy Annex: 727,145 sq. ft. of office.

Completions Construction Starts Approvals Demolitions Approved PDSP density that has not gone through Final Site Plan (FSP)

Completions Construction Starts Approvals Demolitions Approved PDSP density that has not gone through Final Site Plan (FSP)

**

**Approval of major site plan amendment for Pentagon Centre PDSP.

Page 3: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

-250

0

250

500

750

1,000

1,250

1,500

1Q3Q2Q 2Q 4Q3Q

20141Q4Q3Q2Q1Q

20163Q2Q1Q 4Q

2011 20124Q

20131Q 1Q 2Q 3Q

20154Q

Residential (Single Family Detached Homes)

-100

-75

-50

-25

0

25

50

75

100

1Q3Q2Q 1Q 2Q 3Q4Q3Q

20141Q

20154Q3Q2Q1Q

20163Q2Q1Q 4Q

2011 20124Q

20131Q 2Q 4Q

Uni

ts

Residential (Total)

Uni

ts

Active Development Applications are currently undergoing County review prior to consideration by the County Board or Administrative Approval. The list below shows the volume and type of currently going through the application process. For the First Quarter of 2016, the following table includes Site Plan applications that have been accepted and filed or are currently under public review (but not on hold). Development statistics reflect the initial Administrative Regulation 4.1 submission (for Site Plan projects) or 4.1.2 submission (for Form Based Code projects), and they are subject to change throughout the public review process and upon adoption by the County Board.

Active Development Applications

Active Development Applications as of March 31, 2016

Source: Active Development Application information is maintained by the Current Planning and Comprehensive Planning Sections of the Planning Division.

Development Tracking Report First Quarter 2016

Residential Quarterly Development Trends

Completions Construction Starts Approvals Demolitions Approved PDSP density that has not gone through Final Site Plan (FSP)

Development Name Area Project Type Office (GFA) Retail (GFA) Other (GFA) Residential Units Hotel Rooms

Metropolitan Park VI Pentagon City Site Plan #105 none 10,178 none 588 none

750 N Glebe Ballston Site Plan #440 none 1,921 none 435 none

2000 Clarendon Blvd. Courthouse Site Plan #441 none 67,252 none 91 none

The Berkeley Other Area Site Plan #431 none none none 287 none

2400 Columbia Pike Columbia Pike FBC none 13,000 none 105 none

South Rhodes Street Columbia Pike N-FBC none none none 405 none

Total none 92,351 none 1,911 none

Page 4: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

In addition to this summary, detailed tables showing completions, construction starts, approvals, and demolitions for residential units, office space, retail space, hotel rooms, and other space for the First Quarter 2016 accompany this document.

The attached tables are divided into four sections:

Data Table Overview

Online Data and Mapping Resources

A map and pictures of development projects are available on the web at http://projects.arlingtonva.us/data-research/

Maps are provided through Arlington County’s GIS mapping application, which allows users to view the location of development activity and click on individual development projects to get detailed data.

Development Tracking Report Third Quarter 2012

About the Center for Urban Design and Research

The Center for Urban Design and Research is part of the Arlington County Planning Division and is responsible for facilitating community education and engagement, advocating urban design and placemaking, developing strategies and plans for improving the urban environment and public realm, and maintaining, analyzing, and disseminating information related to planning development and demographics.

If you have any questions or would like additional information, please contact the Center for Urban Design and Research at (703) 228-3525.

Development Tracking Report First Quarter 2016

Department of Community Planning, Housing and DevelopmentPlanning Division

Center for Urban Design and Research(703) 228-3525

Methodology

Quarterly development tracking reports are generated from County staff reports, County Board minutes, and data on Certificate of Occupancy (CO) permits, building permits, and demolitions permits.

The approval date is the date the project was approved by the County Board (by-right projects are not approved by the County Board). The construction start date is based on the date the Third building permit was approved for the project, and projects are classified as under construction when construction activity commences above grade. Completed projects are those where a CO has been issued. In general, a project is determined to be complete if a Master CO has been issued or if partial certificates of occupancy have been issued for at least 50% of the GFA or units in the project. In some cases, projects were determined to be complete or under construction based on site visits by Planning Division staff. Demolished projects are those where a Demolition permit has been issued.

The projects contained in this report are only those that add or subtract new density (i.e., residential units, hotel rooms, or gross floor area) to current residential, hotel, office, retail and other space inventories in the County. This report does not include data on alterations or additions to single family attached or detached homes.

Each section separately reports Major Projects and Single Family Houses. Data are reported for each of Arlington’s Major Planning Areas, Other Planning Areas, and other geographic areas. Major Planning Areas include Rosslyn, Courthouse, Clarendon, Virginia Square, Ballston, Crystal City, Pentagon City, and Columbia Pike. Other Planning Areas and other geographic areas include Nauck, Shirlington, East Falls Church, Lee Highway, and Four Mile Run.

Interactive maps and additional information are available at http://projects.arlingtonva.us/data-research/.

• Site Plan and other Approved Projects• Completed Projects

• Projects Under Construction• Demolitions

Page 5: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Summary of Site Plan and Other ProjectsArlington County, Virginia

Approved (Not Under Construction) As Of 03/31/2016

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanApprovalProject Name Address Date

ROSSLYN

45,000 550 200 03/12/2016Rosslyn Plaza PDSP 0 4221001 WILSON BVLD 1,810,173

0 63 0 01/23/2016Washington Vista 0 4391411 KEY BLVD 0

55,540 274 0 06/14/20141401 Wilson Blvd 0 4291401 WILSON BLVD 513,004

0 0 168 06/15/2013Colony House 0 4231700 LEE HIGHWAY 0

8,688 0 0 07/21/2012Rosslyn Gateway PDSP - FSP (Phase 1 - Office Building)

0 4191901 FT MYER DR 490,056

10,001 133 148 07/21/2012Rosslyn Gateway PDSP - FSP (Phase 1 - Residential/Hotel Building)

0 4191901 Ft MYER DR 0

7,687 140 0 07/21/2012Rosslyn Gateway PDSP (Phase 2 - Remaining Allocation)

0 4191901 FT MYER DR 0

2,813,233 126,916 1,160 5160ROSSLYN SUBTOTAL

COURT HOUSE

6,960 0 0 03/14/2015Carr Office Building 0 4352038 WILSON BLVD 188,910

0 395 0 02/21/2015Gables N. Rolfe St. 0 4321307 N ROLFE ST 0

14,025 0 0 12/08/20122311 Wilson Blvd 8,800 2632311 WILSON BLVD 149,553

0 188 0 10/15/2011Wakefield Manor 0 4172025 FAIRFAX DR 0

10,000 0 0 11/15/2005NSTA Office Site Plan 0 3821840 WILSON BLVD 107,920

446,383 30,985 583 08,800COURT HOUSE SUBTOTAL

CLARENDON

3,477 580 0 10/20/2015Red Top Cab Site 0 4381200 N HUDSON ST 0

3,660 144 0 07/19/201410th Street Flats 0 UCMUD3132 10TH ST N 4,704

4,704 7,137 724 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

3,200 0 0 01/21/20123901 Fairfax Drive 12,985 3863901 FAIRFAX DR 178,131

0 0 0 01/27/19993803 Fairfax Drive Expansion

0 1963803 FAIRFAX DR 43,045

11,000 0 0 01/01/1994George Mason University - Phase III

183,000 Sp. Ag.3401 FAIRFAX DR 90,000

311,176 14,200 0 0195,985VIRGINIA SQUARE SUBTOTAL

BALLSTON

11,692 330 0 12/12/20154000 Fairfax Drive 0 464000 FAIRFAX DR 0

0 12 0 12/12/2015Ballston Oak Townhouses 0 4361124 N STUART ST 0

Page 1 of 4Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 03/31/2016

Page 6: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanApprovalProject Name Address Date

11,854 0 0 11/14/2015Ballston Quarter Expansion 0 1934238 WILSON BLVD 0

66,475 406 0 11/14/2015Ballston Quarter Residential Building

0 1934100 WILSON BLVD 0

0 0 0 11/14/2015Macy's Department Store and Office Expansion

0 193701 N GLEBE RD 14,838

4,326 173 0 10/17/2015670 N Glebe Rd 0 437670 N GLEBE RD 0

3,000 267 0 01/15/2014Marymount University 0 641000 N GLEBE RD 165,204

0 2 0 12/14/2013Row Homes at Ballston 0 4154210 WASHINGTON BLVD 0

7,670 0 0 07/19/20084040 Wilson Blvd (Founder's Square - North Office)

0 413707 N RANDOLPH 418,810

9,200 237 0 01/21/2006The Spire/Fairmont 0 3314420 FAIRFAX DR 0

598,852 114,217 1,427 00BALLSTON SUBTOTAL

CRYSTAL CITY

0 0 0 12/12/20151770 Crystal Dr Expansion 0 901750 CRYSTAL DR 11,642

0 453 0 01/24/2015The Altaire 0 2400 ARMY NAVY DR 0

0 0 0 03/16/2013Long Bridge Park Aquatics and Fitness Facility (Phase I)

120,420 UP333 Long Bridge Dr 0

0 0 0 10/15/2011Boeing Site - Phase II 0 400608 S BALL ST 131,338

41,325 0 0 12/18/2007Potomac Yard - Land Bay C (National Gateway 3-4-5-6)

0 346JEFFERSON DAVIS HWY 1,064,298

5,015 342 0 04/21/2007Potomac Yard - Land Bay D - West (Brittany West)

23,906 3463001 JEFFERSON DAVIS HWY 0

16,503 360 0 04/21/2007Potomac Yard - Land Bay D-East (Brittany East)

0 346JEFFERSON DAVIS HWY 0

0 252 0 11/14/2006Lofts at Crystal Houses 0 131900 S EADS ST 0

0 198 0 01/01/1981Airport Plaza IV 0 1452600 CRYSTAL DR 0

1,207,278 62,843 1,605 0144,326CRYSTAL CITY SUBTOTAL

PENTAGON CITY

27,200 693 0 09/15/2015Pentagon Centre PDSP - Phase I (FSP)

0 2971201 S HAYES 0

310,500 0 200 09/15/2015Pentagon Centre PDSP - Phase II and III (Remaining Allocation)

0 2971201 S HAYES 705,700

50,000 0 300 09/21/2013PenPlace (Pentagon City PDSP Parcel 1D - Remaining Allocation)

0 1051197 S FERN ST 1,809,000

23,818 1403 0 09/21/2013Pentagon City PDSP (Parcel 3/Metropolitan Park - Remaining Allocation)

0 1051400 S EADS S 0

2,514,700 411,518 2,096 5000PENTAGON CITY SUBTOTAL

COLUMBIA PIKE

81,530 365 0 02/02/2016Columbia Pike Village Center

0 FBC/UP950 S GEORGE MASON DR 0

8,900 173 0 12/12/2015Gilliam Place 0 FBC/UP3507 COLUMBIA PIKE 0

Page 2 of 4Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 03/31/2016

Page 7: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanApprovalProject Name Address Date

0 73 0 02/21/2015Carver Homes 0 FBCN/UP1300 S ROLFE ST 0

0 229 0 02/21/2015Columbia Hills 0 FBCN/UP1010 S FREDERICK ST 0

8,000 73 0 12/19/20144707 Columbia Pike 0 FBC4707 COLUMBIA PIKE 0

0 36 0 07/11/2009Axumite Village 0 FBC/UP1100 S HIGHLAND ST 0

0 98,430 949 00COLUMBIA PIKE SUBTOTAL

SHIRLINGTON

0 0 0 09/19/2015Abingdon Elementary School Addition

30,000 UP3035 S ABINGDON ST 0

0 0 0 030,000SHIRLINGTON SUBTOTAL

LEE HIGHWAY

12,200 22 0 07/08/20062515 Lee Hwy 0 UCMUD2515 LEE HWY 0

5,570 12 0 02/25/20064601-4607 Old Dominion Dr

0 UCMUD4601 OLD DOMINION DR 6,272

6,272 17,770 34 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 0 0 09/20/2014McKinley Elementary School Addition

32,250 UP1030 MCKINLEY RD 0

0 0 0 04/20/20133838 N Cathedral Lane 0 4283838 N CATHEDRAL LN 4,590

4,590 0 0 032,250OUTSIDE METRO SUBTOTAL

7,907,188 884,016 8,578 1,016411,361 SUBTOTAL

SINGLE-FAMILY HOUSES

LEE HIGHWAY

0 4 0 10/01/2009Greenbrier Village Phase II 0 B/R2251 N GREENBRIER ST 0

0 0 4 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 3 0 02/22/2014Honeysuckle Hills URD 0 URD6122 LEE HIGHWAY 0

0 2 0 01/26/2008705/707 N Barton St 0 URD705 N BARTON ST 0

0 0 5 00OUTSIDE METRO SUBTOTAL

0 0 9 00SINGLE-FAMILY HOUSES SUBTOTAL

Page 3 of 4Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 03/31/2016

Page 8: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanApprovalProject Name Address Date

7,907,188 884,016 8,587 1,016ARLINGTON TOTAL 411,361

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 4 of 4Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 03/31/2016

Page 9: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Completed ProjectsArlington County, Virginia

01/01/2016 Through 03/31/2016

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

SINGLE-FAMILY HOUSES

CLARENDON

0 1 0 03/29/20163115 7th St N 03115 7th ST N 0

0 0 1 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

0 1 0 03/16/2016813 N Lincoln St 0813 N LINCOLN ST 0

0 1 0 02/12/20163700 6th Rd N 03700 6TH RD N 0

0 1 0 01/15/2016803 N Lincoln St 0803 N LINCOLN ST 0

0 0 3 00VIRGINIA SQUARE SUBTOTAL

COLUMBIA PIKE

0 1 0 03/08/20161117 S Monroe St 0 401117 S MONROE ST 0

0 0 1 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 1 0 03/25/20162504 N Florida St 02504 N FLORIDA ST 0

0 0 1 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 1 0 03/31/20161817 N Monroe St 01817 N MONROE ST 0

0 1 0 03/28/20164300 18th St N 04300 18th ST N 0

0 1 0 03/17/2016404 S Highland St 0404 S HIGHLAND ST 0

0 1 0 03/14/20162644 N Sycamore St 02644 N SYCAMORE ST 0

0 1 0 03/09/20162809 N Lexington St 02809 N LEXINGTON ST 0

0 1 0 03/09/2016408 S Taylor St 0408 S TAYLOR ST 0

0 1 0 03/08/20162708 N Buchanan St 02708 N BUCHANAN ST 0

0 1 0 03/07/20162126 N Rolfe St 02126 N ROLFE ST 0

0 1 0 03/02/2016616 N Jefferson St 0606 N JEFFERSON ST 0

0 1 0 03/02/20166318 31st St N 06318 31ST ST N 0

0 1 0 03/02/2016844 N Jacksonville St 0844 N JACKSONVILLE ST 0

0 1 0 02/29/20162815 N Underwood St 02815 N UNDERWOOD ST 0

0 1 0 02/29/20166000 27th St N 06000 27TH ST N 0

0 1 0 02/24/20162300 N Vernon st 02300 N VERNON ST 0

0 1 0 02/23/20163100 N Rochester St 03100 N ROCHESTER ST 0

0 1 0 02/22/20164848 30th St N 04848 30TH ST N 0

0 1 0 02/19/20166615 19th St N 06615 19TH ST N 0

0 1 0 02/18/20161713 N Taylor St 01713 N TAYLOR ST 0

0 1 0 02/12/20161720 N Cameron St 01720 N CAMERON ST 0

Page 1 of 2Completed Projects 01/01/2016 Through 03/31/2016

Page 10: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

0 1 0 02/08/20164011 17th St N 04011 17TH ST N 0

0 1 0 02/04/20162608 3rd St N 02608 3RD ST N 0

0 1 0 02/03/20165218 12th St N 05218 12TH ST N 0

0 1 0 02/01/20163323 N Woodrow St 03323 N WOODROW ST 0

0 1 0 01/21/20164938 34th St N 04938 34TH ST N 0

0 1 0 01/20/20165156 37th St N 05156 37TH ST N 0

0 1 0 01/15/20161529 N Randolph St 01529 N RANDOLPH ST 0

0 1 0 01/15/20163701 N Wakefield St 03701 N WAKEFIELD ST 0

0 1 0 01/14/20161318 N Abindgon St 01318 N ABINGDON ST 0

0 1 0 01/14/20162245 John Marshall Dr 02245 JOHN MARSHALL DR 0

0 1 0 01/12/20162906 19th St S 02906 19th ST S 0

0 1 0 01/12/20162911 N Greenbrier St 02911 N GREENBRIER ST 0

0 1 0 01/06/20164709 22nd St N 04709 22ND ST N 0

0 1 0 01/06/20166546 36th St N 06546 36TH ST N 0

0 1 0 01/04/20163307 N Woodrow St 03307 N WOODROW ST 0

0 1 0 01/04/20165830 20th St N 05830 20TH ST N 0

0 0 35 00OUTSIDE METRO SUBTOTAL

0 0 41 00SINGLE-FAMILY HOUSES SUBTOTAL

0 0 41 0ARLINGTON TOTAL 0

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 2 of 2Completed Projects 01/01/2016 Through 03/31/2016

Page 11: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Projects Under ConstructionArlington County, Virginia

Through 03/31/2016

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

ROSSLYN

0 37 0 01/31/2016Gaslight Square Phase III 0 B/R1701 16th ST N 0

0 0 37 00ROSSLYN SUBTOTAL

COURT HOUSE

0 14 0 03/24/2016Transitional Shelter (part of SP #432)

0 4321723 FAIRFAX DR 0

0 0 14 00COURT HOUSE SUBTOTAL

PENTAGON CITY

8,900 0 0 03/04/2016Pentagon Centre PDSP - Building D

0 297675 15TH ST S 0

0 8,900 0 00PENTAGON CITY SUBTOTAL

0 8,900 51 00 SUBTOTAL

SINGLE-FAMILY HOUSES

COURT HOUSE

0 4 0 01/11/2016URD associated with SP 404

0 URD2404 16TH ST N 0

0 0 4 00COURT HOUSE SUBTOTAL

CLARENDON

0 1 0 03/31/20161600 N Edgewood St 01600 N EDGEWOOD ST 0

0 0 1 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

0 1 0 03/30/2016540 N Nelson St 0540 N NELSON ST 0

0 1 0 02/03/2016705 N Kenmore St 0705 N KENMORE ST 0

0 0 2 00VIRGINIA SQUARE SUBTOTAL

COLUMBIA PIKE

0 1 0 03/23/2016828 S Utah St 0828 S UTAH ST 0

0 1 0 03/23/2016829 S Utah St 0829 S UTAH ST 0

0 1 0 01/15/2016821 S Utah St 0821 S UTAH ST 0

0 1 0 01/15/2016824 S Utah St 0824 S UTAH ST 0

Page 1 of 3Projects Under Construction Through 03/31/2016

Page 12: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 01/15/2016825 S Utah St 0825 S UTAH ST 0

0 0 5 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 1 0 02/22/20162511 N Jefferson st 02511 N JEFFERSON ST 0

0 1 0 02/01/20162217 N Culpeper St 02217 N CULPEPER ST 0

0 0 2 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 1 0 03/30/20162429 N Buchanan St 02429 N BUCHANAN ST 0

0 1 0 03/30/20165136 37th Rd N 05136 37TH RD N 0

0 1 0 03/25/2016801 N Barton St 0801 N BARTON ST 0

0 1 0 03/23/2016905 N Greenbrier St 0905 N GREENBRIER ST 0

0 1 0 03/22/20164953 Rock Spring Rd 04953 ROCK SPRING RD 0

0 1 0 03/21/20162917 2nd St N 02917 2ND ST N 0

0 1 0 03/18/20161816 N Cameron St 01816 N CAMERON ST 0

0 1 0 03/18/20163006 N Tacoma St 03006 N TACOMA ST 0

0 1 0 03/16/20164601 38th St N 04601 38TH ST N 0

0 1 0 03/14/20161436 N Inglewood St 01436 N INGLEWOOD ST 0

0 1 0 03/14/20162834 N Somerset St 02834 N SOMERSET ST 0

0 1 0 03/03/20165601 35th St N 05601 35TH ST N 0

0 1 0 03/02/20162615 N Powhatan St 02615 N POWHATAN ST 0

0 1 0 03/02/20164014 18th Rd N 04014 18TH RD N 0

0 1 0 03/02/20165028 25th Rd N 05028 25TH RD N 0

0 1 0 03/02/20165032 25th Rd N 05032 25TH RD N 0

0 1 0 02/26/20161021 N Edison St 01021 N EDISON ST 0

0 1 0 02/26/20163038 N Peary St 03038 N PEARY ST 0

0 1 0 02/25/20163518 13th St N 03518 13TH ST N 0

0 1 0 02/24/20164805 Rock Spring Rd 04805 ROCK SPRING RD 0

0 1 0 02/24/20165344 27th St N 05344 27TH ST N 0

0 1 0 02/22/20164856 30th St N 04856 30TH ST N 0

0 1 0 02/19/20164615 23rd St N 04615 23RD ST N 0

0 1 0 02/12/20165154 14th St N 05154 14TH ST N 0

0 1 0 02/10/20165914 35th St N 05914 35TH ST N 0

0 1 0 02/10/2016727 N Cleveland St 0727 N CLEVELAND ST 0

0 1 0 02/08/20163706 John Marshall Dr 03706 JOHN MARSHALL DR 0

0 1 0 02/08/20164628 38th St N 04628 38TH ST N 0

0 1 0 02/05/20165614 8th Rd N 05614 8TH RD N 0

0 1 0 01/13/20164664 34th St N 04664 34TH ST N 0

0 1 0 01/07/20161912 N Dinwiddie St 01912 N DINWIDDIE ST 0

0 1 0 01/04/20164111 15th St N 04111 15th ST N 0

0 1 0 01/04/20166313 30th St N 06313 30TH ST N 0

0 0 33 00OUTSIDE METRO SUBTOTAL

0 0 47 00SINGLE-FAMILY HOUSES SUBTOTAL

Page 2 of 3Projects Under Construction Through 03/31/2016

Page 13: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

0 8,900 98 0ARLINGTON TOTAL 0

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 3 of 3Projects Under Construction Through 03/31/2016

Page 14: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Summary of DemolitionsArlington County, Virginia

01/01/2016 Through 03/31/2016

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

CLARENDON

0 0 0 01/15/2016Arlington-Alexandria Coalition for the Homeless

2,250 B-R932 N HIGHLAND ST 0

1,392 0 0 01/15/2016 03100 10th ST N 0

0 0 0 01/15/2016Arlington Medical Buidling 03124 10th ST N 3,500

2,341 0 0 01/15/2016Jay's Saloon 03114 10th ST N 0

0 0 0 01/15/2016Sullivan Building 03130 10th ST N 5,760

2,950 0 0 01/15/2016The Car Store 03110 10th ST N 0

9,260 6,683 0 02,250CLARENDON SUBTOTAL

CRYSTAL CITY

0 0 0 02/04/2016400 Army Navy Dr (Paperclip building)

0 2400 ARMY NAVY DR 253,723

253,723 0 0 00CRYSTAL CITY SUBTOTAL

262,983 6,683 0 02,250 SUBTOTAL

SINGLE-FAMILY HOUSES

CLARENDON

0 1 0 03/31/20161600 N Edgewood St 01600 N EDGEWOOD ST 0

0 1 0 01/15/20161500 N Hancock St 01500 N HANCOCK ST 0

0 0 2 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

0 1 0 02/03/2016705 N Kenmore st 0705 N KENMORE ST 0

0 0 1 00VIRGINIA SQUARE SUBTOTAL

COLUMBIA PIKE

0 1 0 03/23/20162804 16th St S 02804 16TH ST S 0

0 0 1 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 1 0 02/22/20162511 N Jefferson St 02511 N JEFFERSON ST 0

0 1 0 01/04/20161908 N Monroe St 01908 N MONROE ST 0

0 0 2 00LEE HIGHWAY SUBTOTAL

Page 1 of 3Summary of Demolitions 01/01/2016 Through 03/31/2016

Page 15: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

OUTSIDE METRO

0 1 0 03/28/20166231 Washington Blvd 06231 WASHINGTON BLVD 0

0 1 0 03/23/20162615 N Powhatan St 02615 N POWHATAN ST 0

0 1 0 03/23/2016905 N Greenbrier St 0905 N GREENBRIER ST 0

0 1 0 03/18/20161119 19th St S 01119 19TH ST S 0

0 1 0 03/18/20161816 N Cameron st 01816 N CAMERON ST 0

0 1 0 03/18/20163006 N Tacoma St 03006 N TACOMA ST 0

0 1 0 03/16/20164601 38th St N 04601 38TH ST N 0

0 1 0 03/15/20161436 N Inglewood St 01436 N INGLEWOOD ST 0

0 1 0 03/14/20162834 N Somerset St 02834 N SOMERSET ST 0

0 1 0 03/14/20164624 Dittmar Rd 04624 DITTMAR RD 0

0 1 0 03/04/20164014 18th Rd N 04014 18TH RD N 0

0 1 0 03/03/20165601 35th St N 05601 35TH ST N 0

0 1 0 02/26/20163038 N Peary St 03038 N PEARY ST 0

0 1 0 02/25/20163518 13th St N 03518 13TH ST N 0

0 1 0 02/24/20164805 Rock Spring Rd 04805 ROCK SPRING RD 0

0 1 0 02/24/20165344 27th St N 05344 27TH ST N 0

0 1 0 02/22/20164856 30th St N 04856 30TH ST N 0

0 1 0 02/19/20161021 N Edison st 01021 N EDISON ST 0

0 1 0 02/19/20164615 23rd St N 04615 23RD ST N 0

0 1 0 02/17/20166575 Williamsburg Blvd 06575 WILLIAMSBURG BLVD 0

0 1 0 02/10/20165914 35th St N 05914 35TH ST N 0

0 1 0 02/10/2016727 N Cleveland St 0727 N CLEVELAND ST 0

0 1 0 02/08/20163706 John Marshall Dr 03706 JOHN MARSHALL DR 0

0 1 0 02/08/20164628 38th St N 04628 38TH ST N 0

0 1 0 02/05/20165614 8th Rd N 05614 8TH RD N 0

0 1 0 01/28/20164767 24th Rd N 04767 24TH RD N 0

0 1 0 01/28/20164780 25th St N 04780 25TH ST N 0

0 1 0 01/22/20164953 Rock Spring Rd 04953 ROCK SPRING RD 0

0 1 0 01/15/20166313 30th St N 06313 30TH ST N 0

0 1 0 01/13/20164664 34th St N 04664 34TH ST N 0

0 1 0 01/07/20161912 N Dinwiddie St 01912 N DINWIDDIE ST 0

0 1 0 01/06/20162917 2nd St N 02917 2ND ST N 0

0 0 32 00OUTSIDE METRO SUBTOTAL

0 0 38 00SINGLE-FAMILY HOUSES SUBTOTAL

Page 2 of 3Summary of Demolitions 01/01/2016 Through 03/31/2016

Page 16: Development Tracking Report First Quarter 2016 · 2016 (January 1, 2016 - March 31, 2016). This report details development activity on a quarterly basis to examine trends that occur

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

262,983 6,683 38 0ARLINGTON TOTAL 2,250

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 3 of 3Summary of Demolitions 01/01/2016 Through 03/31/2016