development project management learning program may 21 june 1, 2012, mekong institute, khon kaen,...
DESCRIPTION
Development Project Management Learning Program May 21 – June 1, 2012, Mekong Institute, Khon Kaen, Thailand Visualization in Participatory Project Planning (VIPP) Make your plan: Visible Readable Changeable MovableTRANSCRIPT
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
Project Design and Planning
Sequence of SystematicProject Design
PP #2.2
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
Problem Analysis
Objectives Analysis
Alternatives Analysis
The sequence of Objectives-Oriented Project Planning (OOPP)
Stakeholder Analysis
1.1.2.2.3.3.
Log. Framework
Plan of OperationsPlan of Operations
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Visualization in Participatory Project Planning (VIPP)
• Make your plan: Visible Readable Changeable Movable
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd PCM Workshop-House Rules
1. Write your own idea on a card.2. Write only one idea on a card.3. Describe in a clear and brief sentence.4. Stick to the facts, and avoid
abstraction and generalizations.5. Write your ideas on the cards before
beginning discussion.6. Obtain a consensus when removing
cards from the board.
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
ANALYSISSTAGE
Stakeholder
Analysis
Problem
Analysis
Objectives
Analysis
Alternatives Analysis
PLANNINGSTAGE
DMF Plan of Operation
(PO)
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Problem Analysis
• Analyze existing situation• Identify important problems• Define core problem• Draw cause effect relationship
Why?• Why?
– Why?» Why?» Why?
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Problem Tree
Visual representation of the causes and effects of existing negative conditions in the project area and/or sector, in the form of a Problem Tree
1. Select the core problem (focal problem).
2. Identify the direct causes of the core problem.
3. Develop the problem tree downwards (add causes).
4. Identify the direct effects of the core ploblem.
5. Develop the problem tree upwards (add effects).
6. Ensure that “cause-effect” relationships are maintained in the
problem tree.
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
Direct Effects
Core Problem
Direct Causes
CORE PROBLEM
CAUSES
EFFECTS
Problem Tree
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
ndExample: Problem Tree
HouseholdIncome
decreases.
FarmersHave to worklong hours.
Rice productivity is low.
Arable land is very limited
Irrigation systemDoes not work
properly
TraditionalFarming methods
are used..
Main facilities are not
well maintained
TerminalFacilities
Are not wellmaintained
FarmersDo not want
To Applyfertilizers
FarmersCannot afford
To buy modern equipment
CAUSES
EFFECTSCore Problem
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Tip for Writing Problem Cards
1. Write existing problems only.
2. Write only one problem per card.
3. Describe the problem in a sentence
4. Do not include both the cause and the effect of a problem on one card.
5. Try to avoid expressions such as “No resources is available.”
(instead, describe the conditions resulting from the lack or absence of the
particular)
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
ndExercise 2: Your Problem Tree
Core ProblemWomen cannot be involved in Income
Generating activities
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Avoid Prefer
There is no hospital
Farmers cannot receive appropriate medical
treatment
Technical skills are inadequate
and vehicles are in poor condition
Technical skills of train operator are
inadequate
Vehicles are in poor condition
Irrigation system Irrigation system does not work
properly
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Objective Analysis
• Rephrase the problems (negative statements) into objectives (positive statements)
• Identify future alternatives objective (add if necessary)
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Objectives Analysis
A Process to change “cause-effect” relationships that were clarified in the Problem Analysis to “means-ends” relationships that would be attained in the project.
Problem Objectives
Farmers cannot receive appropriate medical treatment
Tap water is contaminated with
soil residue
Rice productivity
Is low
Farmers canreceive appropriate medical
treatment
Tap water has nocontaminated with
soil residue
Rice productivity
increases
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
COREPROBLEM
Cause
Effect
Objective Tree
Negative
COREOBLECTIVE
Positive
Means
Ends
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
RiceProductivity
is low
Arable land is very limited
Main facilities are not well maintained
HouseholdIncome
decrease
Farmers have to
work long hours.
Problem Tree<Negative>
Objective Tree<Positive>
CoreProblem
Irrigation systemdoes not
work properly
Traditional farming methodsAre used
FarmersDo not want
to applyfertilizers
RiceProductivity
increase
More arable land
is available
Main facilities are well
maintained
HouseholdIncomeincrease
Farmers ‘s Workload is reduced
Irrigation systemwork properly
Modern farming methods are
introduced
Farmersapply
fertilizers
CoreObjective
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Tips for Writing Objective Cards
1. Describe desirable situations on the cards
2. Confirm the statement whether it is realistic or not.
3. Confirm the statement whether it is feasible or not.
4. Add new cards if necessary.
5. You may not have to rewrite all the problem cards.
6. Do not become an automatic “translation machene”
Desirable?
Realistic?
Feasible?
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
ndExercise 3: Your Objective Tree
Core Objective
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Alternative Analysis
• Identify irrelevant objectives• Analyze objective-impacts relationship• Set project criteria• Choose the best option• Cost – Benefit Analysis• What…….if……..
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
ndProject Selection
1. Circle approaches on the Objective Tree.
2. Name each approach in a manner that makes its objective clear.
3. Confirm the basic points of each approach.
4. Choose selection criteria for comparing the approaches to be examined.
5. Compare and examined the approaches in light of the selection criteria.
6. Select one approach to be developed into a project.
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Example: Project SelectionHousehold
Incomedecreases.
FarmersHave to worklong hours.
Rice productivity is low.
More arable land is
available
Irrigation systemwork
properly
ModernFarming methods
are introduced.
TerminalFacilities are well
maintained
FarmersApply
fertilizers
Modern EquipmentIs available for farmers
Core Objective
MainFacilities Are well
maintained
1.Land Approach 2.Irrigation Approach 3.Technology Approach
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd Project Stakeholder Analysis
• Identify Key Persons, groups, institutions, organizations, etc.
• Form categories, beneficiaries, implementers, partners, etc.
• Analyze the groups• Identify consequences of project
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd
Dev
elop
men
t Pro
ject
Man
agem
ent L
earn
ing
Prog
ram
May
21
– Ju
ne 1
, 201
2, M
ekon
g In
stitu
te, K
hon
Kae
n, T
haila
nd