“Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)” April 13, 2015 Tokyo Electric Power Company The content of this material includes the output of the International Research Institute for Nuclear Decommissioning (IRID) <Reference> Site test “Investigation B1” on grating around the pedestal inside Unit 1 PCV [For April 10]

Upload: vunhu

Post on 02-Jan-2017

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: “Development of a technology to investigate inside the Reactor

“Development of a technology to investigate inside the Reactor Primary Containment Vessel (PCV)”

April 13, 2015Tokyo Electric Power Company

The content of this material includes the output of the International Research Institute for Nuclear Decommissioning (IRID)

<Reference>

‐‐ Site test “Investigation B1” on grating around the pedestal inside Unit 1 PCV ‐

[For April 10]

Page 2: “Development of a technology to investigate inside the Reactor

1. Investigation overview

1

Access points (Planned)

C0, C11,

B0, B18,~~

X‐100B

CRD rail

PLR pump

HVH MS pipe

PLR pipe

HVH

Pedestal Opening

B1, B2,

B3, B4,B5,

B6,

B7,

B8,

B9,B10,

B11,

B12,

B13,

B14,

B18,

B0,

B17,

B16,

B15,

C2,C3,

C4,

C5,

C6,

C7,

C8,

C9,

C10,

C11,

C1,

C0,

Counterclockwise access route(Conducted on April 10)

Investigation device

: Access route (counterclockwise)                 : Access route (clockwise)                           

Purpose: For Unit 1, conducting an investigation in order to collect information on “the 1st floor grating inside the Primary Containment Vessel (PCV)” from the robot inserted through X‐100B penetration pipe.  

Clockwise route

Counterclockwise route

Opening to access Basement floor

Page 3: “Development of a technology to investigate inside the Reactor

2. Access route (performance result)

Actual investigation route

Original route

2

Fallen objectsX100B penetration pipe

B0,B1,

B2,

B3,

B5,

B6,B7,

B8,

B9,B11,

B12,

B14,

B15,

B16,

B17,

B18,

B10,

B13,

B4,

Where the robot  stuck

The investigation was conducted taking on a different route as some objects were found to be fallen on the original access route planned.  The robot was stuck on the route between B14 and B15. 

Approx. 20 mm

Approx. 20 mm

Approx. 20 mm

Approx. 20 mm

Page 4: “Development of a technology to investigate inside the Reactor

3. Investigation results

3

No. Location Investigation results

Opening to access 

basement floors

・B2 investigation* will be conducted next time.TEPCO confirmed there is an opening accessible to the basement as well as no obstacles around it.

② CRD rail

・Yet to be reached at CRD rail.・Images have been taken with a camera facing towards CRD rail from the place where the robot  reached at, which is now under evaluation. 

③On the access 

route

・No significant damages were found on the existing facilities. (such as HVG, PLR pipe, the wall of Pedestal)・Information on the temperature and radiation levels has been obtained at each investigation point.

The following  information were obtained for items ① to ③ of this investigation.

* B2 investigation: Investigation on basement floor excluding the pedestal.

B10,

X‐100B Penetration 

pipe

PLR pump

HVH 

PLR pipe

Pedestal Opening

HVH 

CRD rail

HVH 

Opening to access basement floors

B0,

B1, B2,

B3, B4,B5,

B6,

B7,

B8,

B9,

B11,

B12,

B14,

B13,

Page 5: “Development of a technology to investigate inside the Reactor

B10,

X‐100B Penetration pipe

PLR pump

HVH 

Pedestal Opening

HVH 

HVH 

Opening to access Basement floor

B0,B1, B2,

B3, B4,B5,

B6,

B7,

B8,

B9,

B11,

B12,

B14,

B13,

4‐1. Images (Opening to access the basement)

B4

Spot where the robot can be inserted.

4

With B2 investigation to be conducted next time, TEPCO confirmed there is an opening accessible to the basement as well as  no obstacles around it.

Appri. 20 mm

Approx. 50 mmPLR Pipe

Page 6: “Development of a technology to investigate inside the Reactor

B10,

X‐100B Penetration pipe

PLR pump

HVH 

PLR pipe

Pedestal Opening

HVH 

HVH 

B0,B1, B2,

B3, B4,B5,

B6,

B7,

B8,

B9,

B11,

B12,

B14,

B13,

PLR pipe

B7

4‐2. Images (PLR pipe)

5

Approx. 20 mm

・No significant damages were found on the PLP pipe (for heat retention).

・It was found that a part of the shield has been fallen off.

Page 7: “Development of a technology to investigate inside the Reactor

B10,

X‐100B Penetration pipe

PLR pump

HVH 

PLR pipe

Pedestal Opening

HVH 

HVH 

B0,B1, B2,

B3, B4,B5,

B6,

B7,

B8,

B9,

B11,

B12,

B14,

B13,

4‐3. Images (Equipment hatch and exterior of pedestal)

Exterior of the outer wall of the pedestal

No significant damages were found on the outer wall of the pedestal.

B3

6

Exterior of the equipment hatch.No significant damages were found on the equipment hatch.

B2

Outer wall of the pedestal

Page 8: “Development of a technology to investigate inside the Reactor

HVH(In the center at the bottom) HVH(At the edge of the bottom)

7

No significant damages were found on HVH (D).

B10,

X‐100B Penetration pipe

PLR Pump

HVH 

PLR pipe

Pedestal Opening

HVH 

HVH 

B0,B1, B2,

B3, B4,B5,

B6,

B7,

B8,

B9,

B11,

B12,

B14,

B13,

B1

Approx. 20 mmApprox. 20 mm

4‐4. Images (HVH (D) )

Page 9: “Development of a technology to investigate inside the Reactor

5. Investigation results (Temperature/ dose rate)

Dose rate(Sv/h)

Temperature (℃)

B3 7.4 17.8B4 7.5 19.2B5 8.7 19.4B7 7.4 19.5B11 9.7 19.2B14 7.0 20.2

Temperature and dose rate were measured at the following points.

B10,

X‐100B Penetration 

pipe

PLR pump

HVH 

PLR pipe

Pedestal Opening

HVH 

HVH 

B0,B1, B2,

B3, B4,B5,

B6,

B7,

B8,

B9,

B11,

B12,

B14,

B13,

8

Page 10: “Development of a technology to investigate inside the Reactor

9

6. Investigation robot stuck on route

Object was found to be fallen on the planned route between B 14 and B 15 where was the narrowest part of it.  Following the procedures, the investigation continued  by choosing  an another route avoidable the objects. 

After that, although the robot stuck at a narrow point, it captured some images facing to the direction of CRD rail. (currently the images are under evaluation)

Actual investigation route Original route planned

Where the robot stuck

B15,

Existing pipeB14,

Fallen object

Possible cause and measures:

The robot got stuck with an existing pipe and some shut parts of the grating or uneven part at the joint, which resulted in making the route hard to run on.  

Measures to be taken are under study.

Page 11: “Development of a technology to investigate inside the Reactor

April 201510 11 12 13 14 15 16 17

Fri Sat Sun Mon Tue Wed Thu Fri

1. Investigation on counterclockwise route

2. Investigation on clockwise route

7.  Schedule

10

Robot collection review

Under examination for the implementation period for the investigation on clockwise route.

Investigation

Dose rates were obtained below 10 Sv/h.  A knowlege was obtained that with the same amount of dose rates in “investigation on clockwise route”, the investigation camera which installed into the robot could tolerate two or three days without any problems .As for the case of an investigation on clockwise route, the plan is currently reviewed based on the knowledge obtained above.

Page 12: “Development of a technology to investigate inside the Reactor

Reference: Mock‐up 

11

Spot where the robot stuck

Page 13: “Development of a technology to investigate inside the Reactor

Reference: Mock‐up

12

Spot where the robot stuck

CRD rail