development and rehabilitation of the romanian …•electrified double line •introduction of...
TRANSCRIPT
![Page 1: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/1.jpg)
1
Development and rehabilitation of
the Romanian Railways
Mission „Transport Infrastructure and Railway
Technology“
Bucharest, April 4, 2013
![Page 2: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/2.jpg)
2
The modernization of CFR SA’s railway infrastructure
will enable the achievement of the following technical
parameters:
• running speeds of 160 km/h for passenger trains and of 120
km/h for freight trains
• electrified double line
• introduction of ERTMS and of traffic control systems.
In this way, the railway infrastructure will be compliant
with the technical parameters set down in the international
agreements AGC, AGTC and TER.
MODERNIZATION OF RAILWAY LINES
![Page 3: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/3.jpg)
3
Forecast benefits of the railway line modernization
• Increase in the freight and passenger traffic
• Decrease in the travelling time
• Increase in the quality of the freight and passenger transport
services
• Decrease in the pollution caused by the railway transport
• Decrease in the fuel consumption
• Decrease in the operating costs
• Decrease in the rolling stock and infrastructure maintenance
costs.
![Page 4: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/4.jpg)
4
PAN-EUROPEAN TRANSPORT CORRIDORS SITUATED
ON THE ROMANIAN TERRITORY
Length of Corridor IV
– 1,364 km
Length of Corridor IX
– 551 km
![Page 5: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/5.jpg)
5
CFR SA’s projects,
completed and in progress
• Modernization of the railway sections included
in Corridor IV
• Modernization of railway stations
• Introduction of ERTMS Level 2
![Page 6: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/6.jpg)
MODERNIZATION OF RAILWAY SECTIONS
![Page 7: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/7.jpg)
7
• The project includes the rehabilitation and modernization of railway stations during two
stages, 16 stations in the first stage and 5 stations in the second stage
• As far as the stations in the first stage are concerned, the estimated value amounts to €
166,864,409, whereas the execution duration is 2012 – 2015
• As far as the stations in the second stage are concerned, the estimated value amounts to €
43,130,000, whereas the execution duration is 24 months, if the financing is supplied
• The scheduled works are: modernization of platforms, canopies, commercial spaces,
pedestrian tunnels, internal sanitary installations, sewage and electrical systems, as well as
rehabilitation of the passenger buildings
BENEFITS
• Decrease in the maintenance and operating costs
• Improvement of the quality of CFR’s services supplied to the public
• Increase in the revenues from renting commercial spaces
MODERNIZATION OF RAILWAY STATIONS
![Page 8: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/8.jpg)
8
MODERNIZATION OF RAILWAY STATIONS
![Page 9: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/9.jpg)
9
ETCS/ERTMS LEVEL 2 PILOT PROJECT
Introduction of ETCS/ ERTMS Level 2 on the railway route the Buciumeni Branch – the entry
signal to the Brazi Station (38 km)
Contract value: EUR 39 million
Status: work in progress
Execution duration: 2011- 2014 (30 months)
![Page 10: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/10.jpg)
10
Railway infrastructure projects
under preparation
• Modernization of the railway sections
included in the Northern and Southern
branches of Corridor IV
• Increase in traffic safety
![Page 11: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/11.jpg)
11
MODERNIZATION OF THE Km 614 – GURASADA SECTION
Km 614 – Gurasada (102 km)
Estimated value: EUR 1,041 million
Status: Feasibility Study, Technical Design and Detail Engineering under
completion
Financing proposal: Cohesion Funds (SOP-T 2014 - 2020) + the State
Budget
Execution duration: 2014- 2020
![Page 12: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/12.jpg)
12
MODERNIZATION OF THE GURASADA – SIMERIA SECTION
Gurasada – Simeria (42 km)
Estimated value: EUR 612 million
Financing proposal: Cohesion Funds (SOP-T 2014 - 2020) +
the State Budget
Status: Feasibility Study, Technical Design and Detail
Engineering under approval
Execution duration: 2014- 2020
![Page 13: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/13.jpg)
13
MODERNIZATION OF THE BRASOV - SIGHISOARA SECTION
Brasov - Sighisoara (130 km)
Estimated value: EUR 1,739 million
Financing proposal: Cohesion Funds (SOP-T 2014 - 2020) + the
State Budget
Status: Feasibility Study, Technical Design elaborated
Execution duration: 2016 – 2021
![Page 14: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/14.jpg)
14
Brasov - Predeal (26 km)
Estimated value: EUR 200 million
Financing proposal: Cohesion Funds (SOP-T 2014 - 2020) + the
State Budget
Status: Feasibility Study revised
Execution duration: 2016 – 2020
MODERNIZATION OF THE BRASOV – PREDEAL SECTION
![Page 15: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/15.jpg)
15
MODERNIZATION OF THE CRAIOVA – CALAFAT SECTION
Craiova – Calafat (108 km)
Estimated value: EUR 566 million
Financing proposal: Cohesion Funds (SOP-T 2014 - 2020) + the
State Budget
Status: Feasibility Study revised
Execution duration: until 2020 if the financing is supplied
![Page 16: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/16.jpg)
16
MODERNIZATION OF THE CRAIOVA – CARANSEBES SECTION
Craiova – Caransebes (227 km)
Estimated value: Eur 1,620 million
Financing proposal: Cohesion Funds (SOP-T 2014 - 2020) + the State
Budget
Status: Assessment Study completed
Proposed execution duration: until 2020 if the financing is supplied
![Page 17: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/17.jpg)
17
MODERNIZATION OF THE ARAD – CARANSEBES SECTION
Caransebes – Arad (155 km)
Estimated value: EUR 670 million
Financing proposal: Cohesion Funds (SOP-T 2014 - 2020) + the State
Budget
Status: Assessment Study completed
Execution duration: until 2020 if the financing is supplied
![Page 18: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/18.jpg)
18
Railway
Region Bridges Tunnels Culverts
Total
structures
Brasov 1 3 2 6
Bucharest 7 0 0 7
Cluj 6 2 9 17
Constanta 2 0 2 4
Constanta (on
the Danube) 2 0 0 2
Craiova 8 0 7 15
Galati 14 0 7 21
Iasi 5 1 13 19
Timisoara 4 2 1 7
TOTAL
NETWORK 49 8 41 98
Bridge and tunnel rehabilitation works on
the TEN-T Railway Network Rehabilitation works for 98 railway bridges, culverts and tunnels
Investment value: EUR 170 million
Status: under execution
Execution duration: 2012 - 2014
![Page 19: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/19.jpg)
19
PROJECTS FOR INCREASING TRAFFIC SAFETY
Modernization of the electro-
mechanical interlocking systems
situated on the Ilia-Lugoj Section, in 7
stations
Estimated value: EUR 19 million
Status: Tender preparation
Execution duration: 24 months
Modernization of the electro-mechanical
interlocking systems situated on the Siculeni –
Adjud Section
Estimated value: EUR 41 million
Status: Tender preparation
Execution duration: 36 months
![Page 20: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/20.jpg)
20
PROJECTS FOR INCREASING TRAFFIC SAFETY
Modernization of railway
level-crossings – 112 level-
crossings
Value: EUR 25 million
Status: Tender preparation
Execution duration: 24
months
![Page 21: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/21.jpg)
21
PROJECTS FOR INCREASING TRAFFIC SAFETY
Introduction on large scale of Hot Axle Box and
Blocked Brake Detectors in 21 locations
Value: EUR 16 million
Status: Tender preparation
Execution duration: 29 months
![Page 22: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/22.jpg)
Memorandum of Understanding between the Ministry of Transport and
Infrastructure of Romania and the Ministry of Mobility of the Kingdom of Belgium
regarding the cooperation in the field of infrastructure works for the modernization,
rehabilitation and extension of the railway infrastructure in the area of Bucharest,
including the “Gara de Nord“ Centre
The construction of a modern railway station with a view to streamlining and
facilitating the railway traffic on the route Chitila - Bucharest – the Progresu
Station, including:
◦ the connection tunnel to the Obor Station
◦ the connection tunnel to the Gara de Sud Station
◦ the transformation of the Gara de Nord Station from a terminal station into a
direct connection;
◦ the arrangement of the present “Gara de Nord” Station in the underground.
MODERNIZATION OF THE GARA DE NORD RAILWAY CENTER
PROJECT PROPOSED FOR PUBLIC – PUBLIC PARTNERSHIP
![Page 23: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/23.jpg)
PROJECT PROPOSED FOR PUBLIC – PUBLIC PARTNERSHIP
![Page 24: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/24.jpg)
THE RAILWAY LINE BUCURESTI NORD – HENRI COANDA INTERNATIONAL
AIRPORT
PROJECT PROPOSED FOR PUBLIC – PRIVATE PARTNERSHIP
Railway/underground common station
The Henri Coanda International Airport
Estimated value: EUR 291 million
Execution duration: 28 months
Status: FS prepared, without financing source
The Henri Coanda International Airport
![Page 25: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/25.jpg)
CONSTRUCTION OF INTERMODAL TERMINALS
PROJECT PROPOSED FOR PUBLIC – PRIVATE PARTNERSHIP
Estimated value: EUR 118 million
Status: Feasibility Studies launched
Financing: at least one terminal through SOP-T, the
rest through PPP
Execution duration: 2012 – 2020
![Page 26: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/26.jpg)
MODERNIZATION OF THE RAILWAY RING OF THE MUNICIPALITY
OF BUCHAREST
PROJECT PROPOSED FOR PUBLIC – PRIVATE PARTNERSHIP Estimated value: EUR 350 million
Status: Opportunity Study prepared,
without financing source
Execution duration: 60 months
![Page 27: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/27.jpg)
THE HIGH SPEED RAILWAY LINE
PROJECT PROPOSED FOR PUBLIC – PRIVATE PARTNERSHIP
• The High Speed Railway Line is an integral part of the TEN-T comprehensive network
as a sustainable solution for ensuring mobility at EU level
• The extension of the Paris - Vienna high speed line by means of the connection
Vienna – Budapest – Szeged
• Estimated value: EUR 11 billion
• Status: Launching of the Prefeasibility Study
![Page 28: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/28.jpg)
RAILWAY INFRASTRUCTURE
PROJECTS INCLUDED IN
CFR SA’S LONG-TERM
STRATEGY
![Page 29: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/29.jpg)
The TEN-T Railway Network
• At present, the European Commission is completing the
review of the policy regarding the TEN-T Transport Network,
which will be finalized by approving the Financial Guidelines
and Regulations applicable to this network.
• The new TEN-T Network involves a two level approach,
being made up of the comprehensive network and the core
network.
• The completion deadline of the core network is 2030 and
of the comprehensive network 2050.
![Page 30: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/30.jpg)
The TEN-T Railway Network
The precise configuration of the TEN-T Railway Network on the Romanian territory has been submitted as a
proposal by the Ministry of Transport and Infrastructure to the European Commission. The figure below
presents the TEN-T comprehensive network, underlining the Corridors IV and IX.
![Page 31: Development and rehabilitation of the Romanian …•electrified double line •introduction of ERTMS and of traffic control systems. In this way, the railway infrastructure will be](https://reader034.vdocuments.us/reader034/viewer/2022042117/5e95cbe776b62b7ea02a23b8/html5/thumbnails/31.jpg)
Modernization priorities on the CFR SA network
• Conventional railway line sections included in the Northern
branch of Corridor IV
• Conventional railway line sections included in the
Southern branch of Corridor IV
• Conventional railway line sections included in Corridor IX
• Conventional railway line sections included in the TEN-T
core network
• Conventional railway line sections included in the TEN-T
comprehensive network