DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION Shuo Wang 1 , Eddie Y. Chou 2 , Andrew Williams 3 (1) Department of Civil Engineering, University of Toledo, 2801 W. Bancroft Street, Toledo, OH 43606 Phone: (419) 530-8058 Fax: (419) 530-8116 E-mail: [email protected] (Corresponding Author: Shuo Wang) (2) Department of Civil Engineering, University of Toledo, 2801 W. Bancroft Street, Toledo, OH 43606 Phone: (419) 530-8123 Fax: (419) 530-8116 E-mail: [email protected] (3) Ohio Department of Transportation 1980 W. Broad St., Columbus, OH 43223 Phone: (614) 752-4059 E-mail: [email protected] Submission Date: 07/31/2012 Word Count: Body Text = 4,290 Abstract = 153 Tables 3 x 250 = 750 Figures 5 x 250 = 1,250 Total = 6,443 TRB 2013 Annual Meeting Paper revised from original submittal.

Upload: hoangnga

Post on 24-May-2018

219 views

Category:

Documents


1 download

TRANSCRIPT

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL

PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF

TRANSPORTATION

Shuo Wang1, Eddie Y. Chou

2, Andrew Williams

3

(1)

Department of Civil Engineering, University of Toledo,

2801 W. Bancroft Street, Toledo, OH 43606

Phone: (419) 530-8058

Fax: (419) 530-8116

E-mail: [email protected]

(Corresponding Author: Shuo Wang)

(2)

Department of Civil Engineering, University of Toledo,

2801 W. Bancroft Street, Toledo, OH 43606

Phone: (419) 530-8123

Fax: (419) 530-8116

E-mail: [email protected]

(3)

Ohio Department of Transportation

1980 W. Broad St., Columbus, OH 43223

Phone: (614) 752-4059

E-mail: [email protected]

Submission Date: 07/31/2012

Word Count:

Body Text = 4,290

Abstract = 153

Tables 3 x 250 = 750

Figures 5 x 250 = 1,250

Total = 6,443

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 1

ABSTRACT 1

Optimal use of pavement maintenance and rehabilitation budget is essential in a constrained 2

budget environment such as now. This paper presents the development and implementation of a 3

network-level optimization model within a pavement management information system (PMIS) 4

for the Ohio Department of Transportation (ODOT). Future pavement condition is predicted 5

based on historical pavement data using a Markov transition probability model. Such transition 6

probabilities are updated automatically when new condition data become available each year. 7

The network-level optimization model integrates a linear programming model and the Markov 8

transition probability model. This optimization tool is capable of (1) calculating the minimum 9

budget required to achieve a desired level of pavement network condition, (2) maximizing the 10

improvements of pavement network condition with a given amount of budget, and (3) 11

determining the corresponding optimal treatment policy and budget allocations. It can be used 12

by highway agencies as a decision support tool for network-level pavement management 13

decisions. 14

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 2

INTRODUCTION 1

As a result of the aging pavement networks compounded by budget cuts at most agencies, 2

maximizing the benefits of available maintenance and rehabilitation dollars has become 3

necessary for many highway agencies. This paper presents the development and implementation 4

of a network-level pavement optimization model for the Ohio Department of Transportation. 5

The model is developed using the linear programming algorithm and the Markov 6

transition probability model. The Markov transition probabilities are estimated based upon 7

historical pavement condition data collected by ODOT and such probabilities can be updated 8

automatically when new data become available. The Markov transition matrices are developed 9

for each pavement group with similar characteristics, such as pavement type, last treatment, and 10

system priority. A linear programming optimization model is then established based on the 11

Markov model. The network-level optimization model is implemented using Microsoft Visual 12

Basic .NET (2008). The objective function as well as various constraints, such as the available 13

budget, the allowable treatments at various condition states, and the desired target condition 14

level, can be modified to satisfy the needs of the decision maker. This optimization tool is 15

capable of (1) calculating the minimum budget required to achieve a desired level of pavement 16

network condition, (2) maximizing the improvements of pavement network condition with a 17

given amount of budget, and (3) determining the corresponding optimal treatment policy and 18

budget allocations. 19

20

LITERATURE REVIEW 21

Previously proposed optimization models have two essential components, which are 22

optimization algorithms and pavement condition prediction models (1). Integer and linear 23

programming are two optimization algorithms utilized by most developed pavement optimization 24

models. Li et al. (2) and Ferreira et al. (3) use integer programming models, in which each 25

pavement section is assigned a decision variable and a specific maintenance and rehabilitation 26

plan can be generated for each pavement section. However, this approach results in a very large 27

number of variables and makes the optimization process extremely difficult especially when it is 28

used for large pavement networks (4). On the other hand, linear programming models can be 29

solved within an acceptable time period even if the problem size is quite large (5). Therefore, 30

many researchers, such as Abaza (4), Golabi et al. (6), Bako et al. (7), and Chen et al. (8), have 31

developed network-level optimization models using linear programming. In linear programming 32

models, decision variables are introduced for pavement condition categories instead of specific 33

pavement sections (4). There are two main types of condition prediction models, namely 34

probabilistic models and deterministic models. The rate of pavement deterioration is often 35

uncertain (9). Therefore, the probabilistic model based on the Markov process is the most 36

frequently used approach (4, 6, 7, 8). 37

The development of the optimization model in this research is mainly based on the 38

methodologies adapted from the models developed by Golabi et al. (6) for Arizona DOT and by 39

Chen et al. (8) for Oklahoma DOT. In Golabi et al.’s model, a single Markov transition 40

probability matrix is used to estimate the deterioration trend of pavements receiving routine 41

maintenance, no matter what type of repair treatment has been conducted (8). As a result, 42

pavements with different repair treatments, such as reconstruction and thin overlay, are assumed 43

to deteriorate at the same rate, which is considered by Chen et al. (8) as a major limitation of this 44

model. The main improvement of Chen et al.’s model is that it uses two Markov transition 45

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 3

matrices for each repair treatment. One is for the immediate impact of the treatment on the 1

pavement condition improvement when it is conducted. The other is for the deterioration trend 2

after the treatment. In other words, the deterioration trends for different repair treatments are 3

estimated separately. Therefore, this model is more realistic and accurate in that pavements with 4

different last treatments tend to deteriorate at different rates (8). 5

6

DEVELOPMENT OF MARKOV TRANSITION PROBABILITY MODEL 7

The Markov transition probability model assumes that the probabilities that a pavement 8

deteriorates from a given condition state to other condition states are “stationary transition 9

probabilities” (5, 10). 10

In this paper, pavement conditions are categorized into five states: Excellent, Good, Fair, 11

Poor and Very Poor, based on the pavement condition rating (PCR) score; pavement repair 12

treatments are grouped into four types: Preventive Maintenance (PM), Thin Overlay, Minor 13

Rehabilitation and Major Rehabilitation. The Markov transition probabilities should be 14

estimated for each pavement group with similar characteristics. However, a pavement group 15

must have a significant amount of pavements at various condition states to develop a reliable 16

prediction model (10). Therefore, three critical factors, namely pavement type, system priorities 17

and last repair treatment, are used as parameters to define pavement groups. Two transition 18

probability matrices: the treatment matrix and the Do Nothing matrix, are developed for each 19

repair treatment in each pavement group. The treatment matrix is for the condition improvement 20

the first year the treatment is applied and the Do Nothing matrix is for the deterioration trend 21

after the treatment. 22

There are three challenges in estimating the Markov transition matrices from actual 23

historical data. First, “outliers” in the data need to be excluded to improve the accuracy of the 24

estimation. An example of the outliers is that a pavement section in poor condition may become 25

in good condition the next year without any record of repair treatment. Such pavement sections 26

are removed from the calculation process in this research. Second, pavement condition data are 27

often subject to “attrition”, also referred to as “dropouts” (11). Overtime, only good performing 28

pavements remain, while poor performing pavements are more likely to receive treatments and 29

“drop out”; therefore, prediction models that do not consider dropouts tend to overestimate future 30

pavement conditions, particularly at the later stage of pavement life span (10). This issue is 31

handled by projecting the PCR scores in the next 20 years for each pavement section, assuming 32

that no repair treatment is conducted. The actual historical PCR data and the forecasted PCR 33

data are used in estimating the transition probabilities to offset the impact of those “dropouts”. 34

Third, some pavement groups do not have a sufficient amount of pavements, making the 35

transition matrices less accurate and sometimes unrealistic. For this research, the total mileage 36

of a pavement group should be at least 300 miles; otherwise, the transition probabilities are 37

derived from other similar groups. 38

39

FORMULATION OF NETWORK-LEVEL OPTIMIZATION MODEL 40

This section presents the development of a linear programming model for network-level 41

pavement optimization based on the Markov transition probability model. 42

The pavement network is divided into three sub-networks according to the pavement 43

types (1, Concrete; 2, Flexible; 3, Composite). Each sub-network is divided into four groups 44

according to the last repair treatments (1, PM; 2, Thin Overlay; 3, Minor Rehabilitation; 4, Major 45

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 4

Rehabilitation). Each group is further divided into five pavement condition states (1, Excellent; 1

2, Good; 3, Fair; 4, Poor; 5, Very Poor) based on the PCR score. Each pavement condition class 2

may be recommended for one of the five repair treatments (0, Do Nothing; 1, PM; 2, Thin 3

Overlay; 3, Minor Rehabilitation; 4, Major Rehabilitation). In the optimization model described 4

in this section: N is the number of pavement types, K is the number of repair treatment types, I is 5

the number of pavement condition states and T is the number of analysis years. ikntkY ' is the 6

decision variable representing the proportion of pavement type n in condition state i with last 7

treatment k’ receiving recommended repair treatment k in year t. Two assumptions are: the total 8

mileage of the pavement network remains constant, and the pavement types do not change for 9

any pavement section during the analysis period. 10

Two objective functions are developed. The first one is to minimize the total repair cost 11

of the pavement network to achieve a target condition level (Equation 1): 12

13

Minimize 14

N

n

T

t

K

k

I

i

K

k

kikntk CY1 1 1' 1 0

'

(1) 15

where

kC is the unit cost of applying treatment k. 16

The second objective function is to maximize the proportion of pavements in Excellent, 17

Good, and Fair condition over the analysis period with given budget constraints (Equation 2): 18

Maximize

19

N

n

T

t

K

k i

K

k

ikntkY1 1 1'

3

1 0

'

(2) 20

There are four sets of required constraints namely non-negativity constraints, sum-to-one 21

constraints, initial condition constraints, and state transition constraints. The non-negativity 22

constraints (Equation 3) ensure that all variables in the optimization model are non-negative. 23

24

0' ikntkY (n = 1,…, N; t = 1,…, T; k’ = 1,…, K; i = 1,…, I; k = 0,…, K) (3) 25

The sum-to-one constraints (Equation 4) ensure that the entire pavement network is 26

divided into many proportions and every proportion is represented by a decision variable. 27

28

11 1' 1 0

'

N

n

K

k

I

i

K

k

ikntkY

(t = 1,…, T ) (4) 29

The initial condition constraints (Equation 5) pass the values representing the current 30

pavement network condition distribution to the optimization model. 31

32

ink

K

k

ikkn QY '

0

'1

( n = 1,…, N; k’ = 1,…, K; i = 1,…, I ) (5) 33

where inkQ ' is the proportion of pavement type n in state i with last treatment k’ in initial year. 34

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 5

The state transition constraints (Equation 6) integrate the Markov transition probability 1

model with the linear programming model. From the second analysis year on, the proportion of 2

pavement type n in condition state j with last treatment k’ in year t is derived from two parts of 3

pavement in various condition states in year t-1: one part with last treatment k’ receiving no new 4

treatment (Do Nothing) and the other part receiving new treatment k. 5

6

I

i

ijnkiktn

K

k

I

i

K

k

ijnkkiktnjkntk DNYPYY0

'0')1(

0 0 1

'')1('

7

(n = 1,…, N; t = 2,…, T; k’ = 1,…, K; j = 1,…, I) (6)

8

9

where ijnkP ' is the probability that pavement type n receiving new treatment k transit from state i to 10

state j and ijnkDN ' is the probability that pavement type n with last treatment k’ receiving no new 11

treatment (Do Nothing) moves from state i to state j. 12

In order to make the optimization model more practical, several sets of optional 13

constraints are also introduced. The condition constraints (Equation 7 and 8) ensure that the 14

proportion of pavement in certain condition states is in a prescribed range. 15

16

it

N

n

K

k

K

k

ikntkY 1 1' 0

'

(t = 2,…, T; selected i) (7) 17

it

N

n

K

k

K

k

ikntkY 1 1' 0

' (t = 2,…, T; selected i) (8) 18

where it is the upper limit of the proportion of pavement in condition i in year t and it is the 19

lower limit of the proportion of pavement in condition i in year t. 20

For instance, pavements in Poor and Very Poor condition are considered as deficient. It 21

may be desirable to limit the total amount of deficient pavements (or deficiency level) to a given 22

percentage, say, 5%, of the entire network. If the desirable deficiency level is much lower than 23

the existing deficiency level, a significant amount of rehabilitation would be required to achieve 24

the desired condition target immediately. Therefore, it is more reasonable to allow the condition 25

target (in term of desired deficiency level) to be achieved gradually by linearly reducing the 26

proportion of deficient pavements using Equation 9: 27

28

Ttt

tttt

i

iii

it

'

'211'

11

(9) 29

where i is the desired proportion of condition state i; it is the upper limit of proportion of 30

pavement in condition i in year t; t’ is the year to achieve condition target specified by the user 31

and T is the number of analysis years. 32

The allowable treatment constraints (Equation 10) ensure that certain treatments can only 33

be applied to pavements in certain condition states or with certain last treatments. 34

35

0' ikntkY (t = 1,…, T; selected n, k’, i, k) (10) 36

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 6

Experience reveals that some treatments are cost effective only when pavements are in 1

certain condition states and with appropriate last treatments. For example, Thin Overlay is only 2

cost effective on pavements in Fair or Poor condition, so the corresponding decision variables 3

are set to zero to disallow Thin Overlay on pavements in other condition states. 4

The effectiveness of some treatments is also associated with the last treatment. For 5

instance, if PM is conducted on pavements with last treatments of PM, the underlying distress of 6

the pavement can only be “masked” for a short period of time and the distress may resurface 7

quickly within a few years after treatment. However, PM is a lower cost treatment, which may 8

cause the optimized solution to recommend PM treatments to be applied repeatedly. Therefore, 9

it is necessary to add a set of constraints to limit the use of repeated PM treatments on certain 10

pavements. 11

12

The budget constraints (Equation 11) ensure that the required budgets recommended by 13

the optimized solution do not exceed the maximum available budget for each year. 14

15

t

N

n

T

t

K

k

I

i

K

k

kikntk BLCY 1 1 1' 1 0

'(t = 1,…, T) (11)

16

where L is the total length of the entire pavement network and tB is the maximum available 17

budget in year t. 18

The budget constraints are required for the maximization model and optional for the 19

minimization model. It is possible that the optimized repair policy obtained from the 20

mathematical model would recommend a large number of pavements to be repaired in the first 21

couple of years in order to minimize the total cost over the analysis period. However, the 22

recommended budget may be far beyond the maximum available budget of the highway agency, 23

making the optimized repair strategy unsuitable for practical use. For that reason, the budget 24

constraints can also be included in the minimization model. 25

26

IMPLEMENTATION 27

The network-level optimization model is implemented using Microsoft Visual Basic .NET 28

(2008). The model is solved by an open source linear programming solver, named LP_Solve 29

(12). The optimization tool consists of four components: pavement database, data preparation, 30

optimization analysis and results output. The pavement database stores current and historical 31

pavement conditions, project history, and road inventory data. The data preparation component 32

enables the user to define pavement condition states (Excellent, Good, Fair, Poor, and Very 33

Poor) by selecting the corresponding PCR thresholds; to generate the current pavement condition 34

distribution table for further analysis; and to determine the year from which historical condition 35

data are used to generate the Markov transition probability matrices. The optimization analysis 36

component allows the user to select the proper pavement network for optimization; to input unit 37

cost for each type of repair treatment; to choose appropriate objective functions; to set pavement 38

condition constraints; to select allowable treatments for pavements in different condition states; 39

and to enter the maximum available budget for each year. The results output component enables 40

the user to view the projected pavement condition distribution, the optimized recommended 41

treatment policy, and the corresponding budget allocation. 42

43

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 7

EXAMPLE PROBLEMS 1

This section presents three example problems solved by the optimization tool developed in this 2

study. For the example runs, ODOT’s priority system pavement network which consists of 3

11,941 lane miles of interstate highways, U.S. routes, and state routes is analyzed over the next 4

20 years. The unit costs of the four types of repair treatments, per lane-mile, are: $40, 000 for 5

PM, $100,000 for Thin Overlay, $200, 000 for Minor, and $1,000,000 for Major. 6

Pavement conditions are classified into five categories based on PCR scores as shown in 7

Table 1. 8

9

TABLE 1 Pavement Condition Classification 10

Pavement Condition PCR score range

Excellent PCR >= 85

Good 75 =< PCR < 85

Fair 65 =< PCR < 75

Poor 55 =< PCR < 65

Very Poor PCR < 55

11

Pavements in poor and very poor conditions are considered to be “deficient”. The current 12

network deficiency level is 2.7%. 13

14

Example 1. Minimum Budget to Achieve a Desired Condition Level 15

Example 1 is to calculate the minimum budget required to improve the overall pavement network 16

condition by reducing the deficiency level from 2.7% to 1% within three years and to determine 17

the corresponding fund allocation among different maintenance and rehabilitation treatments. 18

Both the optimized results with and without budget constraints are analyzed and compared. 19

Table 2 shows the allowable treatments for Example 1. 20

21

TABLE 2 Allowable Treatments for Example 1 22

Condition Do

Nothing PM

Thin

Overlay

Minor

Rehab

Major

Rehab

Excellent Yes No No No No

Good Yes Yes No No No

Fair Yes Yes No Yes No

Poor Yes No No Yes Yes

Very Poor Yes No No No Yes

23

The optimization model without budget constraints (Model A) yields a theoretical 24

optimized solution for the problem. Since no maximum available annual budget is defined, the 25

mathematical optimization model could recommend any amount of pavement mileage to be 26

repaired in each year in order to minimize the total cost over the analysis period, which is 20 27

years in this case. Figure 1 shows the recommended budget allocation for each type of 28

treatment, and the corresponding projected pavement condition distribution. 29

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 8

1 (a) 2

3 (b) 4

FIGURE 1 (a) Recommended treatment budget, and (b) pavement condition distribution 5

for Example 1 (without budget constraints). 6

7

0

50

100

150

200

250

Bu

dg

et (

$ M

illi

on

)

Year

PM Thin Overlay Minor Rehab Major Rehab

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Year

Very Poor Poor Fair Good Excellent

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 9

From Figure 1 (a), it can be seen that the required budget for the year 2013 is $206.7 1

million, much higher than the other years. Figure 1 (b) indicates that the deficiency level is 2

reduced gradually from 2.7% to 1%. However, this result may not be suitable for practical use, 3

since the recommended budget for the third year may be far beyond the available maximum 4

annual budget. Besides, the recommended annual budget varies significantly in the first several 5

years, which makes the treatment strategy difficult to be implemented by highway agencies. It 6

should be noted that the funds for years after 2014 are used to maintain the deficiency level at 7

1%, since pavements tend to deteriorate over years. 8

The optimization model with budget constraints (Model B) provides an optimal solution 9

under the constraint that recommended budgets do not exceed the maximum available budget for 10

each year. In this example run, it is assumed that the annual budget limitation is $150 million. 11

All other constraints and objective functions are the same with the Model A. Figure 2 presents 12

the recommended budget allocation for each type of treatment, and the corresponding projected 13

pavement condition distribution. 14

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 10

1

(a) 2

3 (b) 4

FIGURE 2 (a) Recommended treatment budget, and (b) pavement condition distribution 5

for Example 1 (with budget constraints). 6 7

0

50

100

150

200

250

Bu

dg

et (

$ M

illi

on

)

Year

PM Thin Overlay Minor Rehab Major Rehab

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Year

Very Poor Poor Fair Good Excellent

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 11

It can be seen from Figure 2 (a) that the recommended annual budgets are all within the 1

limit of $150 million during the analysis period. Figure 2 (b) indicates that the deficiency level 2

is reduced gradually from 2.7% to 1% in three years. Although the average annual pavement 3

expenditure is $141 million, which is slightly higher than the theoretical optimized result ($140.6 4

million) obtained from Model A, this model yields a more practical and stable solution. 5

Model A provides a maintenance and rehabilitation strategy to minimize the total cost in 6

the 20 years without considering the budget limitation; whereas Model B has one more set of 7

constraints to ensure that the recommended annual budgets do not exceed the maximum 8

available budget limitation. The average annual budget required obtained from Model A is 9

slightly lower than that of Model B, which means Model A yields a better solution than Model B 10

if the total cost in the analysis period is the only consideration. However, taking into account the 11

actual available budget situation, Model B yields a more practical solution. 12

13

Example 2. Maximum Network Condition within Given Budget Constraints 14

Example 2 is to generate the budget allocation plan among various repair treatments to maximize 15

the entire pavement network condition when the available budget level has already been 16

determined. It is assumed that the available annual budget is $140.6 million as calculated by 17

Model A in Example 1, since Model A yields a theoretical optimized result. The objective is to 18

maximize the proportion of pavements in Excellent, Good, and Fair conditions over the whole 19

analysis period. The allowable treatments are the same with Model A in Example 1 (Table 2). 20

Figure 3 shows the recommended budget allocation among different maintenance and 21

rehabilitation treatments, and the corresponding predicted pavement condition distribution. 22

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 12

1 (a) 2

3 (b) 4

FIGURE 3 (a) Recommended treatment budget, and (b) pavement condition distribution 5

for Example 2. 6

7 The comparison between the predicted pavement condition levels obtained from Example 8

1 (Model A) and Example 2 is important, as the total amount of treatment expenditure over the 9

0

20

40

60

80

100

120

140

160

Bu

dg

et (

$ M

illi

on

)

Year

PM Thin Overlay Minor Rehab Major Rehab

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Year

Very Poor Poor Fair Good Excellent

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 13

20 years recommended by the two models is almost the same. Figure 4 shows the comparison of 1

deficiency trends obtained from Example 1 (Model A) and Example 2. 2

3 FIGURE 4 Comparison of deficiency level trends between Example 1 (Model A) and 4

Example 2. 5

6

For Example 2, the objective is to maximize the total proportion of pavements in 7

Excellent, Good, and Fair conditions over the analysis period given the amount of budget each 8

year. Since there are no constraints to control the deficiency level each year, the deficiency level 9

trend is not stable. For Example 1, the objective is to minimize the total cost over the 20 years 10

given the condition level constraints for each year; therefore, the deficiency level is kept at a 11

certain level specified by the user. The average deficiency level derived from Example 1 is 12

1.16%, which is slightly lower than that of Example 2 (1.24%). The main reason is that the 13

model in Example 1 can spend any amount of money each year to achieve the best solution for 14

the entire analysis period, as budget constraints are not introduced. 15

16

Example 3. Allowable Treatments Effects on Annual Budget Requirements 17

Example 3 is a sensitivity analysis to test the impact of different allowable treatments on the 18

required average annual budget to achieve a certain condition target. For instance, the decision-19

maker is interested in the effect of PM on the average annual budget. The two different sets of 20

allowable treatments are shown in Table 2 and Table 3. While in Table 2 PM is allowed to be 21

conducted on pavements in good and fair conditions, it is not allowed in Table 3. 22

0.0%

0.5%

1.0%

1.5%

2.0%

2.5%

3.0%

2011 2013 2015 2017 2019 2021 2023 2025 2027 2029

Def

icie

ncy

Lev

el

Year

Example 1 (Minimizing Cost) Example 2 (Maximizing Benefit)

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 14

TABLE 3 Allowable Treatments for Example 3 (Not Allowing PM) 1

Condition Do

Nothing PM

Thin

Overlay

Minor

Rehab

Major

Rehab

Excellent Yes No No No No

Good Yes No No No No

Fair Yes No No Yes No

Poor Yes No No Yes Yes

Very Poor Yes No No No Yes

2

Eleven deficiency level scenarios are analyzed for this problem, as shown in Figure 5. 3

4 FIGURE 5 Impact of PM on required average annual budget. 5

6

The objective is to minimize the total pavement expenditure in 20 years and the target 7

deficiency level is to be achieved within three years. Budget constraints are not included in the 8

optimization model for Example 3, since the objective is to seek the theoretical minimum budget 9

to achieve a certain deficiency level. 10

It can be seen from Figure 5 that the impact of PM on the required average annual budget 11

is quite significant. If PM is not allowed to be conducted, it would cost much more money to 12

achieve the same condition level given the allowable treatments specified in Table 2 and Table 3. 13

The approximate differences are $36 million for deficiency level targets below 4% and $17 14

million for deficiency level targets above 4%. 15

It should be noted that a sensitivity analysis can also be performed, based on the results 16

shown in Figure 5, to investigate the relationship between condition level target and the required 17

average annual budget. For instance, given the allowable treatments shown in Table 3 where PM 18

70

90

110

130

150

170

190

210

0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10%

Av

era

ge

An

nu

al

Bu

dg

et (

$ M

illi

on

)

Deficiency Level Target

Allowing PM Not Allowing PM

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 15

is not allowed, it can be seen from Figure 5 that when the deficiency level is below 6%, the slope 1

is larger. This means that the required annual budget is more sensitive at lower deficiency levels. 2

3

SUMMARY AND CONCLUSIONS 4

The network-level pavement optimization tool presented in this paper is capable of determining 5

the budget requirements to achieve a given overall pavement network condition, and generating 6

funds allocation plan to maximize the pavement condition level. This decision-making tool 7

enables users to select different objective functions and constraints to generate optimized results 8

based on the various analysis needs. The output of the optimization system includes the 9

projected pavement condition distribution, the optimized recommended treatment strategy, the 10

required treatment budget, and the optimized budget allocation plan over the analysis period. 11

The results of the example runs show that this tool can be implemented by highway agencies for 12

the pavement optimization issues at network-level. 13

14

ACKNOWLEDGEMENTS 15

This paper is based on a research project sponsored by the Ohio Department of Transportation. 16

The authors thank the ODOT personnel for their assistance and guidance. 17

TRB 2013 Annual Meeting Paper revised from original submittal.

Wang, Chou & Williams 16

REFERENCES 1

1. de la Garza, J. M., S. Akyildiz, D. R. Bish, and D. A. Krueger. Development of Network-2

Level Linear Programming Optimization for Pavement Maintenance Programming. 3

Proceedings of the International Conference on Computing in Civil and Building 4

Engineering, Nottingham, UK, June 30 - July 2, 2010 5

6

2. Li, N., R. Haas, and M. Huot. Integer Programming of Maintenance and Rehabilitation 7

Treatments for Pavement Networks. In Transportation Research Record: Journal of the 8

Transportation Research Board, No. 1629, Transportation Research Board of the National 9

Academies, Washington, D.C., 1998, pp. 242-248. 10

11

3. Ferreira, A., A. Antunes, and L. Picado-Santos. Probabilistic Segment-Linked Pavement 12

Management Optimization Model. Journal of Transportation Engineering, Vol. 128, No. 6, 13

2002, pp. 568-577. 14

15

4. Abaza, K. A. Expected Performance of Pavement Repair Works in a Global Network 16

Optimization Model. Journal of Infrastructure Systems, Vol. 13, No. 2, 2007, pp. 124-134. 17

18

5. Hillier, F. S. and G. J. Lieberman. Introduction to Operations Research, 9th ed., McGraw-19

Hill, 2010. 20

21

6. Golabi, K., R. B. Kulkarni, and G. B. Way. A Statewide Pavement Management System. 22

Interfaces, Vol. 12, No. 6, 1982, pp. 5-21. 23

24

7. Bako, A., E. Klafszky, and T. Szantai. Optimization Techniques for Planning Highway 25

Pavement Improvements. Annals of Operations Research, Vol. 58, No. 1, 1995, pp. 55-66. 26

27

8. Chen, X., S. Hudson, M. Pajoh, and W. Dickinson. Development of New Network 28

Optimization Model for Oklahoma Department of Transportation. In Transportation Research 29

Record: Journal of the Transportation Research Board, No. 1524, Transportation Research 30

Board of the National Academies, Washington, D.C., 1996, pp. 103-108. 31

32

9. Butt, A. A., M. Y. Shahin, S. H. Carpenter, and J. V. Carnahan. Application of Markov 33

Process to Pavement Management Systems at Network Level. Proceedings of 3rd 34

International Conference on Managing Pavements, San Antonio, Texas, May 1994. 35

36

10. Chou, E. Y., H. Pulugurta, and D. Datta. Pavement Forecasting Models. Final Report, The 37

University of Toledo, 2008 38

39

11. Laird, N. M., and J. H. Ware. Applied Longitudinal Analysis. John Wiley & Sons, Inc., New 40

Jersey, 2004. 41

42

12. LP_Solve Reference Guide (5.5.2.0), http://lpsolve.sourceforge.net/5.5/. Accessed Jul. 24, 43

2012 44

TRB 2013 Annual Meeting Paper revised from original submittal.