developing validation master plan
TRANSCRIPT
Developing Validation Master PlanDeveloping Validation Master Plan
gmpeyeThe GMP Think-Tank
Process Performance Qualification
11--1. Introduction1. Introduction11--1. Introduction1. Introduction
Equipment Qualification Process
Contract
Design Qualification
Selected Vendor
Design Documents (FS, DS 등)
Design Review
www.gmpeye.co.kr 2 Copyright © 김세중
Installation Qualification
Construction
Quality Testing (FAT) Delivery/Installation/Testing (SAT)
Operational Qualification
Performance Qualification
11--2. Introduction2. Introduction11--2. Introduction2. Introduction
Definition [1]Definition [1]
"Documented verification that the facilities, systems and
equipment, as connected together, can perform effectively and
reproducibly, based on the approved process method and product
specification"
EU GMP Guide Annex 15EU GMP Guide Annex 15
www.gmpeye.co.kr 3 Copyright © 김세중
"Documented verification that the facilities, systems and
equipment, as connected together, can perform effectively and
reproducibly, based on the approved process method and product
specification"
11--3. Introduction3. Introduction11--3. Introduction3. Introduction
Definition [2]Definition [2]
"Documented verification that the equipment and ancillary
systems, as connected together, can perform effectively and
reproducibly based on the approved process method and
specifications"
ICH Q7 API GMP GuideICH Q7 API GMP Guide
www.gmpeye.co.kr 4 Copyright © 김세중
"Documented verification that the equipment and ancillary
systems, as connected together, can perform effectively and
reproducibly based on the approved process method and
specifications"
11--4. Introduction4. Introduction11--4. Introduction4. Introduction
Definition [3]Definition [3]
PQ의 목적PQ의 목적
1. 단위 공정 조건의 확립
www.gmpeye.co.kr 5 Copyright © 김세중
1. 단위 공정 조건의 확립
PQ의 대상PQ의 대상
단위 공정: 시설 또는 설비의 조합 + 기타 공정 요소
2. 단위 공정의 재현성 예측
11--5. Introduction5. Introduction11--5. Introduction5. Introduction
Definition [4]Definition [4]
PersonnelTest
MethodTest
Method
www.gmpeye.co.kr 6 Copyright © 김세중
ProcessInput Output
Equip.
Personnel
Env.
TestMethod
TestMethod
단위 공정과 상관
관계에 있는 품질
특성 요소의 기준
적용
11--6. Introduction6. Introduction11--6. Introduction6. Introduction
PQ 기본 항목(EU GMP Guide Annex 15)PQ 기본 항목(EU GMP Guide Annex 15)
1. tests, using production materials, qualified substitutes orsimulated product, that have been developed from knowledgeof the process and the facilities, systems or equipment
1. tests, using production materials, qualified substitutes orsimulated product, that have been developed from knowledgeof the process and the facilities, systems or equipment
www.gmpeye.co.kr 7 Copyright © 김세중
1. tests, using production materials, qualified substitutes orsimulated product, that have been developed from knowledgeof the process and the facilities, systems or equipment
1. tests, using production materials, qualified substitutes orsimulated product, that have been developed from knowledgeof the process and the facilities, systems or equipment
2. tests to include a condition or set of conditions encompassingupper and lower operating limits
2. tests to include a condition or set of conditions encompassingupper and lower operating limits
11--7. Introduction7. Introduction11--7. Introduction7. Introduction
PQ Process FlowPQ Process Flow
1단계: 팀 구성
2단계: 업무 분장, 일정 조정
www.gmpeye.co.kr 8 Copyright © 김세중
2단계: 업무 분장, 일정 조정
3단계: 프로토콜 작성/검토/승인
4단계: 실행 [2단계]
5단계: 보고서 작성/검토/승인
22--1. Process Performance Qualification1. Process Performance Qualification22--1. Process Performance Qualification1. Process Performance Qualification
PQ Process: Phase 1PQ Process: Phase 1
1단계: 팀 구성1단계: 팀 구성
www.gmpeye.co.kr 9 Copyright © 김세중
공정개발·밸리데이션팀
공정 담당 작업자 분석 담당 작업자
공정 개발 실험 기획자 IPC 담당/기술 지원
22--2. Process Performance Qualification2. Process Performance Qualification22--2. Process Performance Qualification2. Process Performance Qualification
PQ Process: Phase 2PQ Process: Phase 2
2단계: 업무 분장, 일정 조정2단계: 업무 분장, 일정 조정
공정 개발 실험 기획자 실험 방법 기획, 업무 주관, 일정 조정, 진행 등
www.gmpeye.co.kr 10 Copyright © 김세중
공정 개발 실험 기획자 실험 방법 기획, 업무 주관, 일정 조정, 진행 등
IPC 담당/기술 지원 IPC 수행, 기술 지원 등
공정 담당 작업자 실험 계획에 따른 공정 수행
분석 담당 작업자 실험 계획에 따른 물품 분석 수행
22--3. Process Performance Qualification3. Process Performance Qualification22--3. Process Performance Qualification3. Process Performance Qualification
PQ Process: Phase 3 [1]PQ Process: Phase 3 [1]
3단계: 프로토콜 개발3단계: 프로토콜 개발 연구 개발 성과, 유사
제품 공정 경험 등
연구 개발 성과, 유사
제품 공정 경험 등
www.gmpeye.co.kr 11 Copyright © 김세중
PQ Protocol
PQ Protocol
PQ Protocol Template
PQ Protocol Template
검토/승인
검토자와 승인자 지정 [VMP]
연구 개발 성과, 유사
제품 공정 경험 등
22--4. Process Performance Qualification4. Process Performance Qualification22--4. Process Performance Qualification4. Process Performance Qualification
PQ Process: Phase 3 [2]PQ Process: Phase 3 [2]
PQ ProtocolPQ Protocol
1. 표지(Cover Page)1. 표지(Cover Page)
www.gmpeye.co.kr 12 Copyright © 김세중
1. 표지(Cover Page)1. 표지(Cover Page)
2. 승인 페이지(Approval Page)2. 승인 페이지(Approval Page)
3. 본문(Contents)3. 본문(Contents)
4. 첨부(Annex)4. 첨부(Annex)
22--5. Process Performance Qualification5. Process Performance Qualification22--5. Process Performance Qualification5. Process Performance Qualification
PQ Process: Phase 3 [3]PQ Process: Phase 3 [3]
프로토콜 표지프로토콜 표지
1. 제목1. 제목
www.gmpeye.co.kr 13 Copyright © 김세중
1. 제목1. 제목
2. 문서 번호/개정 번호2. 문서 번호/개정 번호
3. 단위 공정/코드3. 단위 공정/코드
4. 근거 문서4. 근거 문서
22--6. Process Performance Qualification6. Process Performance Qualification22--6. Process Performance Qualification6. Process Performance Qualification
PQ Process: Phase 3 [4]PQ Process: Phase 3 [4]
프로토콜 승인 페이지프로토콜 승인 페이지
1. 작성자 정보: 성명, 직위, 서명, 일자
1. 작성자 정보: 성명, 직위, 서명, 일자
www.gmpeye.co.kr 14 Copyright © 김세중
1. 작성자 정보: 성명, 직위, 서명, 일자
1. 작성자 정보: 성명, 직위, 서명, 일자
2. 검토/승인자 정보: 성명, 직위, 서명, 일자
2. 검토/승인자 정보: 성명, 직위, 서명, 일자
3. 개정 내역(또는 별도 페이지)3. 개정 내역(또는 별도 페이지)
22--7. Process Performance Qualification7. Process Performance Qualification22--7. Process Performance Qualification7. Process Performance Qualification
PQ Process: Phase 3 [5]PQ Process: Phase 3 [5]
프로토콜 본문프로토콜 본문
기본 정보: 목적, 적용 범위, 배경 등기본 정보: 목적, 적용 범위, 배경 등
www.gmpeye.co.kr 15 Copyright © 김세중
기본 정보: 목적, 적용 범위, 배경 등기본 정보: 목적, 적용 범위, 배경 등
업무 분장업무 분장
PQ 활동 절차PQ 활동 절차
첨부 문서: PQ 활동에 사용할 서식첨부 문서: PQ 활동에 사용할 서식
22--8. Process Performance Qualification8. Process Performance Qualification22--8. Process Performance Qualification8. Process Performance Qualification
PQ Process: Phase 4 [1]PQ Process: Phase 4 [1]
4단계: 실행4단계: 실행
PQ Protocol
실행에 사용할 서식
문서화
www.gmpeye.co.kr 16 Copyright © 김세중
PQ Protocol
PQ Protocol
실행에 사용할 서식실행에 사용할 서식
PQ 활동PQ 활동
22--9. Process Performance Qualification9. Process Performance Qualification22--9. Process Performance Qualification9. Process Performance Qualification
PQ Process: Phase 4 [2]PQ Process: Phase 4 [2]
PQ ActivitiesPQ Activities
공정 조건 개발 실험 재현성 확인 실험
www.gmpeye.co.kr 17 Copyright © 김세중
공정 조건 개발 실험공정 조건 개발 실험 재현성 확인 실험재현성 확인 실험
1차: 탐색 실험
ß
2차: 범위 설정 실험
설정 조건에서
단위 공정을 반복하여
재현성 확인
22--10. Process Performance Qualification10. Process Performance Qualification22--10. Process Performance Qualification10. Process Performance Qualification
PQ Process: Phase 4 [3]PQ Process: Phase 4 [3]
운전 관련 SOP 초안운전 관련 SOP 초안
공정 조건 개발 실험공정 조건 개발 실험 재현성 확인 실험재현성 확인 실험
OQ 단계
SOP초안
(+조건)
SOP초안
(+조건)
www.gmpeye.co.kr 18 Copyright © 김세중
공정 조건 개발 실험공정 조건 개발 실험 재현성 확인 실험재현성 확인 실험SOP초안
(+조건)
SOP초안
(+조건)
SOP확정
SOP확정
검토/승인 [PV 이전]검토/승인 [PV 이전]
22--11. Process Performance Qualification11. Process Performance Qualification22--11. Process Performance Qualification11. Process Performance Qualification
PQ Process: Phase 5 [1]PQ Process: Phase 5 [1]
5단계: 보고서 [1]5단계: 보고서 [1]
PQ 활동 성과
요약
www.gmpeye.co.kr 19 Copyright © 김세중
PQ Report
PQ ReportPQ 활동 성과PQ 활동 성과
결과
결론
의견/사후 조치
사후 조치: SOP 승인(PV 이전까지)
22--12. Process Performance Qualification12. Process Performance Qualification22--12. Process Performance Qualification12. Process Performance Qualification
PQ Process: Phase 5 [2]PQ Process: Phase 5 [2]
5단계: 보고서 [2]5단계: 보고서 [2]
프로토콜 [1단계] 프로토콜 [2단계]
www.gmpeye.co.kr 20 Copyright © 김세중
공정 조건 개발 실험공정 조건 개발 실험
프로토콜 [1단계]프로토콜 [1단계]
보고서 [1단계]보고서 [1단계]
재현성 확인 실험재현성 확인 실험
프로토콜 [2단계]프로토콜 [2단계]
보고서 [2단계]보고서 [2단계]
22--13. Process Performance Qualification13. Process Performance Qualification22--13. Process Performance Qualification13. Process Performance Qualification
Outputs from PQ ProcessOutputs from PQ Process
단위 공정별 근거 정보단위 공정별 근거 정보
1. 프로세스 개발 역사
SOPSOP
www.gmpeye.co.kr 21 Copyright © 김세중
1. 프로세스 개발 역사
2. 재밸리데이션을 위한 근거 자료
3. 프로세스 변수 설정 근거
4. 프로세스 관리 방법/기준 설정 근거
5. 자체 경계 기준 및 조치 기준 설정 근거
공정 업무 절차
IPC 방법/기준
MBR