developing a sustainability management plan for water...
TRANSCRIPT
LESAM 20072nd Leading Edge Conference on
Strategic Asset Management
Developing Sustainable Management Plans for
Water Supply within Sarawak Malaysiaby Kerry Jones & David Cox
This presentation covers the outcome from using strategic asset management approaches to develop sustainable long term strategies for management of water supply services in Sarawak Malaysia including the tools and techniques used to :– Evaluate the current situation– Identify the status of asset knowledge– Identify future asset management requirements – Develop business improvement plans– Justify future asset management strategies
Developing Sustainable Management Plans forWater Supply within Sarawak Malaysia
Sarawak???
Googled…
Sarawak Facts
• Capital is Kuching.• Largest state of Malaysia (geographically).• Joined Federation of Malaysia in 1963, after a
century of British Colonial rule.• Population of Malaysia is 26.4mil and approx 2.4mil
in Sarawak.• Indigenous tribal pop 44%, chinese 28%, other
28%.• Official language is Bahasa Melayu also known as
Malay, however other languages are common, English, Chinese & native indigenous languages.
• Major religion is Islam.
Sarawak Facts Cont…
• 'the land of the hornbill‘• ‘the land of many rivers’• Abundance of natural resources, petroleum, natural gas.• Thick lush rainforests (timber), undulating landscape. • Large timber logging industry and;• Palm oil & sago plantations.• Tropical climate
Water Supply History
• 1887, Kuching obtained water direct from a nearby stream drawingoff about 100,000 gallons per day (0.45ML/d)
• 1902, an alternative source of supply was developed near Kuching. A 3.5mil gal dam was constructed (15.75 ML).
• Demand from Kuching town increased to 500,000 gallons per day (2.25ML/d).
• Raw water of a suitable quality supply could no longer meet growing demand.
• 1957 first water treatment plant constructed 4ML/d, now 240ML/d• Trend continued, Sibu, Mukah, Miri, Bintulu and Sri Aman
Water Authorities
• First established government body to co-ordinate and facilitate water supply Jabatan Kerja Raya (JKR), Public Works Department.
• 1959 Lembaga Air Kuching (Kuching Water Board) and Lembaga Air Sibu (Sibu Water Board) took over JKR’s responsibilities in Kuching and Sibu city.
• 1995 a State Water Authority was established.• 1996 Lambaga Air Kawasan Utara (LAKU) took over other
growing cities water supply authorities, Miri, Bintulu & Limbang.
• Currently JKR’s responsibilities includes 88 water supply authorities for small towns, communities and villages (kampangs)
Treatment Plants Ranging from 300MLD
ASSET MANAGEMENT TOOLS• Workshops
• Total management planning
• Long-term financial modelling
• Organisational structural analysis techniques
• Key accountability documentation
• Activity analysis
Use of Total Management Planning to evaluate existing situation and quantify asset centric business improvement strategies
BUSINESS PLANBUSINESS PLAN
KEY RESULT AREAS
SUB-PLANS
Customer CharterCustomer Charter
GOVERNMENT OF SARAWAK
Business Development & Management
Corporate Systems Management 17
Corporate Systems Management 17
Quality Management
14
Quality Management
14
Information & Performance Management 15
Information & Performance Management 15
Risk Management
16
Risk Management
16
Human Resources Management
18
Human Resources Management
18
Asset Management
Operations Management
4
Operations Management
4
Maintenance Management
5
Maintenance Management
5
Infrastructure Planning
6
Infrastructure Planning
6
Water Loss & Demand Management 8
Water Loss & Demand Management 8
Asset Procurement
9
Asset Procurement
9
Asset Evaluation& Renewal
7
Asset Evaluation& Renewal
7
Energy Management
11
Energy Management
11
Water Source Management
10
Water Source Management
10
Environmental Stewardship
Environmental ManagementCo-ordination 12
Environmental ManagementCo-ordination 12
Catchment Management
13
Catchment Management
13
TRIPLE BOTTOM LINE FRAMEWORK
SUPPORTING DOCUMENTS / INFORMATION (e.g. Asset Register, Infrastructure Planning Studies, Life-Cycle Costing Procedures etc)
External Social Accountability KPIs
Financial & Asset ManagementSustainability KPIs
EnvironmentalSustainability KPIs
CustomersCustomers POLICY DOCUMENTSPOLICY DOCUMENTS
Customer Service
1
Customer Service
1
Drinking Water Quality Management
2
Drinking Water Quality Management
2
Levels of Service
FinancialSustainability
Financial ManagementPlan 3
Financial ManagementPlan 3
InternalAccountability KPIs
Asset Valuation & Depreciation Policy SocialBALANCED SCORECARDAccountability Framework ©
OP
TIM
ISE
D D
EC
ISIO
N M
AK
ING
Org
anis
atio
nal
Alig
nm
ent
ANNUAL PERFORMANCE PLANANNUAL PERFORMANCE PLAN
KWB / PWD STRATEGIC PLANKWB / PWD STRATEGIC PLAN
Financial Model
Asset RenewalsNeeds Analysis
AssetRegister
Financial Forecast
BUSINESS PLANBUSINESS PLAN
KEY RESULT AREAS
SUB-PLANS
Customer CharterCustomer Charter
GOVERNMENT OF SARAWAK
Business Development & Management
Corporate Systems Management 17
Corporate Systems Management 17
Quality Management
14
Quality Management
14
Information & Performance Management 15
Information & Performance Management 15
Risk Management
16
Risk Management
16
Human Resources Management
18
Human Resources Management
18
Business Development & Management
Corporate Systems Management 17
Corporate Systems Management 17
Quality Management
14
Quality Management
14
Information & Performance Management 15
Information & Performance Management 15
Risk Management
16
Risk Management
16
Human Resources Management
18
Human Resources Management
18
Asset Management
Operations Management
4
Operations Management
4
Maintenance Management
5
Maintenance Management
5
Infrastructure Planning
6
Infrastructure Planning
6
Water Loss & Demand Management 8
Water Loss & Demand Management 8
Asset Procurement
9
Asset Procurement
9
Asset Evaluation& Renewal
7
Asset Evaluation& Renewal
7
Energy Management
11
Energy Management
11
Water Source Management
10
Water Source Management
10
Asset Management
Operations Management
4
Operations Management
4
Maintenance Management
5
Maintenance Management
5
Infrastructure Planning
6
Infrastructure Planning
6
Water Loss & Demand Management 8
Water Loss & Demand Management 8
Asset Procurement
9
Asset Procurement
9
Asset Evaluation& Renewal
7
Asset Evaluation& Renewal
7
Energy Management
11
Energy Management
11
Water Source Management
10
Water Source Management
10
Environmental Stewardship
Environmental ManagementCo-ordination 12
Environmental ManagementCo-ordination 12
Catchment Management
13
Catchment Management
13
Environmental Stewardship
Environmental ManagementCo-ordination 12
Environmental ManagementCo-ordination 12
Catchment Management
13
Catchment Management
13
Environmental Stewardship
Environmental ManagementCo-ordination 12
Environmental ManagementCo-ordination 12
Catchment Management
13
Catchment Management
13
TRIPLE BOTTOM LINE FRAMEWORK
SUPPORTING DOCUMENTS / INFORMATION (e.g. Asset Register, Infrastructure Planning Studies, Life-Cycle Costing Procedures etc)
External Social Accountability KPIs
Financial & Asset ManagementSustainability KPIs
EnvironmentalSustainability KPIs
CustomersCustomers POLICY DOCUMENTSPOLICY DOCUMENTS
Customer Service
1
Customer Service
1
Drinking Water Quality Management
2
Drinking Water Quality Management
2
Levels of Service
Customer Service
1
Customer Service
1
Drinking Water Quality Management
2
Drinking Water Quality Management
2
Levels of Service
FinancialSustainability
Financial ManagementPlan 3
Financial ManagementPlan 3
FinancialSustainability
Financial ManagementPlan 3
Financial ManagementPlan 3
InternalAccountability KPIs
Asset Valuation & Depreciation Policy SocialBALANCED SCORECARDAccountability Framework ©
OP
TIM
ISE
D D
EC
ISIO
N M
AK
ING
Org
anis
atio
nal
Alig
nm
ent
ANNUAL PERFORMANCE PLANANNUAL PERFORMANCE PLAN
KWB / PWD STRATEGIC PLANKWB / PWD STRATEGIC PLAN
Financial Model
Asset RenewalsNeeds Analysis
AssetRegister
Financial Forecast
Financial modelling used to identify funding issues
Returns from the business
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
1 2 3 4 5 6 7 8 9 10
Years - 2000/01 is year 1
%
Return on EquityDividend to EquityModified return on equityReturn on assets (EBIT)
Assets
-
200,000
400,000
600,000
800,000
1 2 3 4 5 6 7 8 9 10Years - 2000/01 is year 1
$'00
0
-
10,000
20,000
30,000
40,000
Capital Expenditure
Total Assets
Cap
ital E
xp. $
'000
Cash Flows
0
10000
20000
30000
40000
1 2 3 4 5 6 7 8 9 10Years - 2000/01 is year 1
$'00
0
Retained profitsIncome TaxDividend CashflowOperating Profit
Use of Generic Activity Frameworks to Evaluate Organisational Structures
Management Framework
ANNUAL PERFORMANCE PLAN
COMMERCIAL WATER SERVICES UNIT
CUSTOMER C
OMMITMENT
ASSET OWNER GROUP OPERATORS
Asset Owner Group• Customer Interface• Investment Planning• Total Asset Management• Core Business Support Services
SLA
Facility Management Groups
•Bulk Treatment•Reticulation Operations
‘Contestable’
SERVICE PROVIDERS
‘Contestable’ SLA
SLA
External Service Providers
Council Provided Services
Project Management Groups
• Construction Groups• Capital Works Projects• Major Periodic Maintenance Projects
• Planning and Design Groups• Strategic Planning• Network Investigation• Project Management• Development Areas
Business Management Services Groups
SLA
Management Framework
ANNUAL PERFORMANCE PLAN
COMMERCIAL WATER SERVICES UNIT
CUSTOMER C
OMMITMENT
ASSET OWNER GROUP OPERATORS
Asset Owner Group• Customer Interface• Investment Planning• Total Asset Management• Core Business Support Services
SLA
Facility Management Groups
•Bulk Treatment•Reticulation Operations
‘Contestable’
SERVICE PROVIDERS
‘Contestable’ SLA
SLA
External Service Providers
Council Provided Services
Project Management Groups
• Construction Groups• Capital Works Projects• Major Periodic Maintenance Projects
• Planning and Design Groups• Strategic Planning• Network Investigation• Project Management• Development Areas
Business Management Services Groups
SLA
Use of Key Accountability Documentation to define all Relationships
Defined Relationships
Purchaser/Regulator/Owner
State Govt
Redefined in termsof:
·Owner of CBU
·
Regulator
·
Service Provider
·Service Purchaser
Roles and Responsibilities defined by:
Annual Performance PlanCustomerGuarantee
Regulatory Framework Business PlanTMP· Customer Charter
· Tax EquivalentsSupply Contracts· Debt Guarantee
· Compliance with regulationsBenchmarking(Planning, Environment and Council)
Marketing Plan
Full Cost PricingService Level Agreements
CSO and SLAs
Business UnitRedefined in termsof:
· Customers
· Shareholders
· Suppliers
· Competitors
Supported byCommercial BusinessSystems
QMS IMS FMS
Accountability Service Provider
“ ”
REGULATORY FRAMEWORK
Evaluation of Current Regulatory ArrangementsThe most significant observation on the existing
regulatory framework was the absence of requirements for: -
• asset management planning;• infrastructure performance monitoring and
reporting;• customer service performance monitoring and
reporting; and• best practice governance framework for ownership
of long life assets.
We recommend that the existing regulatory framework be enhanced through:
• mandating of asset management planning and auditing of water supply agencies performance against their asset management plans; mandating establishment of customer service targets and annual performance reporting;
• Establishment of a government agency responsible for a water industry regulation including asset management regulation ;
• enhancement of the functions of asset ownership so all State owned water infrastructure is managed for performance and outcomes.
Recommended Organisational Arrangements & Regulatory Framework
Commercialised State Government
Department
Commercialised State Government
Department
JKRDepartment
State Water Regulator
State Water Regulator
Existing Support for SWA
Existing Support for SWA
Existing Support
for SWSCC
Existing Support
for SWSCC
Enhanced KuchingWater Board
Enhanced Water Boards
Rural WS
Water Supply Branch
Water Supply Branch
Urban WS Close to
Water Boards
KWBWB
New Regulatory Framework
Control Centre & Telemetry
Control Centre & Telemetry
Planning & Construction
Group
Planning & Construction
Group
Revenue Collection
Revenue Collection
Existing
Recommended
Control Centre & Telemetry
Control Centre & Telemetry
Asset Management
Group
Asset Management
Group
Asset Management
Group
Asset Management
Group
FINANCIAL SUSTAINABILITY
-100,000
-50,000
0
50,000
100,000
150,000
200,000
250,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
OperatingProf it
capitalcommitment
Cash Flow
Debt Level
CSOs
Capital Grants
-200,000
0
200,000
400,000
600,000
800,000
1,000,000
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
OperatingProfit
capitalcommitment
Cash Flow
Debt Level
Agency 2
-50,000
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
OperatingProf it
capitalcommitment
Cash Flow
Debt Level
Agency 3
Agency 1
Each agency required a different financial strategy
The Agencies have many Management Strengths:• Capability of customer information systems and reporting
of customer information;• Quality systems and use of 5S;• Dedication of staff and management enthusiasm for
quality outcomes;• Performance measurement;• Use of variable speed pumping by zoned water supply
system Sibu Water Board;• Use of WTP SCADA by Sibu Water Board.
However the Management Challenges included:
• One agency currently operating in a cash flow negative position;
• Public sector constraints and requirements from permanent positions;
• Lack of management autonomy;• Limited Mechanisms for ongoing review of tariff
and charges;• X-subsidies from commercial to domestic;• Expectations to extend systems into rural areas.
We concluded that Agencies could Improve:• Asset Management and Total Life Cycle costing
approaches;• Use of monitoring and telemetry;• Trending analysis of data currently being collected in
particular analysis of reservoir level and pump station data to identify NRW hotspots;
• Optimisation of energy consumption;• Maintenance of telecommunications and SCADA
equipment;• Network modelling and NRW capability;• The level and hierarchy of infrastructure plans;• Capital works planning capacity and capability.
Use of Organisational structural analysis to identify areas for asset management
capacity improvement
Agency 1 Organisational Analysis
Govt Provided Services
Management Framework
�ANNUAL PERFORMANCE PLAN
CUSTOMERCOMMITMENT
�ASSET OWNER GROUP
�Asset Owner Group
�Customer Interface
�Investment Planning
�Total Asset Management
�Core Business Support Services
SLA
Facility Management Groups
�Bulk Treatment
�Reticulation Operations
�Operations Centre, telemetry and instrumentation
�Accountability
�Accountability
SLA
SLA
External Service Providers
Project Management Groups
� Construction Program Managers
� Capital Works Projects
� Major Periodic Maintenance Projects
� Planning and Design Groups
� Strategic Planning
� Network Modelling
� Project Management
� Development Areas
�Business Management Services Groups
� Finance
� IT
� HR
� Administration
� Metering
� Security
SLA
Govt Provided Services
Management Framework
�ANNUAL PERFORMANCE PLAN
WATER SERVICES UNIT
CUSTOMERCOMMITMENT
�ASSET OWNER GROUP
�Asset Owner Group
�Customer Interface
�Investment Planning
�Total Asset Management
�Core Business Support Services
SLA
Facility Management Groups
�Bulk Treatment
�Reticulation Operations
�Operations Centre, telemetry and instrumentation
�Accountability
�Accountability
SLA
SLA
External Service Providers
Project Management Groups
� Construction Program Managers
� Capital Works Projects
� Major Periodic Maintenance Projects
� Planning and Design Groups
� Strategic Planning
� Network Modeling
� Project Management
� Development Areas
�Business Management Services Groups
� Finance
� IT
� HR
� Administration
� Metering
� Security
SLA
Agency 2 Organisational Analysis
Govt Provided Services
Management Framework
�ANNUAL PERFORMANCE PLAN
COMMERCIAL WATER SERVICES UNIT
CUSTOMER
COMMITMENT
�ASSET OWNER GROUP �OPERATORS
Asset Owner Group�Customer Interface�Investment Planning�Total Asset Management�Core Business Support Services
SLA
Facility Management Groups
�Bulk Treatment
�Reticulation Operations
�Operations Centre, telemetry and instrumentation
�‘Accountability’
� PROJECTSERVICE
PROVIDERS
�‘Accountability’
SLA
SLA
External Service Providers
Project Management Groups
× Construction Program Managers× Capital Works Projects× Major Periodic Maintenance Projects
× Planning and Design Groups× Strategic Planning× Network Investigation× Project Management× Development Areas
�Business Management Services Groups
� Finance
� IT
� HR
� Administration
� Metering
� Security
SLA
Govt Provided Services
Management Framework
�ANNUAL PERFORMANCE PLAN
COMMERCIAL WATER SERVICES UNIT
CUSTOMER
COMMITMENT
�ASSET OWNER GROUP �OPERATORS
Asset Owner Group�Customer Interface�Investment Planning�Total Asset Management�Core Business Support Services
SLA
Facility Management Groups
�Bulk Treatment
�Reticulation Operations
�Operations Centre, telemetry and instrumentation
�‘Accountability’
� PROJECTSERVICE
PROVIDERS
�‘Accountability’
SLA
SLA
External Service Providers
Project Management Groups
× Construction Program Managers× Capital Works Projects× Major Periodic Maintenance Projects
× Planning and Design Groups× Strategic Planning× Network Investigation× Project Management× Development Areas
�Business Management Services Groups
� Finance
� IT
� HR
� Administration
� Metering
� Security
SLA
Any Questions???