developing a framework to build high quality part c and section 619 systems

19
Developing a Framework to Build High Quality Part C and Section 619 Systems June 2014

Upload: sandro

Post on 21-Mar-2016

23 views

Category:

Documents


0 download

DESCRIPTION

Developing a Framework to Build High Quality Part C and Section 619 Systems. June 2014. System Framework: Purpose and Audience. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Developing a Framework to Build High Quality Part C and Section 619

Systems

June 2014

Page 2: Developing a Framework to Build High Quality     Part C and Section 619 Systems

System Framework: Purpose and Audience

Purpose: to guide states in evaluating their current Part C/619 system, identifying areas for improvement, and providing direction on how to develop a more effective, efficient Part C and Section 619 system that requires, supports, and encourages implementation of effective practices.

Audience: the key audience is state Part C and state Section 619 coordinators and staff, with acknowledgement that other key staff and leadership in a state will need to be involved.

Page 3: Developing a Framework to Build High Quality     Part C and Section 619 Systems

System Framework: Process and Partners

• Iterative validation process: the framework is being developed through an iterative process among national and state experts in the field.

• Partner states: the framework is being developed iteratively with 6 states (DE, ID, MN, NJ, PA, WV), so that it reflects (and is applicable to) the diversity of state systems (e.g. Lead Agency, eligibility criteria).

• Technical Work Group (TWG): the Center has a technical work group (TWG) with experts in the field to advise the Center by providing early input on the elements, and later review and give input on drafts, as well as contribute resources available to support states on various elements.

Page 4: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Iterative Validation Process

• Review of the existing literature• Discussions with partner states about what’s

working or not working in their states and what ‘quality’ means in relation to each component

• Draft of components, subcomponents, quality indicators and elements of quality

• Review of drafts and input from: partner states, TWG, ECTA staff, others

• Revisions to drafts based on input• Re-send revised drafts and have partner

states ‘test’ through application• Revisions to drafts again• Share more broadly to get input

Literature

Draft

State Examples

Review/Input

Revise

State Testing

Revise

Broader Input

Page 5: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Partner StatesDelawareLisa Crim, Part C Coordinator, Birth to Three Early Intervention SystemVerna Thompson, Section 619 Preschool Coordinator, Delaware IdahoChristy Cronheim, Part C CoordinatorShannon Dunstan, Early Childhood Coordinator (Section 619 Preschool) PennsylvaniaJim Coyle, Kim Koteles & Mary Anketell, Office of Child Development and Early Learning. Bureau of Early Intervention Services MinnesotaKara Hall Tempel, Part C Coordinator, Lisa Backer, Early Childhood Special Education Supervisor (Section 619 Preschool) New Jersey Terry Harrison, Part C CoordinatorBarbara Tkach, Section 619 Preschool Coordinator West VirginiaPam Roush, Part C Coordinator, West VirginiaGinger Huffman, Section 619 Preschool Coordinator

Page 6: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Technical Work Group Members

6

Mary Beth Bruder, Director, Early Childhood Personnel Center (ECPC), University of CT

Lori Connors-Tadros, Project Director, Center on Enhancing Early Learning Outcomes (CEELO),National Institute for Early Education Research, Rutgers University

Barbara Gebbard and Jodi Whiteman, Center for Training Services and Special Projects, ZERO TO THREE

Maureen Greer, Executive Director, Infant Toddler Coordinator Association (ITCA)

Vivian James, 619 Preschool Coordinator, Office of Early Learning, NC Department of Public Instruction

Grace Kelley, Program Specialist, South East Regional Resource Center (SERRC)

Jana Martella, Co-Director, Center on Enhancing Early Learning Outcomes (CEELO), Education Development Center, Inc.

Robin McWilliam, Director of the Center for Child and Family Research, Siskin Children’s Institute

Cindy Oser, Director of Infant-Early Childhood Mental Health Strategy, ZERO TO THREE

Ann Reale, Principal, ICF International and ELC TA Collaboration Lead, ELC TA Program

Rachel Schumacher, Early Childhood Policy Consultant, R. Schumacher Consulting

Page 7: Developing a Framework to Build High Quality     Part C and Section 619 Systems

System Framework: Assumptions/Parameters

The framework and corresponding self-assessment are designed to be:• Evidence based• Useful to Part C and Section 619 programs, including resources and

exemplars• Responsive to the variation that exists across states; designed in a

way that recognizes that states can reach quality in different ways• Related to critical areas of Part C and Section 619• Consistent with IDEA requirements• Consistent with recommended early childhood practices (e.g. DEC,

DAP)• Consistent with best practices from implementation science• Inclusive of resources and exemplars to illustrate ways state can

meet quality

Page 8: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Purpose of ECTA System Framework

resultGovernance

Finance

Personnel/ Workforce

Data Systems

Accountability & Quality

Improvement

Quality Standards

Implementation of effective practices

Good outcomes for children with disabilities and their families

What does a state need to put into place in order to encourage, support, require local implementation of effective practices?

ECTA System Framework

Page 9: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Governance: Vision, Mission, Purpose

Legal FoundationsAdministrative Structures

Leadership and Performance Management Finance:

Finance Planning Process/ ForecastingFiscal Data

ProcurementResource Allocation, Use of

Funds and DisbursementMonitoring and

Accountability of Funds and Resources

Personnel/ Workforce:

Leadership and Coordinating Structures

Professional/Workforce Recruitment and Retention

Qualified WorkforceOngoing, Systematic and

Effective Professional/Workforce

DevelopmentData System: Purpose & Vision

Data Governance & Management

Stakeholder EngagementSystem Design/Development

Data UseSustainability

Accountability & Quality

Improvement:Planning for Accountability

& ImprovementCollecting & Analyzing

Performance DataUsing Results for Continuous

Improvement

Quality Standards:Child Level StandardsProgram Standards

Page 10: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Governance

Finance

Personnel/ Workforce

Data Systems

Accountability & Quality

Improvement

Quality Standards

Cross cutting themes

Using data for improvement

Communicating effectively

Promoting collaboration

Engaging stakeholders, including families

Establishing/revising policies

Family Leadership & Support

Coordinating/Integrating across EC

ECTA System Framework

To be considered in

every component

Page 11: Developing a Framework to Build High Quality     Part C and Section 619 Systems

System Framework• Products:

– components and subcomponents of an effective service delivery system (e.g. governance, finance, personnel)

– quality indicators scaled to measure the extent to which a component is in place and of high quality

– corresponding self-assessment for states to self-assess (and plan for improvement)

– with resources related to the components of the system framework

11

Page 12: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Structure/Format of Each Component

12

• Component #1– Subcomponent #1

• Quality Indicator #1– Element of Quality #1– Element of Quality #2– Etc.

• Quality Indicator #2– Element of Quality #1– Element of Quality #2– Etc.

• Component #2– Subcomponent #1

• Quality Indicator #1– Element of Quality #1– Element of Quality #2– Element of Quality #3

• Etc.

General progression:In placeOf high qualityUsedReviewed/RevisedAcross EC

Additionally:

• Self-assessment scale• Resources and

examples

Page 13: Developing a Framework to Build High Quality     Part C and Section 619 Systems

As of December 2013, online posting of…- Introduction- Governance- Finance

Coming Soon…- Accountability and Quality Improvement- Quality Standards- Data Systems- Personnel/Workforce

13

http://ectacenter.org/sysframe

Page 14: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Other Aspects of the Framework

• Self-assessment• Resources and Examples• Glossary of terms

Note: Coordinating with other TA Centers and partners in the field on these aspects as well as components

14

Page 15: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Self-Assessment - Purpose

1. To get a ‘snap shot’ of the state’s current status and guide next steps for improvement.

2. To help direct a state’s quality improvement efforts for their C/619 system.

3. The numeric quantitative self-assessment score will allow the state to later show progress.

4. Meant to be a thoughtful process; rich conversation about the system and evidences is the most important part.

5. Encourage states to think about why they want to use the framework and self-assessment before they get started.

15

Page 16: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Identifying Resources and Examples

• Specific as possible to make it useful• Providing the best resources examples

(focus on quality, not quantity) • State examples when possible• We will likely identify places where

resources and examples are needed

16

Page 17: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Coordinating with others

• DaSy• Early Childhood Personnel Center• Early Childhood Systems Work Group

• Coordinating content, resources, format/structure, etc.

17

Page 18: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Timelines

• All components drafted and posted online by the September 2014

• Glossary and self-assessment will be posted Fall/Winter 2014

• Corresponding resources will be added over the next year and ongoing

• Framework content is part of ongoing ECTA TA services and will be supporting states with self-assessment and improvement planning

18

Page 19: Developing a Framework to Build High Quality     Part C and Section 619 Systems

Look for updates via the web site: http://ectacenter.org/sysframe