detalii montaj

TRANSCRIPT

  • INSTALLATION INSTRUCTION

    Roofing

    Roof deck

    Drip EdgeRafterDrip Edge

    Fixing for flashing

    Tipycal developing includid from cm 15 to cm 20

    Roofing

    Straps

    Gutter

    Rafter

    Roof deck

    Straps

    Gutter

    Tipycal developing includid from cm 50 to cm 67Fix with screw for wood or faster for cement

    Fixing for straps

    Rivet for joint gutter and straps

    Fixing for gutter

  • INSTALLATION INSTRUCTION

    Nailing

    25 cm

    3 cm

    Bitustik

    Fixing

  • INSTALLATION INSTRUCTION

    Torch the membrane (100 cm wide) on the center line of the valley, then torch the shingles on into this membrane.Type A) The bituminous shingles of the two pitches will cross each other going up to the other side of at least 25 cm from the center of the valley. Do not fix with nails at a distance less than 40 cm from the center of the valley (Pict. Nr. 9).

    Picture Nr. 1 - Valley Type A (crossed)

    Type B) Install the bituminous shingles on one pitch of the roof overlapping the center of the valley by at least 25 cm. Install the shingles on the other pitch so that they slightly overlap the center of the valley.Mark the center of the valley with the chalk line, cut the bituminous shingles of the second pitch following the marked line obtaining a linear cut along the center of the valley. Seal carefully along the cut with Bitustick. Do not fix with nails at a distance less than 40 cm from the center of the valley (Pict. Nr. 10).

    Picture Nr. 2 - Valley Type B (Cut)

    Apply a bituminous membrane 100 cm wide.

    Apply a bituminous membrane 100 cm wide.

    VALLEYS WITH BITUMINOUS MEMBRANE

    Valley

    1

  • INSTALLATION INSTRUCTION

    3 cm

    Bitustik

    Bitustik Bitustik

    Bitustik

    Install a valley gutter (Pict. Nr. 3) in correspondence of the valley (Pict. Nr. 5). The valley gutter has to be installed before marking the roof.At 10 cm from the center line of the valley apply a line of Bitustick mastic (Pict. Nr. 5).Install the shingles as to former indications and cut them at the center of the valley so (Pict. Nr. 6) that the cutting side meets the central fold of the valley (Pict. Nr. 4).Seal the joint between shingles and valley with a line of Bitustick mastic (Pict. Nr. 4-6).Nails should not be used within at least 30 cm of the center line.

    Picture Nr. 5 - Installation of the valley

    Picture Nr. 6 - Installation of the shingles

    Picture Nr. 3 - Flashing (example) Picture Nr. 4 - Flashing (example)

    VALLEYS WITH FLASHING

  • INSTALLATION INSTRUCTION

    RIDGES

    Install the last row of bituminous shingles up to the ridge line and then bend it over the exceeding part, in order to waterproof the ridge .To obtain the ridges, cut the bituminous shingles into 4 pieces (Picture 7). Before installing bend and position them over the ridge line (see Picture 8). If necessary heat them on the reverse, sanded side.Fix the ridges with 2 nails on each piece which will be overlapped by the following piece (Picture 8). The exposure of the ridge is 14,5 cm.

    Picture Nr. 1- Cutting of the ridges

    SINGLE PITCH RIDGE

    10 cm M

    in

    Install the last row of bituminous shingles up to the ridge line and then cut the exceeding part.Apply single pitch ridge flashing on top and fix it at the vertical side

    Fixing

  • INSTALLATION INSTRUCTION

    Bitustik

    FIXING FIXING

    FIXING

    12 cm Min Bitustik

    Stainless screw

    Silicone

    Metal stud

  • INSTALLATION INSTRUCTION

    FIXING FIXING

  • INSTALLATION INSTRUCTION

    Fixing

    Fixing

    3 cm 12 cm Min

    Width of chimney150 mm Min

    200 mm Min

    450 mm Min

    Width of chimney150 mm Min

    150 mm Min

    150 mm Min

  • INSTALLATION INSTRUCTION

    200 mmMin800 mm Min

    50 cm Min15 cm Min

  • INSTALLATION INSTRUCTION

    Bitustik

    10

  • INSTALLATION INSTRUCTION

  • INSTALLATION INSTRUCTION