details of consultancy firm - dolphin engineersdolphinengineers.com/images/profile.pdf · telephone...

21

Upload: dangbao

Post on 20-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

General Information

S. No. Question Response

1. Company Name Dolphin Engineer

2. Name and Contact information of contact person Rajesh Saxena

B-3, C-49, Vidya Apartments, Paras Marg, Bapu Nagar Jaipur (0141-3269159, 0141-

4036515)

3. Connect No. +91-9680026609

4. Annual Turnover of the company (Last Three

Years)

80 Lac

5. Specify any taxes applicable (along with rate) Service tax 15.00 %

6. Pan No BLPPSO 212P

7. Service Tax No BLPPSO 212P SD001

8. Bank Name Oriental Bank of Commerce

9. Bank Address 69/334 V.T. Road Madhyam Marg Mansarover Jaipur-

10. Bank Branch CBS BRANCH (022)

11. Account Type Current A/c

12. Account Number 07031011002625

13. RTGS / IFSC Code (11 characters) ORBC 0100703

14. MICR Code (9 digits) 302022007

15. Specify any taxes applicable (along with rate) Service tax 15.00 %

16. Experience Details Profile Copy Attached

17. Key Projects in hand Profile Copy Attached

18. Equipment & Resource details Profile Copy Attached

Client Reference 1

Company Name Thought Consultant Jaipur Pvt Ltd

Contact Name Mr. Aashis Gupta

Title / Position Director

Address 1 DA 15, Jawahar Nagar Jaipur.302017

Telephone Number 09829055330

Email Address [email protected]

Length of Relationship 10 Year

Nature of Relationship Survey Work

Customer Reference 2

Company Name Amubja Cement

Contact Name Mr. Hari. S.Chouhan

Title / Position Project Manager

Address PO & Tehsil Marwar Mundwa District Nagaur Pin: - 341026

Telephone Number 09001090736

Email Address [email protected]

Length of Relationship 8 Year

Nature of Relationship Survey Work

Dolphin Engineer’ lies in the following.

• Conducting accurate & precise Topographical Surveys using Total Station & DGPS for Solar parks , Wind Energy, Highways alignments,

Bridge location, Pipeline & Sewerage Systems, Building & Town Planning Projects, and Water Supply Schemes etc.

• Dolphin Engineer’s have provided services to various public & private agencies, government & semi- government departments,

consultants etc.

The important bodies with which Dolphin Engineer is provided services are listed below: -

• RAJASTHAN PUBLIC WORKS DEPARTMENT (PWD)

• GUJRAT AMBUJA CEMENT, PALI.

• RELIANCE ENGINEERING ASSOCIATE LTD., JAIPUR.

• MEGHA ENGINEERING & INFRASTACTURE LTD

• PDCOR JAIPUR

• MANGLAM CEMENT

• SHREE CEMENT. BEAWAR. (AJMER)

• SUZLON INFRASTRUCTURE SERVICE LIMITED

• ENERCON INDIA

• LAHOTY BUILDCAON

• CHANDRKALA ARCHITECTURE

• SPMAL JAIPUR

• GVR AJMER NAGAUR TOLLWAY PRIVATE LTD

• THOUGHTS CONSULTANT JAIPUR PVT LTD

• EMCO LIMITED

• PEARL KRISHNAM DEVELOPER

• GOVT. ENGINEERING COLLAGE BHARTPUR

• BENGAL CITY NIRMAN PVT LTD

• RAYS POWER INFRA PRIVATE LIMITED

• THEME ENGINEERING SERVICES PVT. LTD

• OPULENT RESORTS K KOLKOTA

• GAMESA WIND TURBINES PVT. LTD

• V & A VENTURES LLP

• ADANI RENEWABLE ENERGY PARK

• SANKARA EYE HOSPITAL

• VISHVARAJ ENVIRONMENT PVT LTD

• HINDUSTAN ZINC LTD

• OPULENT RESORT LTD KOLKATTA

• JAI MAHAL PALACE JAIPUR

• COUNTRY CONDO’S LIMITED

• A.B.ENTERPRIEASE

• ADANI RENWABLE ENERGY PARK RAJASTHAN

.

1. Details of Technical Personal/detail of the firm-

SR. NO.

Name of Technical Personnel along with Qualification

Experience ENGINEERS (WITH Specialization)

Qualification GIS Experts Whether employed of Associated on Other condition

1. Rajesh Saxena 22 Yrs Managing Director Diploma in Civil /

Programming

Employed

2. Rakesh Sankhla 21 Yrs Project Manager M.TECH. Employed

3. Shashi Kant 18 Yrs Project

Coordinator

Diploma in Civil /

Programming

Data base Software

developer

Employed

4. Hement Chandlani 15 yrs Diploma in Civil /

Programming

Data base Software

developer

Employed

5. Jitendra Sharma 8 yrs Diploma in Civil /

Programming

Data base Software

developer

Employed

6. Mujmmil Ahmed Ansari 10 Yrs I.T.I. Diploma Employed

7. Raj Kumari Sharma 4 Yr Diploma in Civil Employed

8. Bhagchand

Bairwa

2 Yrs Diploma in ARC `

GIS

Data base Software

developer

Employed

9. Rajendra saini 8 Yrs I.T.I. Diploma Employed

10. Rakesh Saini 7 Yrs I.T.I. Diploma Employed

11. Bhagchand

Meena

7 Yrs Diploma in civil Employed

12. Jay Prakesh 1.5 Yrs I.T.I. Draftsman Employed

13. Ashok Saini 1.5 Yrs I.T.I. Draftsman Employed

14. Mohammed Naeem 2.5 Yrs I.T.I. Surveyor Employed

15. Rajesh Meena 2.5 Yrs I.T.I. Surveyor Employed

16. Pradeep Senwar 3.5 Yrs I.T.I. Surveyor Employed

17. Raju Lal Meena 3.5 Yrs I.T.I. Surveyor Employed

18. Gunjan 1.7 Yrs Draftsman Employed

19. Shiv Lal Saini 2.2 Yrs Surveyor Employed

20. Lala ram Saini 2.2 Yrs Surveyor Employed

21. Puk Raj Saini 3.5 Yrs Surveyor Employed

22. Ganga Ram 3.5 Yrs Surveyor Employed

23. Mukesh Swami 3.5 Yrs I.T.I. Surveyor Employed

24. Banwari lal Kumavat 3.5 Yrs I.T.I. Surveyor Employed

25. Ratan malo 3.5 Yrs I.T.I. Surveyor Employed

26. Shubaham

Khandelwal

3.5 Yrs I.T.I. Surveyor

Draftsman

Employed

27. Daulat Kumar 3.5 Yrs I.T.I. Surveyor Employed

Details of the work experience:-

SR. NO. Name of Project Name of the client (Govt./Semi. Govt./

Private) Page No.

Estimated Project

Cost

Status of the Project

(completed / under Execution / Under Planning

Process)

Details / Proof of Agreement/ Letter of Intent/ Work order etc. (Copy to be attached) Page No.

1.

Total Station Survey (Pilot area ward 39) under project ‘Capacity Building Support for Building Innovative Sanitation Solution for Rajasthan’

IPE Global Limited House, B- 84, Defense Colony, New Delhi 110 024, India.

0.50 Lac completed MD/IPE-DE/2015/703,

dated 27/072016

2.

Detailed Plan & contour Survey Grid level at Every 5X5 Meter of Proposed HDD location on crossings alignment of IOCL pipe line & Pump House Locations for PARADEEP TO HYDERABAD PIPE LINE PROJECT (1100KM)

Consulting Engineers

Group Ltd , B-11(G),

Malviya Industrial Area,

Jaipur-1 Rajasthan

10.0 Lac completed CEG/IOCL/PHPP/2016-17/199

Dated 23 May 2016

3.

Topographical Survey Plan of Existing Land for solar Park at 500MW Bhadla solar park at Village Bhadla, District Jhodpur < Rajasthan India (1339 hect)

Adani Renewable

Energy Park Rajasthan

15 Lac completed AREPRL/DE/C/SO/04/16 on dated

2nd Feb 2016.

4.

Topographical Survey & Auto Leveling

Work for Road widening &

Strengthening DARA to JHALAWAR

(Length-82 km)

Thoughts Consultant

Jaipur Pvt Ltd

2.45 Lac Completed+

Unknown

Mail conformation on 20/01/2016

5. Topographical Survey & New Route Thoughts Consultant 1.85 Lac Completed+ Unknown

Alignment for proposed new bypass for

Pratap garh District (Length-22 km)

Jaipur Pvt Ltd Mail conformation on 25/02/2016

6.

Topographical Survey & Auto Leveling

Work for Road widening &

Strengthening RAJGARH TO LOHARU

(Length-57 km)

Thoughts Consultant

Jaipur Pvt Ltd

2.35 Lac Completed+

Unknown

Mail conformation on 15/03/2016

7.

Carrying out Topographical survey Plan

Work for Rajgarh water supply scheme

package NO. PHED/RGH/WS

A.B. Enterprises &

DEEM Construction

Pvt Ltd

5.22 Lac Completed AB & DEEM /Rajgarh/2016-17/24

8.

Detailed Topographical Survey &

Contour Survey for 80 MW Project

Village Balswaj Tehsil Roorkee Near

Chudiyala Railway Station Uttrakhand

Rays Power Infra

Private Limited

0.89 Lac Completed RAYS/UK/80MW/contour/wo-003

Detailed Topographical Survey &

Contour Survey for 5 MW Project Village

Bewoor District Koppal, KARNATAKA

Rays Power Infra

Private Limited

0.89 Lac Completed RAYS/KARNATAKA/5MW/CONTOU

R/W0-01

9.

Consultancy provide for detailed survey

plan & Auto Leveling for proposed Pump

house & distribution pipe line for water

pipe line at Hanumana M.P.

Intergen Energy

Limited

1.95 Lac Completed Unknown

Mail conformation on 12/012/2015

10

Consultancy provide for detailed

Topographical survey plan & Contour

Plan for waste water treatment Plant at

Narnod Hissar & Thallapallen Andra -

Pradesh

Intergen Energy

Limited

1.95 Lac Completed Unknown

Mail conformation on 12/01/2016

10.

Consultancy provide for detailed survey

plan & Auto Leveling for proposed

Sewerage Line from Pratap nagar to

Chitroli Bagru via Mahindra SEZ Jaipur

(length 110 Km )Rajasthan

VIshvaraj Environment

Pvt. Ltd.

2.57 Lac Completed VEPL/RAJ/WO/SURVEY/2015/001,

on dated 28th Dec 2015

11.

Providing an experienced Surveyor Team

who can Measure your Crane track

alignment and leveling work with

Computerized Instrument Total Station

HINDUSTAN ZINC

LIMITED

0.72 Lac completed No. RGARG-552/ 510001876 &

Vendor Code 9006420

12.

Detailed survey plan & Contour survey

of Proposed for Multi Level Car Parking

using with DGPS & total at Amritsar &

Jaipur Airport

Landmark Material

Testing And Research

Laboratory Pvt. Ltd.

0.50 Lac Completed

Unknown

Mail conformation on 12/03/2016

13.

Topographical Survey Plan of Existing

Land for solar Park at Badla Viilage

Phalodi (2650 Hect.) Phase – III rd

IL&FS Energy Ltd

Sub contract by CEGTH

Jaipur

19.50 Lac completed CEGTH&RC/WO/2014-15-325

On Dated 25/03/2015

14.

Topographical Survey & Auto Leveling

DGPS Control Point Work for Six Line

Project MSH-9 Nagpur to Armori

Maharastra Length 137 km

Theme Engineering

Services Pvt. Ltd

27.75 Lac Completed

Unknown

12/06/2015

15.

Detailed survey plan & Contour survey

of existing site using with DGPS & total

& Khasra Superimposing work for resort

at Degana Rajasthan

Opulent Resorts

Pvt Ltd

Kolkota

0.50 Lac Completed

ORPL/Project/15-16/PO/01

On dated 11/06/2015

16. Taking all required measurement & Jai Mahal Palace 0.50 Lac Completed WO/taj/2015/64 Dated

prepared existing Building drawing. Taj Group 29th May 2015

17.

Service for Field Up-diction of ABD with

Auto Cad. Field Verification & prepared

ABD drawing as per required Format at

Jhalander city

V & A Ventures LLP.

(Reliance Power)

New Dehli

5.50 Lac Completed WO/JLD/00073

on dated 15th April 2015,

18.

Land Survey work study for new Projects

at Gunga-II Balasar Project and Dharvi

Kalan Project in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

7.83

Lac

Completed 40873597 on

dated 17/03/2015

19. Land Survey work study for new Projects

at Gunga Balasar Project in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

4.89

Lac

Completed 40873616 on

dated 17/03/2015

20.

Taking all Government features and

related to our Project like Canals, Border

windmill location, Road & rasta etc in

Ramgarh Village in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

2.13

Lac

Completed 40830145 on

dated 24/11/2014

21.

Service for Field Up-diction of ABD with

Auto Cad. Field Verification & prepared

ABD drawing as per required Format at

Jhalander city

V & A Ventures LLP.

(Reliance Power)

New Dehli

5.50 Lac Completed WO/JLD/00052 on dated 17th Dec 2014,

22.

Topographical Survey Plan of Existing

Land for mini solar Park at kolayat

Viilage Bikane (15 Acre )

Rays Power Infra

Private Limited

0.26 Lac Completed Rays/Ridhu/jul-14cs/WO-01

Dated 25/07/14

23.

Topographical Survey Plan of Existing

Land for mini solar Park at kolayat

Viilage Bikane (86 Acre )

TecSo Projects Limited

Gujrat

1.50 Lac Completed TPL/PO/2014-15/1016 On dated 31 July

2014

24. Digitization work of village map hard Gamesa Wind Turbines 4.88 Lac Completed 40779212 on

copy, conversion in UTM with village

reference point, with Google image

superimposing work at various locations

in Rajasthan.

Pvt. Ltd

dated 26/06/2014

25. Layout Marking at given coordinates

at shri balaji campus.

Shri Balaji Industrial

products Ltd

0.18 Lac Completed No. 02/2014-15

Dated 24/06/014

26.

Digitization work of village map hard

copy, conversion in UTM with village

reference point, with Google image

superimposing work at various locations

in Rajasthan.

Gamesa Wind Turbines

Pvt. Ltd

3.25 Lac Completed 40785710 on

dated 15/07/2014

27.

Detailed Survey & DPR Project for

Proposed Agriculture Collage at Balara

Village Tehsil Kumhre Distt Bhartpur

Office of the Estate

Officer Jobner

0.18 Lac Completed SKANU/JOB/2013-2014

60-63

28.

Topographical Survey Plan of Existing

Land for solar Park at Badla Viilage

Phalodi (5000 Hect.) Phase 2nd

CEG test House Jaipur

7.50 Lac completed CEGTH&RC/WO/2013-14-625

On dated 21 Dec 2013

29.

Carrying out Topographical survey Plan

Work for Regional WSS for 246 Village of

Kaman& Pahari thasil Bhartpur

Saraswati Technical

Services (P)ltd

15.50 Lac Completed STS/2013-14/607

Dated 25th Nov2013

30.

Carrying out Topographical survey Plan

Work for Regional WSS for 199 Village of

Beawer tehsil Ajmer

Saraswati Technical

Services (P)ltd

12.36 Lac Completed STS/2013-14/608

Dated 25th Nov2013

31. Detailed Survey & DPR Project for

Proposed route alignment at SH-62

Binani Cement 1.80 Lac Completed BCL/WO/2013-3014/34

Dated 05/09/2013

Adjacent To Binnaigram Pindwada

32.

Consultancy Service for Preparation of L-

Section for water supply schemes in

Gangapur Lift Canal

SPMAL Jaipur 17.37 Lac Completed SPML-/13-14/Gangapur/proj-

/c/01/41

33.

Preparation of water supply schemes for

laying Pipe lines in Bhilwara

Megha Engineering

Hyderabad

4.25 Lac completed MAIL/ Bhilwara –PHED(Raj)13-

14/W.O.1464

Date 10.09.13

34.

Survey Work for Off take work H

Narmada Canal DPR for 140 Village of

tehsil Gudamalani Badmer

PDCOR Limited 1.23 Lac completed PDCOR/BRWSP/226B

June 27 2013

35.

Survey Work for Off take work L

Narmada Canal DPR for 205Village of

Sheo & Ramsar, 322 Villgae of Choutan

Barmer

PDCOR Limited 1.11 Lac completed PDCOR/BRWSP/226A

June 27 2013

36.

Conducting survey in 668 village in jalor

dist. Capturing Latitude & Longitude &

secondary data collection of existing

water supply

PDCOR Limited 3.75 Lac completed PDCOR/Jalor/69A

April 26 2013

37. Preparation of L-Section for water

supply schemes in Fatehpur Ratan, Ghar

Lahoty Builcaon 25.56 Lac completed LBL/2012-13/Ratangarh /648

12/04/2013

38.

Consultancy Service for “Survey Along

the existing Road from Chikalwas Dam

to Railmagra via Rajamasnd

PDCOR Limited 1.24 Lac completed PDCOR/ Transport Hub /69A

April 26 2013

39. Consultancy Service for Topographical

Survey of Mangli River for Chambal

PDCOR Limited 0.70 Lac completed PDCOR/CBWS/982 A

Feb 22, 2013

Bisalpur Link Project

40.

Consultancy Service for Survey &

demarcation Work of Existing Land at

Village Ramchandra pura Sitapura Jaipur

Pearl Krishnam

Developer

1.96 Lac completed SBPL 2012-13/05

15/02/2013

41.

Preparation of L-Section for water

supply schemes in AKELGARH , Krishi

upaj Mandi Kota

Lahoty Builcaon 0.74 lac completed LBL/2013-13/Akelgarh/444

24/12/2012

42.

Consultancy Service for Govt P.G.

Collage Campus & District Stadium

Campus Dausa

Public Work

Department

0.29 Lac completed Agreement no. 276/10590

01/11/2012

43.

Consultancy Service for Zila Parishad &

DJ Court Campus Dausa

Public Work

Department

0.29 Lac completed Agreement no. 275/10593

01/11/2012

44. Consultancy Service for Survey Work on

MDR 48 Km-0/00 to 4/300 Dausa

Public Work

Department

0.29 Lac completed Agreement no. 278/10757

08/11/2012

45.

Consultancy Service for Topographical

Survey for New Jail Building Campus

Dausa

Public Work

Department

0.29 Lac completed Agreement no. 70/1020

12/06/2012

46. Consultancy Service for Contour Survey

for New Jail Building Campus Dausa

Public Work

Department

0.29 Lac completed Agreement no. 72/1819

15/06/2012

47. Detailed Survey Plan of Existing Colonies

at Dungarpur & Ganagapur

ChandraKala

Architecture

1.35 Lac completed CK-2011-8

24/4/2012

48. Consultancy Service for Preparation of L-

Section for water supply schemes in

SPMAL Jaipur 12.29 Lac Completed SPML-124/12-13/Nagaur/proj-

/c/01/02

Nagaour Lift Canal

49.

Consultancy Service for Preparation of L-

Section for water supply schemes in

Nagaour Lift Canal

Lahoty Builcaon 1.03 Lac Completed LBL/2012-13/Nagour/317

26/06/2013

50.

Consultancy Service for Preparation of

Route Plan L-Section & Complete DPR

Report at Ratan garh

L & T Jaipur 2.70 Lac completed Unknown

51.

Consulting Service for Traffic Volume,

Origin/Destination Survey & Axle Load

survey

GVR Ajmer Nagaur

Tollway Private Ltd

2.45 Completed+

GVRAJNTPL/GEN/04/12-13

Sep 20 , 2012

52.

Topographical Survey & Auto Leveling

Work for Jaisalmer Barmer NH-15 Km

123/40 to 144/500 km Length 21 km

Thoughts Consultant

Jaipur Pvt Ltd

1.05 Lac Completed+

Unknown

20/12/2012

53.

Topographical Survey & Auto Leveling

Work for Shri Ganganagar Padampura

Road (Length-36 km)

Thoughts Consultant

Jaipur Pvt Ltd

1.08 Lac Completed+

Unknown

23/11/2011

54.

Preparation of water supply schemes for

laying Pipe lines in ChottorGarh

Megha Engineering

Hyderabad

1.23 Lac completed Chittorgarh/WSP/Rajasthan-

2010/11 WO.No.1012

Date 25.05.11

55.

Preparation of Route Plan L-Section &

Complete DPR Report for Ambuja

Cement. At Marwar Mundwa for

Drinking water Line

Ambuja Cement

MERTA

3.56 Lac Completed+

2800246531

14.07.11

56. Road alignment & Platform Survey for

our proposed wind farm project sites at

Suzlon Infrastructure

Service Limited

3.20 Lac completed 4500234517

20.07.11

Udaipur

57.

Detailed Survey Plan & 10x 10 m Grid

Contouring of Existing Land for Manglam

Cement (70.0 Hect.)

Mangalam Cement

Ltd

1.07 Lac completed

MC/PS/WO/15438

58.

Topographical Survey & Auto Leveling

Work for Chidawa Singana Road SH-13

Including Chidawa Bye pass ( Length 43

km)

Thoughts Consultant

Jaipur Pvt Ltd

1.16 Lac Completed+

Unknown

25/09/2010

59.

Topographical Survey & Auto Leveling

Work for Bhilwara Mandal garh Ladpura

Including Mandal Garh Byepass (Le

ngth 53 Km )

Thoughts Consultant

Jaipur Pvt Ltd

1.08 Lac Completed+

Unknown

02/09/2010

60.

Topographical Survey & Auto Leveling

Work for Beawer Ras Lambiya Merta

Road, Lambiya Jaitaran & Mangliyawas

Ras Road (Length 178 km)

Thoughts Consultant

Jaipur Pvt Ltd

5.34 Lac Completed+

Unknown

20/03/2010

61.

Road alignment & Platform Survey for

our proposed wind farm project sites at

Jodhpur & Jaiselmer,

Enercon India 4.55 Lac completed 9500023537

25.08.11

62.

Detailed Survey Plan by DGPS & Grid

Contouring of Existing Land 400KV

Power Grid Station Udaipur

EMCO Limited 0.35 Lac completed LOI/PPP-5/soil/2012/1

63. Route Alignment Survey for Proposed

Railway Yard.

Shree Cement 0 Lac completed SCL/Bwr/logistics/16810

64. Detailed Survey Plan & Contouring of Govt. Engineering 0.35 Lac completed GECB/2424

28. Details of Empanelment with Central Govt/State Govt/ Development Authorities / Local Body etc. (Proof to be attached):

Govt. Engineering College at Bhartpur Collage

65. Contour Survey Plan of Existing Land at

Kota

Bengal City Nirman Pvt

Ltd

0.23 Lac completed TIG/KOTA/0001

29. Details of financial turn-over of Consultancy fee for last financial year and current year.

S. NO. Annual Turnover Year & turnover in Rs. Remarks/Page No.

1. 9,75,890.00 Finical Year 2009-2010 --------------------

2. 18,07,980.00 Finical Year 2010-2011 --------------------

3. 37,91,307.00 Finical Year 2011-2012 Audited

4. 32,50,765.00 Finical Year 2012-2013 Provisional

5. 65,25,746.00 Finical Year 2013-2014 Audited

6. 80,01,425.00 Finical Year 2014-2015 Audited

IN HOUSE FACILITIES

In House Equipment (Survey)

Equipment Details Quantity (No’s / Set)

• NAVCOM DGPS (SF-3040) Set

• GeoMax DGPS (Zenith 10) Set

• Total Station (HoriZon Destop 555 R, Sokia Set 500,Pentex-325)

• Auto Levels (Sokkia 20 X C 41)

• Auto Levels (Sokkia 22 X C33)

• Auto Levels (Sokkia 24 X C 32)

04

02

12

03

05

04

• Theodolites 03

• Dumpy Level 03

• Plane Table 08

• Prismatic Compass 10

• Measuring Tapes 20

• Rodometer 06

Computer Facilities

The computer support of Dolphin Engineers consists of the following:

S. No. Equipment Details Quantity (No’s / Set)

A Hardware

a. Computers

Laptop (Hp Pavilion) 03

Curie 3 05

Core two 04

C2D 05

Total 17

b. Plotter A0 Size HP Design Jet 500 C (Up to 42”) 01

c. Printers 02

HP LaserJet 01

S. No. Equipment Details Quantity (No’s / Set)

HP DeskJet 640 C 01

Canon S100SP 01

Total 03

d. Scanners (HP) 01