OUTLINE Exterior Wall Assemblies
Detailing Objectives
Thin-Stone Veneer
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 3
Detailing ObjectivesDOB-1 : FIREDOB-2 : EARTHDOB-3 : WATERDOB-4 : AIR
DOB-5 : COSTDOB-6 : TIMEDOB-7 : SCOPE
FIRE
WATER
AIR EARTH
dryhot
wet cold
ELEMENTS
TIMECOST
SCOPE
eu:a eppstein uhen architects 4
Thin-Stone Veneer PROJECTS :
St. Joseph Outpatient Center GE Healthcare Research Park Acuity
eu:a eppstein uhen architects 5
Thin-Stone Veneer Panelized thin-stone veneer
wall panels Manufacturer : Biesanz Stone Co
Assembly includes 1-1/4” Winona Dolomite
Limestone Stone is held in place with threaded
studs Epoxy-anchored into back of stone
panels 6” welded structural stud frames
eu:a eppstein uhen architects 6
Thin-Stone VeneerDOB-1 Fire (Thermal)
Conduction 4” Polyurethane Insulation Sprayed in stud cavity
Encapsulates metal studs R5 per inch = R20
Sprayed after panels are placed Monolithic installation (+)
Cannot be exposed : Fire hazard Ceiling plenum or Other occupied spaces
Must be covered by Gypsum Board or Sprayed-on fire resistive
coating
eu:a eppstein uhen architects 7
Thin-Stone VeneerDOB-2 Earth (Solid) Panels : welded to
floor edge framing Edge framing
designed for deflection criteria : Panel to panel or Panel & window
system
eu:a eppstein uhen architects 8
Thin-Stone VeneerDOB-3 Water (Liquids)
Barrier system No drainage cavity Water infiltration barrier
stone veneer epoxy joints sealant joints
Closed-cell polyurethane insulation helps to keep water out
of assembly Flashing placed :
under handset copings and window sills
at top of foundation wall
eu:a eppstein uhen architects 9
Thin-Stone Veneer
eu:a eppstein uhen architects 10
Thin-Stone VeneerDOB-4 Air (Vapor) Insulation acts as vapor
barrier Closed cell 3” or more thickness
DOB-5 Cost Comparable to precast Life cycle costs
Very good Very low maintenance
Sealant at panel joints Periodic replacement
eu:a eppstein uhen architects 11
Thin-Stone VeneerDOB-6 Time Labor
Prefabricated panels Ease of installation
Panels can be large Building enclosure fast
All-weather construction Easily installed during winter
DOB-7 Scope Aesthetics
Natural stone product Mix of lights and darks Very high quality look
Coordination Similar to precast panels Shop drawings must be accurate Errors in the field
Pull epoxy-ed stone from panels : difficult
eu:a eppstein uhen architects 12
Cavity Wall : Brick on CMU Project :
UW LaCrosse Residence Hall Project Scope
Occupancy : R-2 Construction Type : Type IIB
Need : Provide a building that meets
the Department of State Facilities (DSF) longevity requirements : 100 yr building
Concerns : Costs Solution :
Provide a century old building system Provide a brick/ block cavity rain
screen wall system
eu:a eppstein uhen architects 13
DOB-1 : Fire (Thermal) Thermal Insulation
2” air space + 2” rigid insulation
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 14
Cavity Wall : Brick on CMUDOB-2 : Earth (Solid) Movement : Materials
CMU/ Brick move/ contract at different rates
eu:a eppstein uhen architects 15
Cavity Wall : Brick on CMUDOB-2 : Earth (Solid) Movement : Elements
Horizontal movement : Vertical control joints (24’ o.c.)
Vertical movement : Horizontal shelf angles
Every two floors or 30’ brick heights
eu:a eppstein uhen architects 16
Cavity Wall : Brick on CMUDOB-2 : Earth (Solid) Structural Support : Dead load bearing
system Openings < 6’ : Bond beams Openings > 6’ : Engineered steel lintels
eu:a eppstein uhen architects 17
DOB-3 : Water (Liquids) Sealant Joints and Gaskets
Provide flashing at all horizontal interruptions in a wall.
Opening Heads Opening Sills Shelf angles Foundations
Drain & Weep Water drained from cavity thru
a series of weeps. Do not use rope weeps. Need to provide vents at top of
cavity (similar to weeps only located at top of cavity.
Vents help equalize cavity pressure
Provide air movements to help dry cavity out.
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 18
DOB-3 : Water (Liquids) Rainscreen Assembly
Cavity wall system utilizes the rain screen principal to control water
Water Allowed to penetrate the
outer layer Directed out of the cavity
thru the use of flashing + counter flashing systems
Sprayed on Air & Moisture Barrier utilize to control air & moisture vapor penetration
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 19
DOB-3 : Water (Liquids) : Window Sills
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 20
DOB-3 : Water (Liquids) : Window Heads Openings < 6’ : Bond beams Openings > 6’ : Engineered steel lintels
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 21
DOB-3 : Water (Liquids) FlashingCavity Wall : Brick on CMU
eu:a eppstein uhen architects 22
DOB-3 : Water (Liquids) : Window Jambs
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 23
DOB-3 : Water (Liquids) : CopingCavity Wall : Brick on CMU
eu:a eppstein uhen architects 24
DOB-3 : Water (Liquids) : Low Roof & Parapet
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 25
DOB-3 : Water (Liquids) : Coping/ Roof
Cavity Wall : Brick on CMU
eu:a eppstein uhen architects 26
Cavity Wall : Brick on CMUDOB-4 : Air (Vapor) Water Vapor
Air Barrier Placement : Critical Warm side : CW
insulation Cavity
Keep Clean : Critical 1” Minimum 2” Preferred
eu:a eppstein uhen architects 27
Cavity Wall : Brick on CMUDOB-5 : Cost Life-Cycle Issues
Cavity Wall : 4” face brick 2” air space 2” rigid insulation 8” CMU
Time tested assembly Over century old Research performance
sources : numerous Material Costs $28-
$36 / s.f.
eu:a eppstein uhen architects 28
Cavity Wall : Brick on CMUDOB-6 : Time Expected Life
100 year building assembly Life-Cycle:
Maintenance : Minimal Sealant/ tuck pointing
Efficient Use of Const Materials Labor intensive
Built one block/ brick at a time Refining the Detail Critical : Specify a mock-up panel
Show wall system components and openings Used to review finished work Provides objective comments/ concerns
All-Weather Construction Majority of winter construction cost (65-
75%) Temporary heat and protection of masonry Keep project moving
Pride of Craftsmanship Craftsmanship intensive
Parts That Are Easy To Handle Installation is easy.
eu:a eppstein uhen architects 29
Cavity Wall : Brick on CMUDOB-7 : Scope Aesthetics
Natural materials+organic : from the earth
Different colors/ textures/ bricks/ bonding
Patterns can provide interest in a project Timeless Features : Never goes out of
style Coordination : S + MEP
Critical for any recessed component. Electrical requires conduit/ boxes to be
set with wall. Do not install pipes inside cavity wall. Need to create pipe chases on warm side
of wall.
eu:a eppstein uhen architects 30
Cavity Wall : Brick on CMUDOB-7 : Scope Forgiving Details : Dimensional
Tolerances Maintain an 8” building module to
minimize cutting All openings need to be kept on 8”
module also
eu:a eppstein uhen architects 31