DETAIL ENGINEERING DESIGNPALEMBANG SHELTER
INDONESIAINFRASTRUCTURE
INITIATIVE
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
TAMPAK
1 : 50 3
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
HALTE JAKABARING
TAMPAK SAMPINGSKALA 1:50
TAMPAK DEPANSKALA 1:50
V E R TE C T 2010
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
TAMPAK
1 : 50 3
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
HALTE JAKABARING
TAMPAK SAMPINGSKALA 1:50
TAMPAK DEPANSKALA 1:50
V E R TE C T 2010
V E R TE C T 2010
C.1 3
574343424339 9,533
69,5213
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL JALUZI
1 : 25 10
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
5555
108
5 20 5
35
10510
28
5
93
22,5 145 145 22,55145145
20
5
25 100 50 150 150 50 100 25
650
5
HALTE JAKABARING
RENCANA JALUZISKALA 1:25
25,9625,96
JALUZI BANGKIRE 2/20 cm
FIN. CAT DUCO
RANGKA JALUZIHOLLOW 5/5 cmFIN. CAT DUCO
HURUF TIMBUL TYPE ARIAL BOLD
FIN. STAINLEES STEEL
RANGKA HURUF BESI PLAT L=5 cm
D
D
JALUZI BANGKIRE 2/20 cmFIN. CAT DUCO
RANGKA JALUZIHOLLOW 5/5 cmFIN. CAT DUCO
DET. H
TAMPAK SAMPING - RENCANA JALUZISKALA 1:25
POTONGAN D - DSKALA 1:10
DETAIL HSKALA 1:10
V E R TE C T 2010
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
SITE PLAN
1 : 100 1
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
90 363,5 104 302,5 160 302,5 370 157,5
430 127,5 82,5 300 300 82,5 370 157,5
160
130
70
90
200
453,5 1239 157,5
1850
LAJU
RK
HU
SU
S B
US
JALA
N R
AY
A
SITE PLANSKALA 1:100
300300
HALTE
±00,00
+80,00
PARKIR SEPEDA+25,00
+25,00
+25,00
+25,00
70360
TEMPAT SAMPAH FIBERGLASS KAP.50 Lt
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DENAH
1 : 50 2
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
1359
80
DENAH HALTESKALA 1:50
HALTE+80,00
+25,00
A
V E R TE C T 2010
35 47,5 300 300 82,5 377,5
765 377,5
86 120,5 100 100 160 100 100 120,5 117 118 117 120
44 67,5
111,5
406,5 160 320,5 352 120
47,5
135
137,5
32,5
1254
135
137,5
352,5
B B
C
C
A
82
63
25
3520
42,5
35
181,5
211
82
113
55
25
97,5
84
77,5
211
35 150 90 60 90 47,5
8
22,5
120 67,5
855
145
600
745
4250
150 6047,5 35
82,5 300 300 82,5
765
195
80
259
145
80
259
211
90 97,5 180 120 180
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
POTONGAN
1 : 50 4
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
POTONGAN A - ASKALA 1:50
PAVING MENYESUAIKAN EKSISTING KW. 1
NATURAL
RINGBALK 15/15 cm
URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN
KURSI PIPA GALVANIS Ø 1,5" FIN. STAINLESS STEEL
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
SANSEVIERIA sp. t=50 cm
+25,00
+80,00
±00,00PONDASI
BATU KALI 1:4
LT. KERAMIK 30/30 cm
URUGAN PASIR t. 10 cm DIPADATKAN
SLOOF BETON15/25 cm
URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN
AANSTAMPING
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
JALUZI BANGKIRE2/20 cm FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PONDASI BETON SETEMPAT
211
V E R TE C T 2010
45 45 37,5 60 90 60 60 180 60 60 4590
45
45 104 82,5 300 300 82,5 370 45
525
149 765 415
186,5 600 452,5
1239
86 53 47,5 150 150 150 150 47,5 53 352
105
258
130
22,5
84
288,5
113
25
45
85
184
211
113
70
480
138
V E R TE C T 2010
45 45 14 45 45 37,5 150 150 300 37,5 45 45 90 59 59 72 45
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
POTONGAN
1 : 50 5
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
+25,00 +25,00
DET. A
DET. B
DET. C
DET. D
POTONGAN B - BSKALA 1:50
+80,00
7°
LT. KERAMIK 30/30 cm
URUGAN PASIR t. 10 cm DIPADATKAN
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
JALUZI BANGKIRE2/20 cm FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
KURSI PIPA GALVANIS Ø 1,5" FIN. STAINLESS STEEL
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
LT. KERAMIK TEKSTUR 30/30 cm
PIPA GALVANIS Ø 1,5" FIN. STAINLEES STEEL
RAILING PIPA GALVANIS Ø 4"
FIN. STAINLEES STEEL
SLOOF BETON 15/25 cm
PONDASI BATU KALI 1:4
AANSTAMPING
URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN
PONDASI BETON SETEMPAT
URUGAN PASIR t. 10 cm DIPADATKAN
RINGBALK 15/15 cm
URUGAN PASIR t. 10 cm DIPADATKAN
PAS. TRANSRAM
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL POTONGAN
1 : 40 6
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
52,5
POTONGAN C - CSKALA 1:40
DETAIL APOTONGAN B - B
SKALA 1:40
DETAIL BPOTONGAN B - B
SKALA 1:40
DET. E
DET. F
+80,00
+25,00
ATAP ONDULINEWARNA BIRU
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
84
2 X ACRYLIC SHEET BENING t=0,8 cm
STANDOFF Ø 3/4" FIN. CHROME
5
12,5 130 130 12,5 105
510
1055
10
37,5
5
35
155
40
5
30
5
137,5 5 137,5
7,5 7,5
20
45
35
5
35
5
45
±00,00
AANSTAMPING
URUGAN PASIR t. 10 cm
DIPADATKAN
PAS. TRANSRAM
SLOOF BETON15/25 cm
RINGBALK 15/15 cm
KURSI PIPA GALVANIS Ø 1,5" FIN. STAINLESS STEEL
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
RAILING PIPA GALVANIS Ø 2" FIN. STAINLEES STEEL
KURSI PIPA GALVANIS Ø 1,5" FIN. STAINLESS STEEL
7,5
97,5
98
7,5
490
9
97,5
82
82
9
80 7,5 52,5 7,5 80 2020
7,5
84
7,5
99
100 120 100
V E R TE C T 2010
190
8
25
42
70
352,5
211
15 77,5 45 45
105
817
58
70
155
80
8
25
45
35
112,5
79
211
40
143
42,5
45,5124,5
1510
72 72
185
300
250
185
70
269
215137,5
150
80 180
121°
112°
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL POTONGAN
1 : 40 6
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
52,5
POTONGAN C - CSKALA 1:40
DETAIL APOTONGAN B - B
SKALA 1:40
DETAIL BPOTONGAN B - B
SKALA 1:40
DET. E
DET. F
+80,00
+25,00
ATAP ONDULINEWARNA BIRU
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
84
2 X ACRYLIC SHEET BENING t=0,8 cm
STANDOFF Ø 3/4" FIN. CHROME
5
12,5 130 130 12,5 105
510
1055
10
37,5
5
35
155
40
5
30
5
137,5 5 137,5
7,5 7,5
20
45
35
5
35
5
45
±00,00
AANSTAMPING
URUGAN PASIR t. 10 cm
DIPADATKAN
PAS. TRANSRAM
SLOOF BETON15/25 cm
RINGBALK 15/15 cm
KURSI PIPA GALVANIS Ø 1,5" FIN. STAINLESS STEEL
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
RAILING PIPA GALVANIS Ø 2" FIN. STAINLEES STEEL
KURSI PIPA GALVANIS Ø 1,5" FIN. STAINLESS STEEL
7,5
97,5
98
7,5
490
9
97,5
82
82
9
80 7,5 52,5 7,5 80 2020
7,5
84
7,5
99
100 120 100
V E R TE C T 2010
190
8
25
42
70
352,5
211
15 77,5 45 45
105
817
58
70
155
80
8
25
45
35
112,5
79
211
40
143
42,5
45,5124,5
1510
72 72
185
300
250
185
70
269
215137,5
150
80 180
121°
112°
VE
RTE
CT 2010
105335
315373
173°1065
10085
8515 5
7°
50 66 30
10 10 140
105
7036
118234
118234
30 20
16 10
150
200
70740
30 20
16 20
6 4
30 30
10 140
306
3040
3054
546
526
50 66 10
10
10
140
8260
60106
66 90
150
6 4
172106
20
153°
PERENC
AN
AA
N PEM
BAN
GUN
AN
HA
LTE BUS RAPID TRA
NSIT (BRT)
TRAN
S MUSI PA
LEMBA
NG
PE
JAB
AT P
EM
BU
AT K
OM
ITME
N
JAS
A K
ON
SU
LTAN
SI P
ER
EN
CA
NA
AN
PE
MB
AN
GU
NA
N H
ALTE
B
US
RA
PID
TRA
NS
IT (BR
T) TRA
NS
MU
SI TA
2010D
INA
S P
ER
HU
BU
NG
AN
KO
TA P
ALE
MB
AN
G
DIS
ETUJU
I
AS
ISTE
N P
ER
EN
CA
NA
AN
PE
MB
AN
GU
NA
N H
ALTE
B
US
RA
PID
TRA
NS
IT (BR
T) TRA
NS
MU
SI TA
2010 D
PU
CIP
TA K
AR
YA
DA
N P
ER
UM
AH
AN
KO
TA P
ALE
MB
AN
G
NO
UR
AIAN
PA
RAF
MEN
GE
TAH
UI/M
EN
YETU
JUI
CATATAN
: PE
JAB
AT P
ELA
KS
AN
A TE
KN
IS K
EG
IATA
N
JAS
A K
ON
SU
LTAN
SI P
ER
EN
CA
NA
AN
PE
MB
AN
GU
NA
N H
ALTE
B
US
RA
PID
TRA
NS
IT (BR
T) TRA
NS
MU
SI TA
2010
DETA
IL POTO
NG
AN
1 : 507 D
IPE
RIK
SA
/DITELITI
DIG
AMBAR
DIR
EN
CAN
AD
IRE
KTU
R
PE
NA
NG
GU
NG
JAW
AB REN
CAN
A
KO
NSU
LTAN P
EREN
CA
NA
UN
IT KER
JA
SU
MBE
R D
AN
A
PE
KE
RJAAN
:
SK
ALA
NO
.GA
MBAR
KO
DE
GAM
BAR
JUD
UL G
AMBAR
:
AR
S
PEMER
INTA
H K
OTA
PALEM
BA
NG
DIN
AS PER
HU
BU
NG
AN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APB
D K
OTA
PALEM
BA
NG
TAH
UN
AN
GG
AR
AN
2010
746
173°
170
170
10
10
10
LT. KER
AM
IKTEK
STU
R
30/30 cm
NO
OSIN
G
STA
IR
RAILIN
G
PIPA G
ALV
AN
IS Ø
4" FIN
. STA
INLEES
STEEL
LT. KER
AM
IK
TEKSTU
R 30/30 cm
PIPA G
ALV
AN
IS Ø
1,5" FIN
. STA
INLEES
STEEL
RAILIN
G
PIPA G
ALV
AN
IS Ø
4" FIN
. STA
INLEES
STEEL
RIN
GBALK
15/15 cm
PLESTER
AN
t =
4 cm
RAILIN
G
PIPA G
ALV
AN
IS Ø
4" FIN
. STA
INLEES
STEEL
PIPA G
ALV
AN
IS Ø
1,5" FIN
. STA
INLEES
STEEL
RIN
GBALK
15/15 cm
PLESTER
AN
t = 4 cm
LT. KER
AM
IK
TEKSTU
R 30/30 cm
SLO
OF B
ETON
15/25 cm
PON
DASI B
ATU
KALI 1:4
LT. KER
AM
IK
30/30 cm
DETA
IL E POTO
NG
AN
C - C
SKALA
1:50
DETA
IL C PO
TON
GAN
B - B
SKALA
1:25D
ETAIL D
POTO
NG
AN
B - B
SKALA
1:25
+80,00
+80,00
+80,00
+25,00
+25,00
7595
100
153°85
85
150
25
1015
80 25
33 15
7510
105 78 80
10482,5
150300
82,5194
120
86120,5
100100
160100
100120,5
117118
117
176
120
53360,8
1359
7°
V E R TE C T 2010
105335315
373
173°10
65100
8585
15
5
7°
50
66
30
10
10
140
105
70 36 118234 118 234
30
20
16
10
150
200
70 740
30
20
16
20
6
4
30
30
10
140
306
30 40 3054546
526
50
66
10
10
10
140
82 60 60 106
66
90
150
6
4
172 106
20
153°
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL POTONGAN
1 : 50 7
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
746
173°
170
170
10
10
10
LT. KERAMIKTEKSTUR 30/30 cm
NOOSING STAIR
RAILING PIPA GALVANIS Ø 4" FIN. STAINLEES STEEL
LT. KERAMIK TEKSTUR 30/30 cm
PIPA GALVANIS Ø 1,5" FIN. STAINLEES STEEL
RAILING PIPA GALVANIS Ø 4" FIN. STAINLEES STEEL
RINGBALK 15/15 cm
PLESTERAN t = 4 cm
RAILING PIPA GALVANIS Ø 4" FIN. STAINLEES STEEL
PIPA GALVANIS Ø 1,5" FIN. STAINLEES STEEL
RINGBALK 15/15 cm
PLESTERAN t = 4 cm
LT. KERAMIK TEKSTUR 30/30 cm
SLOOF BETON 15/25 cm
PONDASI BATU KALI 1:4
LT. KERAMIK 30/30 cm
DETAIL E POTONGAN C - CSKALA 1:50
DETAIL C POTONGAN B - BSKALA 1:25
DETAIL D POTONGAN B - BSKALA 1:25
+80,00
+80,00 +80,00
+25,00
+25,00
75 95
100
153°85 85
150
25
1015
80
25
33
15
75
10
105
78
80
10482,515030082,5194120
86120,5100100160100100120,5117118117
176
120
53360,8
1359
7°
PERENC
AN
AA
N PEM
BAN
GUN
AN
HA
LTE BUS RAPID TRA
NSIT (BRT)
TRAN
S MUSI PA
LEMBA
NG
PEJAB
AT PEM
BUAT K
OM
ITMEN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010D
INAS
PER
HU
BUN
GAN
KO
TA PALEMBAN
G
DIS
ETUJU
I
ASISTEN
PER
ENC
AN
AAN
PEM
BAN
GU
NAN
HALTE
BU
S R
APID
TRA
NS
IT (BRT) TR
AN
S M
US
I TA 2010 D
PU C
IPTA
KAR
YA D
AN
PER
UM
AH
AN
KOTA
PALEM
BANG
NO
UR
AIAN
PAR
AF
MEN
GE
TAH
UI/M
EN
YETU
JUI
CATATAN
: PEJAB
AT PELAK
SAN
A TEK
NIS KE
GIATAN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010
DETA
IL POTO
NG
AN
1 : 406 D
IPER
IKSA
/DITELITI
DIG
AM
BARD
IREN
CAN
AD
IREK
TUR
PEN
ANG
GU
NG
JAW
AB R
EN
CAN
A
KO
NS
ULTA
N PER
ENC
ANA
UN
IT KER
JA
SU
MBE
R D
AN
A
PEK
ERJA
AN :
SKA
LAN
O.G
AM
BARK
OD
E GA
MBAR
JUD
UL G
AMBA
R :
AR
S
PEMER
INTA
H K
OTA
PALEM
BA
NG
DIN
AS PER
HU
BU
NG
AN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APB
D K
OTA
PALEM
BA
NG
TAH
UN
AN
GG
AR
AN
2010
52,5
POTO
NG
AN
C - C
SKALA
1:40
DETA
IL APO
TON
GAN
B - B
SKALA
1:40
DETA
IL BPO
TON
GAN
B - B
SKALA
1:40
DE
T. E
DET
. F
+80,00
+25,00
ATA
P ON
DU
LINE
WARN
A B
IRU
TIAN
G PIPA
GALV
AN
IS Ø
8" FIN
. CAT D
UCO
PIPA G
ALV
AN
IS Ø
1,5" FIN
. CAT D
UCO
84
2 X A
CRYLIC
SH
EET BEN
ING
t=0,8 cm
STA
ND
OFF Ø
3/4" FIN
. CH
RO
ME
5
12,5130
13012,5
105510 105 5
10
37,5
5
35
15 5 40 5 30 5
137,55
137,5
7,57,5
20 45 35
5 35 5
45
±00,00
AAN
STA
MPIN
G
URU
GAN
PASIR
t. 10 cm
DIPA
DATK
AN
PAS. TR
AN
SRAM
SLO
OF B
ETON
15/25 cm
RIN
GBALK
15/15 cm
KU
RSI PIPA
GALV
AN
IS Ø
1,5" FIN
. STA
INLES
S S
TEEL
TIAN
G PIPA
GALV
AN
IS Ø
8" FIN
. CAT D
UCO
RAILIN
G PIPA
GALV
AN
IS Ø
2" FIN
. STA
INLEES
STEEL
KU
RSI PIPA
GALV
AN
IS Ø
1,5" FIN
. STA
INLES
S S
TEEL
7,5
97,5
98
7,5
490
9
97,5
82
82
9
807,5
52,57,5
8020
20
7,584
7,5
99
100120
100
VE
RTE
CT 2010
190
8
25 42
70
352,5
211
1577,5
4545
105 8 17
58 70
155
80 8 25 45 35
112,5 79
211
40
143
42,5
45,5124,5
151072
72
185
300
250
185 70
269
215137,5
150
80180
121°
112°
V E R TE C T 2010
105335315
373
173°10
65100
8585
15
5
7°
50
66
30
10
10
140
105
70 36 118234 118 234
30
20
16
10
150
200
70 740
30
20
16
20
6
4
30
30
10
140
306
30 40 3054546
526
50
66
10
10
10
140
82 60 60 106
66
90
150
6
4
172 106
20
153°
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL POTONGAN
1 : 50 7
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
746
173°
170
170
10
10
10
LT. KERAMIKTEKSTUR 30/30 cm
NOOSING STAIR
RAILING PIPA GALVANIS Ø 4" FIN. STAINLEES STEEL
LT. KERAMIK TEKSTUR 30/30 cm
PIPA GALVANIS Ø 1,5" FIN. STAINLEES STEEL
RAILING PIPA GALVANIS Ø 4" FIN. STAINLEES STEEL
RINGBALK 15/15 cm
PLESTERAN t = 4 cm
RAILING PIPA GALVANIS Ø 4" FIN. STAINLEES STEEL
PIPA GALVANIS Ø 1,5" FIN. STAINLEES STEEL
RINGBALK 15/15 cm
PLESTERAN t = 4 cm
LT. KERAMIK TEKSTUR 30/30 cm
SLOOF BETON 15/25 cm
PONDASI BATU KALI 1:4
LT. KERAMIK 30/30 cm
DETAIL E POTONGAN C - CSKALA 1:50
DETAIL C POTONGAN B - BSKALA 1:25
DETAIL D POTONGAN B - BSKALA 1:25
+80,00
+80,00 +80,00
+25,00
+25,00
75 95
100
153°85 85
150
25
1015
80
25
33
15
75
10
105
78
80
10482,515030082,5194120
86120,5100100160100100120,5117118117
176
120
53360,8
1359
7°
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL POTONGAN
1 : 20 8
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010SWIVEL HOIST RINGS
LOAD RATING 500 Lbs
WIRE ROPE 8 X 25 F (FC) Ø 12 mm
OPEN SPELTER WIRE ROPE SOCKETS SIZE 5/16 - 3/8
TURNBUCKLE EYE ANDEYE COMBINATION - END STOCK DIAMETER 1/4"(SWL 500 Lb)
V E R TE C T 2010
7,5
97,5
98
7,5
40
40
25
70
8
150
121°
112°
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 8" FIN. CAT DUCO
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
JALUZI BANGKIRE 2/20 cm
FIN. CAT DUCO
RANGKA JALUZI HOLLOW 5/5 cmFIN. CAT DUCO
20 170 5 20 5
HURUF TIMBULFIN. STAINLEES
STEEL
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
BESI PLAT L=5 cm
9
97,5
82
82
9
53,96
SWIVEL HOIST RINGSLOAD RATING 500 Lbs
90,5
192,5
7
490
10
104
DETAIL FPOTONGAN C - C
SKALA 1:20
DET. G
DETAIL GSKALA 1:10
VE
RTE
CT 2010
C.13
5743
4342
4339
9,53
3
69,5213
PERENC
AN
AA
N PEM
BAN
GUN
AN
HA
LTE BUS RAPID TRA
NSIT (BRT)
TRAN
S MUSI PA
LEMBA
NG
PEJAB
AT PEM
BUAT K
OM
ITMEN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010D
INAS
PER
HU
BUN
GAN
KO
TA PALEMBAN
G
DIS
ETUJU
I
ASISTEN
PER
ENC
AN
AAN
PEM
BAN
GU
NAN
HALTE
BU
S R
APID
TRA
NS
IT (BRT) TR
AN
S M
US
I TA 2010 D
PU C
IPTA
KAR
YA D
AN
PER
UM
AH
AN
KOTA
PALEM
BANG
NO
UR
AIAN
PAR
AF
MEN
GE
TAH
UI/M
EN
YETU
JUI
CATATAN
: PEJAB
AT PELAK
SAN
A TEK
NIS KE
GIATAN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010
DETA
IL JALU
ZI
1 : 2510
DIP
ERIK
SA/D
ITELITI
DIG
AM
BARD
IREN
CAN
AD
IREK
TUR
PEN
ANG
GU
NG
JAW
AB R
EN
CAN
A
KO
NS
ULTA
N PER
ENC
ANA
UN
IT KER
JA
SU
MBE
R D
AN
A
PEK
ERJA
AN :
SKA
LAN
O.G
AM
BARK
OD
E GA
MBAR
JUD
UL G
AMBA
R :
AR
S
PEMER
INTA
H K
OTA
PALEM
BA
NG
DIN
AS PER
HU
BU
NG
AN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APB
D K
OTA
PALEM
BA
NG
TAH
UN
AN
GG
AR
AN
2010
55
55
108
520
5
35 105 10 28
5
93
22,5145
14522,5
5145
145
20
5
25100
50150
15050
10025
650
5
HA
LT
E JA
KA
BA
RIN
G
REN
CAN
A JA
LUZI
SKALA
1:25
25,9625,96
JALU
ZI B
AN
GKIR
E 2/20 cm
FIN. C
AT D
UCO
RAN
GKA JA
LUZI
HO
LLOW
5/5 cmFIN
. CAT D
UCO
HU
RU
F TIMBU
L TYPE A
RIA
L BO
LDFIN
. STA
INLEES
STEEL
RAN
GKA H
URU
F BES
I PLAT L=
5 cm
DD
JALU
ZI B
AN
GKIR
E 2/20 cmFIN
. CAT D
UCO
RAN
GKA JA
LUZI
HO
LLOW
5/5 cmFIN
. CAT D
UCO
DE
T. H
TAM
PAK S
AM
PING
- REN
CAN
A JA
LUZI
SKALA
1:25PO
TON
GAN
D - D
SKALA
1:10D
ETAIL H
SKALA
1:10
172,15
60 300
15 15 49 17 9 24 17 9 24 17 9 1717 9 24 17 9 24 179
24 17 9 10
15 90 50 50 50 50 50 50 25
15
15 127,15 102,85 55 15
57
58
255,79
31213
10 5
90
90
5
13
20
50
8
20
52
175,79
151525307530
57
255,79
5 200 200 5
410
430
20
50
8
20
52
100
7
70
80
107
V E R TE C T 2010
C.1 3
15 30
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA PARKIR SEPEDA
1 : 30 15
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
50 50 21
F
50 45 50 50 45
RENCANA PARKIR SEPEDASKALA 1:30
24
15 15 15 15 15 1549 50 50 21 49
60°
PAVING MENYESUAIKAN EKSISTING KW. 1
NATURAL
URUGAN PASIR t. 10 cm DIPADATKAN
KANSTEIN
PONDASI BETON TUMBUK
1 : 3 : 5
PIPAGALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ANGKUR BESIØ 10mm
80
PIPA GALVANIS Ø 2,5" FIN. CAT DUCO
PIPA GALVANIS Ø 11
4" FIN. CAT DUCO
15
30
15
110°
PIPA GALVANIS Ø 2 12" FIN. CAT DUCO
PIPA GALVANIS Ø 11
4" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 2 12" FIN. CAT DUCO
URUGAN PASIR t. 10 cm DIPADATKAN
PONDASI BETON TUMBUK1 : 3 : 5
ANGKUR BESIØ 10mm
E E
POTONGAN E - ERENCANA PARKIR SEPEDA
SKALA 1:30
POTONGAN F - FRENCANA PARKIR SEPEDA
SKALA 1:30
F
172,15
60 300
15 15 49 17 9 24 17 9 24 17 9 1717 9 24 17 9 24 179
24 17 9 10
15 90 50 50 50 50 50 50 25
15
15 127,15 102,85 55 15
57
58
255,79
31213
10 5
90
90
5
13
20
50
8
20
52
175,79
151525307530
57
255,79
5 200 200 5
410
430
20
50
8
20
52
100
7
70
80
107
V E R TE C T 2010
C.1 3
15 30
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA PARKIR SEPEDA
1 : 30 15
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
50 50 21
F
50 45 50 50 45
RENCANA PARKIR SEPEDASKALA 1:30
24
15 15 15 15 15 1549 50 50 21 49
60°
PAVING MENYESUAIKAN EKSISTING KW. 1
NATURAL
URUGAN PASIR t. 10 cm DIPADATKAN
KANSTEIN
PONDASI BETON TUMBUK
1 : 3 : 5
PIPAGALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ANGKUR BESIØ 10mm
80
PIPA GALVANIS Ø 2,5" FIN. CAT DUCO
PIPA GALVANIS Ø 11
4" FIN. CAT DUCO
15
30
15
110°
PIPA GALVANIS Ø 2 12" FIN. CAT DUCO
PIPA GALVANIS Ø 11
4" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 2 12" FIN. CAT DUCO
URUGAN PASIR t. 10 cm DIPADATKAN
PONDASI BETON TUMBUK1 : 3 : 5
ANGKUR BESIØ 10mm
E E
POTONGAN E - ERENCANA PARKIR SEPEDA
SKALA 1:30
POTONGAN F - FRENCANA PARKIR SEPEDA
SKALA 1:30
F
PERENC
AN
AA
N PEM
BAN
GUN
AN
HA
LTE BUS RAPID TRA
NSIT (BRT)
TRAN
S MUSI PA
LEMBA
NG
PEJAB
AT PEM
BUAT K
OM
ITMEN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010D
INAS
PER
HU
BUN
GAN
KO
TA PALEMBAN
G
DIS
ETUJU
I
ASISTEN
PER
ENC
AN
AAN
PEM
BAN
GU
NAN
HALTE
BU
S R
APID
TRA
NS
IT (BRT) TR
AN
S M
US
I TA 2010 D
PU C
IPTA
KAR
YA D
AN
PER
UM
AH
AN
KOTA
PALEM
BANG
NO
UR
AIAN
PAR
AF
MEN
GE
TAH
UI/M
EN
YETU
JUI
CATATAN
: PEJAB
AT PELAK
SAN
A TEK
NIS KE
GIATAN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010
DETA
IL POTO
NG
AN
1 : 208 D
IPER
IKSA
/DITELITI
DIG
AM
BARD
IREN
CAN
AD
IREK
TUR
PEN
ANG
GU
NG
JAW
AB R
EN
CAN
A
KO
NS
ULTA
N PER
ENC
ANA
UN
IT KER
JA
SU
MBE
R D
AN
A
PEK
ERJA
AN :
SKA
LAN
O.G
AM
BARK
OD
E GA
MBAR
JUD
UL G
AMBA
R :
AR
S
PEMER
INTA
H K
OTA
PALEM
BA
NG
DIN
AS PER
HU
BU
NG
AN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APB
D K
OTA
PALEM
BA
NG
TAH
UN
AN
GG
AR
AN
2010SW
IVEL H
OIS
T RIN
GS
LOAD
RATIN
G 500 Lbs
WIR
E RO
PE 8 X
25 F (FC) Ø
12 mm
OPEN
SPELTER
WIR
E RO
PE SO
CKETS
SIZ
E 5/16 - 3/8
TURN
BU
CKLE EYE A
ND
EYE CO
MBIN
ATIO
N -
END
STO
CK D
IAM
ETER 1/4"
(SW
L 500 Lb)
VE
RTE
CT 2010
7,5
97,5
98
7,5
40 40
25
70 8
150
121°
112°
ATA
P ON
DU
LINE
WARN
A B
IRU
PIPA G
ALV
AN
IS Ø
4" FIN
. CAT D
UCO
PIPA G
ALV
AN
IS Ø
8" FIN
. CAT D
UCO
TIAN
G PIPA
GALV
AN
IS Ø
8" FIN
. CAT D
UCO
JALU
ZI
BAN
GKIR
E 2/20 cmFIN
. CAT D
UCO
RAN
GKA JA
LUZI
HO
LLOW
5/5 cmFIN
. CAT D
UCO
20170
520
5
HU
RU
F TIMBU
LFIN
. STA
INLEES
STEEL
PIPA G
ALV
AN
IS Ø
4" FIN
. CAT D
UCO
PIPA G
ALV
AN
IS Ø
4" FIN. C
AT D
UCO
BES
I PLAT L=
5 cm
9
97,5
82
82
9
53,96SW
IVEL H
OIS
T RIN
GS
LOAD
RATIN
G 500 Lbs
90,5
192,5
7
490
10
10 4
DETA
IL FPO
TON
GAN
C - C
SKALA
1:20
DET. G
DETA
IL GSKALA
1:10
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL KERBS
1 : 20 9
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
20
15
15
30
10
12
DETAIL KERBSSKALA 1:20
20
50
V E R TE C T 2010
V E R TE C T 2010
C.1 3
574343424339 9,533
69,5213
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL JALUZI
1 : 25 10
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
5555
108
5 20 5
35
10510
28
5
93
22,5 145 145 22,55145145
20
5
25 100 50 150 150 50 100 25
650
5
HALTE JAKABARING
RENCANA JALUZISKALA 1:25
25,9625,96
JALUZI BANGKIRE 2/20 cm
FIN. CAT DUCO
RANGKA JALUZIHOLLOW 5/5 cmFIN. CAT DUCO
HURUF TIMBUL TYPE ARIAL BOLD
FIN. STAINLEES STEEL
RANGKA HURUF BESI PLAT L=5 cm
D
D
JALUZI BANGKIRE 2/20 cmFIN. CAT DUCO
RANGKA JALUZIHOLLOW 5/5 cmFIN. CAT DUCO
DET. H
TAMPAK SAMPING - RENCANA JALUZISKALA 1:25
POTONGAN D - DSKALA 1:10
DETAIL HSKALA 1:10
VE
RTE
CT 2010
C.13
5743
4342
4339
9,53
3
69,5213
PERENC
AN
AA
N PEM
BAN
GUN
AN
HA
LTE BUS RAPID TRA
NSIT (BRT)
TRAN
S MUSI PA
LEMBA
NG
PEJAB
AT PEM
BUAT K
OM
ITMEN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010D
INAS
PER
HU
BUN
GAN
KO
TA PALEMBAN
G
DIS
ETUJU
I
ASISTEN
PER
ENC
AN
AAN
PEM
BAN
GU
NAN
HALTE
BU
S R
APID
TRA
NS
IT (BRT) TR
AN
S M
US
I TA 2010 D
PU C
IPTA
KAR
YA D
AN
PER
UM
AH
AN
KOTA
PALEM
BANG
NO
UR
AIAN
PAR
AF
MEN
GE
TAH
UI/M
EN
YETU
JUI
CATATAN
: PEJAB
AT PELAK
SAN
A TEK
NIS KE
GIATAN
JAS
A KON
SU
LTAN
SI PE
RE
NC
ANAA
N PE
MB
ANG
UN
AN H
ALTE B
US
RAP
ID TR
AN
SIT (BR
T) TRA
NS
MU
SI TA
2010
DETA
IL JALU
ZI
1 : 2510
DIP
ERIK
SA/D
ITELITI
DIG
AM
BARD
IREN
CAN
AD
IREK
TUR
PEN
ANG
GU
NG
JAW
AB R
EN
CAN
A
KO
NS
ULTA
N PER
ENC
ANA
UN
IT KER
JA
SU
MBE
R D
AN
A
PEK
ERJA
AN :
SKA
LAN
O.G
AM
BARK
OD
E GA
MBAR
JUD
UL G
AMBA
R :
AR
S
PEMER
INTA
H K
OTA
PALEM
BA
NG
DIN
AS PER
HU
BU
NG
AN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APB
D K
OTA
PALEM
BA
NG
TAH
UN
AN
GG
AR
AN
2010
55
55
108
520
5
35 105 10 28
5
93
22,5145
14522,5
5145
145
20
5
25100
50150
15050
10025
650
5
HA
LT
E JA
KA
BA
RIN
G
REN
CAN
A JA
LUZI
SKALA
1:25
25,9625,96
JALU
ZI B
AN
GKIR
E 2/20 cm
FIN. C
AT D
UCO
RAN
GKA JA
LUZI
HO
LLOW
5/5 cmFIN
. CAT D
UCO
HU
RU
F TIMBU
L TYPE A
RIA
L BO
LDFIN
. STA
INLEES
STEEL
RAN
GKA H
URU
F BES
I PLAT L=
5 cm
DD
JALU
ZI B
AN
GKIR
E 2/20 cmFIN
. CAT D
UCO
RAN
GKA JA
LUZI
HO
LLOW
5/5 cmFIN
. CAT D
UCO
DE
T. H
TAM
PAK S
AM
PING
- REN
CAN
A JA
LUZI
SKALA
1:25PO
TON
GAN
D - D
SKALA
1:10D
ETAIL H
SKALA
1:10
35 194 176
176 157,5
150 300 47,5
135
80
137,5
215
137,5
47,5
15
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA PONDASI
1 : 75 11
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
V E R TE C T 2010
15 90 15 303,5 30 30 3014
30 30 30 337,5 30 30 30 280 30 30 30 90
15
55
75
140
60
1515 170 30 170 30 82,5 370 97,5 15
2330
44,5
30
30
30
80
337,5
127,5 300 300 127,5
120 303,5 959 370 90
92,5
430 1420
187,5
172,5
70
90
200
82,5430 67,5 325 157,5
135
47,5
32,5
120 180 120 180 120 67,5
137,5
104 82,5 300 300 82,5 37090 363,5
135
80
137,5
120
430 127,5 35 55 142,5 142,5 307,5 35 194
557,5 3547,5
150
PONDASI BATU KALI 1:4
PONDASI BETON TUMBUK
PONDASI ROLAGH
KANSTEIN
RENCANA PONDASI MENERUS
SKALA 1:75
RENCANA SLOOF DAN PONDASI SETEMPAT
SKALA 1:75
RENCANA RINGBALK DAN KOLOM
SKALA 1:75
KG KG KG
KP KP KP
KP
KP KP
KP
PONDASI BETON SETEMPAT
35 194 176
176 157,5
150 300 47,5
135
80
137,5
215
137,5
47,5
15
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA PONDASI
1 : 75 11
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
V E R TE C T 2010
15 90 15 303,5 30 30 3014
30 30 30 337,5 30 30 30 280 30 30 30 90
15
55
75
140
60
1515 170 30 170 30 82,5 370 97,5 15
2330
44,5
30
30
30
80
337,5
127,5 300 300 127,5
120 303,5 959 370 90
92,5
430 1420
187,5
172,5
70
90
200
82,5430 67,5 325 157,5
135
47,5
32,5
120 180 120 180 120 67,5
137,5
104 82,5 300 300 82,5 37090 363,5
135
80
137,5
120
430 127,5 35 55 142,5 142,5 307,5 35 194
557,5 3547,5
150
PONDASI BATU KALI 1:4
PONDASI BETON TUMBUK
PONDASI ROLAGH
KANSTEIN
RENCANA PONDASI MENERUS
SKALA 1:75
RENCANA SLOOF DAN PONDASI SETEMPAT
SKALA 1:75
RENCANA RINGBALK DAN KOLOM
SKALA 1:75
KG KG KG
KP KP KP
KP
KP KP
KP
PONDASI BETON SETEMPAT
35 194 176
176 157,5
150 300 47,5
135
80
137,5
215
137,5
47,5
15
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA PONDASI
1 : 75 11
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
V E R TE C T 2010
15 90 15 303,5 30 30 3014
30 30 30 337,5 30 30 30 280 30 30 30 90
15
55
75
140
60
1515 170 30 170 30 82,5 370 97,5 15
2330
44,5
30
30
30
80
337,5
127,5 300 300 127,5
120 303,5 959 370 90
92,5
430 1420
187,5
172,5
70
90
200
82,5430 67,5 325 157,5
135
47,5
32,5
120 180 120 180 120 67,5
137,5
104 82,5 300 300 82,5 37090 363,5
135
80
137,5
120
430 127,5 35 55 142,5 142,5 307,5 35 194
557,5 3547,5
150
PONDASI BATU KALI 1:4
PONDASI BETON TUMBUK
PONDASI ROLAGH
KANSTEIN
RENCANA PONDASI MENERUS
SKALA 1:75
RENCANA SLOOF DAN PONDASI SETEMPAT
SKALA 1:75
RENCANA RINGBALK DAN KOLOM
SKALA 1:75
KG KG KG
KP KP KP
KP
KP KP
KP
PONDASI BETON SETEMPAT
20 15
113
25
7
50
30 30
PLESTERAN t = 4 cm
LT. KERAMIK 30/30
URUGAN PASIR t. 10 cm DIPADATKAN
SLOOF BETON 15/25
2 Ø 10 mm
Ø 6 - 150 mm
URUGAN TANAH PENINGGIAN LANTAI
DIPADATKAN
PAVING MENYESUAIKAN EKSISTING KW. 1
NATURAL
URUGAN PASIR t. 10 cm DIPADATKAN
PAS. TRANSRAM
AANSTAMPING
URUGAN PASIR t. 10 cm DIPADATKAN
URUGAN PASIR t. 10 cm DIPADATKAN
+ 0.00
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
LT. KERAMIK 30/30
URUGAN PASIR t. 10 cm DIPADATKAN
SLOOF BETON 15/25
PONDASI BATU KALI 1:4 URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN
2 Ø 10 mm
Ø 6 - 150 mm
URUGAN TANAH PENINGGIAN LANTAI
DIPADATKAN
DETAIL SLOOF (SL)
4Ø12mm 2Ø16mm
Ø8mm-150
SKALA 1:10
4 Ø 12 mm
Ø 12 - 150 mm
10
15
80
8
10
8
25
15
55
30
30 7,5 15
105
42
8
17
38
1041
45
30
45
45 30 45
45 30 45
120
15
180
70
+ 0.00
3 Ø 12 mm
Ø 8 - 150 mm
Ø 12 - 150 mm
LANTAI KERJA BETON t = 5 cm
4Ø10mm
Ø6mm-150
V E R TE C T 2010
C.1 3
105
20
5
PLESTERAN t = 4 cm
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL PONDASI
1 : 20 12
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
DETAIL KOLOM PRAKTIS (KP) DAN
RINGBALK (RB)SKALA 1:10
DETAIL KOLOM PIPA GALVANIS (KG)
SKALA 1:10
DETAIL PONDASI MENERUSSKALA 1:20
DETAIL PONDASI BETON SETEMPATSKALA 1:20
RB
KG
SL
RB RB
SL
4 Ø 10 mm
Ø 6 - 150 mm
20 15
113
25
7
50
30 30
PLESTERAN t = 4 cm
LT. KERAMIK 30/30
URUGAN PASIR t. 10 cm DIPADATKAN
SLOOF BETON 15/25
2 Ø 10 mm
Ø 6 - 150 mm
URUGAN TANAH PENINGGIAN LANTAI
DIPADATKAN
PAVING MENYESUAIKAN EKSISTING KW. 1
NATURAL
URUGAN PASIR t. 10 cm DIPADATKAN
PAS. TRANSRAM
AANSTAMPING
URUGAN PASIR t. 10 cm DIPADATKAN
URUGAN PASIR t. 10 cm DIPADATKAN
+ 0.00
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
LT. KERAMIK 30/30
URUGAN PASIR t. 10 cm DIPADATKAN
SLOOF BETON 15/25
PONDASI BATU KALI 1:4 URUGAN TANAH PENINGGIAN LANTAI DIPADATKAN
2 Ø 10 mm
Ø 6 - 150 mm
URUGAN TANAH PENINGGIAN LANTAI
DIPADATKAN
DETAIL SLOOF (SL)
4Ø12mm 2Ø16mm
Ø8mm-150
SKALA 1:10
4 Ø 12 mm
Ø 12 - 150 mm
10
15
80
8
10
8
25
15
55
30
30 7,5 15
105
42
8
17
38
1041
45
30
45
45 30 45
45 30 45
120
15
180
70
+ 0.00
3 Ø 12 mm
Ø 8 - 150 mm
Ø 12 - 150 mm
LANTAI KERJA BETON t = 5 cm
4Ø10mm
Ø6mm-150
V E R TE C T 2010
C.1 3
105
20
5
PLESTERAN t = 4 cm
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DETAIL PONDASI
1 : 20 12
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
TIANG PIPA GALVANIS Ø 8" FIN. CAT DUCO
DETAIL KOLOM PRAKTIS (KP) DAN
RINGBALK (RB)SKALA 1:10
DETAIL KOLOM PIPA GALVANIS (KG)
SKALA 1:10
DETAIL PONDASI MENERUSSKALA 1:20
DETAIL PONDASI BETON SETEMPATSKALA 1:20
RB
KG
SL
RB RB
SL
4 Ø 10 mm
Ø 6 - 150 mm
2015
113 25
7
50
3030
PLESTER
AN
t =
4 cm
LT. KER
AM
IK 30/30
URU
GAN
PASIR
t. 10 cm
DIPA
DATK
AN
SLO
OF B
ETON
15/25
2 Ø 10 m
m
Ø 6 - 150 m
m
URU
GAN
TAN
AH
PEN
ING
GIA
N LA
NTA
I D
IPAD
ATK
AN
PAVIN
G M
ENYES
UAIK
AN
EK
SIS
TING
KW
. 1 N
ATU
RAL
URU
GAN
PASIR
t. 10 cm
D
IPAD
ATK
AN
PAS. TR
AN
SRAM
AAN
STA
MPIN
G
URU
GAN
PASIR
t. 10 cm
DIPA
DATK
AN
URU
GAN
PASIR
t. 10 cm
DIPA
DATK
AN
+ 0.00
TIAN
G PIPA
GALV
AN
IS Ø
8" FIN
. CAT D
UCO
LT. KER
AM
IK 30/30
URU
GAN
PASIR
t. 10 cm
DIPA
DATK
AN
SLO
OF B
ETON
15/25
PON
DASI B
ATU
KALI 1:4
URU
GAN
TAN
AH
PENIN
GG
IAN
LA
NTA
I DIPA
DATK
AN
2 Ø 10 m
m
Ø 6 - 150 m
m
URU
GAN
TAN
AH
PEN
ING
GIA
N LA
NTA
I D
IPAD
ATK
AN
DETA
IL SLO
OF (S
L)
4Ø12m
m2Ø
16mm
Ø8m
m-150
SKALA
1:10
4 Ø 12 m
m
Ø 12 - 150 m
m
10 15 80 8 10 8 25 15 5 5
30 307,5
15
105 42 8 17 38 10 4 1
45
3045
4530
45
4530
45
120
15
180 70
+ 0.00
3 Ø 12 m
m
Ø 8 - 150 m
m
Ø 12 - 150 m
m
LAN
TAI K
ERJA
BETO
N
t = 5 cm
4Ø10m
m
Ø6m
m-150
VE
RTE
CT 2010
C.13
10 5 20 5
PLESTER
AN
t = 4 cm
PERENC
AN
AA
N PEM
BAN
GUN
AN
HA
LTE BUS RAPID TRA
NSIT (BRT)
TRAN
S MUSI PA
LEMBA
NG
PE
JAB
AT P
EM
BU
AT K
OM
ITME
N
JAS
A K
ON
SU
LTAN
SI P
ER
EN
CA
NA
AN
PE
MB
AN
GU
NA
N H
ALTE
B
US
RA
PID
TRA
NS
IT (BR
T) TRA
NS
MU
SI TA
2010D
INA
S P
ER
HU
BU
NG
AN
KO
TA P
ALE
MB
AN
G
DIS
ETUJU
I
AS
ISTE
N P
ER
EN
CA
NA
AN
PE
MB
AN
GU
NA
N H
ALTE
B
US
RA
PID
TRA
NS
IT (BR
T) TRA
NS
MU
SI TA
2010 D
PU
CIP
TA K
AR
YA
DA
N P
ER
UM
AH
AN
KO
TA P
ALE
MB
AN
G
NO
UR
AIAN
PA
RAF
MEN
GE
TAH
UI/M
EN
YETU
JUI
CATATAN
: PE
JAB
AT P
ELA
KS
AN
A TE
KN
IS K
EG
IATA
N
JAS
A K
ON
SU
LTAN
SI P
ER
EN
CA
NA
AN
PE
MB
AN
GU
NA
N H
ALTE
B
US
RA
PID
TRA
NS
IT (BR
T) TRA
NS
MU
SI TA
2010
DETA
IL PON
DA
SI
1 : 2012
DIP
ER
IKS
A/D
ITELITI
DIG
AMBAR
DIR
EN
CAN
AD
IRE
KTU
R
PE
NA
NG
GU
NG
JAW
AB REN
CAN
A
KO
NSU
LTAN P
EREN
CA
NA
UN
IT KER
JA
SU
MBE
R D
AN
A
PE
KE
RJAAN
:
SK
ALA
NO
.GA
MBAR
KO
DE
GAM
BAR
JUD
UL G
AMBAR
:
AR
S
PEMER
INTA
H K
OTA
PALEM
BA
NG
DIN
AS PER
HU
BU
NG
AN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APB
D K
OTA
PALEM
BA
NG
TAH
UN
AN
GG
AR
AN
2010
TIAN
G PIPA
G
ALV
AN
IS Ø
8" FIN
. CAT D
UCO
DETA
IL KO
LOM
PR
AKTIS
(KP) D
AN
RIN
GBALK
(RB)
SKALA
1:10
DETA
IL KO
LOM
PIPA
GALV
AN
IS (K
G)
SKALA
1:10
DETA
IL PON
DASI M
ENER
US
SKALA
1:20
DETA
IL PON
DASI B
ETON
SETEM
PAT
SKALA
1:20
RB
KG
SL
RB
RB
SL
4 Ø 10 m
m
Ø 6 - 150 m
m
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA ATAP
1 : 75 13
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
15 200 200
315 95
225 150 150 150 150 610
1850
95 585
1850
1
2+70,00
+25,00
+25,00
+25,00
33
RENCANA POLA LANTAISKALA 1:75
1
2
3
PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL
LT. KERAMIK 30/30
LT. KERAMIK TEKSTUR 30/30
PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
RENCANA RANGKA ATAPSKALA 1:75
RENCANA RANGKA ATAPSKALA 1:75
V E R TE C T 2010
490 60 680 370 150
120
210
550 780 370 150
120
95
115
50 50
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA ATAP
1 : 75 13
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
15 200 200
315 95
225 150 150 150 150 610
1850
95 585
1850
1
2+70,00
+25,00
+25,00
+25,00
33
RENCANA POLA LANTAISKALA 1:75
1
2
3
PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL
LT. KERAMIK 30/30
LT. KERAMIK TEKSTUR 30/30
PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
RENCANA RANGKA ATAPSKALA 1:75
RENCANA RANGKA ATAPSKALA 1:75
V E R TE C T 2010
490 60 680 370 150
120
210
550 780 370 150
120
95
115
50 50
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA ATAP
1 : 75 13
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
15 200 200
315 95
225 150 150 150 150 610
1850
95 585
1850
1
2+70,00
+25,00
+25,00
+25,00
33
RENCANA POLA LANTAISKALA 1:75
1
2
3
PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL
LT. KERAMIK 30/30
LT. KERAMIK TEKSTUR 30/30
PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
RENCANA RANGKA ATAPSKALA 1:75
RENCANA RANGKA ATAPSKALA 1:75
V E R TE C T 2010
490 60 680 370 150
120
210
550 780 370 150
120
95
115
50 50
150 150 150 150 610
1850
95 585
1850
V E R TE C T 2010
30 360 7,5
55
110
37,5
60 60
15 200 200
315 95
225
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA POLA LANTAI
1 : 75 14
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
457,51001501202407062,59060372,5
530
40
60
30
15 15
60
60
10
110
60
30
15
30 90 30 237,5 60 6012,5
30 150 30 90 120 90 30 150 10 120
60 15
15
UBIN PENGARAH BERMOTIF GARIS-GARIS 30/30 cm
UBIN PERINGATAN BERMOTIF BULAT 30/30 cm
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
RENCANA RANGKA ATAPSKALA 1:75
1
2+70,00
+25,00
+25,00
+25,00
3
RENCANA POLA LANTAISKALA 1:751
2
3
PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL
LT. KERAMIK 30/30 cm
LT. KERAMIK TEKSTUR 30/30
PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 4" FIN. CAT DUCO
150 150 150 150 610
1850
95 585
1850
V E R TE C T 2010
30 360 7,5
55
110
37,5
60 60
15 200 200
315 95
225
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA POLA LANTAI
1 : 75 14
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
457,51001501202407062,59060372,5
530
40
60
30
15 15
60
60
10
110
60
30
15
30 90 30 237,5 60 6012,5
30 150 30 90 120 90 30 150 10 120
60 15
15
UBIN PENGARAH BERMOTIF GARIS-GARIS 30/30 cm
UBIN PERINGATAN BERMOTIF BULAT 30/30 cm
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
RENCANA RANGKA ATAPSKALA 1:75
1
2+70,00
+25,00
+25,00
+25,00
3
RENCANA POLA LANTAISKALA 1:751
2
3
PAVING MENYESUAIKAN EKSISTING KW. 1 NATURAL
LT. KERAMIK 30/30 cm
LT. KERAMIK TEKSTUR 30/30
PIPA GALVANIS Ø 8" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 4" FIN. CAT DUCO
172,15
60 300
15 15 49 17 9 24 17 9 24 17 9 1717 9 24 17 9 24 179
24 17 9 10
15 90 50 50 50 50 50 50 25
15
15 127,15 102,85 55 15
57
58
255,79
31213
10 5
90
90
5
13
20
50
8
20
52
175,79
151525307530
57
255,79
5 200 200 5
410
430
20
50
8
20
52
100
7
70
80
107
V E R TE C T 2010
C.1 3
15 30
PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI PALEMBANG
PEJABAT PEMBUAT KOMITMEN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010DINAS PERHUBUNGAN KOTA PALEMBANG
DISETUJUI
ASISTEN PERENCANAAN PEMBANGUNAN HALTE BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
DPU CIPTA KARYA DAN PERUMAHAN KOTA PALEMBANG
NO URAIAN PARAF
MENGETAHUI/MENYETUJUI
CATATAN :
PEJABAT PELAKSANA TEKNIS KEGIATAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN HALTE
BUS RAPID TRANSIT (BRT) TRANS MUSI TA 2010
RENCANA PARKIR SEPEDA
1 : 30 15
DIPERIKSA/DITELITI
DIGAMBARDIRENCANADIREKTUR
PENANGGUNG JAWAB RENCANA
KONSULTAN PERENCANA
UNIT KERJA
SUMBER DANA
PEKERJAAN :
SKALA NO.GAMBAR KODE GAMBAR
JUDUL GAMBAR :
ARS
PEMERINTAH KOTA PALEMBANGDINAS PERHUBUNGAN
Jl. Pangeran Sido Ing Lautan 35 Ilir Telp. 442547 Palembang 30146
APBD KOTA PALEMBANGTAHUN ANGGARAN 2010
50 50 21
F
50 45 50 50 45
RENCANA PARKIR SEPEDASKALA 1:30
24
15 15 15 15 15 1549 50 50 21 49
60°
PAVING MENYESUAIKAN EKSISTING KW. 1
NATURAL
URUGAN PASIR t. 10 cm DIPADATKAN
KANSTEIN
PONDASI BETON TUMBUK
1 : 3 : 5
PIPAGALVANIS Ø 4" FIN. CAT DUCO
ATAP ONDULINEWARNA BIRU
PIPA GALVANIS Ø 1,5" FIN. CAT DUCO
ANGKUR BESIØ 10mm
80
PIPA GALVANIS Ø 2,5" FIN. CAT DUCO
PIPA GALVANIS Ø 11
4" FIN. CAT DUCO
15
30
15
110°
PIPA GALVANIS Ø 2 12" FIN. CAT DUCO
PIPA GALVANIS Ø 11
4" FIN. CAT DUCO
PIPA GALVANIS Ø 4" FIN. CAT DUCO
PIPA GALVANIS Ø 2 12" FIN. CAT DUCO
URUGAN PASIR t. 10 cm DIPADATKAN
PONDASI BETON TUMBUK1 : 3 : 5
ANGKUR BESIØ 10mm
E E
POTONGAN E - ERENCANA PARKIR SEPEDA
SKALA 1:30
POTONGAN F - FRENCANA PARKIR SEPEDA
SKALA 1:30
F