ABOUT SINGRAULISingrauli is the 50th district of Madhya Pradesh State of Union Republic India. It was granted districtstatus on 24th May 2008, with its headquarter at Waidhan to fullfill the aspirations of people of thisplace. It has been formed after dividing it from Sidhi district. Singrauli has three tehsils namely 1. Singrauli2. Deosar 3. Chitarangi. It has three develovment blocks by the same name. Singrauli Town is a municipalcorporation with a population of about 2 lakhs. The estimated population is about 11 lakhs. Singrauli isfast emerging as an energy hub of India , especially for electric power and coal and therefore locally it is alsocalled Urjanchal ( a Hindi word which means land of energy ). The total installed capacity of all powerplants at Singaruli is around 10% of total installed capacity of India.

The area in the eastern part of the state of MP and the adjoining southern part of Sonebhadra Distt. in thestate of UP is collectively known as Singrauli. Singrauli is emerging as India's Energy Capital, the placeearlier known as Shringavali, named after the sage Shringi, was once upon a time covered with dense andunnavigable forests and inhabited by wild animals. The place was considered so treacherous that it wasused by the Kings of Rewa State, who ruled the area till 1947, as an open air prison for detaining errantcivilians and officers.

Just two generations ago, small holders were tending their parcels of land here, and the original inhabitantswere gathering honey and herbs in the forest. In the late fifties, a large scale dam banked up the water of theRiver Rihand. The dam known as Govind Vallabh Pant Sagar, was inaugurated by Pt. Jawahar LalNehru in 1962. Later, rich coal deposits spread over an area of 2200 km² in the state of M.P. and U.P.(southern part of Sonebhadra Distt.) were discovered close to the artificial lake that could be used togenerate electricity.

In this district, Northern Coal Fields (NCL) is spread over a vast area with a production of about 15-20percent of total coal in the country. There are 11 Open cast mines of the NCL which supplies coal to around8-9 Power Projects spread in and around Singrauli both in Madhya Pradesh and Uttar Pradesh. VindhyaNagar NTPC is the single largest Super Thermal Power Project of the country with a power production of3260MW. NTPC Shaktinagar is adjoining this place with another 2000MW power capability. NTPCRihand is nearby with another 2000MW capacity. Apart from these power projects there are at least 5Power Projects of the State Government of UP with a combined capacity of about 4500MW.

Singrauli is going to become the "Power capital" of the Country with new power projects being set up in nearfuture. Apart from Power Projects 9 Open cast coal mines are also going to start production within 3 years.Land Acquisition for all these Power Projects are all most over and these power projects will getcommissioned by 2011-12. Reliance, ESSAR, Hindalco, Jaypee and DB Power are establishing theirpower projects here. Hindalco is establishing its" Aluminium Smelter" Plant under the SEZ Act and thisunit is going to be a total Export Oriented Unit. The Combined Investment of all these projects is going tobe around 1 lakh Crores.

Singrauli with its natural resourses and enabling environment by the State Government and Districtadministration has become most suitable destination for investment. The Chief Minister of M.P. ShriShivraj Singh Chauhan dreams to develop Singrauli on the lines of Singapore

Page 3: Destination Singrauli

De tination

ingrauliThe brochure illustrates various projects that are

taking shape in Singrauli

"I want to develop Singrauli into another Singapore."

- Shivraj Singh ChauhanChief Minister, Madhya Pradesh

Page 4: Destination Singrauli

District Collectorate, Singrauli

Page 5: Destination Singrauli

Destination Singrauli

3

Anil Dhirubhai Ambani Group

ReLI NCeSasan Ultra Mega Power Project (S.P.L.)Company : Reliance (Anil Dhirubhai Ambani Group-ADAG)

1. Reliance Power Ltd. is executing 3960 MW Sasan Ultra

Mega Power Project (UMPP) through its 100% wholly

owned subsidiary Sasan Power Ltd. (SPL) at village

Sasan, District Singrauli, Madhya Pradesh.

2. Sasan UMPP has been allotted 3 captive coal mines–

namely Moher, Moher-Amlohri extention and

Chhattrasal. These are the largest mines in the country

in terms of volume handled. Sasan UMPP is the biggest

integrated coal mine cum power project in India.

3. Sasan UMPP is a project of national importance and

would benefit 35 crore people in 7 states of India. State

of Madhya Pradesh is the largest beneficiary with

1,500 MW (37.5% of total capacity) allocated to the

state.

4. The project is based on environment friendly Super

Critical Technology and has far less impact on

environment than conventional coal based plants. The

plant also has very high efficiency resulting in lower

coal consumption thereby saving precious natural

resource– coal.

5. SPL has advanced commissioning schedule of Sasan

UMPP from the schedule in PPA.

6. Project has achieved Financial Closure. This is the

largest debt financing on project finance basis in India.

Within an estimated investment of over Rs 19,500

crores, project would play a significant role in

economic development and industrialization in

Madhya Pradesh. The project would generate several

direct and indirect employment opportunities

resulting in social and economic upliftment of local

community.

7. Environment clearance and final forest clearance for

power plant and Moher & Moher– Amlohri extention

coal mines have been obtained. In compliance to

stipulated conditions by MoEF, Environment

Monitoring during construction phase is in progress.

8. Engineering works are complete. Internationally

reputed consultants such as Black & Veatch, Toshiba,

STUP, HOK etc. are working on the project. Main power

plant equipment is being supplied by Shanghai Electric

Corporation (SEC), one of the largest power plant

equipment manufacturers in the world.

Page 6: Destination Singrauli

Destination Singrauli

4

9. Construction at site is in full swing. Site enabling works have

been completed. TG Column erection, permanent store have

completed while boiler & bunker erection, Power House

Building (PHB), TG Deck shuttering is in progress. BOP civil

works are also in advanced stage.

10. SPL is committed towards the social & economic development

of project affected & surrounding villages. As a part of its

proactive approach towards welfare of local community, SPL

started a mobile medical facility including an ambulance van

to provide free medical services to the villagers, much before

construction work had commenced at site.

11. To relocate affected families, SPL has developed a R&R village

“Surya Vihar”, spread over an area of 368.97 acres, with all

basic facilities such as School, Health Care Centre, Market

Place, Panchayat Bhavan, Temple, roads, drinking water,

sanitation and electrification, etc. The SPL R&R package

provides benefits better than NRRP & MP Model R&R Policy

and ensures sustainable development.

12. SPL has constructed ready to move-in houses on residential

plots of 5400 sq feet. The house has basic amenities such as

toilet, kitchen, smokeless chulha, electrification, etc. About

450 families have got their House/Plot allotment done.

13. School in R&R village “Surya Vihar”, run by DAV organization,

is providing free education & stipend to the wards of displaced

families. Presently, 765 students are studying in R&R village

school.

14. Free medical treatment & medicines is being provided at the

health care centre at Surya Vihar, having functional

laboratory. More than 5000 patients have benefitted from the

hospital.

15. Trainings for skill development such as CIDC training and

tailoring for women have been organized. 12 Cooperative

Societies have also been formed by the PAPs who are being

allotted works by SPL and its agencies. The cumulative value

of works allotted till date is more than Rs 3 Crores.

16. Monthly old age pension & destitute pension is being provided which is in addition to the old age pension given

by Government. Presently, 200 persons are receiving old age pension from SPL.

17. Weekly “Bazaar”, is being organized at “Surya Vihar” in the open built up shops constructed for this purpose by

SPL in which villagers from nearby places also participate.

Reliance AirportAllotment of Govt. land for Airport ( Phase - I) has been done. Land Acquisition for Airport is

under progress. This airport will be fully owned by Reliance and will be ready for operation in near future.

Reliance (Phase -II)

Page 7: Destination Singrauli

Destination Singrauli

5

Moher & Moher Amlohri ExtensionCoal BlockCompany : Reliance (Anil Dhirubhai Ambani Group-ADAG)

Anil Dhirubhai Ambani Group

ReLI NCe

A BRIEF NOTE OF MOHER AND MOHER-AMLOHRI EXTENSTION COAL BLOCK (20 MTPA)

INTRODUCTION

EXECUTIVE SUMMARY

Moher and Moher-Amlohri Extension coal blocks under the command area of Northern Coalfields Ltd havebeen allocated to Sasan Power Ltd by Ministry of Coal vide letter no. 13016/4/2006-CA-I dated 13thSeptember 2006. In terms of the letter, the Govt. decided on the basis of competitive bidding about thedeveloper of the Sasan UMPP and accordingly Sasan Power Limited along with the Moher and Moher-AmlohriExtension coal blocks were transferred to Reliance Power Limited on 7th August 2007. The coal produced fromthe above mines would be exclusively used for power generation by Sasan Power Limited (6X660 MW) as wellas another Power Plants belonging to Reliance Power Limited.

I) Name of the Mine : Moher &Moher-Amlohri Extension Opencast Mine

ii) Target Capacity of Mine : 20.00 Mtpa

iii) Life of the Mine : 29 years

iv) Coalfield : Singrauli Coalfield

v) Location : Singrauli District, M.P.

vi) Company : Sasan Power Limited

vii) End use of Coal : Proposed Sasan Ultra Mega Power Plant (3960 MW) and otherproposed

power plants under RPL group

viii) Grade of Coal :

ix) Geological Blocks & Reserves : a) Area : Total area- 15.39 sq.km.

(Moher-10.70 sq.km. + Moher-Amlohri -4.69 sq.km.)

b) Net Geological reserves : 575.00 MT

x) Extractable Coal Reserves : 470.43 Stripping Ratio (m3/t) : 4.03

xi) Required Excavation Capaity : Coal – 13 M m3 + OB – 78 M m3

xii) Total Land Requirement: 2240 Ha : a. Forest Land : 1198 Ha,

b. Government Land : 213.204 Ha,

c. Private Land : 776.744 Ha

xiii) Manpower Requirement : 1021 Persons

xiv) Major Equipments : 1. Dragline (43-51m3 bucket capacity/ 100 m boom length) – 2 nos.

2. Shovel : a) OB (36-38 m3) – 5 nos.

b) Coal (10 m3) – 4 nos.

Page 8: Destination Singrauli

?

?

Indraprastha Coal Block : Delhi -

Harayana Mineral Development

Corporation

Andhra Pradesh Mineral Development

Corporation Coal Block

Destination Singrauli

6

c) Miscellaneous (2-3 m3) – 2 nos.

3. Rear Dumpers: a) OB (240 T) – 30 nos.

b) Coal (100 T)

4. Drills: a) Dragline Benches (311 mm) – 2 nos.

b) Shovel Benches (250 mm) – 7 nos.

c) Coal (160 mm) – 4 nos.

5. Dozers: a) 850 HP – 5 nos.

b) 560 HP – 8 nos.

c) 450 HP – 2 nos.

The Mining Plan proposes to start South Pit first by developing a mine entry through the western side box-cut.

The volume of OB in the box-cut has been estimated as 12.65 Mm3.

The North Pit is proposed to be developed from the year-2 onward from the box-cut area located on the

western side for which 22.81 Mm3 will be excavated. Coal production starts from year-2 from the South Pit

and the same from North Pit starts from year-3.

The most suitable mining technology for the proposed opencast mine will be using a combination of

Draglines and shovel-dumper system considering the following geo-mining conditions:

Gentle gradient of Turra Seam floor, viz. 2°-3° in South Pit and 3°-5° in North-East Pit

Mining of multiple seams viz. Turra (12.30-19.30m) and Purewa (19.50-26.15 m)

Overburden cover above Purewa Seam (84.70m to 198.47m) and Parting between Turra and Purewa

Seams is in the range of 51.97m to 68.70m

Large scope of work including 20.00 Mt. of ROM coal and 78.21 Mm3 (Peak) per annum of OBR.

Shovel-dumper system for higher benches and draglines on the parting between Turra and Purewa Seams

has been proposed in the Mining Plan as this is the most suitable technology under the present geo-

mining condition.

xv) Mining Operation

xvi)Mining Technology

?

?

?

?

?

?

Other Coal Blocks(under exploration)

Page 9: Destination Singrauli

Destination Singrauli

7

Chatrasal Coal BlockCompany : Reliance ADA Group

A BRIEF NOTE OF CHHATRASAL COAL BLOCK (5 MTPA)

INTRODUCTION

LOCATION:

MINING STATUS:

Salient Mining features and post mining Activities :

Chhattrasal coal block has been allocated to Sasan Power Ltd by Ministry of Coal vide letter no. 13016/4/2006-CA-Idated 26 Oct'2006. In terms of the letter, the Govt. decided on the basis of competitive bidding about thedeveloper of the Sasan UMPP and accordingly Sasan Power Limited along with the Chhattrasal coal block wastransferred to Reliance Power Limited on 7th August 2007. The coal produced from the above mines would beexclusively used for power generation by Sasan Power Limited (6X660 MW) as well as another Power Plantsbelonging to Reliance Power Limited.

Chhattrasal Block is located in between Amelia Block, on the north and Mahan Block, on the south, in theeasternmost part of Main basin, Singrauli Coalfield. It falls in between latitudes 24o 2' 41'' & 24o 4' 26” North andlongitudes 82o 22' 34'' & 82o 26' 15” East and is covered by Survey of India toposheet No. 63L/8 on RF 1:50,000(2cm=1km). Administratively, it is under the jurisdiction of Singrauli (Waidhan) tehsil, District Sidhi of MadhyaPradesh State.

The block is free from mining activity. Nearby OCPs are located about 20 Km north-west of the block in Moher sub-basin.

Total 10 coal seams, including splits section of Seam III & V namely Seam I, II, III Bottom, III Top, IV, V Bottom, V Top,VI, VII and VIII in ascending order exist in the block.

Open Cast proposition are for seams VII and VIII

Seam VII is the thickest and most potential seam of the block.

Life of the Project is 21 Years. Rated Production achieved on 3rd year of production.

Minable reserve: 94.80 Million Tones

1. Backfilling starts from 3rd year of mining operations

2. Total 88.82 Mm3 (16%) is proposed to be dumped in external dump and balance 461.66 Mm3 (84%) in

internal dump

3. About 5% of the total mine area will be left as mine void.

4. Maximum depth of water in the left out void is less than 40m.

This water reservoir will improve the water balance chart of the area and used for irrigation purposes.

?

?

Anil Dhirubhai Ambani Group

ReLI NCe

Page 10: Destination Singrauli

Destination Singrauli

8

Chitrangi Power ProjectCompany : Reliance (Anil Dhirubhai Ambani Group-ADAG)

Anil Dhirubhai Ambani Group

ReLI NCe

Reliance Power is executing the Chitrangi Project on a fast track

mode. The following progress has been made towards project

Implementation.

The Detailed Project Report (DPR) for the 6 × 660 MW

Thermal Power Project has been finalized.

All the major engineering/other studies have been completed.

A Memorandum of Understanding (MoU) was signed

with the Government of Madhya Pradesh (GoMP) on

20TH Sept 2007 to set up the 3960 MW thermal Power

Plant.

A State Support Agreement (SSA) was also signed with

GoMP on 26TH October 2007 to facilitate project

implementation.

Section 41 Agreement and detailed R & R Agreement

(Over and above Model R & R Policy 2002) was signed on

10/08/2010.

Possession of 1353 Ares of Government Land obtained.

Advance Possession of 1159. Acres of Government land

received from GoMP Dated 11/10/2010

Acquisition of 341.76 Acres of Pvt Land is in progress

Section 9(1) Public Hearing for Khokhwa Village held on

25/11/2010. Gazette Notification of Section 6 of Villages

Jhamtihewa, Badgad and Bagaiya done on 29/10/2010.

1. Engineering/Other Studies :

2. Memorandum of understanding (MoU)/ State Support

Agreement (SSA) :

3. Land :

F

F

F

F

F

F

F

“Nishulk Medical Camp” organized at

Khokhwa Village on 27/12/2009

“Inauguration of Ambulance Service 24/07/10” Daily

Medical Camps/Ambulance service at Villages

Khokhwa, Jhamtihewa, Badgad,

Bagaiya & Kapurdehi.

Area Grading and Leveling for BTG Area in

Khokhwa Village started in Dec 2010.

1. Topography Survey Completed

2. Preliminary Geotechnical Investigation Completed

3. Water Intake Study Completed

4. Preliminary Transportation Study Completed

5. Area Drainage Study Completed

6. Socio Economic Study Completed

Sl. No. Study Status

Page 11: Destination Singrauli

Plotting of R & R Site started. Construction of Approach Road toR & R Village in Progress

Public Information Centre (PIC) activated in Khokhwa forDissemination of Information/Guidance to PAP's/PAF'sregarding R & R Benefits

CIDC Training: Mason Training for villagers already in Progressat Khokhwa, Jhamtihewa & Kapurdehi.

Site Office(in Porta Cabins) Functional at Khokhwa Village

Construction of Helipad Completed at Khokhwa Site.

Environmental Clearance obtained on 28/05/2010 for 3960MW Power Generation Project

Consent to Establish obtained from MPPCB on 30/09/2010

In Principle Approval obtained from GoMP for allocation of 0.14MAF of water in Jan 09

Water Allocation for the project from Gopad River has beenapproved by the district water Committee and therecommendation forwarded to the state level committee.

4. Resettlement and Rehabilitation :

5. CSR :

7. Environmental Clearance :

8. Water :

F

F

F

F

F

F

F

F

F

Boundary wall work started in Nov 2010 inprogress at Khokhwa Village

Construction of Cement Store/ WeighBridge in Progress at Site

Permission granted by Ministry of Coal (MoC) on 13 May 2009 for use of coal from Moher, Moher Amlohri andChatrasal Coal Blocks.

EPC Contractor has been selected.

International Competitive Bidding (ICB) was conducted for selection of EPC Contractor.

Application has been filed for Construction Power to MPPKVVCL for Supply of 5 MVA on 33KV

Application has been filed with Power Grid Corporation of India Ltd for power Evacuation and long term openaccess.

Letter of Intent (LoI) obtained from Madhya Pradesh Power Trading Company Limited (MPPTCL) for 1241 MWpower from the project in May 08.

The Information Memorandum for Financing Launched in Sept 2009

Rs 5000 Crore of Loan Syndication already tied up.

A Dedicated Team of 50 Professionals is at present posted at Site

A team of more than 150 Professionals at Corporate Office Mumbai is working for the project. The Plot Planhas been finalized

9. Fuel Linkage :

10. EPC Contractor :

11. Construction Power :

12. Power Evacuation and Long Term Open Access :

13. Sale of Power :

14. Financing :

15. Organizational Setup :

F

F

F

F

F

F

F

F

F

Destination Singrauli

9

Page 12: Destination Singrauli

ESSAR GROUP

ESSAR POWER LTD

The Essar Group is a multinational conglomerate and a leading player in the

sectors of Steel, Energy, Power, Communications, Shipping Ports & Logistics,

Construction, and Mining & Minerals. With operations in more than 20 countries

across five continents, the Group employees 60,000 people, with revenues of

about USD 15 billion in FY08-09.

Essar Power currently operates five power plants with a combined capacity of

1,200 MW in three locations across India which is being expanded to 6000MW.This

includes two gas-based plants and one liquid fuel based plant in Hazira, a co-

generation plant in Vadinar and a coal-based plant in Visakhapatnam.

Essar Power has an immaculate track record of safety, and has won several safety

awards. The 515 MW Hazira plant is among the few power plants in India to receive

the ISRS (International Safety Rating System) safety rating, which has also helped

the company win the very elite Sword of Honour, the British Safety Council's

highest award. Essar Power is committed to reducing emissions from its plants and

earning carbon credits. The 500 MW combined cycle power plant at Hazira is

eligible for Certified Emission Reductions (CERs) under the Kyoto Protocol's Clean

Development Mechanism (CDM).

Essar Power is today driven by a team of highly skilled technical experts who area

amongst the best in the country. Essar has built a competent and experienced

team to construct, manage and operate its state-of-the-art power plants.

ESSAR POWER M.P. LTD

• As part of ambitious plans of expanding its Power Business, Company is setting

up a 2000 MW coal based Thermal Power Plant at villages Karsualal,

Bandhora, Khairahi & Nagwa Tehsil & District Singrauli M.P.

• MoU for 2000 MW has been signed between EPMPL & Govt. of M.P. on

17.01.2007.

• In the Ist phase ,ESSAR POWER M.P. LTD. (EPMPL) a part of ESSAR POWER is

setting up Rs 4860 Crore ,1200 MW ( 2x 600 MW) pithead Coal based Thermal

Power Plant at 4 Villages namely Karsualal, Bandhora, Khairahi & Nagwa in

Singrauli Tehsil of Singrauli Distt. in Madhya Pradesh.

• Coal Linkage- Mahan Coal Block located at 4 Km distance from site allotted to

Joint venture Company Mahan Coal Ltd formed between EPMPL & Hindalco.

• All statutory permits & clearances have been received for the project,

construction activities are progressing according to schedule Target for

completion is 2011.

POWER

Mahan Super Thermal Power ProjectCompany : Essar Group

Destination Singrauli

10

Page 13: Destination Singrauli

11

• Essar has already placed orders for all the long lead items for all its projects with

reputed vendors and the supply of plant and equipments has also begun.

• Evacuation of power will be through dedicated transmission facilities under

implementation through Essar Power Transmission Limited for which the open

access approval has been received.

• Final Awards (LA) for all 4 villages namely Nagwa, Bandhoura, Khairahi and

Karsualal Village are issued.

• Forest Clearance is available.

• Govt. Land – Total land available with the company.

• Financial Closure achieved in June, 2009.

• Basic Engineering 100% completed

• Detailed Engineering >90% completed. Balance is in progress.

• All equipments and materials ordered.

• Major consignments started arriving at site.

• Approx. 73000 MT of Materials received at site.

• Entire project area levelled and graded.

• Boundary wall complted.

LAND STATUS

PLANT PROGRESS

PROCUREMENT PROGRESS

CONSTRUCTION PROGRESS

Total Land in the project area 705.14 Ha. 1742.40 Acre

Private land 503.37 Ha 1243.83 Acre

Government land 185.81 Ha 459.13 Acre

Govt. Forest land 15.96 Ha 19.02 Ha

39.44 Acre 46.99 AcrePvt Revenue Forest (included in Pvt land)

LAND DETAILS & STATUS

Sr. No Detail Features

1 Project capacity (MW) 1200 MW

2 Size of Steam Turbine (MW) 600

3 Number of steam turbines 2

4 Number of Boilers 2

5 Boiler technology Sub critical

6 Condenser cooling Circulating water cooled with IDCT

CONFIGURATION OF POWER PLANT

Destination Singrauli

Page 14: Destination Singrauli

12

Destination Singrauli

• Sufficient Concreting facility commissioned at site.

• Administration building completed. Open and Closed storage yards completed.

• Construction at al fronts is going on all full swing.

Unit # 1 – Boiler drum lifted on 20.06.10 .Generator placed on foundation.

Unit # 2 – Boiler drum lifting on 10.06.11.

• Other Construction activities going on at fast pace at all the fronts. As can beseen from annexed photographs.

• For the first time in the history of country, Essar has gone for providingSustenance/ Livelihood Allowance (Monthly Bhatta) to each male member inthe age group 18-50 yrs @ [Min Industrial wages + Rs 10] calculated for 30 daysup to age of 58 years .Present rate is Rs 5190/- per month.

• Free education to children of PAP's up to Class -10.

• Development of Medical centre with well qualified Doctor & provision ofAmbulance Services.

• Difference between Land rate payable as per Land Acquisition Act -1894 &Guidelines for land Rate for the Year - 2008-09 to all land losers.

• PAP's are being provided plots of size 90 X 60 ft= 5400 sq ft (502 sq. mtr)

• Priority to be given the PAP's in jobs based on their skills & qualification.

• Provision of reservation for PAP's in Allotment of shops in R&R colony.

• All PAP's at R & R colony are being provided Transit accommodation for theperiod of construction of their houses.

• Most of their construction materials are being transported by EPMPL from theirexisting house to their respective plots.

• Construction of infrastructure facilities in R & R colony - Roads, Sanitation,Sewage system, High School, Community centre / Panchayat hall, CooperativeStores / Market, Religious Place, Health Centre, Grazing ground, Cattle sheds,Cremation & Burial ground.

• Summary of Sustenance and pension allowance under R & R Benefits has beendescribed below-

SALIENTFEATURESANDACHIEVEMENTSOFR&RPOLICYAGREEDWITHSTATEGOVT.

ACHIEVEMENTS UNDER R & R -

DETAILS OF R & R BENEFITS GIVEN

PAPs Bandhora Khairahi Nagwa Total

Allowance 213 92 138 443

Pension 19 5 15 39

Widow Pension 4 1 0 5

Total 236 98 153 487

House Grant (Const) 260 48 152 460

Transportation Grant 255 30 135 420

Page 15: Destination Singrauli

Destination Singrauli

13

• 722 children from PAFs communities are getting education in Essar aidedSaraswati Shishu Mandir School at Nand Vihar Colony, Nagwa, and the schoolhas been commenced since July 2010.

• 603 plots have been allotted to displaced PAFs.

• Under priority of project affected perosns' engagement through pettycontractor, 476 persons are working in different construction activities of theplant.

• Roads-15 km of roads developed.

• Water - 60 no. of hand pumps install and 10 nos. are in progress.

• Sanitation - 15 km of drain developed.

• School - School building's construction is completed & started functioning fromIst July 2010 with strength of approx 700 students.

• Community centre / Panchayat hall - under construction.

• Cooperative stores / Market - under construction.

• Religious Place - under construction

• Health center- made available in Visthapit Colony and construction of hospital isin progress.

• Grazing ground -made available

• Cattle sheds - constructed.

• Cremation & Burial ground - under construction

• Separate community Bath Rooms & Toilets have been provided for Ladies &Gents.

• Entertainment Room provided with Colour TV & Dish TV connection.

• Cultural programs are being organised in Visthapit Colony.

• Electrification of Rehabilitation Nand Vihar Colony is almost completed.

• Free education to children of PAP's up to Class -10. One building for juniorsection has completed & started functioning from Ist July 2010 with strength ofapprox 300 students. Now 722 students have admitted in junior classes andschool operates in two shifts with additional teachers and school staff.

• Under Free Computer Training to Project affected youth, 240 students havebenefitted so far.

• Free Medical facility by Site clinic and Ambulance facility for PAP's

• Under skill improvement of project affected communities 105 youths have gotfree ITI training.

• School Stationary , Bag & Water Bottle distribution (2500 nos.) to all school goingchildren in the project areas

• Blanket distribution to every PAP on vacation of his residential accommodation.

• 2 schools' buildings have constructed in lieu of previous school buildings hadacquired due to project area & simultaneously 1 Aganwadi is being constructeddue to affected by project. All three buildings are situated in village Bandhoura.

• 6 plots had allotted to Ganiyari blast victims on the request of DistrictAdministration.

• As on date 13 cooperative societies of PAP's (324 nos.) have been registered &allotted work without tendering amounting to Rs. 90 lacs.

• 3 special camps have been organized for Khairahi & Nagwa village for taking careof Heat stroke patients.

CSR Initiatives by EPMPL

Page 16: Destination Singrauli

Mahan Coal LimitedCompany : Joint venture of Essar & Hindalco

MAHAN COAL LIMITED

(JV of M/s. ESSAR Power Ltd. & M/s Hindalco Industries Ltd.)MAHAN COAL BLOCK

Location of Mahan Coal Block

Need of the Project

Mahan Coal Limited (“MCL”), a joint venture company between Hindalco Industries Limited (“HIL”) and EssarPower M.P Limited (“EPMPL”), has been granted a captive coal block (“Mahan Coal Block”) in Singaruli Districtof Madhya Pradesh, which will mine coal for the two ventured companies. The total coal reserves are about144 Million Tonnes with the grade of coal as E to F. The Mahan Coal Block is to produce 8.5 Million Tonnes ofcoal per annum by open cast mining system

Mahan coal block is located on the plateau on the eastern fringe of the Main Basin in Singrauli Coalfield, SidhiDistrict, Madhya Pradesh. Almost entire ML area (1182.35 ha) falls under Mohanban Reserve Forest. Part ofrevenue land (17.65 ha) of Amelia and Budher villages of Waidhan block, Singrauli district falls under theLease area. The block geographically extends from Longitude 82o 22' 30” to 82o 24' 49” E and Latitude 24o 00'28" to 24o 02' 32" N and the entire lease area falls in Survey of India topo sheet-63-L/8. The block is about 35-km from WAIDHAN , which is the district head quarter and is approachable from Rajmilan village and Parsonacrossing. It is also approachable from Singrauli township and NCL (HQ) via Waidhan and Rajmilan by about 60-km long fair weather road. A fair weather approach road from Rajmilan village passes through the northernpart of the block and leads to Gajrabahra railway station, which is about 6-km from the western limits of theblock. Nearest major town is Waidhan located about 35-km eastwards.

The activities in both these Power Plants are in very advanced stage and the plants are scheduled to becommissioned in middle of the year 2010. The coal project is to be worked by “State of Art Opencast MiningTechnology” to keep the mining costs to absolute minimum. The ultimate capacity of the mine is 8.5 MillionTonnes per annum, which is required to be achieved by October 2011. The corresponding Overburden (OB)removal shall be around 50 Million Cubic Meters per annum, which has to be achieved from the second yearof operation.

The Mahan Coal Mining Project is proposed to cater to requirement of the twoThermalPower Plants of M/sEssar Power Ltd. and M/S Hindalco Industries Ltd for almost 15 years.

is proposing to set-up a greenfield integrated aluminum complex under the nameof Mahan Aluminium with a production capacity 3,25,000 TPA (primary aluminium metal) near Bargawan,Deosar tehsil in Sidhi district, Madhya Pradesh. To cater to the demand of electricity on continuous basis, a650-MW coal based captive power plant is also proposed in the complex. The coal requirement for the projectis about 3.5-MTPA.

is proposing to set-up 1200-MW thermal power plant, agreenfield project, under the name ofEssar Power (MP) Limited near Karsua village, Waidhan block, Singrauli district, Madhya Pradesh. The coalrequirement for the project is about 5.0-MTPA.

Hindalco Industries Limited

ESSAR group

14

Destination Singrauli

Page 17: Destination Singrauli

MAHAN ALUMINIUM PROJECTHindalco Greenfield Venture in M.P.

Company : Hindalco (Aditya Birla Group)

PROJECT SNAPSHOT :

MOU signed with Government of Madhya Pradesh on 23rd May 2006

Location :

Raw Materials :

Technology and Engineering :

Statutory Clearances :

Project spending :

Man Power and Vendors working at site :

Construction progress :

Near Bargawan on NH-75E

Alumina : To be sourced from captive sources in Orissa / Uttar Pradesh

Coal : 3.5 Mln Ton from Mahan Coal block & 0.5 Mln Ton from others

Water : 4,500 cu m / hr from Gopad river

Investment : Rs. 9,200 Cr

Smelter process technology licensor & basic engineering: Aluminum

Pechiney, France.

Detailed engineering –Engineers India Limited

All major clearances including environment related have been obtained.

Approval for SEZ by Ministry of Commerce, Govt. of India.

Ordered Rs. 8200 Cr. / Spent Rs. 3200 Cr.

Around 10000 people working at site.

Major Indian & international contractors like L&T, Rohan, BHEL, Solios MBE,

Simplex, Alstom, Areva, Thermax are operational at site.

Smelter : Pot line, Green Anode Plant, Gas Treatment Centre, Cast house

are under progress .

CPP : Unit 1, 2,3,4, Coal Handling Plant, Water treatment plant are under

progress.

F

F

F

F

F

F

F

F

PROGRESS :

SMELTER AREA PHOTOS

Facility Capacity (Phase-I) Start Date

Smelter 3.25 LTPA 1st Metal by July 2011

Captive Power Plant 750 MW (6×150 MW – 5W+1S) 1st Unit by May 2011

Destination Singrauli

15

Page 18: Destination Singrauli

CPP (Captive Power Plant) AREA PHOTOS :

R&R COLONY :

Ø

Ø

Ø

Ø

Ø

Total no. of houses planned: 1200 / 'ready for occupation'- 720 / Under construction - 200 / No. of PAFs residing at R&R: 300.

Rain water harvesting : three check dams constructed at R&R colony

Primary Health Centre, School & Anganawadi: Construction nearing completion.

11 KV HT power transmission line (17 KM) : Construction nearing completion.

Other infrastructure planned : Community Hall, Shops & market place, temple etc.

16

Destination Singrauli

Page 19: Destination Singrauli

CSR INITIATIVES :

Key focus areas :

Health care :

Hygiene & sanitation :

Skill enhancement training programs :

Healthcare, education, skill development,

capacity building & livelihood.

General & mobile Health Camps ongoing at all

four project affected villages as well as R&R colony. Sponsored

Family Planning Camps organized jointly with Dist. Admin.

Sanitation improvement in village schools

Distribution of utensils to children for mid day meals

Pump repairing workshop

Diesel engine mechanic workshop

Tailoring training workshops – conducted regularly at R&R

Colony

6 month long vocational training of PAPs at ITI have

commenced in Oct'10.

Formation of 30 Self Help Groups (SHG) exclusively for

women & 12 Co-operative Societies & allocation of contract

works - FirstMilkCo-operative formed in SingrauliDistrict.

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Destination Singrauli

17

Page 20: Destination Singrauli

POWERGRID, the Central Transmission Utility (CTU) of the country and

a Navratna Company operating under Ministry of Power, is engaged in

power transmission business with the mandate for planning, co-ordination, supervision and control over complete Inter-

State transmission system and operation of National and Regional Power Grids. At present POWERGRID owns & operates a

huge transmission network comprising 79556 Ckt Km transmission lines, 132 No Sub-Stations, 89170 MVA transformation

capacity and 22400 MW Inter-State transmission capacity.

POWERGRID, Vindhyachal office is looking after Operation & Maintenance of existing transmission lines of Vindhyachal

Super Thermal Power Station viz 2 Nos 400 KV S/C Vindhyachal Korba Ckt-1 & Ckt-2 lines, 2 No D/C Vindhyachal - Jabalpur Ckt

Vindhyachal Pooling Sub-Station

765/400 KV Vindhyachal Pooling Sub-Station

Comapny : Power Grid Corporation of India Limited

heeJejef«e[

1&2 and Ckt 3&4 lines, 2 Nos D/C Vindhyachal - Satna Ckt 1&2 and Ckt 3&4 transmission lines. Apart

from this, we are also constructing the transmission lines for evacuation of power from Sasan UMPP

(2 No 765 KV S/C Sasan - Satna Transmission lines) and Vindhyachal Stage-IV (400 KV D/C (Quad)

Vindhyachal - Vindhyachal Pooling line). In future 2 No 765 KV S/C transmission lines shall be

constructed from Vindhyachal Pooling to Satna Sub-Station.

POWERGRID has to establish a 765/400 KV Pooling Sub-Station near Vindhyachal Generation

Project for pooling of Power from Vindhyachal Stage-IV (1000 MW), Rihand Stage-III (1000 MW) as

well as Aryan Coal Benefication Pvt Ltd (1200 MW) Generation Projects.

For construction of Vindhyachal Pooling Sub-Station, land has been identified in Village Khamhariya

and Parasdehi, Tehsil & District Singrauli (MP) and a proposal submitted for acquisition of 57.56 Hac

Land comprising 25.50 Hac Private Land and 32.06 Hac MP Govt Land which also includes 10.76 Hac

Revenue Forest .

Regarding 25.50 Hac Private Land In-Principal

approval has been obtained from Govt of MP,

an amount of Rs 23678202.00 has been

deposited to Land Acquisition Officer and Land

has been notified under Section 4 (already

published in MP Gazete dated 17.12.2010 and

two local New papers Dainik Jagaran & Vindhya

Jyoti dated 18.10.10.

Regarding 18.05 Hac MP Govt Land, proposal for

advance possession submitted to Principal Secretary

(Rev), Bhopal on 04.12.2010 and for 10.76 Hac Revenue

Forest, proposal has been submitted to DFO, Singrauli.

18

Destination Singrauli

Page 21: Destination Singrauli

AMELIA (NORTH) COAL BLOCKCompany : Jaypee Group

The Ministry of Coal, Govt. of India had allotted Amelia (North) Coal

Block (located at Majhauli village, Distt. Singrauli, MP) to M.P. State

Mining Corporation Ltd. and Jaiprakash Associates Ltd. had been

selected as a Joint Venture partner (the new company formed being

“Madhya Pradesh Jaypee Minerals Ltd.” on 27th January 2006) to

develop and mine coal from the coal block which will be utilized for

the 1320 MW (2×660 MW) thermal power plant being set up by

Jaiprakash Power Ventures Ltd. (a subsidiary of Jaiprakash Associates

Ltd.) at Nigri village, Distt. Singrauli, MP.

Amelia (North) Coal Block is located in Village – Majhauli, Tehsil –

Deosar, Distt. Singrauli, (M.P.). Amelia (North) Coal Mine Project shall

undertake coal mining activity at an annual capacity of 2.8 MTPA over

a total lease area of 482 Ha. The entire lease area falls within forest

land which forms part of Mohanban Reserve Forest.

1. Mineable coal reserve (open cast) – 70 Million Tonnes.

2. Production capacity (open cast) – 2.8 MTPA.

3. Stripping ratio – 1:8.4

4. Grade of coal – mainly D & E type

5. Active mining area – 482 Ha

6. Expected mine life (open cast) – 27 years

7. Mining Plan – approved in Nov. 2006

8. Environmental clearance – approved in July 2007

9. Forest Clearance – under process

10. Private land acquired through

Land Acquisition – 80.15 Ha

11. Govt. Land acquired through

allocation – 36.77 Ha

A railway siding is approved near the mining block where coal will be

loaded into wagons. Coal shall be transported through Coal Handling

plant (CHP)-2.8 Kms. Length from mine site on (ground level) up to

loading point.

Salient features of the coal mining project :

Destination Singrauli

19

Page 22: Destination Singrauli

Socio-Economic Activities :

Ø

Ø

Ø

Against land acquired though Land Acquisition Act

approximately 300 persons (land oustees) have been

employed.

30 persons from above have been given training for 1 month

at our Jaypee Cement Factory Training Centre, Rewa for

running and maintenance of excavators, dumpers, drilling

machines as well as production of cement bricks.

Dispensary was commissioned in February 2007 and

providing free medical consultancy through certified Doctor

as well as free medicine. So far over 90,000 patients have received treatment.

As per R&R policy Pension has been distributed to elderly land oustees from October 2010.

3 handpumps have already been commissioned in Majhauli village and further 3 more shall be commissioned in

January 2011.

1 water tanker is deployed for providing drinking water to nearby Govt. School and villagers.

Permission for maintenance of PMGSY road from Behtadand to Ujjani (Approx . 8Km) has been received and

contracts have been awarded to parties for strengthening the same.

As per R&R policy, land is being identified for land oustees (approx. 60 persons).

Drawing for construction of school has been finalised and construction for same shall commence in 2011.

As per R&R policy, an amount of Rs. 5 Lacs has been contributed to Collector, Singrauli towards exemption of

Stamp Duty and Land Registry Fees for those land oustees purchasing land elsewhere for their livelihood.

Ø

Ø

Ø

Ø

Ø

Ø

Ø

Similar to the joint venture agreement between M/s Jaiprakash Associates Ltd. and M/s Madhya Pradesh State Mining

Corporation for Amelia (North) Coal Block, a joint venture agreement was signed for Dongri Tal – II Coal Block on 24th

December 2008. Dongri Tal – II Phase – I is an opencast coal mining project consisting of 1392 Ha. Land with a production

capacity of 2.8 MTPA which shall be consumed at Nigrie Thermal Power Plant having the installed capacity of 1320 MW. The

geology of Dongri Tal – II Phase – I is Singrauli Main Basin with level topography. The mining lease lies in four villages viz.

Dongri, Digwaha, Bhainsabuda and Bajaudi, Tehsil – Singrauli, District – Singrauli, M.P., with 1392 Ha. revenue land (Govt.

land 968 Ha. and Private land 424 Ha).

1. Mineable coal reserve - 38 Million Tonnes.

2. Coal seams - VII & VIII.

3. Production - 2.8 MTPA.

4. Maximum depth of pit - 129 (Meters).

5. Grade of coal - B to E (Major grade – “C”)

The mining methods that shall be adopted are drilling, blasting, loading & haulage/ transport. Mine shall be opened up from

in crop, coal lying at a depth of 14 meters. The coal will be transported from mining site to Nigrie Thermal Power Plant by rail.

SPECIFIC FEATURES :

Dongri Tal – II Phase – I – At a glance

20

Destination Singrauli

Page 23: Destination Singrauli

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT, NIGRIECompany : Jaypee Group

1. Rehabilitation & Resettlement.

i. Total residential houses in the project – 72

ii. Total project affected families under Rehabilitation &

Resettlement – 180

iii. Total permanent jobs given under land acquisition as

well as under R &R – 409

iv. Total temporary “Majdoori” jobs given under R&R -

596

v. Total person over and above 60 years of age being

given pension under R&R scheme since

November,2009 – 19

vi. Total amount disbursed under R&R @ Rs.75,000/-

per person for construction of new house – Rs.

87,75,000.00

vii. Total amount disbursed under R&R @ Rs.20,000/-

per person to families who did not take plots - Rs.

18,00000.00

viii. Total amount disbursed under R&R as Rehabilitation

& Resettlement grant @ Rs.15,000/- per person – Rs.

10,20,000.00

ix. Total amount disbursed under R&R @ Rs.1,000/- per

person as transportation charges – Rs. 68,000.00

x. Total nos of plots given to families under R&R for

construction of new house - 28

xi. Total School going children of families coming under

R&R who are being provided stipend under R&R

scheme from July, 2010 – 66 so far

xii. The company will be providing a school from July,

2011 for imparting a decent/good education to the

children of families coming under R&R.

i. The company is already operating a 12 bedded

hospital with all necessary/adequate equipment

since 2008 for giving proper health care to villagers

in the vicinity of the Project. Treatment as well as

medicines are provided free of cost to the villagers.

On an average, about 150 persons get treatment on

a daily basis.

ii. The company has also provided a medical van facility

which goes to about 14 nearby villages and provides

free treatment to the villagers.

iii. The company also provides free ambulance services

in emergency to all villagers in the vicinity of the

project.

i. The company has also provided about 10 Hand

Pumps in Nigrie as well as nearby villages for benefit

of local population.

ii. In addition, as per requirement, the company also

provides drinking water through tankers during

marriage functions/in emergency in Nigrie/nearby

villages.

iii. The company also provides necessary financial help

for common religious function /other community

work which are organized by local population.

2. Health

3. Social responsibility.

Destination Singrauli

21

Page 24: Destination Singrauli

S.No.

Description of work/activitieswith quantity Status as on date

Name of Test Total Completed Balance

Jai Prakash Power Ventures Ltd.Jaypee Nigrie Super Thermal Power Project, Nigrie, Singrauli, M.P. Brief Project Status-Descriptive on 30.11.2010

1. A. MAIN PLANT : Soil Testing Bore holes (BH) 37+4 41 0

Electrical Resistivity test (ERT) 10 10 –

Plate Load Test (PLT) 11 11 –

Cross Hole Shear Wave test (CHST) 5 3 2

Seismic Refraction Test (SRT) 2 – 2

Cone Penetration Test (CPT) 22 22 –

Menard Pressure Meter Test (MP) 4 – 4

Permeability Test (PM) 4 – 4

California Bearing Ratio Test (CBR) 7 – 7

Testing Completion Schedule Dec. 2010

B. MAIN PLANT CIVIL WORK

i. Boiler Unit-I Founding level is 334 mts.

33 nos. foundations completed. Back filling done and handed over to M/s. L&T.

ii. Mill Unit-II Mill area PCC work 1378 cum is completed.

Mill area raft concreting completed. Total quantity 4923 m.

iii. TG Hall ABC rows excavation upto 335 m in progress. Quantity acheived 27000 m

Batching Plant of M/s/ JMC erection completed and commissioned.

F

F

F

F

F

F

3

iv. Boiler Unit-II The founding level of Boiler Unit-II is given by Engineering as 330M/ 328M as per

site condition.

Excavation upto 328M level is in progress 95% completed PCC/Plu concrete

work in progress 11574 cum out of 14000 cum achieved.

v. Mill Area Unit-II 70% excavation completed.

Preparation of PCC at one location is in progress.

vi. ESP Unit-I Excavation upto 331 is completed in pass ‘A’ PCC is planned from 01.12.2010

Excavation in pass ‘E’ completed upto 324 m level.

vii. Chimney Excavation completed. Quantity acheived is 20000 M

Batching plant of M/s GDCL erection completed and commissioned. PCC in

progress 59 M completed.

F

F

F

F

F

F

F

F

3

3

D. CONSTRUCTION OF ROADS

IN PROJECT AREA

Total 24.88 Km

i. 21 M wide – 3905 RM 65% earth work completed and WBM activity is in progress.

ii. 10 M wide – 5668 RM 40% earth work completed.

iii. 4.5 M wide – 15312 RM 4.5% earth work completed.

F

F

F

Total Area plannedfor Excavation

Area Excavatedtill date

Balance are to beExcavated

C. AREA GRADING

i. Earthwork in cutting 49.89 Lac Cum 21.03 Lac Cum 28.86 Lac Cum

ii. Earthwork in filling

22

Destination Singrauli

Page 25: Destination Singrauli

S.No.

Description of work/activitieswith quantity Status as on date

Total Length Completed Balance

E. MAIN PLANT BOUNDARY WALL9563.19 RM7000 RM 2563.19 RMY – Piece fixing 4000 RM 5563.19 RMBarbed wire3800 RM 5763.19 RMFixing 3500 RM 6063.19 RMConcertina fixing

F. WEIR / BARRAGE Blasting work 8000 CuM completed and 5000 CuM rocks removed.Design of Weir is under revision– Rock excavation work is under Hold

G. RAILWAY SIDING Engineering scale plan for Railway siding of JNSTPP (2×660 MW) has been

approved by Railway vide DRM (W)’s office, Jabalpur letter No. JBP/W/100/DB-

1/Genl/Pt.XVII(S-36) dated 15.03.2010 to RITES, Nagpur and the same was

confirmed by RITES, Nagpur vide there Letter No. RITES/PO/NGP/JPVL/G-

62/Vol. I/No. 000905 dated 01.04.2010 to JPVL.To suit the availability of plant land MGR bulb has been modified by RITES by

increasing the degree of curvature from 6 deg to 8 deg. the revised drawing of

MGR bulb received from RITES on 09.04.2010 and same has been forwarded to

DCPL to revise the plant layout.

F

F

F

F

2. CONSTRUCTION POWERi. 33/11 KV substation Completed and ready for charging

2×5 MVAii. 33 KV overhead Double 37 KM Completed.

Circuit Line 43 KM6.2 km of 33 KV line in forest area– all 89 poles erected and line stringing and

tree cutting work is completed Expected date of commissioning is 14.12.2010iii. 11 KV overhead lines

(a) Phase 1 – 6 KM 134/155 poles erected and 4.6 km of line completed out of 6 km.iv. 11 KV/415 Volt transformer 5 No. 11 KV/415V transformer substation erected and ready for charging.

substation(a) Phase 1 – 8 Nos

v. DG Sets 2×250 KVA DG Sets are functioning in Base Camp2×250 KVA DG Sets are functioning in APP & Batching Plant Area.1×160 KVA + 1×50 KVA DG Sets are functioning in main Plant Area.2×1000 KVA DG Sets are building under construction. Expected date.

vi. Area Illumination 6 Nos lighting masks are installed in main plant area.1 Nos lighting mask is installed in steel yard.1 Nos lighting mask is installed in batching plant area.4 Nos lighting mask are installed in base camp area.

3. 400 KV DOUBLE CIRCUIT Preliminary survey completed. Detailed survey is completed.TRANSMISSION LINE Tree counting in private area is completed

Letter given to forest department for survey.Permission for survey in forest area of Sidhi District & Satna District is obtained.

Sidhi District – 7.2 KM out of 8.5 KM – Tree counting completed

Satna District – 0.8 KM out of 0.8 KM – Tree counting completed

Rewa District – 0.0 KM out of 2.0 KM

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

Destination Singrauli

23

Page 26: Destination Singrauli

S.No.

Description of work/activitieswith quantity Status as on date

Total Length Completed Balance

4. TOWNSHIP

A. Boundary Wall 3288.50 RM 32.82.50 RM 6 RM

B. Cement Grinding unit 38.93.50 RM 1491.50 RM 2402.50 RM

Boundary Wall

C. Sardar Patel Uchttar Contract awarded. The contractor has mobilized to site and started the

Madhyamic Vidyalaya (SPUMV) work.

This school to catter for children

of families under R&R also

Phase - 1 Casting of plinth beam completed 81 No. of columns out of 81 Nos. are casted

upto lintel level. Earth filling upto plinth level Block masonry work upto lintel

level is in progress.

Slab casting for 7 rooms in ground floor completed.

Columns for 4 rooms in first floor completed.

Block – Masonry work in progress.

Phase - 2 Excavation, PCC, column footing and column upto lintel level 77 nos completed

out of 94 Nos.

Dhoka masonry work upto plinth beam bottom completed and plinth beam

casting completed. Columns upto 2.5 M (lintel level) work in progress.

Slab for 4 rooms in ground floor completed.

RCC done for 4 rooms columns upto 1st floor completed

Block – Masonry work in progress.

D. Guashala Column casting completed upto Roof Truss level. Concrete block masonry &

paltering work completed.

E. Power Lodge Excavation completed.

PCC for all 128 footing completed.

128 footing are casted.

120 columns are completed upto plinth level

Plinth Beam work in progress.

Columns 40 Nos. completed upto lintel level 138.

F. Police Station Work upto lintel level completed.

Shuttering work in progress for roof slab.

G. 48 Nos. H-Type Houses Work started

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

24

Destination Singrauli

Page 27: Destination Singrauli

NTPC Vindhyanagar Stage - 4 Ash DykeCompany : National Thermal Power Corporation (NTPC)

'VINDHYACHAL SUPER THERMAL POWER STATION'

The largest thermal power station of the NTPC and Nation is the serving the country with the installed capacity of 3260

MW. It has 6 units of 210MW each commissioned between 1987 to 1992 as stage-1 with Russian collaboration. In stage-

2 1000 MW (2x500MW) was added in 1999-2000. In 2006-07 2 more units of 500MW each was commissioned in stage-3

thus making the largest thermal power station of the country.This glorious power station is situated in the Singrauli

District with daily coal consumption of 55000 MW. The coal linkage for this station is from the Nigahi Coal Mines of NCL.

From there, the coal is transported by Merry Go Round (MGR) transportation system (22 Kms length with double track)

owned and operated by NTPC. NTPC Vindhyachal has always shown an encouraging trend and the station has recorded

more than 92% Plant load factor from last 4 years. During 2008-09 Vindhyachal has made a new record of 93.15% PLF.

NTPC VINDHYACHAL was awarded IPMA AWARD FOR EXCELLENCE IN PROJECT EXECUTION OF STAGE-III in the year

2008. VSTPS has been awarded prestigious IEEMA award for Fast track project execution in Year 2009.

NTPC VINDHYACHAL will retain its largest status with further capacity addition of 1000 MW (2 X500MW) in stage-4. The

construction is in its full swing and units are expected to be commissioned in 11th Five Year Plan.

For expansion only 500 Acres of land is being acquired at Baliyari Village for Ash Dyke . With the capacity addition NTPC

Vindhyachal is dedicated towards environmental protection and Social care.

Destination Singrauli

25

Page 28: Destination Singrauli

M.P. Sanik Coal Mines Limited (Amelia Coal Block)Company : Joint Venture of Sanik Aryan Group (49%) & Govt. of M.P. (51%)

BRIEF DESCRIPTION OF THE PROJECT

HIGHLIGHTS

PROJECT SITE INFORMATION

Nearest Railway Station

"DEORAGRAM" - for providing Railway siding for the block

Topography

Drainage

.

M.P. Sainik Coal Mining Pvt. Ltd. is a Joint Venture Company of MIs. M.P.State Mining Corporation Ltd. (A Govt. of

Madhya Pradesh Undertaking). Amelia Coal Block has been allotted in the name of M/s.M.P.State Mining

Corporation Ltd. vide Govt. of India, Ministry of Coal, New Delhi letter No.13016/3/2003-CA/CA-1 dated

12.01.2006. Amelia Coal Block is located in Tehsil Singrauli Dist. Singrauli (M.P.)

Amelia Opencast and Underground Coal Project is in Main Basin of Singrauli Coalfields, District Singrauli, Madhya

Pradesh.

Located in the North-Eastern Part of Main Basin-Singrauli Coalfields, Singrauli District of Madhya Pradesh.

Block area 16.273 sq. km. of Mohan Ban Reserve Forest.

Accessibility: Tehsil & District Singrauli, M.P. approximately at a distance of about 30 Kms from Waidhan.

Katni-Singrauli-Chopan branch of West Central Railway - 5 Km. west of block.

Undulating - Ground elevation varies between 381 m and 484m above MSL.

Controlled by Northerly flowing Kanchan Nadi.

Numerous seasonal Nalas in the block leasehold which flows into Kanchan Nadi which ultimately joins Mahan

river.

?

?

?

?

?

?

?

?

26

Destination Singrauli

Page 29: Destination Singrauli

NEED OF THE PROJECT

Major Portion of coal production is linked to Thermal Power Stations of M.P. Power Generation Corporation

Limited (MPPGCL)

Basket Mine for nereby Thermal Power Stations to meet their coal Sortages.

To Bridge the gap between Demand & Supply of Coal to other costumer like Cement, Steel, Power etc.

India has more than 250 Billion Tonnes of estimated coal reserves. In the growing Power shortage Scenario in the

country power availability can be augmented by Thermal Generation using coal as the main fuel. The coal

produced from Amelia Coal Block will be gainfully utilized by the State Govt. as follows:

?

?

?

PROJECT COST :

LAND USE DETAILS :

LAND RECLAMATION PLAN

REHABILITATION PLAN

The tentative cost of the project is around 1200 crore.

1. LOCATION Tehsil : Singrauli, District : Singrauli (Madhya Pradesh)

2. TYPE OF LAND

Tenancy Land 381.280 Ha

Govt. Land 314.000 Ha

Forest Land 128.570 Ha

Total 1978.850 Ha

1. It is proposed to reclaim the land technically and biologically by backfilling the overburden and leveling by

graders and dozers.

2. The land will be restored to economic utilization value.

3. Plantation over the backfilled areas will be carried out systematically.

1. Due to the acquistion of land approx. 580 persons are likely to be affected.

2. The norms for rehabilitation of the project affected persons will be strictly in line with the approved

Rehabilitation Scheme 2002 of Govt. of Madhya Pradesh.

3. P.A.Ps will be rehabilitated by way of offering them suitable jobs as per bnorms/Guidelines.

4. Site for rehabilitation will be developed and provided to Project Affected Persons (PAP).

BENEFITS TO GOVT. OF MADHYA PRADESH

Social Benefits :

General Benefits :

!

!

!

!

!

Employment opportunities for 3000 workers

Socio economic benefits to the local population due to development of area

Some other ancilary Industries will come up tin the area generating more employment opportunities.

Gap between demand and supply of coal bridged to the extent of 8.4 MTPA.

More thermal generation will help industrialization of state of Madhya Pradesh.

Destination Singrauli

27

Page 30: Destination Singrauli

Progress Report of Independent Power Projects Proposed in the state of Madhya Pradesh

1. Milestone of the MOU :

2. Project Related Activities Clearance :

Name of the Company : DB Power (Madhya Pradesh) Limited

Proposed Capacity : 1320 MW (2×660 MW)

I. Date of MOU 15th February 2008, (Validity of MOU is extended till 14th February 2010 wide

Agreement Dated 18th February 2009)

II. Submission of implementation Submitted on 18th April 2008 schedule

III. Submission of feasibility report / DPR Festibility Report submitted with GoMP on 7th June 2008 also,

revised feasibility report submitted on 12th August 2008 DPR is under preparation, to be submitted

shortly.

IV. Signing of implementation agreement Implementation agreement will be signed after completion of

land acquisition and obtaining other statutory clearances from concerned authorities.

V. Offer of sale of power to MPEB 37.5% to MPEB as per MOU with GoMP

VI. Power purchase agreement We are in the process of participanting in bid for sale of power to Northern

and Western Grid

(a) For supply of power to MPEBN 37.5% to MPEB as per MOU with GoMP. as per MOU

(b) For supply of balance power 62.5% to Western and Norther Grid to other

A. I. Feasibility report for Site Proposed Plant site in villages Gorgi-Papal-Mahuagaon

identification and NOC from Chhamrachh in Deosar Tehsil of Singrauli District (Erstwhile Sidhi)

energy department

II. Submission of R&R Plan t Consultant has been appointed to conduct the survey and prepare

State Revenue Department final report. Survey has been done and report preparation is in

progress.

Progress as on date.

DB Power Ltd, an unlisted company belonging to media house Dainik Bhaskar Group, plans to set up three thermal

power plants in Chhattisgarh and Madhya Pradesh.

The unit in Singrauli district of Madhya Pradesh will have a total generation capacity of up to 2690 MW.

The first two power plants will be set up in Chhattisgarh, having a capacity of 1,320 MW and 270 MW, respectively.

The first plant is expected to be commissioned in 2011.

DB Power has already been allotted coal mines in Chhattisgarh having 100 million tons reserves.

The third plant will come up in Madhya Pradesh and will have a generation capacity of 2690 MW. A fourth 270 MW

unit, based on coal washery rejects and middling coal, will come at Korba.

The Madhya Pradesh plant is expected to be operational a year after the Chhattisgarh facility.

DB POWER (MADHYA PRADESH) LIMITEDCompany : Dainik Bhaskar Group

28

Destination Singrauli

Page 31: Destination Singrauli

III. Application for land acquisition Application is Submitted in July 2008 Recommendation has been to state

Revenue Department sent to District Collector from State Revenue Department of notification of land.

Notification from Govt. of Sec. 4 for land acquisition is awaited.

Total Land As on date 335.75 acres of private land has been acquired by the company out of total land area of

1500 Acres.

Land allocation and confirmation towards availability of the same has been obtained from respective

authorities.

IV. Application for water allocation Water allocation for 1320 MW has already been obtained in August from WRD

2008 Total water requirement approved for peak capacity is 55 MCM PA

(a) Water requirement It has been approved by state govt. in August 200855 MCM pa for

1320 MW (2×660 MW)

(b) Source of water Gopad River

(c) Status of allocation of Allotment letters received for 55 MCM PA.

Water We have submitted Conceptual plan and Pre-feasibility report for

construction of anicut on river Gopad on to March 2009 approval

awaited from WRD.

V. MOE&F clearance status Form-I & TOR (Term of Reference) is submitted in December 2008

And the same has been approved in the MOEF Meeting Dated

10th February 2009

(a) Application Date Form-I is submitted in December 2008

(b) Status of TOR TOR has been approved on 10 February 2009

(c) Status of public hearing TOR is already approved EIA report is being prepared and public

hearing will be organized after submission of EIA report

VI. Submission of application for Application for coal linkage was submitted on 29th may 2008 Coal

block

(a) Coal requirement 7652 MT Coal linkage from Coal India Limited

for 1320 MW (2×660 MW) Application for coal linkage has been submitted on 29 May 2008.

Also related queries are replied and further updates regarding

land and water are provided alongwith plant order documents ot

CEA in October-November 2008. Feedback awaited from state

Govt.

(b) Target for signing Fuel After allotment of Coal Linkage. Awaiting final approval of Coal

supply Agreement Linkage from Standing Linkage Committee

Ministry of Coal and New Delhi. Our case will be discussed in next

SLC (Standing Linkage Committee) Meeting Application for

Captive coal block is submitted on 4th June 2009

(c) Rail Transport Clearance Consulting Agency is being finalized for conducting feasibility

Destination Singrauli

29

Page 32: Destination Singrauli

30

study on Railway siding as well as MGR for transporting coal from

mining area loading siding to power plant site.

VII. Status of other statutory (1) Land allocation approved by GOMP

clearance obtained (2) Land Availability confirmed by Collector-Singrauli.

(3) Coal Linkage application awaiting approval from SLC MOC

(4) Agreement for water under Progress.

(5) Application for Clearance of Chinney heigh will be submitted

after land acquisition and fixing location of chimney.

(6) Clearance from Defence Ministry will be taken up after

acquisition of land

(7) Any other clearance if rquired will be obrtained from time-

to-time after complete acquisition of land.

(8) Notification for section-4 awaited from state Govt.

I. Estimated cost of project Power Plant (2×660 MW) Estimated Amount

(In Rs. Cr.) (In %)

Total Envisaged 5940 100%

Investment

Means of Finance

Equity 1782 30%

Debt 4158 70%

Total 5940 100%

II. Status of financial closure Negotiations with Financial Institutions are under progress

III. Construction power arrangement Yet to Apply

IV. Project construction commencement Construction to egin after clearance from MOFE & R&R

settlement date/status of preliminary as per final approved

RAP construction at site

V. Unitwise commissioning schedule First unit, within 36 months and second unit within 39 (Take

oer) months from date of Notice to Proceed (NTP).

VI Power evacuation arrangement Application is submitted to PGCIL for long term open access

vide letter No. DBPL/MP/PGCIL/02042009 on dated 6th

April 2009.

B.Construction Related Activities :

Destination Singrauli

Page 33: Destination Singrauli

P.Narahari, IAS joined as Collector and District Magistrate on 2nd March 2009 and Anurag, IPS

joined as SP around the same time in the month of January. The entire Land Acquisition and

R&R were reviewed by the new team of administration and new methodologies were

prepared to tackle the enormous amount of activity that is happening in the district. Land

Acquisition cannot be done without effectively planning for the R&R and suitable packages

need to be designed to cater to the demands of the Project Affected Peoples (PAPs). What

rolled out in the next 2 years is a PAPs friendly administration which helped in the smoother

eviction of people and R&R.

Mutually agreeable “Time Line Schedule” (MATS) is a new concept that has been developed in Singrauli for Land

Acquisition and R&R. Land acquisition officer (LAO) & Project Head of the Company prepare the MATS draft and it is

approved in the weekly Projects' Review meeting after thorough discussion.

Mutually agreeable “Time Line Schedule” (MATS) is the requirement of changing times. Generally the land

acquisition takes its own time because a prescribed procedure has to be followed--- sec 4/6/9/Award! The

companies for which Land acquisition takes place assert enormous pressure for quick land acquisition. Land

acquisition follows eviction for which pressure is exerted. Our officers also need some time to resolve issues and do

land acquisition following due procedure. Hence a mutually agreeable time line schedule takes care of both sides'

time lines.

Projects' Review Weekly meetings are organized for breaking schedule into smaller actionable units & execution

and also to review the implementation of MATS. If any emergency crops up or new developing issues have to be

resolved then these weekly meetings help to resolve them immediately.

About 100-125 Class-3/4 officers were selected from various departments of the district. They were grouped into

teams, each team comprising of 4-5 persons. They were trained by the Collector himself. Each day they were picked

up in vehicles at 7am from a fixed place and dropped back by 12pm. Again picked up at 4pm and dropped back by

7pm. Each group was given a sheet with a list of 20 PAFs (Project Affected Families). The team visits the house of

PAFs and sits in their house and talks to them. The team explains to them about land acquisition, the need for

eviction & shifting to R&R Colony. They write down all issues raised by the PAF and redress the issues there & then

itself if possible. They visit the same PAFs several times till they are convinced. If the issues raised by PAFs are

beyond their jurisdiction then they bring it to the notice of Tehsildar/SDM. Tehsildar/SDM would solve such issues

immediately and if not possible then those issues reach ADM/DM who resolve them amicably using their

descrition.

During such team visits some of the oustees had problems pertaining to shifting to new places/R&R Colony.

They wanted time to construct their own house. Such PAFs were provided with a) Temporary rental arrangement b)

Transit accommodation. In 3 months all issues resolved and BTG/EW of Reliance & ESSAR cleared.

Mutually agreeable “Time Line Schedule”:

Entirely new method of Transition:

Singrauli Model of Land Acquisition and R&R

Destination Singrauli

31

Page 34: Destination Singrauli

32

Destination Singrauli

District Administration organizes mega camps. These camps include:

a) Lok Kalyan Shivirs b) Patta vitaran for PAFs shifted to R&R colony

c) Rozgar Melas d) Redressal camps pertaining to R&R issues.

(i) Free Industrial: At least one adult person of a displaced/affected family is being given free industrial training

(ITI/CIDC).

(ii) Free Computer training: Essar is giving computer training thru Aptech.

(iii) Stipend: To encourage the PAPs to join such training programme a stipend of Rs 1000 per month is being

provided. The stipend is being given on the basis of attendance and performance.

(iv) Reliance has started a Women SHG which is into Stitching/embroidery etc.

(v) Self employment: The District Administration is arranging for the loans from the banks for the displaced

people, women, men, youth etc. of all ages to set up their own business.

(vi) Employment opportunities at the R & R Colony are also being provided thru the training programmes under

SGSY/CEDMAP to self-help groups. Organizing Rozgar Melas for the unemployed youth.

(vii) Other Self-Employment opportunities were created thru the following organizations of the State

Government:

a) District Industries Center (DIC) b) Antyavsayi Corporation (SC Welfare)

c) ST Welfare Corporation d) OBC Welfare Corporation

All applications & complaints received are feeded into software designed for R&R issues. Redressal of such

applications is done in the same week. Pasting of redressed issues at the “Admin building” of the Dist Admin at the

project sites. If necessary personally intimating the applicants about their applications. At least one officer of the

Dist Admin sits daily at the Admin Building to listen to PAFs and redress their issues. This could be

Tehsildar/SDM/ADM/DM. The Company people also sit at the Admin Building to resolve issues and problems on a

dialy basis.

• R &R Package has been revised to suit to the needs of PAFs.

• A tripartite agreement is designed which is signed between district administration, company and the

registered labour co-operatives to ensure that work is awarded to such societies without tendering. This

agreement is first of its kind and is the most PAF friendly concept evolved in Singrauli district.

• Stamp Duty and Land Registry Exemption: As per the guidelines of MP R&R 2002 Section 29 (3) the Project

Affected Families will be encouraged to buy agricultural land and the stamp duty and land registry charges for

the quantum of land purchased will be exempted (equivalent to the quantum of land acquired). Started

The set of activities include:

Placement Based Skill Development Programmes:

Grievance Redressal Mechanisms:

Revision of R&R Package:

Page 35: Destination Singrauli

implementing this provision. The objective is to encourage PAP's to fruitfully utilize the compensation

paid under Land Acquisition process and also the restoration of livelihood for the farming community. A

Standard Format was designed for easy application by the PAPs.

1) The project authority submits a detailed employment action plan which entails a broader

description of the skill and work wise man/women power deployment plan during construction

phase as well as operation and maintenance phase. The dist administration is ensuring that mainly

the PAPs get such work and only in case of non-availability of PAPs then outsiders to be allowed to

work.

2) The project authority ensures that each project affected family gets some source of livelihood in

the long run either through direct employment in the company or as a member of the Labour

Societies or shop allotment in the township and the R&R colony etc.

• Reliance started their school in the academic year 2009-10. More than 650 students are admitted.

Their Hospital is also in place and is catering to the health needs of nearby villages.

• Essar has outsourced school for the children to Saraswati Shishu Mandir. About 700 children of PAPs

are already admitted. Their hospital is functional since 2009.

• JP is staring their School from April 2011 but their hospital has earned goodwill in many nearby areas

for the past few years.

• Hindalco has made adhoc arrangement made for School and is starting own school in April 2011.

Hindalco renovated PHC Bargawan and started it from 15th Aug 2010.

• Regular Health Camps by all the companies. Hindalco is specially sponsoring for NSVT mega camps.

• Urjanchal Scholarship Society

• State of Art Training centre on the lines of L&T CSTI Chennai to be established in Singrauli.

• Construction of “Anganwadis” in the Project areas as well as nearby areas.

• Environmental Impact Assessment Study initiative.

• Creation of Singrauli Development Authority.

Employment action Plan:

School & Health:

Other Major Initiatives:

“Umuntu ngumuntu ngabantu”

“A person is a person because of other people.”

- Nelson Mandela

(Xhosa Language of South Africa)

Page 36: Destination Singrauli

Pri

nte

d b

y:A

nand P

rinte

rs, 9307765305

Pri

nte

d b

y:A

nand P

rinte

rs, 9455237323

Designed & Developed by

Collector & District Magistrate

Singrauli (M.P.) Pin : 486 886

Tel : 07805 - 234541 (O), 244110(R), 234540(F)

Email : [email protected], [email protected]

Web : www.singraulidist.org

P. Narahari, IAS