Raichur, 1 x 250 MW, Unit 8
Nalco CPP Exp, 2x 210MW, Unit 9 & 10
Rayalseema, Stage III, 210MW, Unit 5
Neyveli, CFBC, 2x 250MW Unit 1 & 2
Vallur, 3x 500MW, Unit 1, 2 & 3
Kothagudam, 1x 500MW
Simhadri,Stage II , 2x 500MW, Unit 3& 4
-
8/13/2019 Despatch Status of Commissioning Procedures1
3/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
4/93
0 T / HR
USTRIAL PROJECTS
US
TPH &1X67.5MW STG UNIT
US
-
8/13/2019 Despatch Status of Commissioning Procedures1
5/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
6/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
7/93
S . No Description Document no Document Date
1Procedure for Boiler Hydraulic
test and preservationPS:TSX:
2 Procedure for EDTA cleaning PS:TSX:
3
Procedure for steam blowing
and oil flushing of fuel oil
system
4Procedure for lube oil flushing of
rotating machinesPS:TSX:
5
Procedure for air and gas
tightness test of furnace and
ducts for pulverised coal firing
boilers
PS:TSX:
6Procedure for commissioning of
CC pumpsPS:TSX:
7Procedure for air in leak test of
ESPPS:TSX:
8Procedure for commissioning of
HPBP systemPS:TSX:327:00:12 21.07.2012
9
Procedure for steam blowing of
boiler and associated steam
lines including aux. steam lines
PS:TSX:
RAYALASEEMA - 600 MW
-
8/13/2019 Despatch Status of Commissioning Procedures1
8/93
10Procedure for clean air flow test
of coal pipesPS:TSX:
11
Procedure for detergent flushing
of preboiler system PS:TSX:
12Procedure for lube oil flushinng
of MDBFPPS:TSX:
13
Procedure for hydraulic test and
fushinng of Turbine lube oil and
jacking oil system
PS:TSX:
14Procedure for hydraulic test and
fushinng of Control Fluid systemPS:TSX:
15Procedure for condenser flood
test/ Vacuum tightness testPS:TSX:
16Procedure for lube oil flushinng
of TDBFPPS:TSX:
17
Procedure for hydraulic test and
flushing of Generator seal oil
system
PS:TSX:
18Procedure for hydraulic test and
flushing of Generator PW system
PS:TSX:
19Procedure for Generator air
tightness testPS:TSX:
-
8/13/2019 Despatch Status of Commissioning Procedures1
9/93
20Procedure for commissioning of
LPBP systemPS:TSX:
RETURN TO COMMISSIONING PROCEDURES MAIN PA
-
8/13/2019 Despatch Status of Commissioning Procedures1
10/93
Despatch date
26.07.2012
-
8/13/2019 Despatch Status of Commissioning Procedures1
11/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
12/93
E
-
8/13/2019 Despatch Status of Commissioning Procedures1
13/93
S . No Description Document noDocument
Date
1Procedure for Boiler Hydraulic test and
preservation
PS:TSX:262:00:11
2 Procedure for EDTA cleaning PS:TSX:265:00:11/00 03.01.2012
3Procedure for steam blowing and oil
flushing of fuel oil system
4Procedure for lube oil flushing of
rotating machinesPS:TSX:264:00:11/00 03.01.2012
5Procedure for air and gas tightness testof furnace and ducts for pulverised coal
firing boilers
PS:TSX:268:00:12 05.01.2012
6Procedure for commissioning of CC
pumpsPS:TSX:
7 Procedure for air in leak test of ESP PS:TSX:
8Procedure for commissioning of HPBP
systemPS:TSX:326:00:12 21.07.2012
9
Procedure for steam blowing of boiler
and associated steam lines including
aux. steam lines
PS:TSX:
10Procedure for clean air flow test of coal
pipesPS:TSX:182:00:10 23.06.2010
11Procedure for detergent flushing of
preboiler system
PS:TSX:
12Procedure for lube oil flushinng of
MDBFPPS:TSX:
KAKATIYA.
-
8/13/2019 Despatch Status of Commissioning Procedures1
14/93
13
Procedure for hydraulic test and
fushinng of Turbine lube oil and jacking
oil system
PS:TSX:
14 Procedure for hydraulic test andfushinng of Control Fluid system
PS:TSX:
15Procedure for condenser flood test/
Vacuum tightness testPS:TSX:
16Procedure for lube oil flushinng of
TDBFPPS:TSX:
17Procedure for hydraulic test and flushing
of Generator seal oil system PS:TSX:
18Procedure for hydraulic test and flushing
of Generator PW systemPS:TSX:
19Procedure for Generator air tightness
testPS:TSX:
20Procedure for commissioning of LPBP
systemPS:TSX:
RETURN TO COMMISSIONING PROCEDURES MAIN PA
-
8/13/2019 Despatch Status of Commissioning Procedures1
15/93
Despatch date
26.12.2011
12.01.2012
12.01.2012
12.01.2012
26.07.2012
12.01.2012
-
8/13/2019 Despatch Status of Commissioning Procedures1
16/93
E
-
8/13/2019 Despatch Status of Commissioning Procedures1
17/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservation
PS:TSX:267:00:12
2 Procedure for EDTA cleaning PS:TSX:266:00:12
3Procedure for steam blowing and oil
flushing of fuel oil system
4Procedure for lube oil flushing of rotating
machinesPS:TSX:
5
Procedure for air and gas tightness test of
furnace and ducts for pulverised coal firingboilers
PS:TSX:268:00:12
6 Procedure for commissioning of CC pumps PS:TSX:
7 Procedure for air in leak test of ESP PS:TSX:
8Procedure for commissioning of HPBP
systemPS:TSX:298:00:12
9
Procedure for steam blowing of boiler and
associated steam lines including aux.steam lines
PS:TSX:
10Procedure for clean air flow test of coal
pipesPS:TSX:182:00:10
11Procedure for detergent flushing of
preboiler systemPS:TSX:317:00:12
12 Procedure for lube oil flushinng of MDBFP PS:TSX:
13 Procedure for hydraulic test and fushinngof Turbine lube oil and jacking oil system
PS:TSX:
14Procedure for hydraulic test and fushinng
of Control Fluid systemPS:TSX:
15Procedure for condenser flood test/
Vacuum tightness testPS:TSX:
NTPL 2X500 MW, TUTICORIN
-
8/13/2019 Despatch Status of Commissioning Procedures1
18/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
19/93
Document
Date
Despatch
date
04.01.2012 24.01.2012
04.01.2012 12.01.2012
05.01.2012 12.01.2012
07.06.2012 11.06.2012
23.06.2010 12.01.2012
12.07.2012 17.07.2012
-
8/13/2019 Despatch Status of Commissioning Procedures1
20/93
AIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
21/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservationPS:TSX:259:00:11
2 Procedure for EDTA cleaning PS:TSX:258:00:11/00
3Procedure for steam blowing and oil flushing
of fuel oil system
4Procedure for lube oil flushing of rotating
machinesPS:TSX:287:00:12
5
Procedure for air and gas tightness test of
furnace and ducts for pulverised coal firing
boilers
PS:TSX:268:00:12
PS:TSX:286:00:12
6 Procedure for air in leak test of ESP PS:TSX:
7 Procedure for commissioning of HPBP system PS:TSX:298:00:12
8
Procedure for steam blowing of boiler and
associated steam lines including aux. steam
lines
PS:TSX:290:00:12
9 Procedure for clean air flow test of coal pipes PS:TSX:182:00:10
10 Procedure for ALKALI BOILOUT PS:TSX:271:00:12/00
11 Procedure for lube oil flushinng of MDBFP PS:TSX:302:00:12
12Procedure for hydraulic test and fushinng of
Turbine lube oil and jacking oil systemPS:TSX:277:00:12
13 Procedure for condenser flood test/ Vacuumtightness test
PS:TSX:
14Procedure for Detergent flushing of pre -boiler
systemPS:TSX:288:00:12
STERLITE (SIIL) 2X80 MW, TUTICORIN
RETURN TO COMMISSIONING PROCEDURES M
-
8/13/2019 Despatch Status of Commissioning Procedures1
22/93
Document
DateDespatch date
03.12.2011 09.12.2011
03.11.2011 09.12.2011
05.05.2012 24.05.2012
05.01.2012
05.05.2012
12.01.2012
05.06.2012
07.06.2012 11.06.2012
18.05.2012 24.05.2012
23.06.2010 12.01.2012
17.01.2012 24.01.2012
11.06.2012 14.06.2012
10.04.2012 12.04.2012
08.05.2012 24.05.2012
.
AIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
23/93
S .
NoDescription Document no
1Procedure for Boiler Hydraulic test and
preservation
PS:TSX:256:00:11/REV
00
2Procedure for CHEMICAL CLEANING OF
BOILER USING EDTAPS:TSX:253:00:11/00
3Procedure for steam blowing and oil
flushing of fuel oil system
4Procedure for lube oil flushing of rotating
machinesPS:TSX:
5
Procedure for air and gas tightness test
of furnace and ducts for pulverised coal
firing boilers
PS:TSX:268:00:12
6Procedure for steam blowing of boilerand associated steam lines including aux.
steam lines
PS:TSX:
7Procedure for clean air flow test of coal
pipesPS:TSX:182:00:10
8Procedure for detergent flushing of
preboiler systemPS:TSX:
9Procedure for lube oil flushinng of
MDBFPPS:TSX:
10 Procedure for hydraulic test and flushingof Turbine lube oil and jacking oil system
PS:TSX:
11Procedure for condenser flood test/
Vacuum tightness testPS:TSX:
12 Procedure for lube oil flushinng of TDBFP PS:TSX:
13 procedure for ALKALI BOILOUT PS:TSX:272:00:12/00
S .
NoDescription Document no
1 Procedure for Boiler Hydraulic test PS:TSX:
2Procedure for STEAM FLUSHING OF
PREBOILER SYSTEMPS:TSX:
3 Procedure for ALKALI BOIL OUT PS:TSX:251:00:11/00
MRPL, 4X270 T / HR, MANGALOR
RETURN TO COMMISSIONING PROCEDURES
MRPL 1X85 TPH HRSG .
-
8/13/2019 Despatch Status of Commissioning Procedures1
24/93
4Procedure for oil flushing of turbine oil
systemPS:TSX:
5 Procedure for HRSG GAS TIGHTNESS TEST PS:TSX:252:00:11/00
6Procedure for CHEMICAL CLEANING USING
EDTAPS:TSX:
7 Procedure for clean air flow test of coal pipesfor pulvarised coal fired boilers
PS:TSX:
8Procedure for commissioning of HPBP
systemPS:TSX:
9
Procedure for steam blowing of boiler and
associated steam lines including aux. steam
lines
10 Procedure for clean air flow test of coal pipes PS:TSX:
11Procedure for detergent flushing of preboiler
system
12 Procedure for lube oil flushinng of MDBFP PS:TSX:
13Procedure for FLUSHING OF GT LUB OIL
SYSTEM
PS:TSX:260:00:11
PS:TSX:328:00:12
14Procedure for hydraulic test and fushinng of
Control Fluid systemPS:TSX:
15Procedure for condenser flood test/ Vacuum
tightness testPS:TSX:
16Procedure for lube oil flushinng of Turbine oil
syatemPSTX
17 Procedure for hydraulic test and flushing ofGenerator seal oil system
PS:TSX:
18Procedure for hydraulic test and flushing of
Generator PW systemPS:TSX:
19 Procedure for Generator air tightness test PS:TSX:
20Procedure for commissioning of LPBP
system
RETURN TO COMMISSIONING PROCEDURES
-
8/13/2019 Despatch Status of Commissioning Procedures1
25/93
Document
DateDespatch date
11/30/2011 12/1/2011
11/30/2011 12/23/2011
05.01.2012 12.01.2012
23.06.2010 12.01.2012
19.01.2012 27.01.2012
Document
DateDespatch date
28.11.2011 29.11.2011
.
MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
26/93
29.11.2011 01.12.2011
13.12.2011
24.07.2012
14.12.2011
27.07.2012
MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
27/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
28/93
S . No Description Document noDocument
Date
1Procedure for Boiler Hydraulic test and
preservationPS:TSX:269:00:12 1/13/2012
2 Procedure for EDTA cleaning PS:TSX:270:00:12 1/13/2012
3Procedure for steam blowing and oil
flushing of fuel oil system
4Procedure for lube oil flushing of
rotating machines
5
Procedure for air and gas tightness test
of furnace and ducts for pulverised coal
firin boilers
PS:TSX:268:00:12 05.01.2012
6Procedure for commissioning of CC
pumpsPS:TSX:
7 Procedure for air in leak test of ESP PS:TSX:
8Procedure for commissioning of HPBP
systemPS:TSX:323:00:12 20.07.2012
9
Procedure for steam blowing of boiler
and associated steam lines including
aux. steam lines
PS:TSX:
10Procedure for clean air flow test of coal
pipes
PS:TSX:182:00:10 23.06.2010
11Procedure for detergent flushing of
preboiler systemPS:TSX:316:00:12 12.07.2012
12Procedure for lube oil flushinng of
MDBFPPS:TSX:
13
Procedure for hydraulic test and
fushinng of Turbine lube oil and jacking
oil system
PS:TSX:
14
Procedure for hydraulic test and
fushinng of Control Fluid system PS:TSX:
15Procedure for condenser flood test/
Vacuum tightness testPS:TSX:
16Procedure for lube oil flushinng of
TDBFPPS:TSX:
MONNET 2X525 MW, ORISSA .
-
8/13/2019 Despatch Status of Commissioning Procedures1
29/93
17Procedure for hydraulic test and flushing
of Generator seal oil systemPS:TSX:
18Procedure for hydraulic test and flushing
of Generator PW systemPS:TSX:
19Procedure for Generator air tightness
testPS:TSX:
20Procedure for commissioning of LPBP
systemPS:TSX:
RETURN TO COMMISSIONING PROCEDURES MAIN PA
-
8/13/2019 Despatch Status of Commissioning Procedures1
30/93
Despatch date
24.01.2012
24.01.2012
12.01.2012
25.06.2012
12.01.2012
17.07.2012
-
8/13/2019 Despatch Status of Commissioning Procedures1
31/93
E
-
8/13/2019 Despatch Status of Commissioning Procedures1
32/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
33/93
Document Date Despatch date
17.10.2011 22.10.2011
03.01.2012 12.01.2012
03.01.2012 12.01.2012
05.01.2012 12.01.2012
21.07.2012 26.07.2012
23.06.2010 12.01.2012
16.07.2012 31.07.2012
16.07.2012 31.07.2012
16.07.2012 31.07.2012
L.
AIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
34/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservationPS:TSX:262:00:12
2 Procedure for EDTA cleaning PS:TSX:265:00:11/00
3Procedure for steam blowing and oil flushing
of fuel oil system:
4Procedure for lube oil flushing of rotating
machinesPS:TSX:264:00:11/00
5
Procedure for air and gas tightness test of
furnace and ducts for pulverised coal firingboilers
PS:TSX:268:00:12
6 Procedure for commissioning of CC pumps PS:TSX:
7 Procedure for air in leak test of ESP PS:TSX:
8 Procedure for commissioning of HPBP system PS:TSX:324:00:12
9
Procedure for steam blowing of boiler and
associated steam lines including aux. steamlines
PS:TSX:
10 Procedure for clean air flow test of coal pipes PS:TSX:182:00:10
11Procedure for detergent flushing of preboiler
systemPS:TSX:
12 Procedure for lube oil flushinng of MDBFP PS:TSX:313:00:12
13Procedure for hydraulic test and fushinng of
Turbine lube oil and jacking oil system PS:TSX:315:00:12
14Procedure for hydraulic test and fushinng of
Control Fluid systemPS:TSX:
15Procedure for condenser flood test/ Vacuum
tightness testPS:TSX:314:00:12
MALWA STAGE - 1, 2X600 MW.
-
8/13/2019 Despatch Status of Commissioning Procedures1
35/93
16 Procedure for lube oil flushinng of TDBFP PS:TSX:
17Procedure for hydraulic test and flushing of
Generator seal oil systemPS:TSX:
18 Procedure for hydraulic test and flushing ofGenerator PW system
PS:TSX:
19 Procedure for Generator air tightness test PS:TSX:
20 Procedure for commissioning of LPBP system PS:TSX:
RETURN TO COMMISSIONING PROCEDURES
-
8/13/2019 Despatch Status of Commissioning Procedures1
36/93
Document Date Despatch date
26.12.2012
03.01.2012 12.01.2012
03.01.2012 12.01.2012
05.01.2012 12.01.2012
21.07.2012 26.07.2012
23.06.2010 12.01.2012
11.07.2012 17.07.2012
12.07.2012 17.07.2012
12.07.2012 17.07.2012
-
8/13/2019 Despatch Status of Commissioning Procedures1
37/93
MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
38/93
S . No Description Document no
1
Procedure for steam blowing of boiler and
associated steam lines including aux.
steam lines
PS:TSX:
2Procedure for hydraulic test and fushinng
of Turbine lube oil and jacking oil systemPS:TSX:
3Procedure for condenser flood test/
Vacuum tightness testPS:TSX:
TNPL 40 MW, STG.
RETURN TO COMMISSIONING PROCEDURES M
-
8/13/2019 Despatch Status of Commissioning Procedures1
39/93
Document
Date
Despatch
date
AIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
40/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservationPS:TSX:
2 Procedure for EDTA cleaning PS:TSX:306:00:12
3Procedure for steam blowing and oil flushing
of fuel oil system
4Procedure for lube oil flushing of rotating
machinesPS:TSX:
5
Procedure for air and gas tightness test of
furnace and ducts for pulverised coal firing
boilers
PS:TSX:268:00:12
6 Procedure for commissioning of CC pumps PS:TSX:
7 Procedure for air in leak test of ESP PS:TSX:
8 Procedure for commissioning of HPBP system PS:TSX:298:00:12
9
Procedure for steam blowing of boiler and
associated steam lines including aux. steam
lines
PS:TSX:
10 Procedure for clean air flow test of coal pipes PS:TSX:182:00:10
11Procedure for detergent flushing of preboiler
systemPS:TSX:
12 Procedure for lube oil flushinng of MDBFP PS:TSX:
13Procedure for hydraulic test and fushinng of
Turbine lube oil and jacking oil systemPS:TSX:
14Procedure for hydraulic test and fushinng of
Control Fluid systemPS:TSX:
15Procedure for condenser flood test/ Vacuum
tightness testPS:TSX:
16 Procedure for lube oil flushinng of TDBFP PS:TSX:
17Procedure for hydraulic test and flushing of
Generator seal oil systemPS:TSX:
18Procedure for hydraulic test and flushing of
Generator PW systemPS:TSX:
19 Procedure for Generator air tightness test PS:TSX:
20 Procedure for commissioning of LPBP system PS:TSX:
HINDALCO 6X150 MW, ORISSA.
RETURN TO COMMISSIONING PROCEDURES M
-
8/13/2019 Despatch Status of Commissioning Procedures1
41/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
42/93
S . No Description Document no Document Date Despatch date
1Procedure for Boiler Hydraulic test and
preservationPS:TSX:166:00:09 19/02/2010 Soft copy sent
2 Procedure for EDTA cleaning PS:TSX:200:00:10 11/8/2010 Soft copy sent
3Procedure for steam blowing and oil
flushing of fuel oil system PS:TSX:202:00:10 13/8/2010 Soft copy sent
4Procedure for lube oil flushing of rotating
machinesPS:TSX:203:00:10 13/08/2010 Soft copy sent
5
Procedure for air and gas tightness test of
furnace and ducts for pulverised coal firing
boilers
PS:TSX:167:00:09 19/02/2010 Soft copy sent
6Procedure for commissioning of CC
pumpsPS:TSX:201:00:10 13/08/2010 Soft copy sent
7 Procedure for air in leak test of ESP PS:TSX:173:00:09 23/03/2010 24/03/2010
8Procedure for commissioning of HPBP
systemPS:TSX:210:00:10 13.08.2010
SOFT COPY
SENT
9
Procedure for steam blowing of boiler and
associated steam lines including aux.
steam lines
PS:TSX:209:00:10 28/10/2010 Soft copy sent
10Procedure for clean air flow test of coal
pipesPS:TSX:199:00:10 11/8/2010 Soft copy sent
11Procedure for detergent flushing of
preboiler systemPS:TSX:216:00:10 3/6/2011 Soft copy sent
VALLUR, 3x 500MW, Unit 1, 2 & 3
-
8/13/2019 Despatch Status of Commissioning Procedures1
43/93
S . No Description Document no Document Date Despatch date
VALLUR, 3x 500MW, Unit 1, 2 & 3
12 Procedure for lube oil flushinng of MDBFP PS:TSX:170:00:09 3/3/2010 Soft copy sent
13Procedure for hydraulic test and fushinng
of Turbine lube oil and jacking oil systemPS:TSX:169:00:09 3/3/2010 Soft copy sent
14Procedure for hydraulic test and fushinng
of Control Fluid systemPS:TSX:213:00:10 2/11/2010 Soft copy sent
15Procedure for condenser flood test/
Vacuum tightness testPS:TSX:212:00:10 1/11/2010 Soft copy sent
16 Procedure for lube oil flushinng of TDBFP
17Procedure for hydraulic test and flushing
of Generator seal oil systemPS:TSX:207:00:10 26/10/2010 soft copy sent
18Procedure for hydraulic test and flushing
of Generator PW systemPS:TSX:208:00:10 26/10/2010 Soft copy sent
19 Procedure for Generator air tightness test PS:TSX:211:00:10 1/11/2010 soft copy sent
20Procedure for commissioning of LPBP
systemPS:TSX:223:00:11 18/04/11 Soft copy sent
21generator testing procedure for first
synchronisationPS:TSX:224:00:11 18.01.2012 Soft copy sent
-
8/13/2019 Despatch Status of Commissioning Procedures1
44/93
S . No Description Document no Document Date Despatch date
VALLUR, 3x 500MW, Unit 1, 2 & 3
22procedure for steam flushing of pre boiler
systemPS:TSX:293:00:12 28.05.2012 Soft copy sent
RETURN TO COMMISSIONING PROCEDURES MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
45/93
S . No Description Document no
1 Procedure for Boiler Hydraulic test andpreservation
2 Procedure for EDTA cleaning PS:TSX:122:00:09
3Procedure for lube oil flushing of rotating
machines
4
Procedure for steam blowing of boiler and
associated steam lines including aux.
steam lines
PS:TSX:140:00:09
5Procedure for clean air flow test of coal
pipesPS:TSX:103:00:08
6Procedure for air and gas tightness test of
furnace and ductsPS:TSX:104:00:08
7 Procedure for lube oil flushinng of MDBFP PS:TSX:138:00:09
8Procedure for steam flushing of preboiler
systemPS:TSX:139:00:09
9Procedure for hydraulic test and fushinng
of Turbine lube oil and jacking oil systemPS:TSX:141:00:09
10Procedure for condenser flood test/
Vacuum tightness testPS:TSX:149:00:09
11 Procedure for hydraulic test and flushingof Generator seal oil system
PS:TSX:146:00:09
12 Procedure for Generator air tightness test PS:TSX:150:00:09
Raichur, 1 x 250 MW, Unit 8
-
8/13/2019 Despatch Status of Commissioning Procedures1
46/93
RETURN TO COMMISSIONING PROCEDUR
-
8/13/2019 Despatch Status of Commissioning Procedures1
47/93
Document Date Despatch date
28/8/2009 10/9/2009
27/11/2009 5/12/2009
15/10/2008 21/11/2008
17/11/2008 20/11/2008
26/11/2009 1/12/2009
26/11/2009 1/12/2009
27/11/2009 1/12/2009
5/1/2010 11/1/2010
4/1/2010 6/1/2010
5/1/2010 6/1/2010
-
8/13/2019 Despatch Status of Commissioning Procedures1
48/93
S MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
49/93
Sl no Description Document no
1 Procedure for chemical cleaning by EDTA PS:TSX:092:00:08
2Procedure for Steam flushing of preboiler
systemPS:TSX:091:00:08
3Procedure for oil flushing of Turbine oil
systemPS:TSX:087:00:07
4
Procedure for Steam blowing of Boiler and
associated steam lines including Aux
Steam lines
PS:TSX:090:00:08
5
Standard procedure for clean air flow test
of coal pipes for pulverised coal fired
boilers
PS/TSX/103/00/08 REV 00
6 Procedure for Turbine control oil flushing PS:TSX:108:00:08
7Procedure for oil flushing of lub oil system
of BFPPS:TSX:107:00:08
8Procedure for Condensor Vacuum
tightness test
9Procedure for air and gas tightness test of
furnace and ductsPS:TSX:104:00:08
10Standard procedure for air and gas
tightness test of steam generator
Nalco Angul, Units 9 & 10, 2 X 120 M
RETURN TO COMMISSIONING PROCEDURES
-
8/13/2019 Despatch Status of Commissioning Procedures1
50/93
Document date Despatch date
2/7/2008
16/05/2008 27/05/08
21/03/2008 22/04/08
10/4/2008 22/04/08
15/10/2008 21/11/2008
24/11/2008 1/12/2008
20/11/2008 1/12/2008
17/11/2008 20/11/2008
AIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
51/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservation
2 Procedure for EDTA cleaningPS:TSX:198A:00:10
3Procedure for steam blowing and oil
flushing of fuel oil system
4Procedure for lube oil flushing of rotating
machines
PS:TSX:198:00:10
PS:TSX:198:00:10
5 Procedure for air in leak test of ESP
6Procedure for commissioning of HPBP
system
7
Procedure for steam blowing of boiler and
associated steam lines including aux.
steam lines
PS:TSX:198B:00:10
8Procedure for clean air flow test of coal
pipes
9Procedure for air and gas tightness test of
furnace and ducts
10Procedure for detergent flushing of
preboiler system
PS:TSX:142:01:09
Rev-01
11 Procedure for lube oil flushinng of MDBFPPS:TSX:175:01:10
Rev-01
12 Procedure for hydraulic test and fushinngof Turbine lube oil and jacking oil system
PS:TSX:160:00:01Rev-01
13Procedure for condenser flood test/
Vacuum tightness test
PS:TSX:177:01:10.
Rev-01
NEYVELI, CFBC, 2x 250MW Unit 1
-
8/13/2019 Despatch Status of Commissioning Procedures1
52/93
14Procedure for hydraulic test and flushing
of Generator seal oil systemPS:TSX:161:00:09
15 Procedure for Generator air tightness test PS:TSX:164:00:09
16Procedure for commissioning of LPBP
systemPS:TSX:178:00:10
RETURN TO COMMISSIONING PROCEDUR
-
8/13/2019 Despatch Status of Commissioning Procedures1
53/93
Document Date Despatch date
23/07/2011 25/07/2011
23/07/2010
23/07/201125/07/2011
23/07/2011 25/07/2011
25/08/2010 24/09/2010
21/09/2010 24/09/2010
21/09/2010 24/09/2010
25/08/2010 24/09/2010
& 2
-
8/13/2019 Despatch Status of Commissioning Procedures1
54/93
21/01/2010 8/2/2010
1/2/2010 8/2/2010
21/04/2010 10/5/2010
S MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
55/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservation
2 Procedure for EDTA cleaning PS:TSX:176:00:10
3Procedure for lube oil flushing of rotating
machinesPS:TSX:183:00:10
4
Procedure for steam blowing of boiler and
associated steam lines including aux.
steam lines
PS:TSX:185:00:10
5 Procedure for clean air flow test of coalpipes
PS:TSX:182:00:10
6Procedure for air and gas tightness test of
furnace and ductsPS:TSX:051:00:06
7 Procedure for lube oil flushinng of MDBFP
8Procedure for steam flushing of preboiler
system PS:TSX:038:00:06
9Procedure for hydraulic test and fushinng
of Turbine lube oil and jacking oil systemPS:TSX:055:00:06
10Procedure for condenser flood test/
Vacuum tightness test
11Procedure for hydraulic test and flushing
of Generator seal oil system
PS:TSX:029:00:06
12 Procedure for Generator air tightness test
RAYALSEEMA, STAGE - III, 210MW,
** - Most of the Stage II procedures will be used for S
-
8/13/2019 Despatch Status of Commissioning Procedures1
56/93
RETURN TO COMMISSIONING PROCEDUR
-
8/13/2019 Despatch Status of Commissioning Procedures1
57/93
Document Date Despatch date
20/04/2010 28/04/2010
23/06/2010 24/06/2010
23/06/2010 24/06/2010
23/06/2010 24/06/2010
17/07/2006 23/06/2010
16/03/2006 23/06/2010
23/06/2010 24/06/2010
17/04/2006 23/06/2010
Unit 5
tage III, Unit 5
-
8/13/2019 Despatch Status of Commissioning Procedures1
58/93
S MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
59/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservation
2 Procedure for EDTA cleaning PS:TSX:106 00 08
3Procedure for commissioning of CC
pumps
4Procedure for steam blowing and oil
flushing of fuel oil system
5
Procedure for lube oil flushing of rotating
machines PS:TSX:101 00 08
6
Procedure for air and gas tightness test of
furnace and ducts for pulverised coal firing
boilers
PS:TSX:104 00 08
7 Procedure for air in leak test of ESP
8Procedure for commissioning of HPBP
system
9Procedure for steam blowing of boiler andassociated steam lines including aux.
steam lines
PS:TSX:102 00 08
10Procedure for clean air flow test of coal
pipesPS:TSX:103 00 08
11 Procedure for lube oil flushinng of MDBFP PS:TSX:188 00 10
12 Procedure for steam flushing of preboilersystem
PS:TSX:196 00 10
13Procedure for hydraulic test and fushinng
of Turbine lube oil and jacking oil systemPS:TSX:186 00 10
14Procedure for hydraulic test and fushinng
of Control Fluid systemPS:TSX:191 00 10
KOTHAGUDEM, 1x 500MW
-
8/13/2019 Despatch Status of Commissioning Procedures1
60/93
15Procedure for condenser flood test/
Vacuum tightness test PS:TSX:192 00 10
16 Procedure for lube oil flushinng of TDBFP PS:TSX:194 00 10
17Procedure for hydraulic test and flushing
of Generator seal oil systemPS:TSX:189 00 10
18Procedure for hydraulic test and flushing
of Generator PW systemPS:TSX:190 00 10
19 Procedure for Generator air tightness test PS:TSX:193 00 10
20Procedure for commissioning of LPBP
system
RETURN TO COMMISSIONING PROCEDUR
-
8/13/2019 Despatch Status of Commissioning Procedures1
61/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
62/93
15/07/2010 16/07/2010
8/10/2010 14/10/2010
13/07/2010 15/07/2010
13/07/2010 14/07/2010
16/07/2010 20/07/2010
S MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
63/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
64/93
14Procedure for hydraulic test and fushinng
of Control Fluid system
15Procedure for condenser flood test/
Vacuum tightness testPS:TSX:301:00:12
16 Procedure for lube oil flushinng of TDBFP PS:TSX:310:00:12
17Procedure for hydraulic test and flushing
of Generator seal oil systemPS:TSX:303:00:12
18Procedure for hydraulic test and flushing
of Generator PW systemPS:TSX:304:00:12
19 Procedure for Generator air tightness test PS:TSX:305:00:12
20Procedure for commissioning of LPBP
systemPS:TSX:312:00:12
21Generator testing procedure for first
synchronisation
RETURN TO COMMISSIONING PROCEDUR
-
8/13/2019 Despatch Status of Commissioning Procedures1
65/93
Document Date Despatch date
23/12/2011 28/12/2011
03.01.2012 10.01.2012
23.05.2012 24.05.2012
3/1/2012 10.01.2012
5/1/2012 10.01.2012
23.05.2012 24.05.2012
Ranipet Ranipet
16.07.2012 19.07.2012
25.04.2012 04.05.2012
23/06/2010 10.01.2012
04.07.2012 04.07.2012
08.06.2012 14.06.2012
13.05.2012 24.05.2012
-
8/13/2019 Despatch Status of Commissioning Procedures1
66/93
08.06.2012 14.06.2012
06.07.2012 07.07.2012
15.06.2012 07.07.2012
16.06.201207.07.2012
16.06.2012 25.06.2012
10.07.2012 12.07.2012
S MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
67/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservationPS:TSX:129 00 09
2 Procedure for EDTA cleaning PS:TSX:180 00 10
3Procedure for steam blowing and oil
flushing of fuel oil systemPS:TSX:159 00 09
4Procedure for lube oil flushing of rotating
machinesPS:TSX:148 00 09
5
Procedure for air and gas tightness test of
furnace and ducts for pulverised coal firingboilers
PS:TSX:130 00 09
6 Procedure for air in leak test of ESP PS:TSX:143 00 09
7Procedure for commissioning of HPBP
systemPS:TSX:147 00 09
8
Procedure for steam blowing of boiler and
associated steam lines including aux.
steam lines
PS:TSX:205:00:10
9Procedure for clean air flow test of coal
pipesPS:TSX:158 00 09/00
10Procedure for detergent flushing of
preboiler systemPS:TSX:165 00 09
11 Procedure for lube oil flushinng of MDBFP PS:TSX: 135 00 09
12Procedure for hydraulic test and fushinng
of Turbine lube oil and jacking oil systemPS:TSX: 133 00 09
13Procedure for hydraulic test and fushinng
of Control Fluid system
SIMHADRI
http://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/129%2000%2009%20APPROVED%20PROCEDURE%20FOR%20BOILER%20HYDRAULIC%20TEST%20AND%20PRESERVATION..pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/180%2000%2010%20APPROVED%20procedure%20for%20edta%20chemical%20cleaning%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/159%2000%2009%20APPROVED%20procedure%20for%20steam%20blowing%20and%20oil%20flushing%20of%20fuel%20oil%20system.%20simhadri.ziphttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/148%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20&%20hydrotest%20of%20lub%20oil%20system%20of%20rotary%20equipments.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/130%2000%2009%20APPROVED%20procedure%20for%20air%20and%20gas%20tightness%20of%20furnace%20and%20ducts.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/143%2000%2009%20APPROVED%20procedure%20for%20air%20in%20leak%20test%20of%20esp.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/147%2000%2009%20Procedure%20for%20commissioning%20of%20HP%20BY%20PASS%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/165%2000%2009%20APPROVED%20procedure%20for%20detergent%20%20flushing%20of%20preboiler%20system%20-%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/135%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20of%20MDBFP%20LUB%20OIL%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/133%2000%2009%20APPROVED%20procedure%20for%20hydraulic%20test%20and%20flushing%20of%20turbine%20lub%20-%20oil%20and%20jacking%20oil%20system%20.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/133%2000%2009%20APPROVED%20procedure%20for%20hydraulic%20test%20and%20flushing%20of%20turbine%20lub%20-%20oil%20and%20jacking%20oil%20system%20.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/135%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20of%20MDBFP%20LUB%20OIL%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/165%2000%2009%20APPROVED%20procedure%20for%20detergent%20%20flushing%20of%20preboiler%20system%20-%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/147%2000%2009%20Procedure%20for%20commissioning%20of%20HP%20BY%20PASS%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/143%2000%2009%20APPROVED%20procedure%20for%20air%20in%20leak%20test%20of%20esp.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/130%2000%2009%20APPROVED%20procedure%20for%20air%20and%20gas%20tightness%20of%20furnace%20and%20ducts.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/148%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20&%20hydrotest%20of%20lub%20oil%20system%20of%20rotary%20equipments.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/159%2000%2009%20APPROVED%20procedure%20for%20steam%20blowing%20and%20oil%20flushing%20of%20fuel%20oil%20system.%20simhadri.ziphttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/180%2000%2010%20APPROVED%20procedure%20for%20edta%20chemical%20cleaning%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/129%2000%2009%20APPROVED%20PROCEDURE%20FOR%20BOILER%20HYDRAULIC%20TEST%20AND%20PRESERVATION..pdf -
8/13/2019 Despatch Status of Commissioning Procedures1
68/93
14Procedure for condenser flood test/
Vacuum tightness testPS:TSX:136 00 09
15Procedure for flushing of Generator seal
oil systemPS:TSX:153 00 09
16Procedure for hydraulic test and flushing
of Generator PW systemPS:TSX:157 00 09
17 Procedure for Generator air tightness test PS:TSX:152 00 09
18Generator testing procedure for first
synchronisationPS:TSX:154 00 09
RETURN TO COMMISSIONING PROCEDUR
http://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/136%2000%2009%20APPROVED%20PROCEDURE%20FOR%20CONDENCER%20FLOOD%20TEST%20AND%20VACUUM%20TIGHTNESS%20TEST.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/153%2000%2009%20APPROVED%20procedure%20for%20flushing%20of%20generator%20seal%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/152%2000%2009%20APPROVED%20procedure%20for%20generator%20air%20tightness%20test.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/152%2000%2009%20APPROVED%20procedure%20for%20generator%20air%20tightness%20test.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/153%2000%2009%20APPROVED%20procedure%20for%20flushing%20of%20generator%20seal%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/136%2000%2009%20APPROVED%20PROCEDURE%20FOR%20CONDENCER%20FLOOD%20TEST%20AND%20VACUUM%20TIGHTNESS%20TEST.pdf -
8/13/2019 Despatch Status of Commissioning Procedures1
69/93
Document Date Despatch date
9/11/2009 21/11/2009
21/06/2010 1/7/2010
13/01/2010 25/03/2010
4/1/2010 6/5/2010
19/02/2010 12/3/2010
31/12/2009 27/01/2010
17/07/2010
22/10/2010 3/11/2010
13/08/2010 13/09/2010
1/3/2010 7/5/2010
14/11/2009 13/01/2010
14/12/2009 27/01/2010
-
8/13/2019 Despatch Status of Commissioning Procedures1
70/93
3/6/2010 22/06/2010
24/02/2010
18/09/2010
23/02/2010 16/03/2010
3/3/2011 10/3/2011
S MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
71/93
S . No Description Document noDocument
Date
1Procedure for Boiler Hydraulic
testPS:TSX:215:00:10 23/11/2010
2Procedure for STEAM FLUSHING
OF PREBOILER SYSTEMPS:TSX:219:00:11 3/11/2011
3Procedure for steam blowing of
main steam linesPS:TSX:222:00:10 15/03/2011
4Procedure for oil flushing of
turbine oil systemPS:TSX:221:00:10 11/3/2011
5
Procedure for air and gas
tightness test of furnace, ducts
and ESPs boilers
PS:TSX:214:00:10 23/11/2010
6Procedure for CHEMICAL
CLEANING USING EDTAPS:TSX:230:00:11 18/07/2011
7
Procedure for clean air flow test
of coal pipes for pulvarised coal
fired boilers
PS:TSX:247:00:11 21/11/2011
8Procedure for detergent flushing
of preboiler system
RINL 1X330 TPH & 1X67.5 MW STG UNIT.f
http://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/PS%20TSX%20215%2000%2010%20RINL%20BOILER%20HYDRAULIC%20TEST%20(REV).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/procedure%20for%20sream%20flushing%20of%20preboiler%20system%20219.00.11%20rinl%20tba.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/222%2000%2010%20RINL%20procedure%20for%20steam%20blowing%20of%20main%20steam%20lines.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/221%2000%2010%20RINL%20procedure%20for%20oil%20flushing%20of%20turbine%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/RINL%20PS%20TSX%20214%2000%2010%2023112010%20AIR%20AND%20GAS%20TIGHTNESS%20TEST%20OF%20FURNACE%20&%20DUCTS%20OF%20BOILER.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/RINL%20PS%20TSX%20214%2000%2010%2023112010%20AIR%20AND%20GAS%20TIGHTNESS%20TEST%20OF%20FURNACE%20&%20DUCTS%20OF%20BOILER.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/221%2000%2010%20RINL%20procedure%20for%20oil%20flushing%20of%20turbine%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/222%2000%2010%20RINL%20procedure%20for%20steam%20blowing%20of%20main%20steam%20lines.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/procedure%20for%20sream%20flushing%20of%20preboiler%20system%20219.00.11%20rinl%20tba.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/PS%20TSX%20215%2000%2010%20RINL%20BOILER%20HYDRAULIC%20TEST%20(REV).pdf -
8/13/2019 Despatch Status of Commissioning Procedures1
72/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
73/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
74/93
PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
75/93
S . No Description Document no
1Procedure for Boiler Hydraulic test and
preservation
2 Procedure for EDTA cleaning PS:TSX:
3Procedure for lube oil flushing of rotating
machinesPS:TSX:
4
Procedure for steam blowing of boiler and
associated steam lines including aux.
steam lines
PS:TSX:273:00:12/00
5 Procedure for clean air flow test of coalpipes
PS:TSX:
6Procedure for air and gas tightness test of
furnace and ductsPS:TSX:
7 Procedure for lube oil flushinng of MDBFP
8Procedure for steam flushing of preboiler
system PS:TSX:
9Procedure for hydraulic test and fushinng
of Turbine lube oil and jacking oil systemPS:TSX:
10Procedure for condenser flood test/
Vacuum tightness test
11Procedure for hydraulic test and flushing
of Generator seal oil system
PS:TSX:
12 Procedure for Generator air tightness test PS:TSX:
13Standard Procedure for commissioning of
HP BypassPS:TSX:298:00:12
SURANA, TPP -2 X 210MW, RAIC
-
8/13/2019 Despatch Status of Commissioning Procedures1
76/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
77/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
78/93
S MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
79/93
S . No Description Document no Document Date
1Procedure for Boiler Hydraulic test
and preservation
2 Procedure for EDTA cleaning PS:TSX:
3Procedure for commissioning of CC
pumps
4Procedure for steam blowing and oil
flushing of fuel oil system
5Procedure for lube oil flushing of
rotating machinesPS:TSX:
6
Procedure for air and gas tightness
test of furnace and ducts for
pulverised coal firing boilers
PS:TSX:
7 Procedure for air in leak test of ESP
8Procedure for commissioning of
HPBP system
9
Procedure for steam blowing of
boiler and associated steam lines
including aux. steam lines
PS:TSX:
10Procedure for clean air flow test of
coal pipesPS:TSX:
11Procedure for lube oil flushinng of
MDBFPPS:TSX:
BELLARY - 2, 1x 500MW
-
8/13/2019 Despatch Status of Commissioning Procedures1
80/93
-
8/13/2019 Despatch Status of Commissioning Procedures1
81/93
Despatch date
-
8/13/2019 Despatch Status of Commissioning Procedures1
82/93
E
-
8/13/2019 Despatch Status of Commissioning Procedures1
83/93
SL.NO. TITLE OF THE PROCEDURE
VALLUR
3X500MW
2X80MW JINDAL
600MW
N.CHENNAI
2X600MW
1 Procedure for Boiler Hydraulic test and
preservation 19.02.10 09.12.11 22.10.11 28.12.11
2 Procedure for EDTA cleaning 08.11.10 24.01.12 12.01.12 10.01.12
3 Procedure forsteam blowing and oil flushing of fuel
oil system
13.08.10
DOC. NA PENDING PENDING 24.05.12
4 Procedure for lube oil flushing of rotating machines 13.08.10 24.05.12 12.01.12 10.01.12
5 Procedure for air and gas tightness test of furnace
and ducts for pulverised coal firing boilers 19.02.10 05.06.12 12.01.12 10.01.12
6 Procedure for commissioning of CC pumps 13.08.10 NA PENDING 24.05.12
7 Procedure for air in leak test of ESP 24.03.10 PENDING PENDING ranipet
8 Procedure for commissioning of HPBP system 29.10.10 11.06.12 PENDING 19.07.12
9 Procedure for steam blowing of boiler and
associated steam lines including aux. steam lines 28.10.10 24.05.12 PENDING 04.05.12
10 Procedure for clean air flow test of coal pipes 08.11.10 13.01.12 12.01.12 10.01.12
11 Procedure for detergent flushing of preboiler
system
03.08.11
DOC. NA 24.05.12 PENDING 07.07.12
12 Procedure for lube oil flushinng of MDBFP 03.03.10 13.06.12 31.07.12 14.06.12
13 Procedure for hydraulic test and flushing of Turbine
lube oil and jacking oil system 02.12.11 PENDING 31.07.12 24.05.12
14 Procedure for hydraulic test and fushinng of Control
Fluid system 29.11.11 NA PENDING PENDING
15 Procedure for condenser flood test/ Vacuum
tightness test 29.11.11 PENDING 31.07.12 14.06.12
16 Procedure for lube oil flushinng of TDBFP not
applicable NA PENDING 07.07.12
17 Procedure for hydraulic test and flushing of
Generator seal oil system 02.12.11 NA PENDING 07.07.12
18 Procedure forhydraulic test and flushing of
Generator PW system 26.10.10 NA PENDING 07.07.12
19 Procedure for Generator air tightness test 02.12.11 NA PENDING 25.06.12
20 Procedure for commissioning of LPBP system 18.04.11 NA PENDING 11.07.12
21 procedure for steam flushing of preboiler system 28.05.12
** DOCUMENT NOT AVAILABLE IN THE FILE
2012 MAY COMPLEATION PLI
COMMISSIONING PROCEDURES (PLANNED FOR 2
-
8/13/2019 Despatch Status of Commissioning Procedures1
84/93
RETURN TO COMMISSIONI
-
8/13/2019 Despatch Status of Commissioning Procedures1
85/93
TUTUCORIN
500MW
MALWA
2X600 MW
KAKATIYA
600 MW
MONNET
525 MW
HINDALCO
6X150 MW
TNPL 40MW
STG
MRPL 4X270
T/HRBELLARY-2
1X500MW SURANA
PENDING 28.12.11 PENDING 24.01.012 PENDING NA 30.11.11 PENDING
13.01.12 10.01.12 10.01.12 24.01.012 12.07.12 NA 23.12.11 PENDING
PENDING PENDING PENDING PENDING PENDING NA PENDING PENDING
PENDING 10.01.12 10.01.12 PENDING PENDING NA PENDING PENDING
13.01.12 10.01.12 10.01.12 13.01.12 13.01.12 NA13.01.12
PENDING
PENDING PENDING PENDING PENDING PENDING NA NA PENDING
PENDING PENDING PENDING PENDING PENDING NA NA PENDING
11.06.12 PENDING PENDING 25.07.12 11.06.12 NA NA 11.06.12
PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING
13.01.12 10.01.12 10.01.12 13.01.12 13.01.12 NA13.01.12
PENDING
17.07.12 PENDING PENDING 17.07.12 PENDING NA PENDING PENDING
PENDING 17.07.12 PENDING PENDING PENDING NA PENDING PENDING
PENDING 17.07.12 PENDING PENDING PENDING PENDING PENDING 04.01.12
15.12.11 PENDING
PENDING PENDING PENDING PENDING PENDING NA NA PENDING
PENDING 17.07.12 PENDING PENDING PENDING PENDING PENDING PENDING
PENDING PENDING PENDING PENDING PENDING NA PENDING PENDING
PENDING PENDING PENDING PENDING PENDING NA NA PENDING
PENDING PENDING PENDING PENDING PENDING NA NA PENDING
PENDING PENDING PENDING PENDING PENDING NA NA PENDING
PENDING PENDING PENDING PENDING PENDING NA NA PENDING
12-13) PREPARED & PENDING - FOR COAL FIRED POWER PLANT
-
8/13/2019 Despatch Status of Commissioning Procedures1
86/93
NG PROCEDURES MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
87/93
RAYAL-600
PENDING
PENDING
PENDING
PENDING
26.07.12
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
-
8/13/2019 Despatch Status of Commissioning Procedures1
88/93
EDTA BHEL SOL
1 Simhadri -4 30.11.11 10/15/2011
R211140;
dt:07.12.2011
40,000 KGE;m/S
a.v.msales
corproation.
R211135;
Dt:03.12.2011
690 litrs;m/s
Arudra
ENGINEERS
PVT.LTD.
2 Vallur-1 28.08.11
R211012;Dt:
03.05.11;
40,000Kgs; M/s.
Chemi-culture
R210163;
Dt:31.01.11;
690 Ltrs; M/s.
Chemicals(India
) company
3 Neyveli - 2 30.01.12
4North
Chennai 1
R211123
dt:18.11.2011
1500ltrs m/s
arudra
engineers
PVT.ltd.
5 Vallur 2
R-211166dt;13.02.12 40
000 kgs m/s a.v.m
sales corproation
CHEMIC
SL.
NOPROJECT
BLU
Date
Deter
Flushing
Date
Indenting
date
-
8/13/2019 Despatch Status of Commissioning Procedures1
89/93
6North
Chennai 2
7 RINL
R210118;
dt:08.11.2010;
14000kgs.m/s.a.v.m.sales
corporation
R210163;
Dt:31.01.11;
240 Ltrs; M/s.Chemicals(India
) company
8 MRPL
9BHAVINI
Kalpakkam
10JINDAL
2X600 MW
11JINDAL
STEEL
RETURN TO COMMISSI
-
8/13/2019 Despatch Status of Commissioning Procedures1
90/93
BHEL MAX AmmoniaHydrazine
Hydrate
Disodium
phosphate
Tri sodium
Phosphate
Rinopal
R211135;
Dt:03.12.2011
690 litrs;m/s
arudra
ENGINEERS
PVT.LTD.
R211136;
Dt:03.12.2011
5600 litrs;m/s
suchem
international
R211137;
Dt:05.12.2011
5900litrs;m/s
chemi-culture,
R03.12.2011;
Dt:03 12 2011
200kg;m/s
suchem
international
R211136;
Dt:03.12.2011
900kg;m/s
suchem
international
R210163;
Dt:31.01.11; 690
Ltrs; M/s.
Chemicals(India)
company
R210166;Dt:31.01
.11; 9800Ltrs;
M/s. Chemi-
culture
R210165;Dt:31.
01.2011;
4800kgs;
M/s.Bhanwaria
l Jhanwar &
sons
R210165;Dt:31.0
1.2011; 4800kgs;
M/s.Bhanwarial
Jhanwar & sons
R210167;Dt:31.
01.11; 1100Kgs;
M/s. Suchem
international
R211100; Dt:
03.10.11;
1000Ltrs; M/s.
Chemi-culture
R211099; Dt:
03.10.11; 1200
Ltrs; M/s.
A.V.M Sales
corporation
R211123 dt:18
11 2011 1500 kgs
m/s arudra
engineers PVT.ltd
R211128;
DT:24.11.2011.11
100 LTRS.M/S
CHEMI-Culture
R.211129;
DT:24.11.2011
1200ltrs.m/s
suchem
international
R.211129
dt:24.11.2011.
1000kgs m/s
suchem
international
R-211160DT;24/01/12 5600
LTRS M/S
SUCHEM
INTNRNATION.
LS REQUIREMENT
PO No ,Date & Quantity
-
8/13/2019 Despatch Status of Commissioning Procedures1
91/93
R210163;
Dt:31.01.11; 240
Ltrs; M/s.Chemicals(India)
company
R2100119; dt
08.11.2010; 1400
ltrs; m/s.southernchemicals,hyd
R210120;
dt: 08.11.2010
;1200kgs.m/sbhanwarlal
Jhanwar @
sons
ONING PROCEDURES MAIN PAGE
-
8/13/2019 Despatch Status of Commissioning Procedures1
92/93
Remarks
-
8/13/2019 Despatch Status of Commissioning Procedures1
93/93