Designing the Future

of NMDOT

NM Section ITESeptember 3, 2015

Tamara P. Haas, P.E.Asset Management & Planning Division Director

[email protected]

MAP-21 Performance-Based Planning Umbrella

Asset Management

Plan

Performance-Based Long Range Plan

STIP tied to goals, targets

Highway Safety

Improvement Plan

Highway Safety Plan

Congestion, Air Quality

Plan

Freight Plan

Performance Focused

New Mexico 2040

Transportation Plan

Purpose of the plan

Provide a visionary, transparent, predictable, performance-based, and strategic framework to guide decision-making for future transportation investments in New Mexico.

Note: This plan meets the requirements of federal law (23 USC 135) for each state to develop a long range plan that is based on wide and diverse stakeholder input; addresses multiple modes of transportation (including bicycles and pedestrians); is statewide in scope; and has a 20-year minimum horizon.

Phased Development

PHASE 1: Existing Conditions − “Where Are We Now?”

• Data and Information Needs Assessment• Existing Conditions and Trends Analysis

PHASE 4: Implementation − “What Will It Take?”• Plan Writing, Graphic Design, & Document Management

• Plan Approval and Implementation

PHASE 2: Strategic Direction − “Where Do We Want To Go?”

• Vision, Goals, Objectives, and Performance Measures

• Scenario Analysis• Target SettingPHASE 3: Resource Allocation − “How Will We Get

There?”• Plan Alternatives Analysis

Completed

Summer

2014

Completed

Fall 2014

Completed

Winter

2015

Public

Review of

Draft

Currently

Underway

Alternative ways of moving forward

Regional Working Groups

Stakeholder Engagement

Top Down – reviewed by committees with decision

making authority

Bottom up – developed by working groups with broad

expertise from all regions of New Mexico

Statewide Working Groups1. Public health, safety & security2. State of good repair3. Access, mobility, & connectivity4. Economic vitality—freight movement5. Economic vitality—regional development6. Visitor travel, recreation & tourism7. State, federal and tribal lands8. Cultural, historic, natural resources9. Plan implementation

NMDOT Coordinating Committee

All divisions & districts

Metropolitan/Regional

Coordinating Committee

MPO and RTPO staff

Tribal Coordinating Committee

All 22 tribes

New Mexico Citizens and

Visitors

Other Groups

Interagency Coordinating Committee

State & federal agencies

The stakeholders told us:

1. Identify sustainable revenue sources / use resources efficiently

2. Preserve and maintain what we already have3. Improve public transportation4. Support economic development5. Address public health and safety needs6. Provide access and mobility for everyone7. Support freight movement8. Protect and preserve what makes New Mexico special9. Coordinate across jurisdictional / regulatory

boundaries10.Improve data collection, management and sharing

2040 Plan Vision and Goals

Goals and Strategies

Transparency and Accountability» Outstanding, customer-focused employees recruit, reward, retain

» Public trust + support form partnerships and retain 2040 Plan coordinating committees to leverage external resources

» Data + information improve quality to support project and program evaluation

» Project evaluation develop and implement evaluation criteria and statewide project prioritization process based on 2040 Plan Goals and Strategies

Safety for All System Users» Data-driven, proactive processes implement Strategic Highway

Safety Plan

» Partnerships with other agencies identify and pursue opportunities

Goals and Strategies

Preservation and Maintenance» Preservation-first asset management strategy

develop and implement the Transportation Asset Management Plan (TAMP)

» Life-cycle cost analysis use to evaluate and prioritize all types of projects (including capacity expansion)

» Prioritization by tier prioritize investment of funds by modal “tier” to achieve minimum standards for design, maintenance, and efficient operations

Goals and Strategies

Access and Connectivity» Operations and Demand Management First proactively

implement all reasonable operations and demand management strategies before committing scarce capital funds to expand capacity

» Strategic Investment in Key Corridors focus NMDOT resources (considering full life-cycle cost) to support movement of people and goods along a limited number of key corridors (i.e., corridors with regional, statewide, interstate, or international significance)

» Land use – transportation coordination prioritize projects, programs, and activities that help minimize transportation infrastructure and service costs through coordination of transportation and land use planning (including site selection for public facilities)

» Changing Demographics align transportation system to be responsive to changing demographic trends (aging population, Millennials, etc.)

Goals and Strategies

Respect Cultures, Environment, History, Quality of Life» Context sensitive solutions:

• find a “best fit” transportation solution that meets expectations of both NMDOT and community stakeholders

» Require and respect local plans• Target funds to support communities that develop 2040

Plan-consistent transportation plans and demonstrate financial and administrative capacity to implement them successfully

» Environmentally friendly practices• Minimize or avoid negative impacts on the natural

environment where possible

» Recreation and tourism • Work proactively with public and private-sector partners to

advance state, regional, and tribal tourism and recreational goals while minimizing adverse impacts to cultural resources

Implementation Priorities

FFY 2016-2017»Develop Project Evaluation Criteria» Identify and Acquire Data»Develop Socio-Economic Forecasts

NMDOTTransportation

Asset Management

Plan

TAM Mission

NMDOT uses data-driven asset

management to maximize use of

limited public resources and maintain

the state’s transportation

infrastructure in the best possible

condition.Do what you can, with what you have, where you are. Theodore Roosevelt 26th president of US (1858 - 1919)

Manage Assets Effectively

Tradeoff Analysis

Policy Goals & Objectives

Budgets

Expectations

Resource Allocations

Improvement Programs &

Delivery

Performance Monitoring

Goals & Investments Are Aligned With

Performance Data

Draft Guiding Principles

Condition and Performance» Maintain current condition (5% Structurally

Deficient) or show slight improvement for the NHS

» Maintain no better than 10% Structurally Deficient for the non-NHS

» When offered an alternative, maintain what we have before adding capacity

» Determine thresholds for Good, Fair, and Poor using Pavement Condition Rating (PCR), with recognition to MAP-21 requirements (pavement)

Draft Guiding Principles

Funding and Resource Allocation» Reserve a % of budget for statewide

prioritization» A % of the model recommendation can be

overridden by engineering judgment » Delineate funding decisions between Interstate,

non-Interstate NHS, non-NHS, and Off System

Management Systems» Bridge» Pavement» Other Assets (Future TBD)

10 Year Asset

Targets

Sound DataProgramming

Material Performance

Political Actions

Construction Costs

Model Accuracy

Funding

• Our plans face uncertainty

• We need to acknowledge that uncertainty

Risks

10 Year Asset

Targets

Material Performance

Programming

Construction Costs

Political Actions

Model Accuracy

Sound Data

Funding

• Our plans face uncertainty

• We need to acknowledge that uncertainty

Risks

Asset Condition

Current $0 $25 $50 $75 $100 $125

NHS 3.4% 26.5% 17.5% 8.4% 3.1% .7% .4%

Non-NHS 6.5% 34.2% 28.7% 15.1% 4.7% .9% .3%

All 5.1% 30.6% 23.5% 12.0% 3.9% .8% .4%

at various 10-Year annual funding levels

23

Bridge % Structurally Deficient

Pavement Condition

Current $110 $165 $220 $275 $330 $385

Interstate 58.6 43.3 50.0 51.5 59.3 63.6 66.3

Non-I NHS 56.7 42.4 47.5 49.7 59.5 64.6 65.3

Non-NHS 51.1 37.6 44.2 49.8 54.3 57.8 60.9

All 53.3 39.4 45.6 51.4 56.1 60.1 63.4

Data-Mature DOT Planning

STIPDesign

RoadwayTraffic

Structures

Construction

As-Builts

Maintenance

Traffic & Safety

DataManagement

FinancialData

AnalysisBusiness systems

2040 Plan

DataWarehouseGovernanceIntegration

Project Delivery

OperationsRevenue Forecasting

Data Governance

Budget State FY 16

Revenues

State: $456,061,500

Federal:$408,602,800

Total: $864,664,300

Expenses

Salary: $157,071,400Debt: $143,489,200Operational: $122,227,000Restricted: $103,956,573Betterments: $89,048,000

$248,872,127

Total:$864,664,300

Funds District Field Supplies and

Contract Maintenance, Snow

Removal, etc.

Funds Asset Management &

Capacity Projects,

NMDOT Planning Process

NMDOT Strategic Plan

• Vision: Set the standard for a safe, reliable and efficient transportation system

New Mexico 2040Transportation

Plan

Transportation Asset Management

Plan

State Transportation Improvement

Program

Policy Direction Planning Capital Programs Implementation

Construction

Modal Programs

Maintenance and

Operations

Monitoring, Reporting Adjustments (Annual Performance Report)