Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Grade 3 - Officer (Job Position) Grade 4 - Sr. Officer (Job Position)
Grades
1 1.1 1.1.1
General SkillsManage Inventory Basic knowledge of Inventory Manage Inventory Basic knowledge of Inventory Par Levels Re-Order Level Maintaining Ledger
1.1.1.1 1.1.1.2 1.1.1.3 1.1.1.4 1.1.1.5 1.1.1.61.1.2
Par Levels Re-Order Level Maintaining Ledger Material Estimation Inventory Controls Developing Inventory Reports Verifying Inventory Reports Developing Inventory System
1.1.2.1 1.1.2.2 1.1.2.3 1.1.2.4 1.1.2.5 1.1.2.61.2 1.2.1 1.2.2 1.2.4 1.2.5 1.3 1.3.1
Par Levels Re-Order Level Maintaining Ledger Material Estimation Developing and improving Inventory Controls Designing and verifying Reports Planning Developing Maintenance Schedules Developing SOPs Developing Protocols Maintaining History Record Technical Writing Technical Reports Technical Writing Technical Reports
1.3.2 1.4 1.4.1 1.4.2 1.4.3 1.4.4 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3
Feasiblity Reports General Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation Vendor Dealing Developing Quotation Comparison Comparison Analysis Drawings Studying Schematics (Electrical) Studying Design Layout As-Built Drawings Verifying design as per As-Built Drawings Verifying quantities as per As-Built Drawings General Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation
Feasiblity Reports
Drawings Studying Schematics (Electrical) Studying Design Layout
1.7 1.7.1 1.8 1.8.1 1.8.1.1 1.8.1.2 1.8.1.3 1.9 1.9.1 1.9.2 2 2.1 2.1.1 2.1.2 2.1.3 2.1.4
Tools Tool Handling Outsource Project Supervision Electrical Wiring Verification Supervisory Report DB Installation Material Quality and Quantity Quantity Surveyor Verifying Quality Material
Tools Tool Handling Outsource Project Supervision Electrical Wiring Verification
DB Installation Material Quality and Quantity Quantity Surveyor Verifying Quality Material
HVAC AC InstallationInner / Outer Drain Pipe Electric Wiring Copper piping
AC InstallationInner / Outer Drain Pipe Electric Wiring Copper piping
2.2 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.3 2.3.1 2.3.2 2.3.3 2.4 2.4.1 2.4.1.1 2.4.1.2 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 2.4 2.4.1 2.4.2 2.4.3 2.5 2.6 2.6.1 2.6.2 2.6.3 2.7 2.7.1 2.7.2
Other Installations Blower / Fan motor Fan Blades Compressor Gas Charging Soldring Brazing Checks Ampere reading Suction / Discharge Pressure Gas Pressure
Other Installations Blower / Fan motor Fan Blades Compressor Gas Charging Soldring Brazing Checks Ampere reading Suction / Discharge Pressure Gas Pressure
Maintenance SchedulesGeneral / Master Maintenance Schedule Formation Following Schedules Implementing Schedules Report Formation Verifying Reports Maintenance Record Management Refrigerators / Water Cooler Installation Compressor Gas charging Troubleshooting Repair Work Control Card Remote Circuit Boards Refrigerators / Water Cooler Installation Compressor Gas charging Troubleshooting Repair Work Control Card Remote Circuit Boards Following Schedules General / Master Maintenance
RecommendationsAC Tonnage AC Location
2.7.3 2.7.4 2.8 2.8.1 2.8.1.1 2.8.1.2 3 3.1 3.2 3.3 3.3.1 3.3.2 3.3.3 3.4 3.4.1 3.4.2 3.4.3 3.4.3.1 3.4.3.2 3.5 3.5.1 3.5.2 3.5.3 3.5.4 3.5.4.1 3.5.4.2 3.5.4.3 3.5.4.4 3.5.4.5 3.6 3.6.1
Cooling Capacity Temperature Control
OthersHVAC Expense reports Developing Report Analyzing Report
Electrical InstallationsCircuit breakers & connectors UPS / Other Appliances Electrical and Data Wiring Chiseling / Conduiting Cabling and Wiring Testing and Repair Intercom & PABX system Chiseling / Conduiting Wiring Telephone DB Installations / Testing Maintenance / Repair Maintenance / Repair / Troubleshooting DBs Switch gear LT panel Repairing Fixtures Lighting Fixtures Electrical Fixtures Electrical motors UPS Electrical appliances/apparatus Load Analysis Calculating Load Calculating Load Circuit breakers & connectors UPS / Other Appliances Electrical and Data Wiring Chiseling / Conduiting Cabling and Wiring Testing and Repair Intercom & PABX system Chiseling / Conduiting Wiring Telephone DB Installations / Testing Maintenance / Repair Maintenance / Repair / Troubleshooting DBs Switch gear LT panel Repairing Fixtures Lighting Fixtures Electrical Fixtures Electrical motors UPS Electrical appliances/apparatus
3.6.1.1 3.6.1.2 3.6.2 3.6.2.1 3.6.2.2 3.7 3.7.1 3.7.2 3.7.3 3.7.3.1 3.7.3.2 3.7.3.3 3.7.3.4 3.8 3.8.1 3.8.2 3.8.3 3.8.4 3.8.5 3.8.6 4 4.1 4.2 4.3 4.4 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 4.4.6
Equipment / Fixture Total Load Utility Bills Bill Calculation Understanding Bill Energy Conservation Control Utility Expense Control Utility Consumption Recommending Energy Efficient Equipment / Fixtures UPS Split Unit AC Cables / Wires Electrical Fixtures Genset Schedule Formation Following Schedules Implementing Schedules Report Formation Verifying Reports Maintenance Record Management Following Schedules Genset
Equipment / Fixture Total Load
Genset
Maintenance Record Management
Biomedical InstallationEquipment Installation Calibration Testing Maintenance Schedule Formation Following Schedules Implementing Schedules Report Formation Verifying Reports Maintenance Record Management Maintenance Record Management Following Schedules Equipment Installation Calibration Testing Maintenance Maintenance
4.5 4.5.1 4.5.2 4.5.3 4.5.3.1 4.5.3.2 5 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.2 5.2.1 5.2.2 5.2.3 5.2.4 5.3 5.3.1 6 6.1 6.1.1 6.1.2 6.1.3 6.2 6.2.1 6.2.2 6.2.3 7 7.1 7.1.1
Safety Prcautions Medical Equipments Precautions Safety Measures Electrical Safety of Equipment Personal Saftey
Safety Prcautions Medical Equipments Precautions Safety Measures Electrical Safety of Equipment Personal Saftey
Carpentry WorksInstallation Door, Windows and wooden frames Door, drawer and cabinet locks and latches Door Hinges Door Closer Repair Work Doors and Windows Door and Windows frames Food and side trolleys wheels Foot steps Construct Cabinets / Shelves
Carpentry WorksInstallation Door, Windows and wooden frames Door, drawer and cabinet locks and latches Door Hinges Door Closer Repair Work Doors and Windows Door and Windows frames Food and side trolleys wheels Foot steps Construct Cabinets / Shelves
Paint WorksStarting Paint Paint Removal Paint Mixing Coating patches, holes and cracks Painting Paints walls, and ceilings Paints food and side trolleys Paints patient beds
Paint WorksStarting Paint Paint Removal Paint Mixing Coating patches, holes and cracks Painting Paints walls, and ceilings Paints food and side trolleys Paints patient beds
Plumbing WorksInstallations / Testing / Maintenance Pipes (Soil and Waste)
Plumbing WorksInstallations / Testing / Maintenance Pipes (Soil and Waste)
7.1.2 7.1.3 7.1.4 7.1.5 7.1.6 7.2 7.2.1 7.2.2 7.2.3 7.2.4 7.2.5 8 8.1 8.1.1 8.1.1.1 8.1.2 8.1.2.1 8.1.2.2 8.1.2.3
Fittings / Fixtures Suction Pump and Motors Geysers Water Tank (UG / OH) Sizing of Fixture / Fitting Repair Work Fittings / Fixtures Suction Pump and Motors Geysers Water Tank (UG / OH) Pipes (Soil and Waste)
Fittings / Fixtures Suction Pump and Motors Geysers Water Tank (UG / OH) Sizing of Fixture / Fitting Repair Work Fittings / Fixtures Suction Pump and Motors Geysers Water Tank (UG / OH) Pipes (Soil and Waste) Repair Work
Construction WorksProject Supervision Planning Ms. Project Initiation Project Charter Project needs and Requirements Financial Analysis 8.1.2.3.1 Project Cost 8.1.2.3.2 Making and Revewing Contracts 8.1.2.3.3 Analyzing BOQ 8.1.3 8.1.3.1 8.1.3.2 8.1.4 8.1.5 8.1.6 Design Revewing Architectural Drawings AutoCAD Execution and Supervision Monitoring and Controlling Systems Completion Reports
GradesGrade 5 - Executive (Job Position) Grade 6 - Sr. Executive (Job Position)
Manage Inventory Basic knowledge of Inventory
Material Estimation Inventory Controls Developing Inventory Reports Verifying Inventory Reports Developing Inventory System Setting Par Levels Setting Re-Order Level Developing Ledger Material Estimation Developing and improving Inventory Controls Designing and verifying Reports Planning Planning Developing Maintenance Schedules Developing SOPs Developing Protocols Maintaining History Record Developing Inventory System
Vendor Dealing Developing Quotation Comparison Comparison Analysis
As-Built Drawings
As-Built Drawings Verifying design as per As-Built Drawings
Verifying quantities as per As-Built Drawings
Outsource Project Supervision Electrical Wiring
Supervisory Report
General / Master Maintenance
General / Master Maintenance Schedule Formation
Implementing Schedules Report Formation Verifying Reports
RecommendationsAC Tonnage AC Location
Cooling Capacity Temperature Control
HVAC Expense reports Developing Report
HVAC Expense reports
Analyzing Report
Utility Bills Bill Calculation Understanding Bill Energy Conservation Control Utility Expense Control Utility Consumption Recommending Energy Efficient Equipment / Fixtures UPS Split Unit AC Cables / Wires Electrical Fixtures Genset Genset Schedule Formation
Implementing Schedules Report Formation Verifying Reports
Maintenance
Maintenance Schedule Formation
Implementing Schedules Report Formation Verifying Reports
Construction WorksPlanning Ms. Project Initiation Project Charter Project needs and Requirements Financial Analysis Project Cost Making and Revewing Contracts Analyzing BOQ Design Revewing Architectural Drawings AutoCAD Execution and Supervision Monitoring and Controlling Systems Completion Reports
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 3 - Officer (Job Position)Step 2
1 1.2 1.2.5 1.4 1.4.1 1.4.2 1.4.3 1.4.4
General SkillsGeneral Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation Tools Tool Handling Outsource Project Supervision Electrical Wiring Verification Supervisory Report DB Installation Material Quality and Quantity Quantity Surveyor Verifying Quality Material Material Quality and Quantity Quantity Surveyor Approved Quality Material 1.6 1.6.1 1.6.2 1.6.3 1.7 Tools Tool Handling General Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation General Electric Work
AC InstallationInner / Outer Drain Pipe Copper piping Electric Wiring
AC InstallationInner / Outer Drain Pipe Copper piping
AC Installation
Electric Wiring
1.7.1
Other Installations Gas Charging Soldring Brazing
Other Installations Gas Charging Soldring Brazing
Other Installations
2
2.1 2.1.1 2.1.2 2.2.1 2.2.2 2.2.3 2.2.4
Blower / Fan motor Fan Blades Compressor Checks Ampere reading Suction / Discharge Pressure Gas Pressure Checks Ampere reading Suction / Discharge Pressure Gas Pressure
Blower / Fan motor Fan Blades Compressor
Maintenance SchedulesGeneral / Master Maintenance Schedule Formation Following Schedules Implementing Schedules Report Formation 2.2.5 Verifying Reports Maintenance Record Management 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 Refrigerators / Water Cooler Installation Compressor Gas charging Troubleshooting Refrigerators / Water Cooler Installation Compressor Gas charging Following Schedules General / Master Maintenance
ition)Step 3
Refrigerators / Water Cooler
Troubleshooting
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 4 - Sr. Officer (Job Position)Step 2
1
General SkillsManage Inventory Basic knowledge of Inventory Par Levels Re-Order Level Maintaining Ledger Drawings Studying Schematics (Electrical) 1.3 1.3.1 1.3.2 1.4 1.4.1 1.4.2 1.4.3 1.4.4 1.5 1.5.1 Technical Writing Technical Reports Feasiblity Reports General Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation Vendor Dealing Quotation Comparison Comparison Analysis 1.6 1.6.1 1.6.2 1.6.3 1.7 Drawings Schematics (Electrical) Design Layout As-Built Drawings Tools
1.7.1
Tool Handling
Outsource Project SupervisionElectrical Wiring Verification Supervisory Report DB Installation Material Quality and Quantity Quantity Surveyor Verifying Quality Material 2 2.1 2.1.1 2.1.2 2.1.3 2.1.4 2.2 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.3 2.3.1 2.3.2 2.3.3 Material Quality and Quantity Quantity Surveyor Verifying Quality Material Material Quality and Quantity Quantity Surveyor Electrical Wiring Verification
HVAC AC InstallationInner / Outer Drain Pipe Electric Wiring Copper piping Other Installations Blower / Fan motor Fan Blades Compressor Gas Charging Soldring Brazing Checks Ampere reading Suction / Discharge Pressure Gas Pressure
Maintenance SchedulesGeneral / Master Maintenance Schedule Formation Following Schedules Implementing Schedules General / Master Maintenance
Report Formation Verifying Reports Maintenance Record Management 2.4 2.4.1 2.4.2 2.4.3 2.5 2.6 2.6.1 2.6.2 2.6.3 Refrigerators / Water Cooler Installation Compressor Gas charging Troubleshooting Repair Work Control Card Remote Circuit Boards Troubleshooting Repair Work Control Card Remote Circuit Boards Refrigerators / Water Cooler Maintenance Record Management
osition)Step 3
Manage Inventory Basic knowledge of Inventory Par Levels Re-Order Level Maintaining Ledger Drawings Studying Schematics (Electrical) Technical Writing Technical Reports Feasiblity Reports
Drawings Schematics (Electrical) Design Layout As-Built Drawings
Electrical Wiring
Supervisory Report
Material Quality and Quantity
Verifying Quality Material
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 3 - Officer (Job Position)Step 2
General SkillsPlanning Maintenance Schedules SOPs Policies Protocols History Recording Technical Writing Technical Reports Feasiblity Reports Vendor Dealing Quotation Comparison Comparison Analysis Drawings Schematics (Electrical) Design Layout As-Built Drawings Tools Tool Handling 1 1.1 History Recording Planning Maintenance Schedules Planning
Electrical InstallationsCircuit breakers & connectors UPS / Other Appliances 1.2 1.2.1 1.2.2 Electrical and Data Wiring Chiseling / Conduiting Cabling and Wiring Electrical and Data Wiring Chiseling / Conduiting Cabling and Wiring Electrical and Data Wiring Circuit breakers & connectors
1.2.3 1.3 1.3.1 1.3.1.1 1.3.1.2
Testing and Repair Intercom & PABX system Chiseling / Conduiting Wiring Telephone DB 1.3.1.2.1 Installations / Testing 1.3.1.2.1 Maintenance / Repair Intercom & PABX system Chiseling / Conduiting Wiring Telephone DB Installations / Testing Intercom & PABX system
3 3.1 3.2 3.3 3.4
Maintenance / Repair / Troubleshooting DBs Switch gear LT panel Genset Schedule Formation Following Schedules Implementing Schedules Report Formation Verifying Reports Maintenance Record Management 3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 Repairing Fixtures Lighting Fixtures Electrical Fixtures Electrical motors UPS Electrical appliances/apparatus Repairing Fixtures Lighting Fixtures Electrical Fixtures Electrical motors Repairing Fixtures Following Schedules Genset
tion)Step 3
Planning
SOPs Policies Protocols
Electrical and Data Wiring
Testing and Repair
Telephone DB
Maintenance / Repair Maintenance / Repair DBs Switch gear LT panel
Repairing Fixtures
UPS Electrical appliances/apparatus
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 4 - Sr. Officer (Job Position)
General SkillsManage Inventory Basic knowledge of Inventory Par Levels Re-Order Level Maintaining Ledger Technical Writing Technical Reports Feasiblity Reports Drawings Studying Schematics (Electrical) Studying Design Layout Tools Tool Handling 1 1.1
Electrical InstallationsCircuit breakers & connectors UPS / Other Appliances 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.1.1 1.3.1.2 Electrical and Data Wiring Chiseling / Conduiting Cabling and Wiring Testing and Repair Intercom & PABX system Chiseling / Conduiting Wiring Telephone DB Telephone DB Testing and Repair Electrical and Data Wiring
1.3.1.2.1 Installations / Testing 1.3.1.2.1 Maintenance / Repair 3 3.1 3.2 3.3 3.4 Maintenance / Repair / Troubleshooting DBs Switch gear LT panel Genset Schedule Formation Following Schedules Implementing Schedules Report Formation Verifying Reports Maintenance Record Management 3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 Repairing Fixtures Lighting Fixtures Electrical Fixtures Electrical motors UPS Electrical appliances/apparatus UPS Electrical appliances/apparatus Repairing Fixtures Maintenance / Repair Maintenance / Repair DBs Switch gear LT panel
Load AnalysisCalculating Load Equipment / Fixture Total Load Utility Bills Bill Calculation Understanding Bill Energy Conservation Control Utility Expense Control Utility Consumption Recommending Energy Efficient Equipment / Fixtures UPS
Split Unit AC Cables / Wires Electrical Fixtures Outsource Project Supervision Electrical Wiring Verification Supervisory Report DB Installation Material Quality and Quantity Quantity Surveyor Approved Quality Material
Guideline
Grade 4 - Sr. Officer (Job Position)Step 2 Step 3
Manage Inventory Basic knowledge of Inventory Par Levels Re-Order Level Maintaining Ledger Technical Writing Technical Reports Feasiblity Reports Drawings Studying Schematics (Electrical) Studying Design Layout Studying Design Layout Drawings
Calculating Load Equipment / Fixture Total Load
Recommending Energy Efficient Equipment / Fixtures UPS
Split Unit AC Cables / Wires Electrical Fixtures Outsource Project Supervision Electrical Wiring Verification Supervisory Report DB Installation Material Quality and Quantity Quantity Surveyor Quantity Surveyor Outsource Project Supervision Electrical Wiring
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 3 - Officer (Job Position)Step 2 Step 3
General SkillsPlanning SOPs Policies Protocols History Recording Technical Writing Technical Reports Feasiblity Reports General Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation 1 1.1 1.2 1.3 General Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation Biomedical Installation Biomedical Installation General Electric Work History Recording Planning
Biomedical Installation Equipment Installation Calibration TestingMaintenance Schedule Formation Following Schedules Implementing Schedules Report Formation Verifying Reports Maintenance Record Management Following Schedules Maintenance
Equipment Installation Calibration TestingMaintenance
Maintenance Record Management
1.4 1.4.1 1.4.1.1 1.4.1.2 1.4.2
Safety Prcautions Medical Equipments Precautions Safety Measures Electrical Safety of Equipment Medical Equipments Precautions Safety Measures Electrical Safety of Equipment Medical Equipments
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 4 - Sr. Officer (Job Position)Step 2 Step 3
General SkillsManage Inventory Basic knowledge of Inventory Par Levels Re-Order Level Maintaining Ledger Drawings Studying Schematics (Electrical) Technical Writing Technical Reports Feasiblity Reports General Electric Work Checking Ampere Calculating Load Checking Connections Electircal Fixture installation 1 1.1 1.2 1.3 Electircal Fixture installation Biomedical Installation General Electric Work Manage Inventory Basic knowledge of Inventory Par Levels Re-Order Level Maintaining Ledger Drawings Studying Schematics (Electrical) Technical Writing Technical Reports Feasiblity Reports
Biomedical Installation Equipment Installation Calibration TestingMaintenance Schedule Formation Following Schedules Implementing Schedules Report Formation
Calibration TestingMaintenance Maintenance
Following Schedules
Verifying Reports Maintenance Record Management 1.4 1.4.1 1.4.1.1 1.4.1.2 1.4.2 Maintenance Record Management
Safety Prcautions Medical Equipments Precautions Safety Measures Electrical Safety of Equipment Load AnalysisCalculating Load Equipment / Fixture Total Load Calculating Load Equipment / Fixture Total Load
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 3 - Officer (Job Position)Step 2
1 1.1 1.1.1 1.1.2 1.1.3 1.1.4
Capentry WorksInstallation Door, Windows and wooden frames Door, drawer and cabinet locks and latches Door Hinges Door Closer Repair Work1.2.1 1.2.2 1.2.3 1.2.4
Installation Door, drawer, cabinet locks and latches Door Hinges Door Closer Repair Work
Installation Door, Windows and wooden frames
1.2
Repair Work Doors and Windows Door and Windows frames
Doors and Windows Door and Windows frames Food and side trolleys wheels Foot steps Construct Food and side trolleys wheels Foot steps
1.3 1.3.1
Cabinets / Shelves Inventory Management Manage Inventory Par Levels Re-Order Level Maintaining Ledger Maintaining Ledger Manage Inventory
2
2 2.1
2.2
Material Estimation Paint Works
3
3.1 3.1.1 3.1.2 3.1.3 3.2 3.2.1 3.2.2 3.2.3
Starting Paint Paint Removal Paint Mixing Coating patches, holes and cracks Painting Paints walls, and ceilings Paints food and side trolleys Paints patient beds
Starting Paint Paint Removal Paint Mixing
Starting Paint
Coating patches, holes and cracks Painting Paints food and side trolleys Paints patient beds Painting Paints walls, and ceilings
)Step 3
Construct Cabinets / Shelves
Manage Inventory Par Levels Re-Order Level
Material Estimation
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 3 - Officer (Job Position)Step 2
1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6
Plumbing Works Installations / Testing / Maintenance Pipes (Soil and Waste) Fittings / Fixtures Suction Pump and Motors Geysers Over head Water Tank Underground Water Tank Drawings2.1 2.2
Installations / Testing / Maintenance Pipes (Soil and Waste) Fittings / Fixtures
Installations / Testing / Maintenance
Suction Pump and Motors Geysers Over head Water Tank Underground Water Tank
2
Layout As-Built Repair Work Repair Work Fittings / Fixtures Suction Pump and Motors Geysers Water Tank (UG / OH) Pipes (Soil and Waste) Repair Work
3 3.1 3.2 3.3 3.4 3.6
Fittings / Fixtures Suction Pump and Motors Geysers Water Tank (UG / OH) Pipes (Soil and Waste)
n)Step 3
Drawings Layout As-Built
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 5 - Executive (Job Position)
General SkillsManage Inventory Basic knowledge of Inventory Material Estimation Inventory Controls Developing Inventory Reports Developing Inventory System Par Levels Re-Order Level Maintaining Ledger Material Estimation Planning Maintaining History Record Vendor Dealing Developing Quotation Comparison Comparison Analysis As-Built Drawings Verifying quantities as per As-Built Drawings Developing Inventory System Setting Par Levels Setting Re-Order Level Developing Ledger Material Estimation Planning Maintaining History Record Vendor Dealing Developing Quotation Comparison Manage Inventory Basic knowledge of Inventory Material Estimation Inventory Controls
Outsource Project SupervisionElectrical Wiring Supervisory Report General / Master Maintenance Implementing Schedules Report Formation
Recommendations
Recommendations
AC Tonnage AC Location Cooling Capacity Temperature Control HVAC Expense reports Developing Report Utility Bills Bill Calculation Understanding Bill Recommending Energy Efficient Equipment / Fixtures UPS Split Unit AC Cables / Wires Electrical Fixtures Genset Implementing Schedules Report Formation Cables / Wires Electrical Fixtures Recommending Energy Efficient Equipment / Fixtures Temperature Control
deline
Grade 5 - Executive (Job Position)Step 2 Step 3
Basic knowledge of Inventory
Developing Inventory Reports Developing Inventory System
Material Estimation
Vendor Dealing
Comparison Analysis As-Built Drawings Verifying quantities as per As-Built Drawings
Outsource Project SupervisionElectrical Wiring Supervisory Report General / Master Maintenance Implementing Schedules Report Formation
Recommendations
Recommendations
AC Tonnage AC Location Cooling Capacity
HVAC Expense reports Developing Report Utility Bills Bill Calculation Understanding Bill Recommending Energy Efficient Equipment / Fixtures UPS Split Unit AC
Genset Implementing Schedules Report Formation
Imam Clinic(Department Name) - Specific GuidelineSr. #
List of Skills Step 1
Grade 5 - Executive (Job Position)
General SkillsManage Inventory Basic knowledge of Inventory Verifying Inventory Reports Developing Inventory System Developing and improving Inventory Controls Designing and verifying Reports Planning Developing Maintenance Schedules Developing SOPs Developing Protocols As-Built Drawings Verifying design as per As-Built Drawings General / Master Maintenance Schedule Formation Verifying Reports HVAC Expense reports Analyzing Report Energy Conservation Control Utility Expense Control Utility Consumption Genset Schedule Formation Verifying Reports Maintenance Maintenance General / Master Maintenance Schedule Formation Planning Developing Maintenance Schedules Developing Inventory System Developing and improving Inventory Controls
Schedule Formation Verifying Reports
Schedule Formation
Construction WorksPlanning Ms. Project Initiation Project Charter Project needs and Requirements Financial Analysis Project Cost Making and Revewing Contracts Analyzing BOQ Design Revewing Architectural Drawings AutoCAD Execution and Supervision Monitoring and Controlling Systems Completion Reports Design Revewing Architectural Drawings AutoCAD Planning Ms. Project Initiation Project Charter
eline
Grade 5 - Executive (Job Position)Step 2 Step 3
Manage Inventory Basic knowledge of Inventory Verifying Inventory Reports Developing Inventory System
Designing and verifying Reports Planning
Developing SOPs Developing Protocols As-Built Drawings Verifying design as per As-Built Drawings General / Master Maintenance
Verifying Reports HVAC Expense reports Analyzing Report Energy Conservation Control Utility Expense Control Utility Consumption Genset Schedule Formation Verifying Reports Maintenance
Verifying Reports
Initiation
Project needs and Requirements Financial Analysis Project Cost Making and Revewing Contracts Analyzing BOQ Design Design Financial Analysis
Execution and Supervision Monitoring and Controlling Systems Completion Reports
Imam Clinic Human Resource Department Grade Categorization
Grade
Designation 15 Director General 14 Director 13 Asst. Director 12 General Manager 11 Asst. General Manager 10 Sr. Manager 9 Asst. Senior Manager 8 Manager 7 Asst. Manager 6 Sr. Executive 5 Executive 4 Sr. Officer 3 Officer 2 Asst. Officer 1 Internee