Page 1: Design & Verify Phase

Design & Verify PhaseSENIOR DESIGN TEAM 25: PALM HARVESTER

Page 2: Design & Verify Phase

2

Group Members

Gianni Alessandria, IE Bolivar Lobo, IE Louis-Olivier Verret, IE

Brian Newman, ME Yuze (Liam) Liu, ME Ricardo Aleman, ME David Boswell, ECE

Louis

Page 3: Design & Verify Phase

3

Advisors

Dr. Okoli (Sponsor) Dr. Olawale (IE supervisor) Dr. Amin (ME senior design coordinator) Dr. Clark (ME advisor) Dr. Frank (ECE senior design coordinator) Dr. Moss (ECE advisor)

Louis

Page 4: Design & Verify Phase

Project Review

Palm Harvester

GoalDevelop an

effective, efficient, and economical oil

palm harvester

4Louis

Page 5: Design & Verify Phase

Define Phase

Goal ◦ Construct a semiautonomous oil palm harvesting

machine Budget

◦ $2,000 Expectations

◦ Consider safety, affordability, efficiency and reliability

Page 6: Design & Verify Phase

6

House of Quality

Page 7: Design & Verify Phase

7

Customer requirements

Page 8: Design & Verify Phase

8

Quality characteristics

Page 9: Design & Verify Phase

9

Results

Page 10: Design & Verify Phase

10

Measure Phase 1. Brainstormed Cart with Telescoping Pole

2. Built a small mechatronic prototype

3. Developed the Mechatronic Concept

Page 11: Design & Verify Phase

11

Cart with Telescoping Pole ConceptCOMPONENTS

• Cutting Tool (A)

• Telescoping Pole (B)

• Tree Grips (C)

• Cart (D)

• Power/ Auxiliary System (E)

A

B

D & E

Oil Palm

Palm Harvester

R = 5ft

H ≤ 40ft

h = 4ft

Drawing not to scale

C

Ricardo

Page 12: Design & Verify Phase

12

Analyze Phase Overview of the design

Fabrication

Delivery of most components

Page 13: Design & Verify Phase

Recap of the Design Phase

Louis

Page 14: Design & Verify Phase

14

Test 1 Design Phase Goal:

• Extending Pole

• Winch

• Cart

Louis

Page 15: Design & Verify Phase

15

Results of Test

POSITIVES◦ Winch ◦ Poles ◦ Reinforcements of cart◦ Mobility of the cart

ISSUES◦ Unstable Poles◦ Sliding Experienced ◦ Cart veered left ◦ Rotation of the

extending pole◦ Pivot block had

incorrect threading

Louis

Page 16: Design & Verify Phase

16

Veering of Cart

Actual

Target

SOLUTION

Reduce wobble in legs to improve maneuverability

• Temporary solution by filling gaps with material to occupy space

•Future work can improve the legs by designing them more rigidly

Louis

Page 17: Design & Verify Phase

17

Loose Pivot Ring ISSUE

◦ Gap Between ring and pole ◦ Need a better way to secure

pole inside pivot ring

SOLUTION

◦ Add a T-Handle Screw ◦ Tightening of pole

Louis

Page 18: Design & Verify Phase

18

Loose Pivot RingISSUE SOLUTION

Louis

Page 19: Design & Verify Phase

19

Rotation of PoleISSUE

Rotation of the pole during testing

Lead to Failure

Need to constrain pole rotations

SOLUTION •Use inner plastic bars to constrain rotation

• Also use orange tape along tubes to watch for potential rotations

Louis

Page 20: Design & Verify Phase

Testing Issue 4: Bracket Yielding• The pulley brackets yielded

• Why wasn’t this anticipated?

• See wire twisted around pole

• Twisting wire required extra winch force which wasn’t expected, thus yielding

• Need to reinforce pulley brackets

20Louis

Page 21: Design & Verify Phase

Solution 4: Bracket Yielding• Need to reinforce pulley brackets

• Bending likely because of extra load from twisting rope

• One fix is to constrain rotation ( Solution 3)

• Also use pulley with wing to distribute load better

21Louis

Page 22: Design & Verify Phase

Assembly Status

22Louis

Page 23: Design & Verify Phase

Assembly Status All mechanical subassemblies have been completed!

23Louis

Page 24: Design & Verify Phase

Verify Phase

Gianni

Page 25: Design & Verify Phase

25

Mounting of the Subassemblies

Gianni

Page 26: Design & Verify Phase

26

Test 2 • SETUP TIME &

PROCEDURE

• TREE GRIPS

• ELECTRONICS• CAMERA• CUTTING TOOL

Gianni

Page 27: Design & Verify Phase

27

Results Positives• No injuries• Poles rise up 25ft high• Tree grips were functioning

properly• Partially constrained rotation• Friction tape held tree grip well

against the poles.• Mounted camera provided

good view of the tree grip.

Gianni

25ft

Page 28: Design & Verify Phase

28

Camera • Mounted camera provided a good view of the tree grip (right below

the pole saw)

Gianni

Page 29: Design & Verify Phase

29

Issues: Not High Enough! The device got stuck at

25 ft. Reason:

Upper tree grip was cranked closed.

We followed an incorrect sequence.

SOLUTION: Adhere to Operation

Manual

Gianni

Page 30: Design & Verify Phase

30

Issues: Pulleys & Brackets Lowest pulley mount

bent because of angle with respect to pole axis and insufficient fastening.

2nd lowest pulley bracket buckled outward due to est. 100lbs weight of poles + 100lbs friction.

Gianni

Page 31: Design & Verify Phase

31

Solution #1 Reinforcements added to the pulleys to avoid outward bending.

Gianni

Page 32: Design & Verify Phase

32

Solution #2 New pulley configuration for better stability and rope alignment. Less moment about the pole’s base.

Gianni

Page 33: Design & Verify Phase

33

Issue: Pole Saw’s Length Pole saw was not clamped far enough

Tree grips were further out from the pole axis than the tip of the pole saw.

SOLUTION: EXTEND POLE SAW

Gianni

Page 34: Design & Verify Phase

34

Issue: Gap on Wheels Excessive gap between

wheels and wheel assembly caused additional wobbling when moving the cart.

SOLUTIONWe placed washers to

fill the gap.

Gianni

Page 35: Design & Verify Phase

35

Additional Issues Encountered Excessive 17mph winds Ropes got tangled and were hectic to deal with LONG SET UP TIME – 30 MIN Winch used to control upper tree grip is annoying to use

backwards Didn’t have legal permission to cut branches from nearby

trees

Gianni

Page 36: Design & Verify Phase

Operation Manual

Bolivar

Page 37: Design & Verify Phase

Operation Manual Two main parts:

◦ Assembly of the cart.◦ Operation during cutting.

Cart Assembly:◦ Extend legs of the cart.◦ Attached arm brackets on the extending pole.◦ Pivot pole from horizontal position to vertical.

37Bolivar

Page 38: Design & Verify Phase

Operation Manual Cutting Operation:

◦ Extend pole using the crank ◦ Close arm brackets using crank◦ Cut fruit using camera and ropes

38Bolivar

Page 39: Design & Verify Phase

Operation Improvement Cart Assembly:

◦ Pivoting the pole caused problems. ◦ Arm brackets caused a problems when pivoting

also

Cutting operation◦ Ropes arranged in a better position

39Bolivar

Page 40: Design & Verify Phase

40

Safety ConsiderationsPROTECTIVE GEAR:

INDUSTRIAL HELMET

SAFETY GOGGLES

GLOVES

Bolivar

Page 41: Design & Verify Phase

41

Keep the harvester stationary Check for level groundDo not push/pull the harvester while the poles are extended

BEFORE OPERATION:

Safety Considerations

Use the bullseye from cart

Bolivar

Page 42: Design & Verify Phase

42

Fix tree grips to tree before turning on pole saw

Remain attentive for falling branches or fruit

DURING OPERATION:

Safety Considerations

Bolivar

Page 43: Design & Verify Phase

43

In case of inclement weather, it is recommended to stop the operation, lower the poles, and resume only after the weather has been cleared.

In case the telescoping pole falls, the operator should immediately stop and exit outside of the range that the pole saw can cover.

DURING OPERATION:

Safety Considerations

43 ft

Bolivar

Page 44: Design & Verify Phase

44

CURRENT & FUTURE WORK Monitor acrylic case installed. Test 3 – this weekend!

# of people to prop up the pole vertically

Minimum time to move tree to tree

Time to cut a branch

Poster for EE, IE, & ME open house. Final Report & Presentation

Bolivar

Page 45: Design & Verify Phase

45

FUTURE WORK

Bolivar

Page 46: Design & Verify Phase

46

Questions, Concerns, Suggestions?