design proposal -- 600 elsbeth

Upload: rappleton

Post on 09-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    1/11

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    2/11

    600 ELSBETH STREET: HISTORIC CONTEXTlan ha, Jason lytle, kim martinez, priscilla valentine, kari wanenmacher, virginia wherry-beaman

    TL Marsalis &JS Armstrong

    purchase

    land near

    Hords ridge,

    naming it Oak

    Cliff.

    1887

    1900s

    Hillside Addition

    development

    begins

    1893

    1908

    1910

    191

    4

    1

    962

    190

    3

    Oak Cliff merges

    with Dallas

    Miller &

    Stemmons

    addition

    purchased from

    hillside addition

    affluent residential

    communities grow

    near the trolley

    line

    JT Zang & Chas

    Mangoldpurchase Lake

    Cliff city park

    & develop the

    Crystal Hill

    Addition

    The Trinity River

    floods (15 of

    rain)

    Oak Cliff is

    isolated from

    Dallas as the

    Iron Bridge

    submerges

    The Oak Cliff & Dallas

    concrete bridge is

    completed (the Houston

    Viaduct)

    Civil Rights

    Movement

    Oak Cliff

    demographics evolve

    into a more diverse

    population

    North (old) Oak

    Cliff declines along

    with the economy

    North Oak Cliff

    revitalization begins

    Oct.21,1929

    The

    stock

    market

    crashes

    Nov.22,1963

    John F. Kennedy

    assassinated

    1931

    A unique residential

    style emerges that

    mixes architectural

    elements

    Historic Cliff

    Towers development

    begins

    1963

    The Oswalds

    separate & Lee

    Harvey moves

    to Neely St

    1920s

    1960s

    1970s--Pre

    sent

    Lee Harvey

    & Marina

    Oswald

    move into

    The Elsbeth

    apartments

    Lake Cliff Park Entrance

    N. Bishop Fire Station

    WH Hords Residence

    1946

    A Wynne begins wynnewood

    Village housing &

    commercial development

    Park Hotel by Marsalis

    Melba Theater

    Texas Theater

    opens

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    3/11

    600 ELSBETH STREET: ARCHITECTURAL ELEMENTS

    lan ha, Jason lytle, kim martinez, priscilla valentine, kari wanenmacher, virginia wherry-beaman

    Neighborhoods of Oak Cliff 1900-1920

    600 Elsbeth St

    roofs

    Brackets

    Portico

    Brick Patterns

    Balustrades & Staircase

    Victorian House

    on Cedar Crest

    Arts & Crafts House

    Daisy Polk House

    1

    3

    5

    4

    2

    6Dormers

    (Van Buren Ave)

    BurrOak St.

    Kidd Springs

    Bishop Arts district

    Crystal Hill

    Addition

    Miller & Stemmons

    Addition

    600 Elsbeth St

    Trolley Route

    N

    1 2

    65

    43

    Gable RoofMansard Roof

    Hip RoofFlat Roof

    Soldiering

    English Tudor Recessed (Inset) Shed Dormer

    Spanish Moorish Style

    Spanish

    Eclectic Texas

    Theater

    Eclectic

    Bishop Arts DistrictQueen Anne House

    on Eastus

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    4/11

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    5/11

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    6/11

    Wallpaper MailboxMoulding Wall Color

    Lobby Floor Plan & Concept

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    7/11

    Wall Color

    Closet

    Moulding

    Studio Floor Plan & Concept

    Wallpaper

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    8/11

    Wall Color Wood FinishMoulding Ceiling

    Bedroom Floor Plan & Concept

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    9/11

    Backsplash Counter Tops Wall ColorCabinet Finish

    Kitchen Concept

    Powder

    DW

    Laundry

    Laundry

    Ref.

    KITCHEN

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    10/11

    600 ELSBETH STREET: GREEN PROPOSAL

    Low VOC (volatile organiccompounds)Paints

    primers

    RECYCLINGIsolated area in each Unit

    Separate Recyclables

    Pick Up Available

    XERISCAPEnative plants

    Permeable Pathways

    Drip Irrigation

    Shade Control

    lan ha, Jason lytle, kim martinez, priscilla valentine, kari wanenmacher, virginia wherry-beaman

    ENERGY CONSERVATIONDouble Glazed Window

    Sealed Entry Doors

    Motion Activated Lights

    Reflective paint Finish

    RENEWABLE ENERGYSigned 2 yr Contract

    Energy Efficient bulb

    Energy Efficient

    Appliances

    REDUCE FUEL500 miles or Less

    Local Contractors

    Reuse materials

    GREEN LABELSEnergy Star

    Green Seal

    Forest Stewardship Counc

    US Green Build

    sealers

    Adhesives

    WATER CONSERVATIONLow Flow Fixtures

    Motion Sensor Faucets

    High Efficiency Washer

  • 8/8/2019 Design Proposal -- 600 Elsbeth

    11/11