Liquefied Natural Gas (LNG)
For the 2014 SPE Roughneck Camp
Chris Caswell, Director – LNG and FLNG
KBR
July 17, 2014
![Page 2: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/2.jpg)
How to Plan a 30 Minute Discussion on LNG
2
• SPE Objective:
– “What happens after gas is produced and before it becomes a
marketable product – (For liquid natural gas transportation,
specifically)?”
• Presentation Strategy:
– Short list of key messages
– Cover primarily the liquefaction link of the LNG chain
– Encourage questions
![Page 3: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/3.jpg)
Key Messages for Today
3
• Produced gas (even when separated or treated near the
reservoir) requires extensive and mandatory conditioning
to make LNG
• LNG projects are large complex projects, often in remote
locations
– Process design is not simplistic,
– Scope is highly civil/mechanical,
– Projects are capital intensive, and
– Not all LNG plants are created equal (NALPACE)
• Offshore liquefaction (FLNG) significantly increases the
complexity of an LNG project
![Page 4: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/4.jpg)
Items Not Addressed Today
4
• LNG transfer, storage, regasification, and LNG shipping
– Regas: more simplistic than liquefaction, but important
– Shipping: decades of efficient manufacturing methods
• Economics:
– Capital cost estimates and schedules (e.g. US$ per ton of LNG)
– Onshore LNG vs. FLNG, baseload plants vs. tolling facilities
• Market views / growth of LNG
– Industry statistics, project forecasts, and LNG news
• Review of liquefaction projects and process technologies
– History, size, and growth of LNG trains and complexes
– Licensor share, process selection, cycle efficiency, equipment, etc.
– Permitting, siting, approval process in the USA
– Terminal (regas) conversions to liquefaction (export)
– Ownership of projects and the contracting community
![Page 5: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/5.jpg)
Why LNG: Long Distance Transportation of Natural Gas
![Page 6: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/6.jpg)
The Transportation of Natural Gas
Pipeline
Gas to Chemicals
Methanol DME Ammonia
GTL & LNG
LNG
Pipeline & LNG
![Page 7: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/7.jpg)
What is LNG? Typically, LNG is:
• “Cool” natural gas at essentially atmospheric pressure
• Liquefied at -161º C (-256º F) and slightly subcooled
• Colorless, odorless, non-corrosive, and non-toxic
• A mixture of components, primarily C1, C2, C3, and N2
• Example composition of LNG (mol %): – 85-90 % methane (C1)
– 3-8 % ethane (C2) – 1-3 % propane (C3) – 1-2 % butanes (iso-C4 and n-C4) – 0-2 % pentanes (iso-C5 and n-C5) – 0-2 % nitrogen (N2)
![Page 8: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/8.jpg)
Source: GAS CONDITIONING FOR IMPORTED LNG by D. McCartney for 82nd annual GPA Convention, March 2002.
![Page 9: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/9.jpg)
Volumetric Reduction of Natural Gas
Natural Gas LNG
Plant LNG
-161oC
Volume Reduction
600:1
![Page 10: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/10.jpg)
FE
ED
GA
S
N2
C1
C2
C3
C4
C5
Hg
H20
CO2/H2S
C6+
Condensate
Removal
Gas
Treating
NGL
Removal Liquefaction End
Flash
Condensate A
cid
Ga
s
Natural
Gas
Liquids
Wa
ter
Me
rcu
ry
LNG
![Page 11: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/11.jpg)
What are the End Uses for LNG?
• Imported LNG can support the following activities:
– Augmenting baseload pipeline supply
– Support peak-shaving activities (peak demand periods)
– Fuel for nearby power plants
– Feedstock for industrial use (Ammonia, Ethylene)
– Fuel substitution (natural gas for diesel) at reduced cost
![Page 12: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/12.jpg)
How LNG is Made: The Traditional LNG Value Chain
Gas Production & Transmission Gas Treatment & Liquefaction
LNG Receiving Terminal
LNG Shipping
Natural Gas End Use
Key Issue - Integrating all links in the chain
![Page 13: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/13.jpg)
LNG Facilities Are Remote
NIGERIA LNG SITE – early 1990’s
![Page 14: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/14.jpg)
LNG Facilities Are Complex
NIGERIA LNG FACILITY
![Page 15: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/15.jpg)
What Does an LNG Train Look Like?
![Page 16: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/16.jpg)
SEGAS LNG First single train of 5 Mt/a
![Page 17: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/17.jpg)
What Does an Complete LNG Facility Look Like?
![Page 18: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/18.jpg)
LNG Facility Example: SEGAS LNG
![Page 19: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/19.jpg)
Train 4: 4.4 Mt/a
Train 3: 2.5 Mt/a
![Page 20: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/20.jpg)
Design of an LNG Plant
Australia Northwest Shelf LNG Plant – 1989, 1993
![Page 21: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/21.jpg)
Design Factors Affecting Overall Cost
• Targeted Plant Capacity
• Number/size of Process Trains
– Series or parallel within train
– Large vs. small train
– Common Areas / Utilities
• Availability / Reliability
– Sparing, maintenance,
startup/shutdown
– OPEX costs
• Modular Concepts
– Constructability
• Site Selection
– Marine access, soils,
earthquake
• Design Margins
• Plant Layout
• Project Execution
• Schedule (life cycle)
• “NALPACE” – Not all LNG Plants are Created Equal
– Because of site-specific criteria, it is unwise to compare one plant to another based solely on capacity and capital cost (US$ per Mt/a)
![Page 22: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/22.jpg)
Natural Gas Data – Feed Gas to LNG Plant
• Typical inlet Composition? No, but an example:
2.0% Nitrogen, 86.0% Methane
6.0% Ethane, 3.0% Propane
1.5% Total Butane+
1.0% Carbon Dioxide
Trace: H2S, Hg, RSH, COS, BTX
• In reality, there is no such thing as a typical inlet gas
composition
– Coal seam methane reserves can have > 98% methane
– Acid gas content (CO2) as high as 15% in Australia and
potentially much higher (over 50%) in stranded fields
– Associated gas reservoirs could have waxes (e.g. C20+) that
affect flow assurance
![Page 23: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/23.jpg)
Work (input)
Basic Refrigeration - Simple PFD
Process Flow Diagram
Q High Temperature
(Ambient)
Q Low Temperature
(Sub - Ambient)
Condenser
Suction Drum
Compressor
Heat Exchanger
J-T Valve
Accumulator
Rough “rule of thumb”: 35 MW of shaft power per Mt/a for “efficient” liquefaction processes
Where the magic happens
GAS in
LNG out
Large amount of Energy Input
Driver (not shown) Compressor
Heat Exchangers
Refrigerant is a Vapor
Refrigerant is a Liquid
![Page 24: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/24.jpg)
Typical Block Diagram – Liquefaction Plant
DEHYDRATION & MERCURY REMOVAL
CHILLING LIQUEFACTION NITROGEN
REJECTION
REFRIGERATION
SYSTEM
REFRIGERATION
SYSTEM
OFFSITE
LNG
STORAGE
HYDROCARBON
FRACTIONATION
NATURAL
GAS
FEED
C2
FUEL
FUEL
LNG
C3
C4
BY PRODUCT
GASOLINE
C4 C2
A two-stage refrigeration cycle is used in this example
CO2 REMOVAL
![Page 25: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/25.jpg)
Typical Block Diagram - Liquefaction Plant
CO2 REMOVAL
DEHYDRATION & MERCURY REMOVAL
CHILLING LIQUEFACTION NITROGEN
REJECTION
REFRIGERATION
SYSTEM
REFRIGERATION
SYSTEM
OFFSITE
LNG
STORAGE
HYDROCARBON
FRACTIONATION
NATURAL
GAS
FEED
C2
FUEL
FUEL
LNG
C3
C4
BY PRODUCT
GASOLINE
C4 C2
![Page 26: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/26.jpg)
Acid Gas Removal Requirements
• Removal of CO2 to 50 parts per million (ppm) – CO2 would freeze at cryogenic temperatures
– Safely below solubility limit of CO2 in LNG
• Removal of H2S (to end-user pipeline specifications) – Specification is often total weight of sulfur in LNG product
– Targeted removal of Mercaptans and COS
• Acid Gas Disposal (after capture) – Venting (in small quantities), thermal oxidation (burning), or
– Sequestration (large quantities, e.g. Gorgon LNG)
• About 80% of AGRU Cost is associated with Solvent Regeneration System
– AGRU absorber is heaviest vessel (but not largest) in the plant
![Page 27: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/27.jpg)
Typical Acid Gas Removal Scheme Process Flow
Stripper
Low-
Pressure
Flash
Reboiler
Reflux
Condenser
Acid Gas
Lean Amine
Bulk
Absorber
Lean
Absorber
Treated Gas
Semi-Lean
Amine Amine
Cooler
Rich Amine
Sour Gas Sour Gas
Flash Gas
High-
Pressure
Flash
Lean/Rich
Exchanger
![Page 28: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/28.jpg)
Typical Block Diagram - Liquefaction Plant
DEHYDRATION & MERCURY REMOVAL
CHILLING LIQUEFACTION NITROGEN
REJECTION
REFRIGERATION
SYSTEM
REFRIGERATION
SYSTEM
OFFSITE
LNG
STORAGE
HYDROCARBON
FRACTIONATION
NATURAL
GAS
FEED
C2
FUEL
FUEL
LNG
C3
C4
BY PRODUCT
GASOLINE
C4 C2
CO2 REMOVAL
![Page 29: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/29.jpg)
Typical Dehydration Scheme Process Flow
Water
Saturated
Natural Gas
Water
Drier
Precooler
Hydrocarbon
Liquid
Regeneration Gas
Compressor Regeneration
Cooler
Regeneration
Gas Knockout
Drum
Dry Gas To
Liquefaction
Regeneration
Heater
Filter
2 Driers
(Absorption)
1 Drier
(Regeneration)
Molecular Sieve Process Vessels
Commonly a 3 bed system (2 operating)
Outlet specification: 1 ppm water
Regeneration System to remove water from beds
![Page 30: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/30.jpg)
Mercury Removal Unit
• Mercury has to be removed from natural gas to prevent
corrosion in aluminum equipment
– E.g. the Main Cryogenic Heat Exchanger
• Removal of mercury by:
– Adsorption via sulfur impregnated bed in vessel – common
– As part of dehydration with added mol sieve – less common
• Replacement of Hg removal beds is necessary for
maintenance
– No regeneration like in dehydration
– If integrated with dehydration, Hg is with water on regeneration
![Page 31: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/31.jpg)
Typical Mercury Removal Scheme Process Flow
(Single)
Mercury
Removal
Column
To Liquefaction Unit
From Dehydration Section
Outlet Gas Specification is generally 10 ng (nanograms) of mercury per cubic meter of gas.
Particle Filter
![Page 32: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/32.jpg)
Typical Block Diagram - Liquefaction Plant
DEHYDRATION & MERCURY REMOVAL
CHILLING LIQUEFACTION NITROGEN
REJECTION
REFRIGERATION
SYSTEM
REFRIGERATION
SYSTEM
OFFSITE
LNG
STORAGE
HYDROCARBON
FRACTIONATION
NATURAL
GAS
FEED
C2
FUEL
FUEL
LNG
C3
C4
BY PRODUCT
GASOLINE
C4 C2
CO2 REMOVAL
![Page 33: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/33.jpg)
APCI Propane Pre-cooled MR Process
Simplified version
![Page 34: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/34.jpg)
APCI Propane Pre-cooled MR Process
DEHY/Hg
REMOVAL
MP
C 3
LP
C 3
TREATED
FEED
GAS HP
C 3
LLP
C 3
NRU
LOW BTU
FUEL GAS
LNG
RUNDOWN
To FRACTIONATION
LLP
C 3
HP
C 3
MP
C 3
LPG
REINJECTION
HP
MR MP
MR
MR LIQ EXP
LP
MR
REFLUX
DRUM
SCRUB
COLUMN
LNG
EXP
MCHE
LP
C 3
LNG
PRODUCT
PUMP
![Page 35: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/35.jpg)
Typical Block Diagram - Liquefaction Plant
DEHYDRATION & MERCURY REMOVAL
CHILLING LIQUEFACTION NITROGEN
REJECTION
REFRIGERATION
SYSTEM
REFRIGERATION
SYSTEM
OFFSITE
LNG
STORAGE
HYDROCARBON
FRACTIONATION
NATURAL
GAS
FEED
C2
FUEL
FUEL
LNG
C3
C4
BY PRODUCT
GASOLINE
C4 C2
CO2 REMOVAL
![Page 36: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/36.jpg)
APCI Propane Pre-cooled MR Process
DEHY/Hg
REMOVAL
MP
C 3
LP
C 3
TREATED
FEED
GAS HP
C 3
LLP
C 3
NRU
LOW BTU
FUEL GAS
LNG
RUNDOWN
To FRACTIONATION
LLP
C 3
HP
C 3
MP
C 3
LPG
REINJECTION
HP
MR MP
MR
MR LIQ EXP
LP
MR
REFLUX
DRUM
SCRUB
COLUMN
LNG
EXP
MCHE
LP
C 3
LNG
PRODUCT
PUMP
Red lines denote the feed gas path through liquefaction
and the path of NGLs (natural gas liquids)
Benzene
comes out here
by cold reflux
![Page 37: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/37.jpg)
Typical Block Diagram - Liquefaction Plant
DEHYDRATION & MERCURY REMOVAL
CHILLING LIQUEFACTION NITROGEN
REJECTION
REFRIGERATION
SYSTEM
REFRIGERATION
SYSTEM
OFFSITE
LNG
STORAGE
HYDROCARBON
FRACTIONATION
NATURAL
GAS
FEED
C2
FUEL
FUEL
LNG
C3
C4
BY PRODUCT
GASOLINE
C4 C2
CO2 REMOVAL
![Page 38: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/38.jpg)
Nitrogen Removal
• The higher the nitrogen content of LNG, the lower its gross
heating value
– Therefore, why transport an undesirable component in the LNG?
– Balance cost of removal vs. influence on heating value
• However, some nitrogen in LNG can reduce the boil off of
more valuable components during transport
– Nitrogen vaporizes first, before methane
• Modest concentrations of N2 can be reduced by a flash drum
– Deeper removal by a N2 removal column/process
• Nitrogen specification in LNG is commonly 1% max
![Page 39: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/39.jpg)
Typical Block Diagram - Liquefaction Plant
CO2 REMOVAL DEHYDRATION
& MERCURY REMOVAL
CHILLING LIQUEFACTION NITROGEN
REJECTION
REFRIGERATION
SYSTEM
REFRIGERATION
SYSTEM
OFFSITE
LNG
STORAGE
HYDROCARBON
FRACTIONATION
NATURAL
GAS
FEED
C2
FUEL
FUEL
LNG
C3
C4
BY PRODUCT
GASOLINE
C4 C2
![Page 40: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/40.jpg)
Propane Pre-cooled MR Process
DEHY/Hg
REMOVAL
MP
C 3
LP
C 3
TREATED
FEED
GAS HP
C 3
LLP
C 3
NRU
LOW BTU
FUEL GAS
LNG
RUNDOWN
To FRACTIONATION
LLP
C 3
HP
C 3
MP
C 3
LPG
REINJECTION
HP
MR MP
MR
MR LIQ EXP
LP
MR
REFLUX
DRUM
SCRUB
COLUMN
LNG
EXP
MCHE
LP
C 3
LNG
PRODUCT
PUMP
![Page 41: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/41.jpg)
Typical Fractionation Scheme Process Flow
• Uses of Fractionation Unit:
– Make liquid products for sale (LPG and Condensate help econ)
– Make refrigerants (MR make-up or high purification C3)
– Stabilize NGLs for reinjection
Scrub
Column
Bottoms
Deethanizer Depropanizer Debutanizer
Condensate to
Storage
C3 to
Storage
C2 to
Storage
LPG
Reinjection
to MCHE
C3
Ref
C3
Ref
HO HO HO
SW SW
SW
HO: Hot Oil (or other heat), SW: Seawater (or other cooling)
![Page 42: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/42.jpg)
A Few Words on Floating LNG
![Page 43: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/43.jpg)
Treating & Liquefaction
Storage & Loading
Shipping
LNG Transportation
LNG Receiving Terminal LNG Liquefaction Facility
“Complex project at a
challenging location”
“Using efficient
fabrication
methods”
“Moderate size project at
industrial location”
Standard LNG Value Chain
![Page 44: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/44.jpg)
The Full Floating LNG Chain
FPSO or FLNG FSRU
Complex Project,
Efficient Fabrication,
with Marine Installation
![Page 45: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/45.jpg)
New Complexities for Designing Offshore LNG
• Marinization of Process Design – Layout, equipment selection, and equipment spacing
• Modularization – Strategy, weight/size, fabrication and assembly plan
• Safety, Accommodation, Spill protection, LNG Storage
• Turret and mooring systems – Towing / transportation to site
• Hookup, Commissioning, and Startup – Pre-commissioning prior to tow, isolation offshore
– Turnaround and Maintenance Operations
• Execution strategy and contracting strategy – Cost competitiveness, internal rate of return, comparison to onshore LNG
![Page 46: Design on Lng and Flng](https://reader033.vdocuments.us/reader033/viewer/2022050700/55cf92b5550346f57b98efee/html5/thumbnails/46.jpg)
Questions